HomeMy WebLinkAboutContract 36461COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.a
WHEREAS, Keller Independent School District, hereinafter called "Developer",
desires to make certain improvements to Keller ISD Elementary No 20 , an addition to
the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton, Parker, and Wise Counties, Texas, hereinafter called
"City", to do certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
That said Developer, acting herein by and through Bob Apetz, its duly authorized
Board President, and the City, acting herein by and through Marc A. Ott, its duly
authorized Assistant City Manager, for and in consideration of the covenants and
conditions contained herein, do hereby agree as follows.
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved and subsequently amended by the City
Council of the City of Fort Worth, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
Keller ISD Elementary No 20
CFA 2007082
09 14 07
1
0
V1�L
E. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
F. Developer shall install or adjust all of the required utties to serve the
development or to construct the improvements required herein.
G. Developer agrees that the City shall not be responsible for any
inadequacies in the preliminary plans, specifications and cost estimates
supplied by the Developer for this Agreement and hereby releases the
City from same.
H. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
I. Developer agrees to provide, at its expense, all necessary rights of way
anA easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
J. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof Water (A)None; Sewer (A-1) None; Paving (B)Attached
Storm Drain (B4) Attached; Street Lights and Signs (C) Attached.
K. City is requiring the widening and/or straightening of the City road(s)
contemplated herein. City shall not be responsible for any costs that
may be incurred for the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developers) agree to install or to cause to have installed, the streets,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1, and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
Keller ISD Elementary No 20 2
CFA 2007082
09 14 07
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B 1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated at $1,247,907.38.
SUMMARY OF
COST
KELLER /SD ELEMENTARY NO 20
Item
Developer
Cost
City Cost
Total Cost
A. Construction
$ -
1. Streets
$11035,298.00
1,035,298.00
2. Storm Drainage
$127,025000
127,025.00
3. Street Lights
$153600200
15,600400
4. Street Name Signs
$245.00
245.00
B. Engineering Design
$ -
C. Construction Engineering
and Management by DOE
4%
$
46,492.92
$
46,492,92
D. Materials Testing by DOE
2%
$
23,246046
$
23,246146
TOTALS
$
1,247,907.38
$ -
$
1,247,907.38
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
The developer is responsible for installation of sidewalk and a separate financial
guarantee is required in the form of a bond or check for the cost of the sidewalk.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees and materials testing. The City will pay additional inspection fee over
4%.
3. City not preparing plans and specifications.
Keller ISD Elementary No 20 3
CFA 2007082
09 14 07
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in quadruplicate in its name and on its behalf by its Assistant City Manager,
attested by its City Secretary, with the corporate seal of the City affixed, and said Developer
has executed this instrument in triplicate, at Fort Worth, Texas this the4j:[&day of
2008
CITY OF FORT WORTH Approval Recommended.
Marc Ott
Assistant City Manager
ATTEST:
City Secretary
Robert Goode, P. E., Director
Transportation and Public Works
to Form
Amy J.
Assistant City Attorney
DEVELOPER
Keller Independent School District
Bob Apetz
Board President
ATTEST:
Keller ISD Elementary No 20
CFA 2007082
09 14 07
0
5'_7IG' 14 rp nr-
OPINION OF PROBABLE CONSTRUCTION COST AUG 0 B
PROJECT: Paving and Drainage Improvements to serve Keller DATE; 81812007
Elementary No, 20
TNP JOB # KSD06318
ITEM
DESCRIPTION
QTY.
UNIT
UNIT COST
TOTAL
I
PERMANENT PAVING IMPROVEMENTS
Unclassified Street Excavation
19800
CY
$3.50
$69,300,00
6" Lime Stabilized Subgrade
19800
SY
$2.25
$44,550,00
Hydrated Lime 27#/SY
270
TON
$105,00
$28,350400
11" Reinforced Concrete - Timberland
9105
SY
$40.00
$364,200,00
9" Reinforced Concrete - Grey Twig
8470
SY
$32.00
$271,040,00
6" Reinforced Concrete for Drive Approach
225
SY
$22.00
$4,950,00
6" Concrete Curb
9102
LF
$2.00
$183204,00
