HomeMy WebLinkAboutContract 36549D13TRIBDTtON: CITY SECRETARY
w�-i;TE-Fu.E CITY OF FORT WORTH CONTRACT N(� .
CANARY -CONSTRUCTION FILE
PINK -PROJECT MANAGER CHANGE ORDER REQUEST
rnr n�unn _ rnrrraarTnu
CHANGE
ORDER NO. ONE
I DATE: May 30, 2007
I D.O.E. NO. (N/A)
PROJECT
DESCRIPTION: Alta Mesa
Pump Station Improvement
Project
ORIGINAL CONTRACTAMOUNT....................................................... $ 380.390.00
EXTRAS TO DATE ......................................................... $ 0.00
CREDITS TO DATE ....................................................... $ 0.00
PROJECT NO. P264-606160035580
CITY SECRETARY CONTRACT NO.
34373
CONTRACTCOST TO DATE.......................................................................................................................................................................................
$ 380.390.00
AMOUNT OF PROPOSED CHANGE
ORDER.............................................................................................................................................................
$ 7 383.00
REVISED CONTRACT AMOUNT ...................
............................................................................................................................... $ 387.773.00
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS....................................................................................................................................... $ 25.000.00
ADDTITONALFUNDING (IF NECESSARY)................................................................................................................................................................ $ 0.00
REMAINING FI JNDS AVAILABLE FOR CHANGE ORDER...................................................................................................................................... $ 17.617.00
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: modify/change the contract as shown below to provide a complete, functional, and
operational plant. These changes are as listed below. Further descriptions and Cost Breakdowns are attached.
As part of the work under the Alta Mesa Pump Station Improvements, the Contractor is to replace Pump #2 at the Russom Ranch Pump Station. While installing the new
pump, the electrical subcontractor noticed that the existing electrical feeder to pump #2 did not meet the current electrical code requirements. The work included in this
change order is the labor to remove the existing feeder and the labor and materials required to replace the feeder by installing new conduit and cable from the electrical
switchgear to the pump #2 motor, complete with all grounding, fittings, terminations, and testing.
Staff has reviewed this change order and is in agreement with the scope of work and the costs associated with the work.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both in time and money) for all costs arising out of, or incidental to, the Change Order.
ORIGINAL CONTRACT TIME
ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS....................................................................................................................................... $ 25.000.00
ADDTITONALFUNDING (IF NECESSARY)................................................................................................................................................................ $ 0.00
REMAINING FI JNDS AVAILABLE FOR CHANGE ORDER...................................................................................................................................... $ 17.617.00
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: modify/change the contract as shown below to provide a complete, functional, and
operational plant. These changes are as listed below. Further descriptions and Cost Breakdowns are attached.
As part of the work under the Alta Mesa Pump Station Improvements, the Contractor is to replace Pump #2 at the Russom Ranch Pump Station. While installing the new
pump, the electrical subcontractor noticed that the existing electrical feeder to pump #2 did not meet the current electrical code requirements. The work included in this
change order is the labor to remove the existing feeder and the labor and materials required to replace the feeder by installing new conduit and cable from the electrical
switchgear to the pump #2 motor, complete with all grounding, fittings, terminations, and testing.
Staff has reviewed this change order and is in agreement with the scope of work and the costs associated with the work.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both in time and money) for all costs arising out of, or incidental to, the Change Order.
ORIGINAL CONTRACT TIME
ADDITIONAL
APPROVED TIME TO DATE
APPROVED CONTRACT TIME
ADDITIONAL TIME FOR THIS CHANGE
TO DATE
ORDER
240 Calendar Days
None
240 Calendar Da s
0 Calendar Da s
CONTRAC OR
/1
DAT
PROJECT MANAGER
DATE
'� I �'
�
l� N
�1�
6{�' �L.a�+
/
MANAGER/CONST. SER.
DATE
DIRECTORlMANAGING DEPT.
DATE
.
