Loading...
HomeMy WebLinkAboutContract 35589STATE OF TEXAS § COUNTY OF TEXAS § CITY SECRETARY CONTRACT NO.' kk fl WHEREAS, the City of Fort Worth ("City") and Schrickel, Rollins and Associates, Inc. ("Consultant") made and entered into City of Fort Worth City Secretary Contract No. 32107, ("Contract"); and WHEREAS, the Contract involves professional services for the following project: - Trail Drivers Park Neighborhood Trail Linkage to the Trinity River Trail S stem; and WHEREAS, it has become necessary to amend the Contract to include an increased scope of work and/or revised maximum fee. NOW, THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the contract: im Article I, Section A of the Contract is amended to include the additional engineering services specified in a letter dated March 29, 2007, a copy of which is attached hereto and incorporated herein. 2. Article II of the Contract is amended to provide for an increase in the maximum fee in the amount of $110,650.00 which is to be paid to Consultant for all work and services under the Contract, as amended, so that the total fee to be paid by City for all work and services shall not exceed the sum of $ 192,650.00. 3. All other provisions of the Contract that are not expressly amended herein shall remain in full force and effect. Executed on this the day of I Ak A 2007. �'L� 0� �� ATTEST: Marty Hendrix City Secretary Conttrjac1t Authorizatioy, CITY OF FORT WORTH By: -Fn r Libl Assistant City Manager Ri hard Zavala, Director Parks and Community Services Department CONSULTANT: Schrickel R pins and ociates Inc. By: Name: Kent E. Bes ey Title: Chief Executive Officer 1161 Corporate Dr. West Suite 200 Arlington, TX 76006 L4OPW`1 i Schrickel, Rollins and Associates, Inc. M 10-_ Landscape Architecture • Civil Engineering Planning Victor W. Baxter, ASLA Kent E. Besley, ASLA Joseph E. Bradley, PE D. Bryant Caswell, PE March 29, 2007 TerryI Cheek, ASLA Terry E. Cullender Dino J. Ferralli, PE Daniel B. Hartman, PE Or. Scott Penn, Park Planner Delbert W. Hirst, ASLA Department of Parks and CommunityServices Sanford P. Robert M. Oteytey, Jr., PE PE City of Fort Worth I AlbertW. Rollins, PE 1200 South Freeway, Suite 2000 Christian Schnitger, PE Suzanne C. Sweek, ASLA Fort^./orth, Texas 76115-1 �99 Clint Wofford, ASLA RE: Trail Drivers Linkage Proposal Gene Schrickel(1927-2005) Here is our informal proposal for the Trinity Trails contract addendum: Summary of Services re Design and Construction Documents Geotech (WMBE). . Survey (W/MBE) Miscellaneous Permitting SWPPP Accessibility Review &Inspection Design & Construction Document CACO (3 site visits/submittals) Easements Total Professional Services Printing Allowance Total All Services $ 6,950.00 13,500.00 5,000.00 2,500.00 1,200.00 60,500.00 10/000000 8/000000 $1071650.00 3 P000900 $110, 65 0.00 Note: DSEI (W/MBE) services to complete the Environmental Assessment will be provided under the terms of the original contract. Please call me if you have any questions. Cordially, .ICKEL, ROLLINS /l C. Sweek, ASSOCIATES, INC. LA 1161 Corporate Drive West, Suite 200 Arlington, TX 76006 • 817.649.3216 • Metro: 817.640.8212 • Fax: 817.649.7645 • SRADESIGN.COM L I Skepws Attachment A Development of the Trail Drivers Trail Linkage Engineers Scope of Services 1. Meet with City officials, adjacent property owners, and others who may be impacted by development of this trail linkage. 2. Walk the potential trail corridor with City staff to set centerline stakes and locate pedestrian bridge to determine the final limits for surveying. 4. Conduct geo-technical investigation. 5. Prepare instruments necessary for property acquisition or granting of easements or rights - of -way. 6: Prepare construction documents that comply with TxDOT PS&E requirements, including Existing Conditions and Removal Plan Site Plan; including Trail -Head Site Grading Erosion Control Plan Bridge Plan and Profile Site Details Turfgrass Planting Plan 7. Prepare Opinion of Probable Construction Cost 8. Coordinate the submittal and review process with tiie City of Fort �✓orth Parks and Community Service Department, City of Fort Worth Department of Engineering (DOE), TxDOT and Texas Department of Licensing and Regulation (TDLR). 