HomeMy WebLinkAboutContract 36507AMENDMENT NO. 4 MMMMMMMM STATE OF TEXAS S CITY SECRETARY CONTRACT NO.. (M&C Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and CH2M Hill, Inc., (Engineer) made and entered into City Secretary Contract No. 28977, (the Contract) which was authorized by the City Council by M&C C-19675 on the 29th day of July 2003 and subsequently revised by three previous amendments; and WHEREAS, the Contract involves engineering services for the following project: Southside II Water Transmission Main from Rolling Hills Treatment Plant to the Crowley Road/Risinger Road Intersection. WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract. 1. Article I, of the Contract is amended to include the additional engineering services specified in M&C C-22602, adopted by the City Council on the 8th day of January, 2008, and further amplified in a proposal letter dated November 8, 2007, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $44,940.00. 2. Article II, of the Contract is amended the maximum fee to be paid to Engineer performed under the Contract, as amended, the City for all work and services sh $11016,299.00. to provide for an increase in for all work and services that the total fee paid by 11 not exceed the sum of 7ge 10re9; 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the Jr. day of , 2008, in Fort Worth, ,� I ,( Tarrant County, Texas. \1) ATTEST Marty Hendrix' City Secretary APPROVAL RECOMN�NDED: A. Douglas Rademaker, P.E. Director, Department of Engineering CH2MHill, Inc. Engineer „ By= :Ken C. Hall, P.E. Vice -President (1 309 W. 7"' Street, Suite 1020 W^ram G7�m TY IC'1 "&") -2 - Contr APPROVED: rizatio� i i� /J ✓� rc A. Ott Assistant City Manager C:i' �9V�:':l 1i�`J�Jk'✓' I K 9 �'. ST CHZMHILL November 8, 2007 Mr. Tony Sholola, P.E. City of Fort Worth Engineering Department 900 Monroe, 2nd Floor Fort Worth, Texas 76102-6311 Subject: Southside II Water Transmission Main Amendment No. 4 Dear Mr. Sholola: CH2M HILL 309 West 7u' Street Suite 1020 Fort Worth, TX 76102 Tel 817.870.1129 Fax 817.878.5753 The purpose of this letter is to request authorization for additional funding to complete the Southside II Water Transmission Main (WTM) Project as described in the amount of $44,940. The additional funding is needed to address changes in the Project and bring it to completion. The amendment is summarized in the following paragraphs and broken out in detail in Attachment 1, enclosed. Project History This project has gone through several iterations due to City funding constraints, property ownership changes and construction of new facilities along the pipeline route that impacted alignment, phasing and project schedule. Our original contract amount for $613,949 was authorized in 2003 and included engineering fees to package the transmission main into three (3) bid packages that would be advertised and awarded at one time. The original design for these packages was completed in July of 2005. Amendment No. 1 in the amount of $8,700 was authorized in October, 2004 to perform surge analysis of the pipeline to size and locate the appropriate air valves along the pipeline. This work was completed in July of 2005. Amendment No. 2 in the amount of $246,539 was authorized in early 2006 and divided the project into four (4) bid packages. It also included a re -alignment of the transmission main along the future Risinger road, additional survey and easement preparation, and design of approximately 8,400 feet of small diameter distribution pipe along Risinger Road, Crowley Road, and I-35. Amendment No. 4 November 8, 2007 Page 2 Amendment No. 3 in the amount of ?87,110 was authorized in June 2007. Due to funding constraints, the amendment further divided the project into five (5) bid packages and included revising drawings to incorporate butterfly valves in lieu of gate valves. Request for Additional Services The following outlines the need for additional services required to complete the design of the Southside II WTM, Part 2 Utility Conflicts Part 2 is the last of the five parts to bid. The project has been advertised and the bid opening was scheduled for September 27, 2007. The bid opening has been postponed until November 8, 2007 due to two utility conflicts. The first utility conflict consists of approximately 1,400 ft of existing AT&T fiber optic along Oak Grove Road between Everman and Joel East. CH2M HILL had proposed to avoid this conflict by aligning the transmission main outside of the right-of-way in this stretch. In early 2006, direction was provided by the City to re -align the pipe inside the right-of-way in order to avoid the need to procure easements. At this time, alignment discussions