HomeMy WebLinkAboutContract 36549D13TRIBDTtON: CITY SECRETARY w�-i;TE-Fu.E CITY OF FORT WORTH CONTRACT N(� . CANARY -CONSTRUCTION FILE PINK -PROJECT MANAGER CHANGE ORDER REQUEST rnr n�unn _ rnrrraarTnu CHANGE ORDER NO. ONE I DATE: May 30, 2007 I D.O.E. NO. (N/A) PROJECT DESCRIPTION: Alta Mesa Pump Station Improvement Project ORIGINAL CONTRACTAMOUNT....................................................... $ 380.390.00 EXTRAS TO DATE ......................................................... $ 0.00 CREDITS TO DATE ....................................................... $ 0.00 PROJECT NO. P264-606160035580 CITY SECRETARY CONTRACT NO. 34373 CONTRACTCOST TO DATE....................................................................................................................................................................................... $ 380.390.00 AMOUNT OF PROPOSED CHANGE ORDER............................................................................................................................................................. $ 7 383.00 REVISED CONTRACT AMOUNT ................... ............................................................................................................................... $ 387.773.00 ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS....................................................................................................................................... $ 25.000.00 ADDTITONALFUNDING (IF NECESSARY)................................................................................................................................................................ $ 0.00 REMAINING FI JNDS AVAILABLE FOR CHANGE ORDER...................................................................................................................................... $ 17.617.00 IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: modify/change the contract as shown below to provide a complete, functional, and operational plant. These changes are as listed below. Further descriptions and Cost Breakdowns are attached. As part of the work under the Alta Mesa Pump Station Improvements, the Contractor is to replace Pump #2 at the Russom Ranch Pump Station. While installing the new pump, the electrical subcontractor noticed that the existing electrical feeder to pump #2 did not meet the current electrical code requirements. The work included in this change order is the labor to remove the existing feeder and the labor and materials required to replace the feeder by installing new conduit and cable from the electrical switchgear to the pump #2 motor, complete with all grounding, fittings, terminations, and testing. Staff has reviewed this change order and is in agreement with the scope of work and the costs associated with the work. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both in time and money) for all costs arising out of, or incidental to, the Change Order. ORIGINAL CONTRACT TIME ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS....................................................................................................................................... $ 25.000.00 ADDTITONALFUNDING (IF NECESSARY)................................................................................................................................................................ $ 0.00 REMAINING FI JNDS AVAILABLE FOR CHANGE ORDER...................................................................................................................................... $ 17.617.00 IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: modify/change the contract as shown below to provide a complete, functional, and operational plant. These changes are as listed below. Further descriptions and Cost Breakdowns are attached. As part of the work under the Alta Mesa Pump Station Improvements, the Contractor is to replace Pump #2 at the Russom Ranch Pump Station. While installing the new pump, the electrical subcontractor noticed that the existing electrical feeder to pump #2 did not meet the current electrical code requirements. The work included in this change order is the labor to remove the existing feeder and the labor and materials required to replace the feeder by installing new conduit and cable from the electrical switchgear to the pump #2 motor, complete with all grounding, fittings, terminations, and testing. Staff has reviewed this change order and is in agreement with the scope of work and the costs associated with the work. