HomeMy WebLinkAboutContract 35554-A2AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO . Sj554" (No M&C Needed) COUNTY OF TARRANT 8 WHEREAS, the City of Fort Worth (City) and Teague Nall and Perkins, (Engineer) made and entered into City Secretary Contract No. 35554, (the Contract) which was authorized by the City Council by M&C C-22181 on the 12th day of June 2007; and WHEREAS, the Contract involves engineering services for the following project: Quail Run Drainage Improvements, Project No. 00629 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 9, 2010, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $39,385.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $93,661.00. City of Fort Worth, Texas Amendment to Engineering Agreement PMO Official Release Date: 10.01.2010 Page 1 of 2 i��=i��CIAL RECORD CITY SECRETARY T. WORTH, TX 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the Fort Worth, Tarrant County, ATTE i Marty Hendrix City Secretary APPROVAL RE �ZSS William P. Director, Works PNWh day of 2010, in Texas. . Verk�st, P.E. Transportation and Public Teague Nall and Perkins ENGINEER A _n // By: Name: C. Ty Hilton, PE Principal 1100 Macon Street Fort Worth, Texas 76102 APPROVED AS TO FORM AND LEGALITiy: Assistant City At City of Fort Worth, Texas Amendment to Engineering Agreement PMO Official Release Date: 8.18.2010 Page 2 of 2 APPROVED: Fernando Costa Assistant City Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX YEA( UE NALL AND PERKINS Civil 6igineering Surveying Landscape Architecture Planning September 9, 2010 Via mail and email: Chad.Simmons@CH2M.com Mr. Chad Simmons, P.E. City of Fort Worth Integrated Program Management 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Quail Run Drainage Improvements, City Project No. 00629 Contract Amendment No. 2 TNP No. FTW 06301 Dear Mr. Simmons: Teague Nall and Perkins, Inc. is submitting this Amendment to the above referenced contract based on additional services requested. The following is a brief description and cost for the additional services provided on this project: Additional Services for Constructability Review Prior to the 60 percent review meeting with the CITY, the ENGINEER shall schedule and attend a project site visit with the CITY Project Manager and Construction personnel to walk the project. The ENGINEER shall summarize the CITY's comments from the field visit and submit this information to the CITY in writing. For this project an additional review meeting is required with CITY Project Manager and Engineering personnel to walk the project and assess potential design alternatives. ■ Engineering Design..........................................................................................$ 19700 Subtotal $ 11700 Additional Services for Traffic Control Plan The original project scope was written around the T/PW specification that provides for the contractor to prepare a traffic control plan as a non -pay item. Since that time the specifications have been updated to require a traffic control plan developed by the Engineer as a part of the project. The following scope will provide for the inclusion of traffic control plans and construction phasi ng necessary to construct the bridge. Engineer will develop a traffic control plan utilizing standard traffic reroute configurations posted as "Typicals" on the CITY's Buzzsaw website as applicable. The typicals need not be sealed individually, if included in the sealed contract documents. Engineer will develop supplemental traffic control drawings as needed for review and approval by the Traffic Division of the Transportation and Public Works Department. These drawings shall be sealed by a professional engineer registered in the State of Texas. The following sheets are anticipated: 1100 Macon Street •Fort Worth, Texas 76102 • 817.336.5773 phone • 817.336.2813 fax www. tnp-online. com Mr. Chad Simmons, PE, September 9, 2010, Page 2 of 5 Overall Traffic ControUSignage Sheet Project Specific Details for Road work and Driveway work City and TxDOT Typical Details as required (Approximately 4 sheets) ■ Engineering Design.......................................................................................... $ 71400 Subtotal $ 7,400 Additional Services for Bid Phase Services ENGINEER will support the bid phase of the project as follows. The ENGINEER shall upload all plans and contract documents onto Buzzsaw for access to potential bidders. Contract documents shall be uploaded in .pdf files and the plans in .pdf and AM files. The ENGINEER shall sell contract documents and maintain a plan holders list from documents sold and downloaded from Buzzsaw. The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional information. The procedures shall include a log of all significant bidders questions and requests and the response thereto. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto Buz zsaw and mail addenda to all plan holders. Attend the bid opening in support of the CITY. Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. Incorporate all addenda into the contract documents and issue conformed sets. Provide 10 full size and 10 half size sets of conformed drawings to the City and 20 sets of specifications. ■ Engineering Support.... Wkstaftsums a Moslem ME ME I I WWWWWWW**4 **t East at Rasmus 0 0 goals was 0 0 assays 0 *$ 21937 ■ Printing Services (Reduction in Total Printing —This reduction may affect our ability to meet our M/WBE goal).Blame ........................... Room ................ wage Basso ........ Rosman ...............($11737) Subtotal $ 11200 Additional Services for Construction Phase Services ENGINEER will support the construction phase of the project as follows. The ENGINEER shall attend the preconstruction conference. After the pre -construction conference, the ENGINEER shall provide project exhibits and attend public meeting to help explain the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected customers. The ENGINEER shall visit the project site at requested intervals as construction proceeds to observe and repor t on progress. The ENGINEER shall review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and Mr. Chad Simmons, PE, September 9, 2010, Page 3 of 5 general compliance with the requirements of the contract for construction. Such rMew shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. The ENGINEER shall log and track all shop drawings, samples and other submittals. As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. The ENGINEER shall attend the "Final" project walk through and assist with preparation of final punch list. ■ No Additional Fee Required. These Services are included in the original contract. Additional Services for Record Drawings The ENGINEER shall prepare record drawings from information submitted by the inspector and/or Contractor. The drawings shall be submitted as full size (22" x 34") mylar drawings with an estimated total of 20 sheets. ■ Engineering S upport......................................................................................... $ 1,600 ■ Printing Services (Fee only includes additional Mylar sheets) .........................