Q7y0'CFM- AMENDMENT No . 1
Cl1ysECh4Y
TO CITY SECRETARY CONTRACT
WHEREAS, the City of Fort Worth (CITY) and James DeOtte
Engineering, Inc. , (ENGINEER) made and entered into City Secretary
Contract No. 50570 (the CONTRACT) which was authorized by M&C C-
28631 on the 20th day of March, 2018 in the amount of $469,270 . 00;
and
WHEREAS, the CONTRACT involves engineering services for
the following project:
Lake Arlington Lift Station Upstream and Downstream Parallel
Relief Sanitary Sewer Gravity Mains
WHEREAS, it has become necessary to execute Amendment No.l
to the CONTRACT to include an increased scope of work and revised
fee.
NOWTHEREFORE, CITY and ENGINEER, acting herein by and
through their duly authorized representatives, enter into the
following agreement, which amends the CONTRACT:
1 .
Article I of the CONTRACT is amended to include the
additional engineering services specified in a proposal dated
June 14, 2019 a copy of which is attached hereto and incorporated
herein. The cost to City for the additional design services to
be performed by Engineer totals $99,454.00.
2 .
Article II of the CONTRACT is amended to provide for an
increase in the fee to be paid to Engineer for all work and
services performed under the Contract, as amended, so that the
total fee paid by the City for all work and services shall be an
amount of $568,724 . 00 .
3" � 0.AL RECORD
` 5ECRE`fARY
W K
Page -1 LL �--J
-
3 .
All other provisions of the Contract, which are not
expressly amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date last written by a
signatory, below.
APPROVED: ENGINEER
City of Fort Worth James D ngineering, Inc.
Jesus J. Chapa Brain Darby, P.E.
Assistant City Manager Vice President
DATE: ' �� ( DATE:
APPROVAL RECOMMENDED:
�e d L
Chris Harder, P.E.
Director, Water Department
APPROVED AS TO FORM AND LEGALITY:
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and administration
of this contract, including ensuring all
performance an reporting requirements.
M&C: N/A
Pratima oud 1, P.E.
Project nager
Date: N/A
Douglas W. Black
Senior Assistant City Attorney OR T
AT97E - �J
Y' 2
Mary J. Kay-4/ & yt_
City Secretary jOFFICiAL RECORD
xA5
MY SECRETARY
Page -2-
00 0 0 00000 m 0� oo Un 0� 0o0o 0 0 0 0 0
!6 t0 69 64 m CDtH 69 69 I`- co 69 m 69 69 N 69 N 69 fA 69 69 m N 'q' O O
tq co ch N (O O
H N CIF
m m V N
64 fA 64 fA N.12 ta N fH 69 69 69 O
3
y �
1C
y
IC
r
d 0 0 0 O 0 0 0 0 o 10 O m 0 0 » O ti 0 0 0 0 0 O O O O
y 1�64 69 64 L,64 69 0) cq 69 CN, 69 69 N� EA N�69 69 69 69 69 N
d 64 Cfl m m
x C) 69 fA 64
LU
U
m
0
F
c o 0 0 0 0
O 69 us yr 69 69
U
a
0
a
d
K
O O O O N O 0
~ co (7) H cli cli fR Qi
Gl 69 �
CL
d �
G �
d
W
G C fA 69 Hi
w p
N Z
G
O O Cn m O O an
V,p CIA
cNh M
7 W W m m
N rn m
C to tJ
o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o O o o 0 0 0
O CO 69 V> O O 69 69 69 m W 69 CO 69 69 O V3 O 69 69 64 64 m N � O O
L .p M (D n C N m V V cd M N CD Qi
❑ Jq to N N N fD m m m t0
p 69 69 69 69 64 64 64 64 64 69 64 C4
i
Z d U
d
m T
N O L' 5 M O O O O M N m M
0 W •�
d
a �
QW v � c m`
d O U
m d E ?
o � v
t-. �_ ++ d o0 0 0 o a N N a
W O P� J
O = Q >+
❑ (n C O 'V' V' V' d' N N M V m N
❑ Q O U O
_! H cn y F
� 3 W
O
L r
Q N at 7 O 7 V m m N
d 6 y
J m c
J o'-
a` c
w
i W N
V d
d �
O c
a` t6
0 0 0 0 0 0
m cq
o
a
c
IL
d y
jQ m O ¢ 0
�' > �--
m c @ J
0 C N
C N C
O G o > d U 3 C d O
G EE
O ? 1 W m '> U " C (n d N N N
O u D' U — ._� L d rn
O C W y O� M y N O CT m N C C [1 d m'dCdE N y O.�LL'J p�y w w Lfn N
E >`G d O [A v! L D N S Q iA O N�` p d0 3 = mo wrn> p O O C 'n i'.3rn d w m d aNd m `c a E c-o a `� U U m m o'� °-ai E o cdiU ° m c H ? acid N m-Od �' ocy . o . ». o❑ a¢a n U o c c o W U o o¢¢ u d d p d c yaUowU UU w m❑ mF U) m mN M �OO d N N N N N(V MM --- LL[V N r' NO N N N O m
Fp- "I I L-iU¢F-LL
\ \\\6.1
J �
CD M; 42m){2/ \
ID E22Gesca
- 3u
§ 0 #»\ 00nLE
� § J&222aaE
IL �\\ ) �
) m\/ /
g )
D
) /
_LU Cl
} z
E Co
k
° �7
» �o
e
/ 2 U) � $
2R / \ _ 2 2
cc m CD a
\w S § { >1
@ ± § ek
E _
0 CO
LU t D c coe �
0 7_ E 2 S
0 $ $ \ < (L @2
\ 2 § ® E
e q § = \_
- -
e0 C, - e
\ � \
/) I A2&&Ci\ k
® (/�2 %o==e
\) ) \ j/ \\\/S / _
- / \ƒ«
2 &KR
J
/ /«)\\/ ]# \(§
\
ƒ §-6 /J -
777- )})
) § E
J& /\\}
®®=K
\
16
) \?ƒ}
JD
arneS Civil Engineering
... ........................................}. De,OI I.e...•...... . ................... ....rveying..