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both in time and money) for all costs arising out of, or incidental to, the Change Order. ORIGINAL CONTRACT TIME ADDITIONAL APPROVED TIME TO DATE APPROVED CONTRACT TIME ADDITIONAL TIME FOR THIS CHANGE TO DATE ORDER 240 Calendar Days None 240 Calendar Da s 0 Calendar Da s CONTRAC OR /1 DAT PROJECT MANAGER DATE '� I �' � l� N �1� 6{�' �L.a�+ / MANAGER/CONST. SER. DATE DIRECTORlMANAGING DEPT. DATE . � D CONT CTIN E DA , TPY A Y Df� , �' l f v y Y CITY MANAGER DATE COUNCIL ACTI REQUIRED): DATE p �I_ � i�.- / Z ,� J d ❑APPROVED ❑DISAPPROVED ❑OTHER Marc A. ®tt As;ls��rzt City Manager A.tteste�t By'; �u�Ga.r 1 -- ..._ trlalrty He nd; t' ,� . '' � �����,11=�,'l ���CJ��?,�4 `����� � fir:; ��� �`r �11ri� Q4ep I�t�!li�l`� ��' ��G�:a Y 7 .": J � 01-30-08 A10:38 IN -07_9 TF4 Bedford TPC ELECTRIC COMPANY, INC. 2816 Central Drive #140118 Telephone: (817) 8584715 Bedford, Texas 76021 Fax: (817) 858-6718 FAX I IN M IVSMI I I AL Qate: May 29I 2p07 To: Crescent Constructors, lnc. Attn: MIKE DAiGRE Fax #: 972-437-2845 Y From: Jay Johnson Pages: 3 {Including Cover) Re: Alta Mesa TPC CMR 373-02 M.D Please see / forward the attached change request for Russum Ranch and see if you can get a verbal approval so that we can proceed tomorrow and advise, k Cc: 373 fife r 005/29/2007 08613 617-858-6718 TPC Bedford #0597 P.002 /003 2816 Central Drive #14011$ Bedford, Texas 76021 Telephone: ($17) $58-6�'15 Fax: (817186M718 CONTRACT MODIFIi4ATI"N REQtJ�;!lT To: Crescent Constructors; Inc. 1100 Grinnell Drive Richardson, Texas 75081 Wn: Mike Daigue PRQJECT NAME: Alta Mesa Puz�np Station PROJECT #: 00355 .PC CMR#: 373-02 Crentlemen, We request a Contract Modification on this project as described below. Excepting only those terms specifically waived or amended herein, all of the terms, conditions, provisions and covenants of the original Contract shall remain in full force and effect. DESCRIPTION OF CHANGE QR MODIFICATION: Russum RamoLAM otor Circuits Remove existing #2 SKV non -shielded motor power cables and 240V space heater circuits / upsize to 2 1 /2'° PVC Flexible conduit inside switchgear cabinet and re-route / install W1 aluminum conduit from motor space heater j-box to switchgear cabinet / upsize to 2 1/2" PVC Flexible metal conduit and fittings at motor termination box / install new #6 5KV non -shielded motor power cables with 600v ground / install new 600V motor space heater cables / Hipot test new 5KV non shielded motor power cables / Megaohm test 600V cables_ .Additive Change Total: 1. CMR Summazti Sheet attaelied. Issued by: Tay Johnson Title: Cc: T.C. / Acct 373 Lle ect Date: w6,263.�3 May 29, 2007 0�.'29 !2007Cd.? Lei?—h50-67 8 n TPC Electric Gc�mpanV. Inc CNIR SUMMARY SHEET Project Name; Alta Mesa Pump Station TPC CMR #: 373-02 Change Descri Pion: Russum Ranch Motor Circuits Date: I 22-Ma Valid For. 30 Da mate By; T.R. MATERIAL /QUOTES: Amount OP Rate Extension Material: $2,720,92 X 1.0 $2,720.92 Equipment: $0.00 X 1.0 $0600 Quote: RPT Testin $528,00 X 1.0 $528.00 SUBTOTAL: $3,248.92 t'4BOR AIIIVUIJ I Op Rate Extension Straight -time Labor Add: .00 $1,012,00 General Foreman Strairght-time Labor (10% of Man Hrs):t46- General Foreman Strai ht-time Labor:00 $161.00 Mat. Proc. & Hndi 5% of Man Hrs : Mat. Proc, &Hndi : 00As-Built Drawing00 $35.0Q SUBTOTAL: $1,30i;.90 nIRECT JOB EXP: Amount O Rate Extension Expendable Tools Material Subtotal) $2 720.92 X 6% $163.26 O&M Quote Subtotal); $0.00 X 1 % $0400 Warranty (Material / Quote Subtotal): $32248.92 X I % $32.49 SUBTOTAL: $195.74 TOTAL: $6,263.43 7 Ui �r�,��J1J�Jtl, ��GUe