Loading...
HomeMy WebLinkAboutContract 50942-A2 Ix ECEIVEID UN 2 5 2019 CJV SECRETA RTH AMENDMENT NO. 2 TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES PIONEER TOWER REHABILITATION STATE OF TEXAS CITY SECRETARY CONTRACT NO. 5094Q 1&3- COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Elements of Architecture, Inc. (Consultant) made and entered into City Secretary Contract No. 50942 (The Contract) which was authorized by the City Council by M&C C-28724, the 6th day of June 6, 2018, for Pioneer Tower Rehabilitation; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional structural review and evaluation. NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I — Scope of Services, Paragraph (3) shall be added to read as follows: (3) Provide additional design services for the analysis of the scaffolding to install a fabric wrap. The cost of this additional service is $875.00 plus $0.00 in reimbursable expenses. The scope of services is described more fully in Elements of Architecture Letter dated June 5, 2019, subject: "Proposal for Architectural/Engineering Services, Pioneer Tower Rehabilitation, Additional Services —Scaffolding Design Review—Add Services 02". And Provide additional design services for the analysis of the existing distressed stone. The cost of this additional service 'is $3,400.00 plus $0.00 in reimbursable expenses. The scope of services is described more fully in Elements of Architecture Letter dated June 5, 2019, subject: `Proposal for Architectural/Engineering Services, Pioneer Tower Rehabilitation, Additional Services—Tower Stone Failure—Add Services 03". City of Fort Worth,Texas OFFICIAL RECORD Standard Agreement for Professional Services AMENDMENT CITY SECRETARY Revision Date:8/1612016 Page 1 of 2 FT. WORTH,TX 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "A". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "A". However the total fee paid by the City shall not exceed a total of$192,347.00 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." 3. All other provisions of this Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED this th A�day of �019, in Fort Worth, Tarrant County, Texas. Elements o itec re, c. - APPROVED: By: By: �(-�/�---- Debbie Ful , AIA Jesus J. Chapa President Assistant City Manager � Ali APPR AL C MENDED: RECORDED: ' a ''d B By: 4&X; t-z� c na le irect r ar J. y Inte im ro erty Management Department City Secre APPROVED AS TO FORM AND LEGALITY: M&C Not Required Contract Authorization By: John aBStAronag Assistant City Attorney CONTRACT COMPLIANCE MANAGER: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, includingensuring all performance and reporting requirements. !OY►By: a,4 Q. h4l�." Brian R. Glass, AIA Architectural Services Manager City of Fort Worth,Texas OFFICIAL RECORD Standard Agreement for Professional Services AMENDMENT CITY SECRETARY Revision Date:8/16/2016 Page 2 of 2 1. VtPOR_ TX 1201 6'h Ave,Suite 100 ELEMENTS Fort Worth,Texas 76104 of Architecture, Inc. Phone817.333.2880 Fax 817.333,2883 June 5, 2019 Ronnie Clements City of Fort Worth 401 West 13th Street Fort Worth,TX 76102 Re: Proposal for Architectural/Engineering Services Pioneer Tower Rehabilitation Additional Services-Scaffolding Design Review-Add Services 02 Dear Ronnie; Elements is pleased to provide to you this proposal for A/E services associated with the review and analysis of the existing scaffolding at the Pioneer Tower for the possible installation of banner/wraps as proposed by the Kimball Museum. RLW will review design by the original scaffolding engineer and impacts to the building. We would require the engineer's calculations of wind loading showing how the addition of the wrap impacts the building for RLW to perform this review. Our deliverable will be in the form of a letter of recommendation and will follow within a week of getting the required information. PROPOSED FEE We propose to provide our services as identified in this proposal for the fees as defined below: Architectural-Elements $ 325.00 Structural Engineering-RLW 1500 x 1.1) $ 550.00 Total Project $ 875.00 PROJECT TEAM RL Woods will be providing structural engineering. All firms are SBE certified firms. If you have any questions regarding this proposal or need to discuss,please call me. Thank you for this opportunity to provide our services to you on this project and we look forward to working with you and your team. Sincerely, Debbie Fulwiler,AIA President Attachments: RL Woods Proposal-email Debbie Fulwiler From: Renate Woods <rwoods-rlwa@att.net> Sent: Wednesday,May 22,2019 1:51 PM To: 'Clements,Ronald'; Debbie Fulwiler Cc: 'Glass,Brian R.';'Balog,Glenn F';'Venables, Roger M' Subject: RE:scaffolding