. n
:;..Engineering....... ............con:m,cnq�Management..
ENGINEERING Inc. Hydrologic and Hydraulic Modeling
...
June 14, 2019
Ms. Pratima Poudyal, P.E.
Water Department
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Ref: Amendment No. 1 - revision 4
Lake Arlington Lift Station Gravity Sewer Mains
City Secretary No. 50570
City Project No. 101311
Ms. Poudyal,
Due to additional services requested by the City as part of the referenced project,
James DeOtte Engineering, Inc. will perform the work outlined in the following
items:
Scope of Work
Project Management:
The number of meetings and number of required monthly SBE reports included in
the original scope of services has been exceeded. Additional services have been
included to provide for additional meetings and required monthly SBE reports.
Archeological Services:
This project is subject to the Antiquities Code of Texas and also Section 106 of the
National Historic Preservation Act due to the U.S. Army Corps of Engineers Section
404 permitting process. After an initial review submittal to Texas Historical
Commission (THC), they have requested an archeological survey of the proposed
alignments.
To satisfy this requirement, field investigations will be conducted as a combination
of reconnaissance and intensive survey, consisting of pedestrian walk-over and
deep mechanical trenching within the floodplain. The soils and setting are
conducive to containing deeply buried surfaces (paleosols) and archeological
deposits; therefore, an estimated 1 1 trenches (between the 2 alignments) will be
lox 817.930.0445 2201 Dottie Lynn Parkway Ste.119 • fort Worth TX,76120 phone 817.446.6877
......................................................................................................................................
TBPLS Firm Reg.No.10101400 TSPE Firm Reg.No.8917
nloa+uwo
June 14, 2019
Amendment No. 1 - revision 4
Lake Arlington Lift Station Gravity Sewer Mains
Page 2
excavated at least 30 feet (9 meters) long and to a maximum depth of 20 feet (b
meters), if feasible. Field methods will comply with the guidelines for archeological
survey as developed by the Council of Texas Archeologists (CTA) and approved
by THC. This investigation will evaluate archeological resources for their potential
eligibility for inclusion in the NRHP or designation as a SAL under the provisions of
the Texas Antiquities Code. Detailed notes and photographs will be taken
throughout the survey. A draft report of all results, including preliminary NRHP/SAL
evaluations of any identified archeological resources and complying with THC
and CTA guidelines will be submitted to the City and THC for review. Once THC
concurrence has been received, a final report will be submitted as per the terms
of the approved archeological permit.
Survey Services:
The City requested an adjustment in the south gravity alignment to relocate a
portion of the alignment from beneath a dump fill area containing mostly broken
reinforced concrete over 20 feet tall to a location outside this fill area. This area
is beyond the limits of the original survey and additional efforts are necessary to
gather the field topography along this City requested alignment adjustment.
Subsurface Utility Engineering (SUE):
The City requested we pursue additional SUE services to locate six utilities previous
not found. Three utilities on the north adjustment and three on the south
alignment. For the deeper utilities on the south alignment, a CDL Truck will be
utilized to locate the utilities or to a depth that verifies no utilities are present that
would conflict with the proposed sewer line profile elevation.
Construction Phase Services - Public Meeting:
The City requested we participate in a separate public meeting for the north
adjustment and the south alignment. Our original scope of services only included
one public meeting. This would provide for one additional public meeting.
fox 817.930.0445 2201 Do19e Lynn Porkwoy Ste.119 • fort Worth TX.76120 phone 817.446.6877
-..........................................................................................................................................................................................
TBPLS Firm Reg,No, 10101400 WE firm Reg.No.8917
40
aiaonna
June 14, 2019
Amendment No. 1 - revision 4
Lake Arlington Lift Station Gravity Sewer Mains
Page 3
Fee
JDEI anticipates the fees listed above for the project to be a not to exceed
amount of $99,454.00. All costs, associated with the identified scope of work, will
be lump sum for the scope provided and will be billed as a percentage of
completed work as determined by JDEI.
Contract Amount: $469,270.00
Amendment Amount: $ 99,454.00
Revised Total Amount: $568,724.00
This scope of work assumes any services not specifically listed as part of this
contract will be treated as an additional service. The owner will be notified before
any additional services are performed.
Sincerely
Brian Darby, P.E.
Vice President
fax 817.930.0445 2201 Dottie Lynn Parkway Ste.119 • fort Worth TX,76120 phone 8I7.446.6877
..LS fi...................................,.............................................................................................................................Reg,...... 917
TBPLS Firm Reg.No.101014(>0 TBPE Firm Rey.No.8917
rNox�uwu