Loading...
HomeMy WebLinkAboutContract 36557 (2)COMMUNITY FAk IIMITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No.� WHEREAS, HILLWOOD ALLIANCE SERVICES. LLC, hereinafter called "Developer", desires to make certain improvements to Westport 20 Infrastructure, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements I1 IC C E. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. The Developer shall award all contracts for the community facilities in accordance with Section II, Policy. Westport 20 Infrastructure 12 07 07 1 01-30-0 8 F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in part, by the alleeed neglikence of the City of Fort Worth, its officers, servants, or employees. H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. I. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). J. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). K. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. L. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to Westport 20 Infrastructure 2 12 07 07 construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A-1) None; Paving (B)Attached Storm Drain (B-1) Attached; Street Lights and Signs (C) Attached.. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developers) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B, B 1 and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $1,349,338.99 Westport 20 Infrastructure 12 07 07 3 SUMMARY OF COST WESTPORT 20 INFRASTRUCTURE Item Developer Cost City Cost Total Cost A. Construction $- 1. Streets $510,476660 $510,476,60 2. Storm Drainage $739,030,00 $739,030,00 3. Street Lights $24,862000 $24,862,00 4. Street Name Signs $- $- B. Engineering Design $- C. Construction Engineering and Management by DOE (4%) $49,980,26 $49,980,26 D. Materials Testing by DOE (2%) $24,990013 $24,990,13 TOTALS $1,3491338,99 $1,349,338,99 Notes: l .All Preliminary Plats filed after July 2000 will require sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. Westport 20 Infrastructure 12 07 07 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by its City Secretary, with the corporate seal of the City affixed, and aid v o er has executed this instrument in triplicate, at Fort Worth, Texas this the<� of� , 2006. Approval Recommended: ATTEST: City Secretary Transportation and Public Works Department /,�� � Robert Goode, P. E. Director City of F Worth Marc Ott Assistant City Manager DEVELOPER: HILLWOOD ALLIANCE SERVICES, LLC., a Texas limited liability company By: Hillwood Development Company, LLC, a Texas limited liability company, Approved o Form: B ' As sistant,Oitv*�Xttorney ATTEST: Corporate Secretary Westport 20 Infrastructure 207 07 5 CARTER &BURGESS, INC. 777 MAIN STREET FORT WORTH, TX 76102 (817) 735-6000 ..\EST\CFA\20071102\043CFA.dgn 12/7/2007 4:04:08 PM CFA Estimate for: WESTPORT 20 INFRASTRUCTURE Sta 5+04.11 to Sta 18+48.49 NOVEMBER 12, 2007 CONSTRUCTION COST SUMMARY WATER DISTRIBUTION SYSTEM $459,334.50 PAVING IMPROVEMENTS $5102476.60 STORM DRAINAGE IMPROVEMENTS $739,030.00 STREET LIGHTS $24,862.00 TOTi4i: DEV,EL:DPIER.I$OND /AMOUNTVV, � ,7$3;703.10 FEE COST SUMMARY CITY INSPECTION FEE (2%) WATER $9,186.69 CITY INSPECTION FEE (4%) PAVING & DRAINAGE $4%980.26 CITY MATERIALS TESTING FEE (2%) WATER $9,186.69 CITY MATERIALS TESTING FEE (2%) PAVING & DRAINAGE $24,990.13 G:\JOB\015007043\ESl1CFA\20071102\20071102 WP20 CFA.xIs U' �, %�;71,!IIY.. YY r4 u � INTERMODAL PKWY. CITY OF FOFT \+'10+ hTH CITY OF HASLET tETJi LEGEND PROP. CONCRETE PROP. ASPHALT TO1REMPAVEMENT SCALE+ i" = 200'I WESTPORT 20 AIL INVESTMENT, LA PAVING EXHIBIT 'B' WESTPORT 20 INFRASTRUCTURE STA 5 + 04.11 TO STA 18 + 48.49 Ciq� � - BYl�t:SS CARTER &BURGESS, INC. 777 AWN STREET PORE WORTH, T%76102 1Hi71735-5000 PROJECT N0. 