9. Provide bidding assistance. 10. Provide limited construction observation. L� Fljffi .Am KIWM Estimated Schedule (Calendar Days) Reconnaissance, Surveying and Base Map Preparation; Meet with adjacent property owners; Geo-technical investigation R.O.W./Easement Instruments Design and Construction Drawings TxDOT, City and State Reviews Bidding, Contract Award, Contract Execution Construction 45 days 30 days 60 days 180 days (est.) 65 days 120 days Page I of 2 City of Fort Worth, Texas COUNCIL ACTION: Approved on 7/17/2007 DATE2 Tuesday, July 17, 2007 LOG NAME: 80TCSP AMEN1 SUBJECT: Authorize Amendment No. 1 to City Associates, Inc., for Final Design and Park Neighborhood Trail Linkage to the REFERENCE NO.: **C-22255 Secretary Contract No. 32107 with Schrickel, Rollins and Preparation of Construction Documents for the Trail Drivers Trinity River Trail System It is recommended that the City Council authorize the City Manager to execute Amendment No. 1 to City Secretary Contract No. 32107 with Schrickel, Rollins and Associates, Inc., in the amount of $110,650.00 for final design and preparation of construction documents for Trail Drivers Park Neighborhood Trail Linkage to the Trinity River Trail System, for a total contract amount of $192,650,00. DISCUSSION: On June 3, 2003, (M&C G-13989) the City Council adopted the Trinity River Vision Master Plan as a -guide for future development along the Trinity River and its major tributaries. The vision of the master plan is to preserve and enhance the river and its corridors -so they remain essential greenways for open space, trails, neighborhood trail connections, wildlife corridors, and special recreation areas. The master plan recommends increased connections to adjacent neighborhoods and parks throughout the City to maximize access to the Trinity River Trail System. Additionally, the City has received a total of $1,660,173.00 in funding appropriations through the Surface Transportation Grant from the Federal Highway Administration for the development of neighborhood trail connections to the Trinity River Trail System. The Foster / Kellis Park connections and the Trail Study have been completed and a balance of $1,458,762.50 is available for design and construction of high priority neighborhood trail connections. On June 6, 2005; (M&C C-20829) City Council authorized the City Manager to execute a contract with Schrickel, Rollins and Associates, Inc., (SRA) in the amount of $82,000, to perform an overall Trail Study within the City of Fort Worth, This Study culminated in a prioritization matrix indicating the highest priority trail connections in the City. This Trail Study, completed in October 2006, identified the Trail Drivers Park Trail Linkage as a high priority connection to link the Diamond Hill neighborhood to the Trinity River Trail System. SRA has submitted a proposal in the amount of $110,650 for the production of construction documents for the Trail Drivers Park Neighborhood Trail Connection. Staff considers this fee to be fair and reasonable for the scope of services proposed. M/WBE -Schrickel, Rollins and Associates, Inc., is in compliance with the City's MWBE Ordinance by committing to 15 percent participation. The City's goal on this project is 15 percent. http://www. cfwnet. org/council�acket/Reports/mc�rint. asp 7/17/2007 Page 2 of 2 Trail Drivers Park is located in COUNCIL DISTRICT 2. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current operating budget, as appropriated, in the Grants Fund. TO Fund/Account/Centers FROM Fund/Account/Centers GR76 539120 080302878010 $110,650400 Submitted for City Manager's Office b�• Libby Watson (6183) Originating Department Head• Richard Zavala (5704) http://www.cfwnet.org/council�acket/Reports/mc�rint.asp 7/17/2007