were held with the City to determine if the pipe should be aligned such that the fiber would have to be relocated and/or protected in place or to align the pipe inside Oak Grove Rd. Because Oak Gove is a high traffic, narrow, two lane, two way road it was decided to relocate and/or protect in -place the fiber as necessary in lieu of placing the pipe inside the roadway and impeding traffic. All subsequent drawing reviews have identified the conflict with the fiber and noted for it to be relocated and/or protected in -place. No comments were received by the City indicating an objection to the proposed alignment. After Part 2 was advertised, the City requested CH2M HILL re-evaluate possible alignments to avoid the fiber. Two options to be considered include 1) align the pipe outside of the right-of-way as originally proposed and 2) align the pipe on the East side of Oak Grove to avoid easements and existing utilities. The second conflict on Part 2 occurs north of Joel East Road with the Paving, Sanitary Sewer, and Drainage Improvements for Carter Distribution Center project, DOE No. 5542. This project includes a 604nch storm drain and storm water impoundment ponds that conflict with approximately 1,000 feet of the proposed 544nch WTM. The Carter Distribution Center project has already been awarded. Coordination with the design engineer for the new improvements will be necessary to coordinate the proposed 544nch WTM, proposed 604nch storm drain, widening of Oak Grove Road, as well as existing utilities so the pipeline can be located in a location that is conducive for future operations and maintenance of the pipeline. As part of the Carter Distribution Center project, the Transportation and Public Works Department (T/PW) has developed preliminary plans for the widening of Oak Grove Road Amendment No. 4 November 8, 2007 Page 3 between Everman and Alta Mesa. The road will be expanded from a two lane, two way, undivided road to a four lane, two way road divided by a median. CH2M HILL has requested electronic files of the future roadway plans from T/PW. We will coordinate any realignment with these plans. Once an alignment is approved, the Storm Water Prevention Pollution Plan (SWPPP) and traffic control drawings for Part 2 will be revised. Additional services are required for realignment of the WTM and to revise the SWPPP and traffic control drawings for Part 2. Part 3 Easement Preparation Parcel 4 and Parcel 5 of Part 3 were submitted to the City for execution in July of 2004. Since then, the property has been re -platted and the City has requested CH2M HILL prepare revised easements. CH2M HILL requests additional services to revise the easements. Surge Analysis CH2M HILL was requested to revise our surge analysis based on an updated distribution system model provided by the City. The surge analysis was originally completed in 2005 as part of Amendment No.1. The updated model included increased demands from the Southside II WTM based on additional tie-ins. As a result of the revised analysis, the quantity of combination air/vacuum release valves (CARVs) was reduced on the overall project from 18 to 9. The City has requested we reflect the removal of the CARVs in the project mylars submitted to the City. CH2M HILL requests additional services for the revised surge analysis and removal of the CARVs from the design for all five parts. Reproduction Services The City has requested CH2M HILL deliver eight sets of half size drawings per Part to assist City staff during construction. The half size sets are to include a scanned copy of the original cover signature sheet and all drawings that were reissued by addenda. The City has also requested an additional 5 sets of full size drawings and contract specifications for Part 2 (in addition to the 45 already furnished) to sell during Bid Phase. Amendment No. 4 November 8, 2007 Page 4 Project Summary A summary of the total project is as follows: Contract Descri tion Fee Original Contract Design, bid, and construction services for 43,775 LF of raw water transmission main. $6135949 Amendment No. 1 Perform surge analysis $8,700 Amendment No. 2 Redesign of 13,600 feet of 48" pipe, redesign of 12,500 feet of 54" pipe, design of an additional 11,200 feet of water distribution pipe. $259,600 Amendment No. 3 Revision from 4 to 5 parts. Change butterfly valves to gate valves. $891110 Amendment No. 4 Part 2 realignment, revise easements, revise surge analysis $44,940 TOTAL PROJECT $1,016,299 We intend to use our M/WBE subconsultant, Leonard Technical Services, to revise the easements on Part 3, locate recently installed utilities on Part 2, revise the SWPPP on Part 2 and prepare up to 2 