Loading...
HomeMy WebLinkAboutContract 35554-A3AMENDMENT No.3 TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and (ENGINEER) made and entered into City Secretary CONTRACT) which was authorized by M&C C-22181 2007 in the amount of $ 43,216.00; and Teague Nall and Perkins, Contract No. 35554, (the on the 12th day of June, WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $11,060.00 which was administratively authorized authorized on November 24th, 2008, Amendment Number 2 in the amount of $39,385.00 which was administratively authorized on October 25th, 2010; and WHEREAS, the CONTRACT involves engineering services for the following project: Quail Run Drainage Improvements, Project No. 00629; and WHEREAS, it has become necessary to execute Amendment No. 3 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated December 14th, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $5,352,00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $99,013,00, 3. All other provisions of the Contract, which are amended herein, shall remain in full force and effect. Page -1- OFFICI�►i� RECORD CITY SE�;RETARY FT. WORTH, TX EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth Fernando Costa Assistant City Manager DATE: APPROVAL RECOMMENDED: Douglals► W. Wiersig, Director, Transportataon and Public Works Department AS TO FORM AND LEGALITY: Douglas W. Black Assistant City Attorney Assistant City Secretary ENGINEER Teague, Nal Principal DATE: Date: and Perkins e• P.E. OFFICIAL. RECOR[ CITY SECRETAR` T. (NORTH, TX Page -2- WI7 TEM UE NALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning December 14, 2011 Via mail and email: Chad.Simmons@CH2M.com Mr. Chad Simmons, P.E. City of Fort Worth Integrated Program Management 1000 Throckmorton Street Fort Worth, Texas 76102 Re: Quail Run Drainage Improvements, City Project No. 00629 Contract Amendment No. 3 TNP No. FTW 06301 Dear Mr. Simmons: Teague Nall and Perkins, Inc. is submitting thisAmendment to the above referenced contract based on additional services requested. The following is a brief description and cost for the additional services provided on this project: Additional Services for Inlet Relocation Based on comments received at the pre -construction neighborhood meeting and direction froIII the City we will relocate the inlet at 5324 Quail Run St. such that when it is re- constructed it will be in the same general location as the existing inlet. This change will require revisions to the following plan sheets: 1 —Project Layout, General Notes, Control Data, &Legend; 3 —Erosion Control Plan; 8 — Hydraulic Tables; 9 — SD Line 'A' Plan and Profile; 10 — SD Line 'B' & LAT 'B-1' Plan & Profile; 11 — SD Line 'C' Plan & Profile (BEGIN to STA 3+50); 12 — SD Line 'C' Plan and Profile (STA 3+50 to END); 13 — Storm Drain Laterals; and, 14 — WL 'A' & 'B' Plan & Profile; The ENGINEER shall provide an initial plan and profile sheet for construction of the inlet and provide the balance of the changes with Record Drawings at the completion of the project. ■ Engineering Design .................................... ......................................................$ 31305 Subtotal $ 3,305 Additional Services for Wedge Mill and Overlay Based on comments received at the pre -construction neighborhood meeting and direction from the City we will provide a wedge mill and overlay detail for Quail Run St. We will also provide quantities for the contractor to provide pricing for this additional work. Adding 1100 Macon Street •Fort Worth, Texas 76102 • 817.336.5773 phone • 817.336.2813 fax www. tnp-online. com Mr. Chad Simmons, PE, December 14, 2011, Page 2 of 2 additional pavement thickness to the street could impact gutter capacity and will require a check of capacity and possible revisions to the hydraulic calculations and inlet lengths. The ENGINEER will evaluate pavement thickness changes and make necessary adjustments to the project plans. ■ Engineering Design.......................................................................................... $ 2,047 Subtotal $ 2,047 Summary of Contract Fee: Original Contract Amount: $ 43,216 Amendment No. 1: $ 11,060 Amendment No. 2 $ 39,385 Amendment No. 3 $ 5,352 Revised Contract Amount $ 99,013 Thank you for consideration of this contract amendment request. If you have any questions, please do not hesitate to call me. Sincerely, TEAGUE N ND PERKINS, INC. Micha I el baum, P. �— Att: Manhour Breakdown Copy: Mr. Ty Hilton, PE - TNP o:\projectskftw06301\docs\contract\ contract amend 03.doc