Loading...
HomeMy WebLinkAboutContract 50570-A1 �j �CJVEI) SECRETARY ,JUN25 2D19 vONTRACTNO. 505w*' Q7y0'CFM- AMENDMENT No . 1 Cl1ysECh4Y TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and James DeOtte Engineering, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 50570 (the CONTRACT) which was authorized by M&C C- 28631 on the 20th day of March, 2018 in the amount of $469,270 . 00; and WHEREAS, the CONTRACT involves engineering services for the following project: Lake Arlington Lift Station Upstream and Downstream Parallel Relief Sanitary Sewer Gravity Mains WHEREAS, it has become necessary to execute Amendment No.l to the CONTRACT to include an increased scope of work and revised fee. NOWTHEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated June 14, 2019 a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $99,454.00. 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $568,724 . 00 . 3" � 0.AL RECORD ` 5ECRE`fARY W K Page -1 LL �--J - 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth James D ngineering, Inc. Jesus J. Chapa Brain Darby, P.E. Assistant City Manager Vice President DATE: ' �� ( DATE: APPROVAL RECOMMENDED: �e d L Chris Harder, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance an reporting requirements. M&C: N/A Pratima oud 1, P.E. Project nager Date: N/A Douglas W. Black Senior Assistant City Attorney OR T AT97E - �J Y' 2 Mary J. Kay-4/ & yt_ City Secretary jOFFICiAL RECORD xA5 MY SECRETARY Page -2- 00 0 0 00000 m 0� oo Un 0� 0o0o 0 0 0 0 0 !6 t0 69 64 m CDtH 69 69 I`- co 69 m 69 69 N 69 N 69 fA 69 69 m N 'q' O O tq co ch N (O O H N CIF m m V N 64 fA 64 fA N.12 ta N fH 69 69 69 O 3 y � 1C y IC r d 0 0 0 O 0 0 0 0 o 10 O m 0 0 » O ti 0 0 0 0 0 O O O O y 1�64 69 64 L,64 69 0) cq 69 CN, 69 69 N� EA N�69 69 69 69 69 N d 64 Cfl m m x C) 69 fA 64 LU U m 0 F c o 0 0 0 0 O 69 us yr 69 69 U a 0 a d K O O O O N O 0 ~ co (7) H cli cli fR Qi Gl 69 � CL d � G � d W G C fA 69 Hi w p N Z G O O Cn m O O an V,p CIA cNh M 7 W W m m N rn m C to tJ o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O o o 0 0 0 O CO 69 V> O O 69 69 69 m W 69 CO 69 69 O V3 O 69 69 64 64 m N � O O L .p M (D n C N m V V cd M N CD Qi ❑ Jq to N N N fD m m m t0 p 69 69 69 69 64 64 64 64 64 69 64 C4 i Z d U d m T N O L' 5 M O O O O M N m M 0 W •� d a � QW v � c m` d O U m d E ? o � v t-. �_ ++ d o0 0 0 o a N N a W O P� J O = Q >+ ❑ (n C O 'V' V' V' d' N N M V m N ❑ Q O U O _! H cn y F � 3 W O L r Q N at 7 O 7 V m m N d 6 y J m c J o'- a` c w i W N V d d � O c a` t6 0 0 0 0 0 0 m cq o a c IL d y jQ m O ¢ 0 �' > �-- m c @ J 0 C N C N C O G o > d U 3 C d O G EE O ? 1 W m '> U " C (n d N N N O u D' U — ._� L d rn O C W y O� M y N O CT m N C C [1 d m'dCdE N y O.�LL'J p�y w w Lfn N E >`G d O [A v! L D N S Q iA O N�` p d0 3 = mo wrn> p O O C 'n i'.3rn d w m d aNd m `c a E c-o a `� U U m m o'� °-ai E o cdiU ° m c H ? acid N m-Od �' ocy . o . ». o❑ a¢a n U o c c o W U o o¢¢ u d d p d c yaUowU UU w m❑ mF U) m mN M �OO d N N N N N(V MM --- LL[V N r' NO N N N O m Fp- "I I L-iU¢F-LL \ \\\6.1 J � CD M; 42m){2/ \ ID E22Gesca - 3u § 0 #»\ 00nLE � § J&222aaE IL �\\ ) � ) m\/ / g ) D ) / _LU Cl } z E Co k ° �7 » �o e / 2 U) � $ 2R / \ _ 2 2 cc m CD a \w S § { >1 @ ± § ek E _ 0 CO LU t D c coe � 0 7_ E 2 S 0 $ $ \ < (L @2 \ 2 § ® E e q § = \_ - - e0 C, - e \ � \ /) I A2&&Ci\ k ® (/�2 %o==e \) ) \ j/ \\\/S / _ - / \ƒ« 2 &KR J / /«)\\/ ]# \(§ \ ƒ §-6 /J - 777- )}) ) § E J& /\\} ®®=K \ 16 ) \?ƒ} JD arneS Civil Engineering ... ........................................}. De,OI I.e...•...... . ................... ....rveying.. . n :;..Engineering....... ............con:m,cnq�Management.. ENGINEERING Inc. Hydrologic and Hydraulic Modeling ... June 14, 2019 Ms. Pratima Poudyal, P.E. Water Department City of Fort Worth 200 Texas Street Fort Worth, Texas 76102 Ref: Amendment No. 1 - revision 4 Lake Arlington Lift Station Gravity Sewer Mains City Secretary No. 50570 City Project No. 101311 Ms. Poudyal, Due to additional services requested by the City as part of the referenced project, James DeOtte Engineering, Inc. will perform the work outlined in the following items: Scope of Work Project Management: The number of meetings and number of required monthly SBE reports included in the original scope of services has been exceeded. Additional services have been included to provide for additional meetings and required monthly SBE reports. Archeological Services: This project is subject to the