$ 100 Subtotal $ 11700 Additional Services for Storrn Water Pollution Prevention Plan For projects that disturb an area greater than one (1) acre, ENGINEER will prepare the Storm Water Pollution Prevention Plan (SWPPP) required for the Project for use by the Contractor during construction. ENGINEER will prepare drawings and details for proposed SWPPP improvement that the Contractor must use during construction. Contractor will be responsible for filing the SWPPP with appropriate regulatory agencies. ■ No Additional Fee Required. These Services are included in the original contract. Additional Services for Subsurface Utility Engineering The ENGINEER shall provide Subsurface Utility Engineering (SUE) to the Quality Levels, as described below. The SUE shall be performed in accordance with Cl/ASCE 38-02. The original contract provided for a Quality Level C for this project. Level B (includes Quality Level C work performed to date) 1. Select and apply appropriate surface geophysical methods) to search for and detect subsurface utilities within the project limits, and/or to trace a particular utility line or system. 2. Based on an interpretation of data, mark the indications of utilities on the ground surface for subsequent survey. Utilize paint or other method acceptable for marking of lines. 3. Unless otherwise directed, mark centerline of single -conduit lines, and outside edges of multi -conduit systems. 4. Resolve differences between designated utilities, utility records, and surveyed features. Mr. Chad Simmons, PE, September 9, 2010, Page 4 of 5 5. Recommend additional measures to resolve differences if they still exist. Recommendations may include additional or different surface geophysical methods, exploratory excavation, or upgrade to Quality Level A data. 6. As an alternative to the physical marking of lines, the ENGINEER may, with CITY's approval, utilize other means of data collection, storage, retrieval, and reduction, that enables the correlation of surface geophysical data to the project's survey control. Level A 1. Expose and locate utilities at specific locations. 2. Tie horizontal and vertical location of utility to survey control. 3. Provide utility size and configuration. 4. Provide paving thickness and type, where applicable. 5. Provide general soil type and site conditions and such other pertinent information as is reasonably ascertainable from each test hole site. ■ Level B SUE and Level A SUE (Assumes 5 test holes) ...................................$ 6,568 ■ Engineering Design.......................................................................................... $ 11660 ■ Administrative Fee (10%) on M/WBE Firm..... wagon Wasomm affoomm 0 0 0 WWWV** mamma Wwaffilloomma &atom a we$ 657 Subtotal $ 8,885 Additional Services for R®W/Easement Services ENGINEER will support and engage a Registered Professional Land Surveyor to perform actives related to drainage easements as outlined below, per direction and guidance from the CITY's Project Manager. Research The ENGINEER shall determine easement needs for construction of the project. Required temporary and permanent easements will be identified based on available information and recommendations will be made for approval by the CITY. Easement Preparation and Submittal The ENGINEER shall prepare documents to be used to obtain permanent and/or temporary easements required to construct the improvements. Corners will not be set for easements. The documentation shall be provided in conformance with the checklists and templates available on the C ITY's Buzzsaw site. Temporary Right of Entry Preparation and Submittal Prior to construction, the ENGINEER shall prepare, mail and obtain Temporary Right of Entries from landowners. It is assumed that letters will only be required for land owners adjacent to temporary construction easements or who are directly affected by the project and no easement is required to enter their property. Mr. Chad Simmons, PE, September 9, 2010, Page 5 of 5 The documentation shall be provided in conformance with the checklists and templates available on the C ITY's Buzzsaw site. ■ Temporary Construction Easements (2 Parcels) ..............................................$ 1,000 ■ Permanent Drainage Easements (2 Parcels) ................................................... $ 1,000 ■ Temporary Right of Entry Documents for Construction (11 Parcels) ................$ 11200 Subtotal $ 3,200 Additional Services for Storm Drain Outfall Re -Design Based on direction received from the Storm Water Department, plan revisions will be made to redesign the outfall structure from Quail Run to the channel outfall along the west side of Burton Hill. The outfall will be designed as a 24-inch bore from the channel bank to the northeast curb line of quail run. The line will run in an easement located between 5320 and 5324 Quail Run. The outfall structure will be designed to limit the potential for erosion in the creek bed. The junction box structure at the upstream end will be designed as a deep structure to allow minimal grade on the outfall pipe to prevent high velocities. Plan and profile views of the new outfall will be re -developed based on supplem entary topographic survey data. City details will be used in addition to special details for the junction box if needed. Approximately one plan and profile sheet and one detail sheet will be required. In addition to the outfall re -design, hydraulics will also include an evaluation of the existing line that collects runoff from Bradford Park at a headwall structure located at the rear of Lot 5. The line also collects water from two on -grade inlets in Burton Hill and discharges in the existing channel behind 5320 & 5324 Quail Run. The purpose of this analysis is to confirm that water does not bypass the headwall structure and surcharge the Quail Run s ystem. ■ Topographic Survey.. seem 0 we V WWWVVVMVV we one W*WWWVVVMV WWWWWWWWWW*VV* VW*WVMV WWWWWW* Wev** none seems on 0 WWWWW** ones $ 32800 ■ Engineering Des ign.......................................................................................... $111500 Subtotal $15,300 Summary of Contract Fee: Original Contract Amount: $ 43,216 Amendment No. 1: $ 11,060 Amendment No. 2 $ 39,385 Revised Contract Amount $ 93,661 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, D PERKINS, INC. Att: Manhour Breakdown Copy: Mr. Ty Hilton, PE - TNP o:\projects\thvOfi261\docs\contract\_contract amend 02.doc