HomeMy WebLinkAboutContract 36630AMENDMENT NO. 1
STATE OF TEXAS S CITY SECRETARY CONTRACT NO.du�
(M&C Not Required)
COUNTY OF TARRANT S
WHEREAS, the City of Fort Worth (City) and Brown & Gay Engineers,
Inc., (Engineer) made and entered into City Secretary Contract No.
33879, (the Contract) which was authorized by the City Council by M&C
C-21583 on the 7th day of July, 2006, and
WHEREAS, the Contract involves engineering services for the
following project.
Water and Sanitary Sewer Replacement Contract 2005 STM-F.
WHEREAS, it has become necessary to execute Amendment No. 1 to
said Contract to include an increased scope of work and revised maximum
fee,
NOW THEREFORE, City and Engineer, acting herein by and through
their duly authorized representatives, enter into the following
agreement which amends the Contract.
1.
Article I, of the Contract is amended to include the additional
engineering services specified in a proposal letter dated January 8,
2008, a copy of which is attached hereto and incorporated herein. The
cost to City for the additional services to be performed by Engineer
total $21,658.00,
2.
Article II, of the Contract is amended to provide for an increase
in the maximum fee to be paid to Engineer for all work and services
performed under the Contract, as amended, so that the total fee paid by
the City for all work and services shall not exceed the sum of
$120,512.
02-14-08 P02�47 �
3.
All other provisions of the Contract which are not expressly
amended herein shall remain in full force and effect.
EXECUTED on this the day of ,
Worth, Tarrant County, Texas.
ATTEST:
Marty Hendrix
City Secretary
APPROVAL RECOMMENDED:
A."Douglas Rademaker, P.E.
Director, Department of
Engineering
BROWN &
Engineer
GAY ENGINEERS
f 9
le
�a.G 1.
Name:Lee Head, P.E.
Vice President
INC.
108 West 3th Street, Suite 200
Fort Worth, TX 76102
APPROVED AS TO
sis
ty Attorney
LEGALITY:
-2-
APPROVED:
2008
, in Fort
a
Fernando Cost
Acting Assistant City Manager
ENGINEERS, INC.
January 8, 2008
Mr. Liam Conlon
Project Manager
City of Fort Worth
1000 Throckmorton Street
Fort Worth, TX 76102
Re: WATER AND SANITARY SEWER REPLACEMENT
CONTRACT 2005 STM-F
Contract Amendment No. 1
City Project No. 00383, BGE Project No. COF02-50
Dear Mr. Conlon:
Brown &Gay Engineers, Inc. has prepared the enclosed fee proposal for additional services for the
referenced project. We are proposing to provide these additional services for a total of $21,658. The
proposed additional scope includes the following:
■ The design of approximately 675 LF of 12-Inch sanitary sewer and approximately 40 LF of 8-
Inch sanitary sewer including additional surveying services.
■ Survey of the concrete panels for the northbound lanes. This survey is to provide information to
assist in determining the proposed 12-Inch water line alignment that results in the most cost-
effective solution minimizing pavement reconstruction. This survey is described in the enclosed
scope provided by ANA Consultants, LLC.
■ Report alignment recommendation for the 12-Inch water line based on imdings from the Panel
Survey. This includes revising the proposed alignment location on the construction plans.
■ Letter Report of alignment alternatives based on evaluation of pavement reconstruction submitted
February 24, 2007.
The breakdown of the proposed fee is as follows:
$ 7,858 (Water Cost - $ 0, Sewer Cost - $ 7,858) Brown &Gay Engineers, Inc. —Basic Services
$ 4,850 (Water Cost - $2,600, Sewer Cost - $ 2,250) ANA Consultants, Inc. —Surveying Services
$ 8,950 (Water Cost - $5,510, Sewer Cost - $ 3,440) Brown &Gay Engineers, Inc. —Additional Services
$21,658 (Water Cost - $8,110, Sewer Cost - $13,548)
This amendment increases the total contract amount from $98,854 to $120,512. The fee for surveying
increases from $16,525 to $21,375. The fee for engineering increases from $82,329 to $99,137.