wrap calcs My fee to review and respond will he$500. Renate'Woods I Principal I Owner V 1151 W.Pioneer Pkwy I Arlington,TX 176013 Structural&Forensic Engineering 1 817.277.6686 exl 1021 rwoods-rlwana,att.net I www.dwaengineers.com From: Clements, Ronald [mailto:Ronaid.Clements@fortworthtexas.gov] Sent: Wednesday, May 22,2019 1:11 PM To: Renate Woods; Debbie Fulwiler(dfulMler@elementsofarc.com) Cc: Glass, Brian R.; Balog,Glenn F; Venables, Roger M Subject: scaffolding wrap talcs Renate', Please see attached emails,with attachments for the calculations from the scaffold engineer. Can you please provide fee for your review of this information and a written response/report addressing them? Also,please provide a timeline of when we can expect that response/report once your fee is approved. Thanks, Ronnie Ronald Clements Registered Architect Property Management Department 401 West 13'"Street Fort Worth,Texas 76102 817.392.8014 Office 817.392.8488 Fax ronaId.e lei ents,,e—ufortworth texas.iov City of Fort Worth— Working together to huilrl a strong community FORTWORT11 How am I doing? Please contact my supervisor: briar.alassCafortworthtexas.!_Yov 1 1201 6'6Ave,Suite 100 ELEMENTS Fort Worth,Texas 76104 of Architecture, Inc. Phone 817.333.2880 Fox 817.333.2883 June 5, 2019 Ronnie Clements City of Fort Worth 401 West 13th Street Fort Worth,TX 76102 Re: Proposal for Architectural/Engineering Services Pioneer Tower Rehabilitation Additional Services-Tower Stone Failure-Add Services 03 Dear Ronnie; Elements is pleased to provide to you this proposal for A/E services associated with the review and analysis of the existing distressed natural stone watertable located just below the brick that fell previously this winter. We understand that the City desires an investigation of this condition to determine if that are any structural deficiencies in the support of the stone which maybe have caused the distress. We will review these conditions and make recommendations for repair. Our deliverable will be in the form of a letter of findings and recommendations. We have assumed that only structural engineering in addition to architectural will be required for this task. PROPOSED FEE We propose to provide our services as identified in this proposal for the fees as defined below: Architectural-Elements $ 650.00 Structural Engineering-RLW(2500 x 1.1) $2,750.00 Total Project $ 3,400.00 PROJECT TEAM RL Woods will be providing structural engineering. All firms are SBE certified firms. If you have any questions regarding this proposal or need to discuss,please call me. Thank you for this opportunity to provide our services to you on this project and we look forward to working with you and your team. Sincerely, Debbie Fulwiler,AIA President Attachments: RL Woods Proposal R. L. Woods & Associates, LLC SftcftW and Forensic En&ftring 1151 W.Pioneer Pkwy Arlington,Texas 76013 817-277-6686 www.riwaengineers.com June 4,2019 Ms. Debbie Fulwiler Elements of Architecture,Inc. 1201 6'h Avenue,Suite 100 Fort Worth,TX 76104 Reference: Evaluate Distress to Stone Veneer Will Rogers Memorial Center -Pioneer Tower Fort Worth,TX. Dear Ms. Fulwiler: As requested by the City of Fort Worth, we are providing this proposal as an additional service on the Pioneer Tower Project. We understand that the band of natural stone located just below the brick on the tower, has experienced distress to the stone veneer and that the City desires an investigation to determine if there are structural deficiencies in the support of the stone which may be causing the noted distress or if the distress is related to non-structural causes(such as water intrusion). Based on our understanding of the project,we propose the following scope of services and compensation: I. SCOPE—DOCUMENTATION AND ANALYSIS A. Review any available drawings detailing the attachment and support of the stone veneer. B. Perform a site visit to observe and document distress. C. Report findings and provide recommendation for repair if structural deficiencies are identified. II. LIMITATION OF SCOPE The scope of our services does not include any other services not specifically listed in the scope of services above. III. PROPOSAL ASSUMPTIONS: A. We plan to perform our services between 8:00 am and 5:00 pm on weekdays. IV. COMPENSATION: We propose to perform these services for a stipulated sum of$2500. This proposal is valid for projects initiated within 90 days from date of this proposal. We look forward to working with your office on this project. Please do not hesitate to contact our office if you have any questions regarding the proposed Scope of Services. Sincerely, R. L. Woods&Associates,LLC W Renate' L. Woods,P.E. Principal