HomeMy WebLinkAboutContract 365324
COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No
WHEREAS, Target Corporation, hereinafter called "Developer", desires to make
certain improvements to land within (or public land immediately adjacent to) Lot 1,
Block 1, Westover Village Addition, an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain inspection and testing work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
Target -Westover Village Addition
CFA 2007084
08 27 07
1
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed
hereunder by said Developer, his contractors, subcontractors, officers,
agents or employees, or in consequence of any failure to properly
safeguard the work, or on account of any act, intentional or otherwise,
neglect or misconduct of said DEVELOPER, his contractors, sub-
contractors, officers, agents or employees, whether or not such
injuries, death or damazes are caused, in whole or in part, by the
alleged negligence (other than the Zross nealiorence or willful
misconduct) of the City of Fort Worth, its officers, servants, or
employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
1049100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
Target -Westover Village Addition 2
CFA 2007084
08 27 07
K. Developer hereby releases and agrees to indemnify and hold the City
harinless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A) None; Sewer (A4) None; Paving (B) Attached;
Storm Drain (134) Attached; and Street Lights and Signs (C) None.
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Stot-�n Drain Facilities
A. The Developers) agree to install or to cause to have installed, the street,
storm
drainage and other community facilities improvements shown as
"current improvements" on the attached Exhibits B and B 1.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street and storm
drainage as shown on the attached Exhibits B and 131. The estimated total
cost of current improvements and related support services specified in this
agreement, including design, construction and inspection is estimated to
be $27,836.40.
Target -Westover Village Addition 3
CFA 2007084
08 27 07
SUMMARY OF COST
TARGET-tNESTI VEK VILLAGE ADDITION
Item
Developer
Cost
City Cost
Total Cost
A. Construction
$ -
1. Streets
$16,699.75
$ 16,699.75
2. Storm Drainage
$9,561.00
$ 91561000
3. Street Lights
$0.00
$ -
4. Street Name Signs
$0.00
$
B. Engineering Design
$ -
C. Construction Engineering
and Management by DOE (4%)
$ 19050A3
$ 13050,43
D. Materials Testing by DOE (2%)
$ 525.22
$ 525.22
TOTALS
$ 27,836.40
$ -
$ 27,836040
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
Target -Westover Village Addition 4
CFA 2007084
82707
1N TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to
be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested
by its City Secretary, with the corporate seal of the City affixed, at Fort Worth, Texas, and
said Developer has ex cuted this instrument in triplicate, at Minneapolis, Minnesota, to be
effective as of theIQT ay of
Approval Recommended:
NO 11+t€�.��aRI;�iJI1�FD=
ATTEST:
LAz
Marty Hendrix
City Secretary
Target -Westover Village Addition
CFA 2007084
82707
5
Transportation and Public Works
Department
Robert Goode, P. E.
Director
City of For�Vorth
Marc Ott
Assistant City Manager
TARGET CORPORATION
13y:
Scott���Nelson
Vice �ident —Real Estate
�, ?I, YES?,
Source: Google Maps TARGET -LOT 1, BLOCK 1
WESTOVER VILLAGE ADDITION
Lawrence A. Cates &Associates, LLP
Consulting Engineers Dallas �kAustin
14800 Quorum Drive, Suite 200 4201 Bee Caves Road, Suite C210
Dallas, Texas 75254 * Austin, Texas 71 4,
Office:972-385-2272 Office:512-327-8800 h
V
i
M
O
N�
h
a
~ O QJON
. k O Q W 04
W Q.