Antiquities Code of Texas and also Section 106 of the National Historic Preservation Act due to the U.S. Army Corps of Engineers Section 404 permitting process. After an initial review submittal to Texas Historical Commission (THC), they have requested an archeological survey of the proposed alignments. To satisfy this requirement, field investigations will be conducted as a combination of reconnaissance and intensive survey, consisting of pedestrian walk-over and deep mechanical trenching within the floodplain. The soils and setting are conducive to containing deeply buried surfaces (paleosols) and archeological deposits; therefore, an estimated 1 1 trenches (between the 2 alignments) will be lox 817.930.0445 2201 Dottie Lynn Parkway Ste.119 • fort Worth TX,76120 phone 817.446.6877 ...................................................................................................................................... TBPLS Firm Reg.No.10101400 TSPE Firm Reg.No.8917 nloa+uwo June 14, 2019 Amendment No. 1 - revision 4 Lake Arlington Lift Station Gravity Sewer Mains Page 2 excavated at least 30 feet (9 meters) long and to a maximum depth of 20 feet (b meters), if feasible. Field methods will comply with the guidelines for archeological survey as developed by the Council of Texas Archeologists (CTA) and approved by THC. This investigation will evaluate archeological resources for their potential eligibility for inclusion in the NRHP or designation as a SAL under the provisions of the Texas Antiquities Code. Detailed notes and photographs will be taken throughout the survey. A draft report of all results, including preliminary NRHP/SAL evaluations of any identified archeological resources and complying with THC and CTA guidelines will be submitted to the City and THC for review. Once THC concurrence has been received, a final report will be submitted as per the terms of the approved archeological permit. Survey Services: The City requested an adjustment in the south gravity alignment to relocate a portion of the alignment from beneath a dump fill area containing mostly broken reinforced concrete over 20 feet tall to a location outside this fill area. This area is beyond the limits of the original survey and additional efforts are necessary to gather the field topography along this City requested alignment adjustment. Subsurface Utility Engineering (SUE): The City requested we pursue additional SUE services to locate six utilities previous not found. Three utilities on the north adjustment and three on the south alignment. For the deeper utilities on the south alignment, a CDL Truck will be utilized to locate the utilities or to a depth that verifies no utilities are present that would conflict with the proposed sewer line profile elevation. Construction Phase Services - Public Meeting: The City requested we participate in a separate public meeting for the north adjustment and the south alignment. Our original scope of services only included one public meeting. This would provide for one additional public meeting. fox 817.930.0445 2201 Do19e Lynn Porkwoy Ste.119 • fort Worth TX.76120 phone 817.446.6877 -.......................................................................................................................................................................................... TBPLS Firm Reg,No, 10101400 WE firm Reg.No.8917 40 aiaonna June 14, 2019 Amendment No. 1 - revision 4 Lake Arlington Lift Station Gravity Sewer Mains Page 3 Fee JDEI anticipates the fees listed above for the project to be a not to exceed amount of $99,454.00. All costs, associated with the identified scope of work, will be lump sum for the scope provided and will be billed as a percentage of completed work as determined by JDEI. Contract Amount: $469,270.00 Amendment Amount: $ 99,454.00 Revised Total Amount: $568,724.00 This scope of work assumes any services not specifically listed as part of this contract will be treated as an additional service. The owner will be notified before any additional services are performed. Sincerely Brian Darby, P.E. Vice President fax 817.930.0445 2201 Dottie Lynn Parkway Ste.119 • fort Worth TX,76120 phone 8I7.446.6877 ..LS fi...................................,.............................................................................................................................Reg,...... 917 TBPLS Firm Reg.No.101014(>0 TBPE Firm Rey.No.8917 rNox�uwu