easements. Sincerely, CH2M HILL Ken C. Hall, P.E. Vice President Encl.: Attachment 1 cc: Mr. Robert Sauceda, P.E. w/encl. Mr. Robert Terrell w/ encl. Chad M. Simmons, P.E. Project Twanager Attachment 1 Southside II Water Transmission Main Proposed Fee, Amendment No. 4 ACTIVI T Y DESCRIPTION GRADE HOURS RATE LABOR SUBCONSULTANT SERVICES TOTAL Part 2 Realignment Coordination Meetings E4 12 $130,00 $1,560000 E5 4 $156075 $627,00 CAD Realignment Effort T4 100 $105475 $10,575,00 Engineering (horz. and vert. align.) E4 16 $130,00 $2,080400 E5 4 $156,75 $627,00 Restrained Joints E4 8 $130,00 $1,040,00 E5 4 $156.75 $627,00 Field Visits E4 8 $130,00 $1,040,00 Revise Traffic Control Plans T4 80 $105475 $8,460,00 E5 12 $156,75 $1,881,00 Easement Preparation $1,200000 Revise SWPPP $3,605.91 Utility Research/Survey E5 2 $156,75 $313,50 $1,200,00 T4 8 $105,75 $846,00 Markup on Subconsultant (10%) $600,59 Subtotal $30,277.09 $6,005.91 $361283.00 Part 3 Easement Preparation $1,200,00 Markup on Subconsultant (10%) $120,00 Subtotal $120.00 $11200.00 $1,320000 Surge Analysis Re -run Surge Analysis E4 12 $130,00 $1,560,00 E5 6 $156.75 $940o5O Revise Technical Memorandum E4 8 $130.00 $1,040,00 E5 2 $156,75 $313.50 Revise Contract Drawings T4 16 $105,75 $19692,00 Subtotal $5,546.00 $53546.00 Reproduction Services Compile Drawings (half size) T4 8 $105,75 $846,00 Reproduction (half size) 02 4 $55.00 $220,00 Expense $75.00 Part 2 Contract Documents $650.00 Subtotal $19141.00 $650.00 $1,791600 TOTAL AMENDMENT NO, 4 FEE $449940.00 AMMENDMENT NO. 4 SUMMARY Total CH2M HILL Cost $37,734.09 Total Subconsultant Cost $7,205.91 AMENDMENT NO. 4 TOTAL FEE $441940.00 M/WBE PERCENTAGE 16.0% City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 1/8/2008 DATE: Tuesday, January 08, 2008 LOG NAME: 30AMEND4SSIIWTR REFERENCE NO.:*C-22602 SUBJECT: Authorize Execution of Amendment No. 4 to City Secretary Contract No. 28977, an Engineering Agreement with CH2M Hill, Inc., for Southside II Water Transmission Main from Rolling Hills Treatment Plant to the Crowley Road/Risinger Road Intersection (City Project No. 00303) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 4 to City Secretary Contract No. 28977, an Engineering Agreement with CH2M Hill, Inc., for Southside II Water Transmission Main from Rolling Hills Treatment Plant to the Crowley Road/Risinger Road Intersection (City Project No. 00303), in the amount of $44,940 to provide additional engineering services on the project, thereby increasing the contract amount to $1,015,799. DISCUSSION: On July 29, 2003, (M&C C-28977) the City Council authorized the City Manager to execute an agreement with CH2M Hill, Inc., in the amount of $613,449 for the design of Southside II Water Transmission Main from Rolling Hills Treatment Plant to the Crowley Road/Risinger Road intersection. The project includes design for the installation of a 48-inch water main on Risinger Road from Crowley Road to Oak Grove Road Cl"d a 54-inch water main on Oak Grove Road from Everman Road to the Rolling Hills Water Treatment Plant. The agreement was subsequently revised by three previous amendments totaling $357,410 as follows: • Amendment No. 1 (administratively approved by the City Manager on November 4, 2004) in the amount of $8,700, provided for a surge modeling analysis for protection of the water main; • Amendment No. 2 (M&C C-21177, December 6, 2005) in the amount of $259,600, provided for realignment of the 48- and 54-inch water mains in order to accommodate the alignment proposed for the future Risinger Road and to also avoid conflicts with previously unknown and recently installed private utilities within the project area; and • Amendment No. 3 (M&C C-22102, May 8, 2007) in the amount of $89,110 provided for incorporation of butterfly valves in lieu of gate valves on the project along with additional survey and easement preparation on the project. Amendment No. 4 will provide the necessary additional engineering services for the realignment of a segment of the 54-inch water main which is in direct conflict with an AT&T fiber optic cable. The amendment will also allow for additional survey, easement preparation and additional surge modeling analysis on the project. CH2M Hill, Inc., proposes to provide the necessary additional engineering services for a lump sum fee of $44,9400 Staff considers this amount to be fair and reasonable. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Water Capital Projects Fund. TO Fund/Account/Centers Submitted for City Manager's Office bv: Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers P264 531200 608140030333 $44,940400 Marc A. Ott (8476) A. Douglas Rademaker (6157) Robert Sauceda (2387)