_ Q: oti�U
Q U WI Id
r ` c OW 410beet
�
a Oda` O
O tioz
m J N o
U O
m > O�
`\ _ J
_ beer
\� pp^e v ' J
beer
�► L mo
d�%yoJbe
W o N
Zd �Y,N b _ O Q V)tito
i �8 _ QjN
Zo P N
co
- + i
co
Oc
bed
W QOViN
f Q
S be,
l l i l i t 1 I rl i 1! I I EMT
(! j 1 I I i[ E U 1---------------- -- \
---
f' id!0
Ifs! IR
! I i! Ided
bet
FM h4 fir D 141
j,
I 11,1141
I l l f 11 l E it 0�1 I ! Ifl d I I I UI F—
W I
; 0 �-t-- IOiiiiiiiN f-DD r Q
aI ���0�r������-�0��-►���-��-�a 3
I I W I V
a-1� I �toI;; �0t;d_Ha k
I m
77
u
~U
\ 0 S yyYY
UOWId I
> 8d
our)
VIW< ZUB rz
F0
Z
Q beb;OW Id..—
.��
30qq
\ \ =_ 08
M
0
N�
2�W
O QJON
W O;ZtWN4
CZ,W ���N
a owl^
Id- W �JSN
OW (� woJj
CD o ��Q_
z
go mo w
`�
=
m Q o
�> o
�o o�
m o m > F—
= c~n . o
D J
W �cn CD do
oQ _to
J
Q�h Oin�N
CO h��N
LL,
qWN
h
W
Q 2`
O1 W000
Vo \ 37
t �,A
I11 bIKLLILIUMIb
I. STREETLIGHTS COST ESTIMATE:
INTERSECTIONS
MID -BLOCK RESIDENTIAL
CHANGE OF DIRECTION RESIDENTIAL
MID -BLOCK COLLECTOR
MID -BLOCK ARTERIAL
MID -BLOCK ARTERIAL MEDIAN
RELOCATE EXISTING LIGHT
QUANTITY UNIT COST TOTAL COST
0 EA $ 2,600 $00,000.00
0 EA $ 2,600 $00,000.00
0 EA $ 2,600 $00,000.00
0 EA $ 2,600 $00,000.00
0 EA $ 3,200 $00,000.00
0 EA $ 3,200 $00,000.00
0 EA $ 1,650 $00,000.00
Subtotal $00,000.00
City's Cost $00,000.00
Developer's Subtotal $00,000.00
4% Inspection fee $0,000.00
Project Total $00,000.00
Adjacent Developer's Cost $00.000.00
Developer's Cost $O.QO
DEVELOPERS COST: $0.00 (Streetlights are not included in project)
CFA CODE it 2007084
Target —Westover Village Addition
Fort Worth, Texas August 21, 2007
PAGE 4 OF EXHIBIT "C"
II. STREETLIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at the approximate locations
shown in exhibit Co immediately after final acceptance of the street construction, in
accordance with engineering plans and specifications approved by the Transportation and
Public Works Department.
2. Streetlights on residential and/or collector streets can be installed using overhead or
underground conductors with the approval of the director of transportation and Public
Works.
3. The City of Fort Worth will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to pay the City of
Fort Worth the amount shown below prior to the City starting its design efforts, at the option
of the developer and at their expense they may purchase the poles, fixtures, and mast arms
from the City in order to assure compliance with city material standards
4. Street lights on arterial streets shall be installed with underground conductors
5. The developer agrees to dedicate all easements required for the installation and
maintenance of the street lights and to provide for the installation of any electrical
transformers required for the proper operations of the street light system
6. The estimated cost of this streetlight installation is detailed on page (1) of exhibit "C" and is
summarized below. The streetlights will remain the property of, and will be maintained by
the City of Fort Worth.
DEVELOPERS COST: $0.00
August 21, 2007
CFA CODE # 2007084
Target -Westover Village Addition
PAGE 2 OF EXH/BlT "C"
III. STREETLIGHTS LOCATIONS:
CFA CODE # 2007084
Target -Westover Village Addition
PAGE 3 OF EXHIBIT "C"
1
2.
3.
Iv
STREET NAME SIGNS
The City %J Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
The Developer will pay for the street name sign installations required
for this development to the extent of $245.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
This development creates the following zero (0) intersections at a cost
to the Developer of $0.00.
(No new {public} intersections)
Target -Westover Village Addition
CFA code: 2007084
August 21, 2007