Loading...
HomeMy WebLinkAboutContract 36630AMENDMENT NO. 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.du� (M&C Not Required) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Brown & Gay Engineers, Inc., (Engineer) made and entered into City Secretary Contract No. 33879, (the Contract) which was authorized by the City Council by M&C C-21583 on the 7th day of July, 2006, and WHEREAS, the Contract involves engineering services for the following project. Water and Sanitary Sewer Replacement Contract 2005 STM-F. WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include an increased scope of work and revised maximum fee, NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract. 1. Article I, of the Contract is amended to include the additional engineering services specified in a proposal letter dated January 8, 2008, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $21,658.00, 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $120,512. 02-14-08 P02�47 � 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of , Worth, Tarrant County, Texas. ATTEST: Marty Hendrix City Secretary APPROVAL RECOMMENDED: A."Douglas Rademaker, P.E. Director, Department of Engineering BROWN & Engineer GAY ENGINEERS f 9 le �a.G 1. Name:Lee Head, P.E. Vice President INC. 108 West 3th Street, Suite 200 Fort Worth, TX 76102 APPROVED AS TO sis ty Attorney LEGALITY: -2- APPROVED: 2008 , in Fort a Fernando Cost Acting Assistant City Manager ENGINEERS, INC. January 8, 2008 Mr. Liam Conlon Project Manager City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Re: WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2005 STM-F Contract Amendment No. 1 City Project No. 00383, BGE Project No. COF02-50 Dear Mr. Conlon: Brown &Gay Engineers, Inc. has prepared the enclosed fee proposal for additional services for the referenced project. We are proposing to provide these additional services for a total of $21,658. The proposed additional scope includes the following: ■ The design of approximately 675 LF of 12-Inch sanitary sewer and approximately 40 LF of 8- Inch sanitary sewer including additional surveying services. ■ Survey of the concrete panels for the northbound lanes. This survey is to provide information to assist in determining the proposed 12-Inch water line alignment that results in the most cost- effective solution minimizing pavement reconstruction. This survey is described in the enclosed scope provided by ANA Consultants, LLC. ■ Report alignment recommendation for the 12-Inch water line based on imdings from the Panel Survey. This includes revising the proposed alignment location on the construction plans. ■ Letter Report of alignment alternatives based on evaluation of pavement reconstruction submitted February 24, 2007. The breakdown of the proposed fee is as follows: $ 7,858 (Water Cost - $ 0, Sewer Cost - $ 7,858) Brown &Gay Engineers, Inc. —Basic Services $ 4,850 (Water Cost - $2,600, Sewer Cost - $ 2,250) ANA Consultants, Inc. —Surveying Services $ 8,950 (Water Cost - $5,510, Sewer Cost - $ 3,440) Brown &Gay Engineers, Inc. —Additional Services $21,658 (Water Cost - $8,110, Sewer Cost - $13,548) This amendment increases the total contract amount from $98,854 to $120,512. The fee for surveying increases from $16,525 to $21,375. The fee for engineering increases from $82,329 to $99,137. Enclosed is a copy of the engineer's opinion of probable construction cost. The pay items are reflective of the standard pay items per CPMS Bid list. The unit prices were updated based on recent City bids. We are available to meet with you at your convenience to discuss this matter further. Sincerely, Carl J. Krogness, P.E. Project Manager Enclosures 108 West 8th Street •Suite 200 •Fort Worth, Texas 76102 • TEL: 817-887-6130 •FAX: 817-887-6135 www.browngay.com BROWN Date: January 4, 2008 BGE Job Number: COF02-50 & GAY ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST ENGINEERS, INC. Additional Work - M-240 Along Walton PROJECT NAME: WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2005 STM-F (Street Maintenance) McCart Avenue from 1-20 Service Road to Duringer Dr. (5300=5899 blk.) Tanglewood Trail from Bellaire Drive South to Overton Park East (3300-3399 blk.) Project Manager: Liam Conlon BID ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL AMOUNT UNIT I: Sewer Improvements 00137 Grass -Sod -- Install SY 60 $ 10.00 600 00147 Topsoil - Install 6 Inches CY 10 $ 16.50 165 00196 Collar -Manhole ~ Install EACH 5 $ 200.00 11000 00201 Inspection -Post Construction Cleaning & TV - Study LF 715 $ 2.00 11430 00202 Ins ection-Preconstruction Cleaning & TV ~ Study LF 715 $ 3.00 21145 00206 Manhole _ Remove EACH 4 $ 400.00 1,600 00207 Manhole-Dro -Std 4 Ft Diam- to 6 Ft depth) Install EACH 1 $ 31000,00 31000 00208 Manhole-Drop-Std 4 Ft Diam-Added Depth (over 6 Ft Depth) � Install VF 2 $ 160,00 320 00213 Manhole-Std 4 Ft Diam to 6 Ft Depth) Install EACH 4 $ 11800,00 71200 00214 Manhole-Std 4 Ft Diam-Added Depth (over 6 Ft Depth) ~ Install VF 8 $ 150.00 1,200 00217 Manhole -Vacuum Test Services EACH 5 $ 100.00 500 00218 Manhole -Watertight Insert Install EACH 5 $ 50.00 250 00258 Pi e-Sewer-12 Inch-SDR26 All Depths) Install LF 675 $ 65.00 43,875 00351 Pipe-Sewer-8 Inch-SDR35 All Depths) Install LF 40 $ 45.00 11800 00354 Sewer Service-4 Inch Install LF 100 $ 20.00 21000 00355 Sewer Service-4 Inch Service Tap — Install EACH 4 $ 400.00 1,600 00356 Sewer Service-4 Inch-2 Way Clean Out — Install EACH 4 $ 200.00 800 00367 Sewer -Service -Cut & Plug Existing All Sizes All Depths Abandon EACH 4 $ 500.00 21000 00372 Trench Safety System 5 Foot Depth — Install LF 740 $ 1.50 11110 00404 Driveway-6 Inch Install (Concrete) SF 50 $ 5.50 275 00542 Dehole-Exploratory Excavation Study EACH 3 $ 600.00 1,800 00443 Pavement-2 Inch Min HMAC on 2/27 Concrete Base 2000-1A ~ Install LF 695 $ 45.00 31,275 00458 Pavement -Concrete on 2/27 Concrete Base (2000- 2) — Install LF 20 $ 80.00 11600 00844 Curb -Curb & Gutter as directed by Inspector Replace LF 50 $ 40,00 21000 Sewer Improvements Subtotal $ 109,545 Contingencies (10%) $ 11,000 Sewer Improvements Total $ 120,545