Enclosed is a copy of the engineer's opinion of probable construction cost. The pay items are reflective
of the standard pay items per CPMS Bid list. The unit prices were updated based on recent City bids.
We are available to meet with you at your convenience to discuss this matter further.
Sincerely,
Carl J. Krogness, P.E.
Project Manager
Enclosures
108 West 8th Street •Suite 200 •Fort Worth, Texas 76102 • TEL: 817-887-6130 •FAX: 817-887-6135 www.browngay.com
BROWN Date: January 4, 2008
BGE Job Number: COF02-50
& GAY ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST
ENGINEERS, INC. Additional Work - M-240 Along Walton
PROJECT NAME: WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2005 STM-F
(Street Maintenance)
McCart Avenue from 1-20 Service Road to Duringer Dr. (5300=5899 blk.)
Tanglewood Trail from Bellaire Drive South to Overton Park East (3300-3399 blk.)
Project Manager: Liam Conlon
BID ITEM
NO.
DESCRIPTION
UNIT
QUANTITY
UNIT
PRICE
TOTAL
AMOUNT
UNIT I: Sewer Improvements
00137
Grass -Sod -- Install
SY
60
$ 10.00
600
00147
Topsoil - Install 6 Inches
CY
10
$ 16.50
165
00196
Collar -Manhole ~ Install
EACH
5
$ 200.00
11000
00201
Inspection -Post Construction Cleaning & TV -
Study
LF
715
$ 2.00
11430
00202
Ins ection-Preconstruction Cleaning & TV ~ Study
LF
715
$ 3.00
21145
00206
Manhole _ Remove
EACH
4
$ 400.00
1,600
00207
Manhole-Dro -Std 4 Ft Diam- to 6 Ft depth) Install
EACH
1
$ 31000,00
31000
00208
Manhole-Drop-Std 4 Ft Diam-Added Depth (over 6
Ft Depth) � Install
VF
2
$ 160,00
320
00213
Manhole-Std 4 Ft Diam to 6 Ft Depth) Install
EACH
4
$ 11800,00
71200
00214
Manhole-Std 4 Ft Diam-Added Depth (over 6 Ft
Depth) ~ Install
VF
8
$ 150.00
1,200
00217
Manhole -Vacuum Test Services
EACH
5
$ 100.00
500
00218
Manhole -Watertight Insert Install
EACH
5
$ 50.00
250
00258
Pi e-Sewer-12 Inch-SDR26 All Depths) Install
LF
675
$ 65.00
43,875
00351
Pipe-Sewer-8 Inch-SDR35 All Depths) Install
LF
40
$ 45.00
11800
00354
Sewer Service-4 Inch Install
LF
100
$ 20.00
21000
00355
Sewer Service-4 Inch Service Tap — Install
EACH
4
$ 400.00
1,600
00356
Sewer Service-4 Inch-2 Way Clean Out — Install
EACH
4
$ 200.00
800
00367
Sewer -Service -Cut & Plug Existing All Sizes All
Depths Abandon
EACH
4
$ 500.00
21000
00372
Trench Safety System 5 Foot Depth — Install
LF
740
$ 1.50
11110
00404
Driveway-6 Inch Install (Concrete)
SF
50
$ 5.50
275
00542
Dehole-Exploratory Excavation Study
EACH
3
$ 600.00
1,800
00443
Pavement-2 Inch Min HMAC on 2/27 Concrete
Base 2000-1A ~ Install
LF
695
$ 45.00
31,275
00458
Pavement -Concrete on 2/27 Concrete Base (2000-
2) — Install
LF
20
$ 80.00
11600
00844
Curb -Curb & Gutter as directed by Inspector
Replace
LF
50
$ 40,00
21000
Sewer Improvements Subtotal $ 109,545
Contingencies (10%) $ 11,000