HomeMy WebLinkAboutContract 51372-CO1 d CITY SECRETARY ORTH, City of Fort Worth CONTRACT NO. Change Order Request �\ Project Namel Concrete Restoration 2019-1 at various locations City Sec# 1 51372 Client Project#{s)l 101604 project Remove and replace with 7'concrete pavement HES M eight locations. Description Contractorl Urban Infraoonstnxtion,LLC Change Order# Date W1312019 City Project Mgrl .loan Pablo De La Cruz City Inspector Damuel Roy Dept TPWStorm Contract Time Water Totals CD Original Contract Amount S753,760.00 $753,760.00 165 Extras to Date •24% Credits to Date Pending Change Orders(in MdC Process) Contract Cost to Date $753.760.00 $753,760.00 488' Amount of Proposed Change Order $57,350.00 $57,350.00 Z Revised Contract Amount $811,110.00 $811,110.00 189 Original Funds Available for Change Orders $0.00 " Remaining Funds Available for this CO $0.00 ..��`` A Additional Funding(d necessary) $57,350.00 $57,350,00 'A,�v' } CHANGE ORDERS to DATE INCLUDING THIS ON AS%OF ORIGINAL CONTRACT 7.6196 ( MAX ALLOWABLE CONTRACT AMOUNT(ORIGINAL CONTRACT COST+25%) $942,200.00 1 LL Change Order No.1 provides funding for the removal and replacement of 550 square yards of additional damaged concrete panels, ; Seminary Drive and the removal of fifteen non-compliant ADA curb ramps on East Seminary Drive,Saint James Street,Knights Court;``rt " - Royale Drive.Change Order No.1 adds a new item"REMOVE ADA RAMP"to this contract The Transportation and Public Works Department staff has reviewed and verified the quantities for additional work under this Change Order No.1.Additionally,to complete this worts,staff recommends that the contract time be extended by a total of 24 calendar days. This Change Order will have no impact on Transportation and Public Works annual operation budget. v M/WBE OFFICE—Office of Business Diversity(OBD):A waiver of the goal for MBE/SBE subcontracting requirements was requested by Transportation and Public Works Department and approved by the OBD,in accordance with the M/WBE or BDE Ordinance,because the purchase of goods or services from sources where subcontracting or supplier opportunities are negligible. V These projects are located in COUNCIL DISTRICTS 4,6,7,8,and 9. ai It is understood and agreed that the acceptance of this Charge Order by the contractor constitutes an accord and satisfaction and represents paymer ►_; in full(both time and money)for all costs arising out of,or incidental to,the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract,including ensuring all performance and reporting requirements. Maw Urban Infraconstruction,LLC 11419~# �5 r � Z - r 7M&CNumber M&C Date Approved RY FT. WORTH,TX FORT WORTH City of Fort Worth Change Order Additions Project Name Concrete Restoration 2019-1 at various locations City Sec# 51372 Client Project# 101604 Project Description FRemove and replace with 7"concrete pavement HES at eight locations. Contractor Urban Infraconstruction,LLC Change Order# Date 6l13l2019 City Project Mgr. Juan Pablo De La Cruz City Inspector F Daniel Roy ITEM —TSCRIPTIMIT— ADDITIONS Unit Unit Cost Total Remove Concrete and Replace with Concrete Pavement HES TPW-M—orm- a er 27 0241. 0 Remove ADA Ramp TPW- torm Water 15.0 EA 00 TPW-Storm Water $57,350.00 Sub Total Additions 57, 5 . Change Order Additions Page 2 of FORT WORTH City of Fort Worth V-�— Change Order Deletions Project Name Concrete Restoration 2019-1 at various locations City Sec# 51372 Client Project 101604 Project Description Remove and replace with 7"concrete pavement HES at eight locations. Contractor Urban Infraconstruction,LLC Change Order# Date 6/13/2019 City Project Mgr. Juan Pablo De La Cruz City Inspector F Daniel Roy DELETIONS ITEM DESCRIPTION DEPT ty Unit UnitCost ota TPW-Storm Water $0.00 ub Total Deletions Change Order Deletions Page 3 of 4 MWWBE Breakdown for this Change Order MWBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders co# DATE AMOUNT None Total $0.00 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Juan Pablo De La Cruz / Name of Employee/Signature Project Manager Title ❑ This form is N/A as No City Funds are associated with this Contract Printed Name Signature OFFICIAL RECORD CITY SECRETARY FT WORTH,TX FORTWORTHCity of Fort Worth ACCEPTANCE OF PREVIOUS MBE COMMITMENT FORM (for use with CHANGE ORDERS or AMENDMENTS greater than$50,000) To be Completed by City Project Manager I Change Order(for Construction Contract) Project Name: City Project Number 101604 Concrete Restoration 2019-1 City Project Manager Contractor: Juan Pablo De La Cruz Urban Infraconstruction, LLC City's MBE Project Goal: 15 Original Amount of Contract: $753,760.00 Accepted MBE Commitment: 15 % Total of Previous Change Order: Date of Last MBE Report: 6/10/2019 i Amount for this Change Order: $57,350.00 Change Order#: 1 Revised Amount of Contract: $811,110.00 Date: 6/10/2019 Language to be inserted in the M&C for this Contract Urban Infraconstruction, LLC agrees to maintain its initial MBE commitment of 15% that it made on the original contract and extend and maintain that same MBE commitment of 15% to this first change order. Therefore Urban Infraconstruction, LLC remains in compliance with the City's BIDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous MBE Commitment form executed by an authorized representative of its company. To be Completed by the Representative of the Contrac Prin a gnature Title Autho iz ignature/Date Urban Infraconstruction, LLC Company Name Contact Name(if different) 2512 C�QAVC�L-- �� 6?MV ( UTbcr�IC�v�sf'�yCf'• COA, Address E-mlbil address f-DkT 76, t l b 9I4-616 -.�k'/ City/State/Zip /4 n Phone number Fax Number f� as of p C2 1 ^~ MBE% Paid to-Date Datb City Project Manager has reviewed the work associated With is Change Order, considers it the same or similar to work in the original Contract, and recommends that the Contractor have the option to retain and confer ' existing MBE commitment. Juan Pablo De La Cruz City Project Manager City Project Manager Signature Date Attach Complete Change Order Documentation and Forward to MIWBE office To be Completed by • • Tasha Kilgore 600539 24% M/WBE Compliance Staff ID# MBE Current% Level via Last Report Redd Digitally signed by Tasha Kilgore 6/13/19 Date:2019.06.13 09:08:28-05'00' M/WBE Signature Date