HomeMy WebLinkAboutContract 36547Tariff for Retail Delivery Service TXU Electric Delivery Company CITY SECRETARY CONTRACT NO 0 L L21 6.3 Agreements and Forms Applicable: Entire Certified Service Area Page 1 of 23 Effective Date: January 1, 2002 Revision: Original 6.3.1 Facilities Extension Agreement WR Number: 2857377 Region/District: Fort Worth This Agreement is made between The City of Fort Worth, hereinafter called "Customer" and Oncor Electric Delivery Company, a Texas corporation, hereinafter called "Company" for the extension of Company Delivery System facilities, as hereinafter described, for service to the Sendera Ranch Pump Station at 14391 John Day Road in Fort Worth, Texas, The Company has received a request for the extension of: (check all that apply) Q STANDARD DELIVERY SYSTEM FACILITIES TO NON-RESIDENTIAL DEVELOPMENT Company shall extend standard Delivery System facilities necessary to serve Customer's estimated maximum demand requirement of 1,500 kW ("Contract kW"). The Delivery System facilities installed hereunder will be of the character commonly described as 2400/4160 volt, 3 phase, at 60 hertz, with reasonable variation to be allowed. ❑ NON-STANDARD DELIVERY SYSTEM FACILITIES Not Applicable: ARTICLE I -PAYMENT BY CUSTOMER At the time of acceptance of this Agreement by Customer, Customer will pay to Company $113,810.22 as payment for the Customer's portion of the cost of the extension of Company facilities, in accordance with Company's Facilities Extension Policy, such payment to be and remain the property of the Company. Should Company not receive payment of $113,810.22 by December 14, 2007, Company will determine a new payment amount. ARTICLE 11 -NON-UTILIZATION CLAUSE FOR STANDARD DELIVERY SYSTEM FACILITIES This Article II applies only to the installation of standard Delivery System facilities. a.The amount of Contribution in Aid of Construction ("CIAC") to be paid by Customer under Article I above is calculated based on the estimated data supplied by Customer or Customer's representative and specified above. Company will conduct a review of the actual load at the designated location to determine the accuracy of the estimated data supplied by Customer or Customer's representative. If, within two (2) years after Company completes the extension of Delivery System facilities, the estimated load as measured by actual maximum kW billing demand at said location has not materialized, Company will re -calculate the CIAC based on actual maximum kW billing demand realized. The installation of a Company meter in connection with Temporary Delivery Service does not constitute substantial completion, b.Customer will pay to Company a "non -utilization charge" in an amount equal to the difference between the recalculated CIAC amount and the amount paid by Customer under Article I, above. Company's invoice to Customer for such "non -utilization charge" is due and payable within fifteen (15) days after the date of the invoice. 01-28-08 A"10�49 IN Tariff for Retail Delivery Service TXU Electric Delivery Company 6.3 Agreements and Forms Applicable: Entire Certified Service Area Page 2 of 23 Effective Date: January 1, 2002 Revision: Original ARTICLE III -TITLE AND OWNERSHIP Company at all times shall have title to and complete ownership and control over the Delivery System facilities extended under this Agreement. ARTICLE IV - GENERAL CONDITIONS Delivery service is not provided under this Agreement. However, Customer understands that, as a result of the installation provided for in this Agreement, the Delivery of Electric Power and Energy by Company to the specified location will be provided in accordance with Rate Schedule 6.1 A.3 — Secondary Service Greater Than 10 kW, which may from time to time be amended or succeeded. This Agreement supersedes all previous agreements or representatioris, either written or oral, between Company and Customer made with respect to the matters herein contained, and when duly executed constitutes the agreement between the parties hereto and is not binding upon Company unless and until signed by one of its duly authorized representatives. ARTICLE V —SPECIAL CONDITIONS Company will provide service contracted for hereunder by means of two separate 2400/4160 volt transformers. The point of delivery will be the load side of Company's 2400/4160 volt metering enclosures. Customer shall install his facilities in such a manner as to provide a split bus configuration, which will not permit the parallel connection of Company's transformers at any time under any condition. Customer shall control the use of electric energy so that Customer's load at the point of delivery is reasonably balanced between the two separate 2400/4160 volt transformers. Should Company determine that Customer is operating in a manner other than that permitted herein, Customer agrees to take corrective action necessary to meet the aforesaid conditions of service. Company restricts the starting of each Customer motor to no more than 4,000 WA at a frequency of no more than 8 starts within any 24 hour period. Should Company determine that Customer is operating in a manner other than that permitted herein, Customer agrees to discontinue operation of such facilities and take corrective action necessary to meet the.*resaid conditions of service. E R: Signature M�rC A, �� P%sAbWt tt Citjr Manager Title Date Signed attested By; 1•farty Hendry City Secrer ; r . 2 ACCEPTED BY COMPA Y: Signature Title Date Signed City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, January 22, 2008 LOG NAME: 60ONCOR REFERENCE NO.. **G-16024 SUBJECT: Authorize Execution of an Agreement with ONCOR Electric Delivery Company for Extension of Permanent Electric Service to the Newly -Constructed Sendera Ranch Pump Station and Ground Storage Tank Facility RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute an agreement in the amount of $113,810.22 with ONCOR Electric Delivery Company for the extension of permanent electric service to the newly -constructed Sendera Ranch Pump Station and Ground Storage Tank facility. DISCUSSION: On November 15, 2005, (M&C C-21159) the City Council authorized the execution of a Community Faces Agreement for the design of the Sendera Ranch Pump Station and Ground Storage Tank, the Northside II 42-inch Approach Water Main and the Northside III Water Main. The proposed Sendera Ranch Pump Station, located in the Sendera Ranch Development, will be capable of pumping water to Northside III and Northside IV pressure plane areas, which includes the Zone 287 annexed area. The Pump Station and five million gallon ground storage tank is nearing completion and will require permanent electrical power for final construction and subsequent facility operation. This development is located in COUNCIL DISTRICT 7. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. TO Fund/Account/Centers FROM Fund/Account/Centers P264 539120 607160037680 $113,810.22 Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: Marc A. Ott (8476) S. Frank Crumb (8207) John Sewell (8369)