4' Sidewalk
5400
LF
$14.00
$75,600000
Sidewalk Ramp
6
EA
$450,00
$2,700400
Remove Asphalt Pavement
1156
SY
$9.00
$10,404,00
Intersection Traffic Signal Timberland & Gre twi
1
LS
$1251000,00
$125,000000
Pavement Striping & Si na e
1
LS
$12,500,00
$12,500,00
Traffic Control
1
LS
$3,500.00
$39500:00
Sodding
1
LS
$4,000,00
$4,000.00
H dromulch Seeding
1
LS
$1,000,00
$1,000,00
PAVING SUBTOTAL
$1,035,298.00
II
DRAINAGE IMPROVEMENTS
3 - 8'x4' MBC
60
LF
$900,00
$54,000000
24" RCP
100
LF
$44.00
$4,400,00
30" RCP
205
LF
$52.00
$103660,00
10' Inlet
4
EA
$2,200,00
$85800:00
Construct 3 - 8'x4' Headwall
1
EA
$18,000,00
$18,000,00
30" Headwall
1
EA
$2,500,00
$2,500,00
24" Headwall
1
EA
$2,300,00
$2,300,00
Remove Existing 3 - 8'x4' Headwall and Rip -Rap
1
EA
$5,000000
$5,000,00
Rock Rip -Rap
600
SY
$35.00
$21,000:00
Trench Safety
365
LF
$1.00
$365,00
DRAINAGE SUBTOTAL
$127,025M
PAVING -DRAINAGE SUBTOTAL
$1,1623323.00
Street Lights
6
EA
$2,500,00
$15,000M
City of Fort Worth T/PW Inspection Fee 4%
$46,49192
City of Fort Worth T/PW Materials Testing Fee 2%
$233246046
Total
$1,2479062.38
III 51 KLLILIUH l b
I. STREETLIGHTS COST ESTIMATE:
INTERSECTIONS
MID -BLOCK RESIDENTIAL
CHANGE OF DIRECTION RESIDENTIAL
MID -BLOCK COLLECTOR
MID -BLOCK ARTERIAL
MID -BLOCK ARTERIAL MEDIAN
RELOCATE EXISTING LIGHT
DEVELOPERS COST: $15,600.00
CFA CODE it 2007082
Keller ISD Elementary # 20
Fort Worth, Texas
PAGE 4 OF EXHIBIT "C"
QUANTITY UNIT COST TOTAL COST
2 EA $ 2,600 $5,200.00
3 EA $ 2,600 $7,800.00
1 EA $ 2,600 $2,600.00
0 EA $ 2,600 $00,000.00
0 EA $ 3,200 $00,000.00
0 EA $ 3,200 $00,000.00
0 EA $ 1,650 $00,000.00
Subtotal $15,600.00
City's Cost $00,000.00
Developer's Subtotal
4% Inspection fee
Project Total
Adjacent Developer's Cost
Developer's Cost
August 21, 2007
$102,400.00
$0,000.00
$00,000.00
$00.000.00
$15,600.00
II. STREETLIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at the approximate locations
shown in exhibit "C", immediately after final acceptance of the street construction, in
accordance with engineering plans and specifications approved by the Transportation and
Public Works Department.
2. Streetlights on residential and/or collector streets can be installed using overhead or
underground conductors with the approval of the director of transportation and Public
Works.
3. The City of Fort Worth will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to pay the City of
Fort Worth the amount shown below prior to the City starting its design efforts, at the option
of the developer and at their expense they may purchase the poles, fixtures, and mast arms
from the City in order to assure compliance with city material standards
4. Street lights on arterial streets shall be installed with underground conductors
5. The developer agrees to dedicate all easements required for the installation and
maintenance of the street lights and to provide for the installation of any electrical
transformers required for the proper operations of the street light system
6. The estimated cost of this streetlight installation is detailed on page (1) of exhibit "C" and is
summarized below. The streetlights will remain the property of, and will be maintained by
the City of Fort Worth.
DEVELOPERS COST: $15,600.00
August 21, 2007
CFA CODE # 2007082
Keller ISD Elementary # 20
PAGE 2 OF EXHIBIT "C"
III. STREETLIGHTS LOCATIONS:
RESIDENTIAL INTERSECTIONS:
Timberland Blvd &Grey Twig Dr
"Street A" & Grey Twig Dr.
MID -BLOCK RESIDENTIAL:
Grey Twig Dr,
3
CHANGE OF DIRECTION RESIDENTIAL:
"Street A"
CFA CO®E # 2007082
Keller ISD Elementary # 20
PAGE 3 OF EXHIBIT "C"
1
1
1
1
2.
K3
Iv
STREET NAME SIGNS
The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
The Developer will pay for the street name sign installations required
for this development to the extent of $245.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
This development creates the following one (1) intersection at a cost to
the Developer of $245.00.
Grey Twig &Timberland Blvd
Keller Elementary No. 20
CFA code: 2007082
August 21, 2007
;� � TEAGUE HALL AND PERK/NS
;,��` � 1f00 Macon etrest
DATE Fort Worth, Texaa 78f02
�? -,. INC* Phona:(817)330- 0773• F a x:(817) 336-2813
AUG 2007 www.tnp=onllna.com
CITY OF FORT WORTH,
LOCATION MAP
CM
ae
o
�+
W
•
I..A.
E
•
b
o
f(e
C
W
O
O
•ZAO
Oy3
O
o3g3
w
`w
D
�
�
e
e
4
a
x
0
3
0
r�
W
V
V
Q
►1
m
H
m
X
W
ro
a
Nm
O °�
•
A w
E
•
m
o
Y y
O
r
�
� K
•
C
� �
C
F. �
e
q
o
�
.�
,
,L�
n
��e�
Gobi;
O
o3e,�
���
��
o�
�
e
0
a
i
a
Nb
w q
�
b
\
A w
B
e
O
�
e y
O
O
F ♦
C
W
O
O
A
i
\
Z A
O
L �
O
=
O
w
O �
�
e
e
a
W
U
Q
Q
w
U
w
O
O
0
0
N
a