�
D CONT CTIN
E
DA ,
TPY A Y
Df� , �'
l
f
v y
Y
CITY MANAGER
DATE
COUNCIL ACTI REQUIRED):
DATE
p
�I_
� i�.-
/ Z ,�
J d
❑APPROVED ❑DISAPPROVED
❑OTHER
Marc A. ®tt
As;ls��rzt City Manager
A.tteste�t By';
�u�Ga.r 1 -- ..._
trlalrty He nd; t'
,�
. '' �
�����,11=�,'l ���CJ��?,�4
`����� � fir:; ��� �`r �11ri�
Q4ep I�t�!li�l`� ��' ��G�:a
Y 7 .": J �
01-30-08 A10:38 IN
-07_9
TF4 Bedford
TPC ELECTRIC COMPANY, INC.
2816 Central Drive #140118 Telephone: (817) 8584715
Bedford, Texas 76021 Fax: (817) 858-6718
FAX I IN M IVSMI I I AL
Qate: May 29I 2p07
To: Crescent Constructors, lnc.
Attn: MIKE DAiGRE
Fax #: 972-437-2845
Y
From: Jay Johnson
Pages: 3 {Including Cover)
Re: Alta Mesa TPC CMR 373-02
M.D
Please see / forward the attached change request for Russum Ranch and see if you
can get a verbal approval so that we can proceed tomorrow and advise,
k
Cc:
373 fife
r 005/29/2007 08613 617-858-6718 TPC Bedford #0597 P.002 /003
2816 Central Drive #14011$
Bedford, Texas 76021
Telephone: ($17) $58-6�'15
Fax: (817186M718
CONTRACT MODIFIi4ATI"N REQtJ�;!lT
To: Crescent Constructors; Inc.
1100 Grinnell Drive
Richardson, Texas 75081
Wn: Mike Daigue
PRQJECT NAME: Alta Mesa Puz�np Station
PROJECT #: 00355
.PC CMR#: 373-02
Crentlemen,
We request a Contract Modification on this project as described below. Excepting only those
terms specifically waived or amended herein, all of the terms, conditions, provisions and
covenants of the original Contract shall remain in full force and effect.
DESCRIPTION OF CHANGE QR MODIFICATION:
Russum RamoLAM otor Circuits
Remove existing #2 SKV non -shielded motor power cables and 240V space heater circuits /
upsize to 2 1 /2'° PVC Flexible conduit inside switchgear cabinet and re-route / install W1
aluminum conduit from motor space heater j-box to switchgear cabinet / upsize to 2 1/2" PVC
Flexible metal conduit and fittings at motor termination box / install new #6 5KV non -shielded
motor power cables with 600v ground / install new 600V motor space heater cables / Hipot test
new 5KV non shielded motor power cables / Megaohm test 600V cables_
.Additive Change Total:
1. CMR Summazti Sheet attaelied.
Issued by: Tay Johnson
Title:
Cc:
T.C. / Acct
373 Lle
ect
Date:
w6,263.�3
May 29, 2007
0�.'29 !2007Cd.? Lei?—h50-67 8 n
TPC Electric Gc�mpanV. Inc
CNIR SUMMARY SHEET
Project Name; Alta Mesa Pump Station
TPC CMR #: 373-02
Change Descri Pion: Russum Ranch Motor Circuits
Date: I 22-Ma
Valid For. 30 Da
mate By; T.R.
MATERIAL /QUOTES:
Amount OP
Rate
Extension
Material:
$2,720,92 X
1.0
$2,720.92
Equipment:
$0.00 X
1.0
$0600
Quote: RPT Testin
$528,00 X
1.0
$528.00
SUBTOTAL: $3,248.92
t'4BOR
AIIIVUIJ
I Op
Rate
Extension
Straight -time Labor Add:
.00
$1,012,00
General Foreman Strairght-time Labor (10% of Man Hrs):t46-
General Foreman Strai ht-time Labor:00
$161.00
Mat. Proc. & Hndi 5% of Man Hrs :
Mat. Proc, &Hndi :
00As-Built
Drawing00
$35.0Q
SUBTOTAL: $1,30i;.90
nIRECT JOB EXP:
Amount
O
Rate
Extension
Expendable Tools Material Subtotal)
$2 720.92
X
6%
$163.26
O&M Quote Subtotal);
$0.00
X
1 %
$0400
Warranty (Material / Quote Subtotal):
$32248.92
X
I %
$32.49
SUBTOTAL: $195.74
TOTAL: $6,263.43