015007.043.00i.0630 DGN=p�\Job\ 015007043\E5T\CFA\ 043CFA.dgn PAGE 4 OF 6 CFA Estimate for: Sta 5+04.11 to Sta 18+48.49 NOVEMBER 12, 2007 STREET IMPROVEMENTS Item No. Ras DESCRIPTION OTY UNIT PRICE AMOUNT 1 T R.C. Street Pavement 83328 S.Y. 37.00 $308,136.00 2 4" HMAC Base Course 82482 S.Y. 17.00 $144,194.00 3 Lime Stabilized Subgrade 81809 S.Y. 2.50 $229022.50 4 Hydrated Lime 30#/SY 132 Ton 110.00 $149534.85 5 5" HMAC Base Course 171 S.Y. 14.75 $2,522.25 6 Remove Existing Pavement 30 S.Y. 10.00 $300400 7 7" Concrete Curb 23612 L.F. 1.50 $31918.00 8 Concrete Header 55 L.F. 25.00 $1,375.00 9 12"-15" Rock Rip Rap 11 S.Y. 60.00 $660.00 10 Dead End Sign W 14-1 1 EA. 650.00 $650900 11 Stop Sign R1-1 1 EA. 650.00 $650.00 12 Type II-CR-4 Markers 61 EA. 9.00 $549.00 13 Type II-AA-4 Markers 122 EA. 9.00 $19098.00 14 Type Y-4 Markers 487 EA. 7.00 $35409.00 15 Type W-4 Markers 244 EA. 7.00 $11708.00 16 lStd White Solid Stop Bar 1 LS 600.00 $600.00 17 1 Street Barricade 55 LF 30.00 $11650.00 18 ITraffic Control Plan 1 LS 25500200 $21500.00 TOTAL - STREET IMPROVEMENTS $510,476.60 G:\JOB\015007043\ESTICFA\20071102\20071102 WP20 CFA.xis 3 INTERMODAL PKWY, FXIST 10' EXI 15' DRO WESTPORT 20 AIL INVESrHENT, L.P. LEGEND PROP. STORM DRAIN LINE PROP. INLET PROP. MANHOLE PROP. HEADWALL EXIST, STORM DRAIN LINE EXIST HDWL SCALES 1/" = 200' OF FORT WORTH _ 14�1 OO I1 ll,%91LEII 111110 STORM DRAINAGE EXHIBIT B-1 WESTPORT INFRASTRUUTURE STA 5 + 04.11 TO STA 18 + 48.49 CARTER &BURGESS, INC. 777 AWN SiREEf FORT WORTH, IX 76102 IBI7) 735-6000 DCN=q�\)ob\ 015007043\EST\CFA\ 043CFA.dgn PROJECT N0. 015007.043.001.0630 PAGE 5 OF 6 CFA Estimate for: Sta 5+04.11 to Sta 18+48.49 NOVEMBER 12, 2007 STORM DRAIN SYSTEM Item No. DESCRIPTION QTY UNIT PRICE AMOUNT 1 2-6'X4' MBC 236 L.F. 700.00 $1655200.00 2 2-7'X4' MBC 618 L.F. 750.00 $463,500000 3 10'X4' SBC 27 L.F. 570.00 $153390.00 4 21" RCP 106 L.F. 45.00 $4,770.00 5 24" RCP 329 1 L.F. 52.00 $175108.00 6 27" RCP 56 L.F. 60.00 $31360.00 7 42" RCP 30 L.F. 100.00 $3,000.00 8 Parallel Wings for 2-7X4' MBC 1 EA. 155000.00 $153000.00 9 5'X5' DROP INLET 1 EA. 35500000 $3,500.00 10 Recessed 10' Curb Inlet 3 EA. 2,200.00 $61600.00 11 STD 4' Manhole 1 EA. 23800.00 $23800.00 12 Junction box 2 EA. 16,000.00 $325000.00 13 Connect 10'X4' SBC To Exist 8'X4' SBC 1 EA. 25000.0O $2,000.00 14 Connect Exist 42" RCP & 21" RCP to Proposed Wye 1 EA. 800.00 $800.00 15 Remove Exist Headwall 2 EA. 1,300.00 $23600.00 16 Trench Safety 11402 L.F. 1.00 $1,402.00 TOTAL -STORM DRAINAGE SYSTEM $7395030.00 G:\JOB\015007043\ESl1CFA\20071102\20071102 WP20 CFA.xis 4 AIL INVESTMENT, L.P. CITY OF FUFT 1rJURTH CITY OOF HASLET IETJI LEGEND PROP SINGLE STREET LIGHT PROP STREET LIGHT CONDUIT PROP PULL BOX C AIL INVESTMENT L.P. DC VOL 4246, f!(i 498 SCALES i " = 200' � PROPOSED PULLBOX PROPOSED CONDUIT(TYP) SED STREET ( TYP) WESTP�RT 20 AIL INVESTMENT, L.P. _`� STREETLIGHTS EXHIBIT 'C' WESTPORT 20 INFRASTRUCTL7RE 5TA 5 + 04.11 TO STA 18 + 48.49 Carter Burgess CARTER & BURGESS, INC. m lwr+ srxeEr FORT WORTH, TX 76102 (BIB 73i-6000 PROJECT N0. 015007.043.001.0630 DGN=q�\job\ 015007043\EST\CFA\ 043CFA.dgn PAGE 6 OF 6 CFM Estimate for: Sta 5+04.11 to Sta 18+48.49 NOVEMBER 12, 2007 STREET LIGHT BASES &STREET SIGNS Item No. DESCRIPTION CiTY1 UNIT I PRICE AMOUNT 1 D40-9T Single Davit Arm 7 EA. 1 15400,00 $9,800000 2 Ballast, 200 W HPS Lamp 7 EA. 200.00 $13400.00 3 3 #4 & 1 #8G In 2" Sch 40 Conduit 19242 L.F. 11.00 $13,662.00 TOTAL STREET LIGHT BASES & SIGNS $241862.00 G:\JOB\015007043\EST\CFA\20071102\20071102 WP20 CFA.xIs 4