AMENDMENT No.3 CONTRACT NO.,
TO CITY SECRETARY CONTRACT No. 49326
WHEREAS, the City of Fort Worth (CITY) and Brown and Gay Engineers,
Inc. , (CONSULTANT) made and entered into City Secretary Contract No.
49326 (the CONTRACT) , which was authorized by M&C C-28291 on the 20th day
of June, 2017 in the amount of $1, 500, 00. 00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number
1 in the amount of $0. 00 which was administratively authorized on the 8th
day of May, 2018, and Amendment Number 2 in the amount of $375, 000. 00
which was authorized by M&C #C-29022 on the 5th day of February, 2019;
and
WHEREAS, the CONTRACT involves professional services for the following
project:
Full-Time Program/Project Management Staff Extension; and
WHEREAS, it has become necessary to execute Amendment No. 3 to the
CONTRACT to include an increased scope of work and revised fee;
NOW THEREFORE, CITY and CONSULTANT, acting herein by and through
their duly authorized representatives, enter into the following
agreement, which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in a proposal dated Jrh day .of April,
2019 ("Proposal") , a copy of which is attached hereto and incorporated
herein. The cost to City for the additional design services to be
performed by Engineer totals $600,000. 00.
2 .
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $2,475,000. 00.
3.
Article III of the CONTRACT is amended to provide for an increase in
City of Fort Worth
Professional Services Agreement Amendment Template OFFICIAL RECORD
CFW Official Release 9/19/2017(Revised for specific terms 4.24.18)
Page 1 of 3 CITY SECRETARY
FT. WORTH,TX
the term of the CONTRACT from the Effective Date for all work and
services performed under the Contract, as amended, so that the total term
for all work and services shall be 36 months .
4 .
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth
Professional Services Agreement Amendment Template
CFW Official Release 9/19/2017(Revised for specific terms 4.24.18)
Page 2 of 3
EXECUTED and EFFECTIVE as of the date subscribed by the City' s designated
Assistant City Manager, below.
APPROVED:
City of Fort Worth CONSULTANT
Brown and Gay Engineers, Inc.
Dana 23urghdyff Carl J. Krogness
Assistant City Manager Vice President
DATE: W1DATE: i w i-`t 2-4 20 L
A ROV"LRECOMMENDED:
Steve Cooke
Interim Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements .
isset e A edo r
Engineering Manager, Transportation and Public Works Department
APPROVED AS TO FORM AND LEGALITY: M&C:
Date:
Douglas . Black 3
Assistant City Attorney
ATTEST: 0� FORf�
U;
2
Mary J. ser
City Secretary
AS
City of Fort Worth OFFICIAL RECORD
Professional Services Agreement Amendment Template
CFW Official Release 9/19/2017(Revised for specific terms 4.24.18) CITY SECRETARY
Page 3 of 3 FT. WORTH,TX
U
= .
April 15, 2019
Ricardo Matute
Capital Delivery Programs Leader, Transportation&Public Works
City of Fort Worth
200 Texas St.
Fort Worth, TX 76102
RE:Amendment No. 3 to City Secretary Contract No. 49326—TPW Full-Time
Program/Project Management Staff Extension
Dear Mr. Matute:
BGE, Inc. is pleased to offer this term extension for staff services to the City of Fort Worth under the
existing contract for Full-Time Program/Project Management Staff Extension. As requested by City
Staff, the staff services include a continuation of current project management for the following
Transportation and Public Works capital improvement projects:
■ Risinger Road from Crowley Road at IH 35W(CPN C01811)
* Risinger Road from McCart Avenue to Crowley Road(CPN CO2239)
■ McCart Avenue from Risinger Road to Twin Leaf Drive and McPherson Boulevard from
West Cleburne Road to McCart Avenue(CPN CO2505)
* Harmon Road from US 81/287 to Golden Triangle (CPN 100459)
* East Bailey Boswell Road Extension (CPN 101018)
* 2018 CIP Year 2, Contracts 13 and 14 (CPN 101475)
* 2018 CIP Year 2 Contract 15 and Year 3 Contract 16 (CPN 101476)
* 2018 CIP Year 2, Contracts 17 and 18 (CPN 101477)
■ Beach Street and Basswood Boulevard (CPN 101582)
* East Northside Drive and Cold Springs Road(CPN 101584)
* WJ Boaz Road and Bowman Roberts Road (CPN 101867)
Serving. Leading. Solving.`"'
BGE, Inc.- 500 West 7th Street, Suite 1800 •Fort Worth,Texas 76102•817-887-6130-www.bgeinc.com
Ricardo Matute
April 15,2019
Page 2
■ Cooks Lane and Ederville Road(CPN 101868)
BGE anticipates continuing to provide these services as summarized in the following table below.
Hours Amount
Sr.Project Manager 1,908 $418,220
Project Manager 1,004 $181,780
Total 2,912 $600,000
Trot
BGE, Inc.proposes to extend the contract term by 12 months and increase the contract amount by
$600,000. The new contract expiration date will be July 19,2020. The new total contract amount
will be$2,475,000. We look forward to continuing to serve the City in its delivery of the Capital
Program.
Sincerely,
/"9.r
Carl J.Krogness
Vice President
Attachments:
■ Amendment No. 3
• Revised Attachment B
ATTACHMENT B
COMPENSATION
Full-Time ProgramlProject Management Staff Extension Services
Time and Materials with Rate Schedule Project
I. Compensation
A. The CONSULTANT shall be compensated for personnel time, non-labor
expenses, and subcontract expenses in performing services enumerated in
Attachment A as follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Category Rate for the CONSULTANT's team member performing the work.
Labor Category Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries,
overhead, and profit.
Field Rates summarized below apply for CONSULTANT staff providing full-time
staff extension services for full-time engagements with a committed duration of
over 12 months. Office Rates apply for all other staff engagements.
Contract Rate Contract Rate Contract Rate Contract Rate
Labor/Staff Classification 2017 2018 2019 2020
Field Office Field Office Field Office Field Office
Program Manager $210.00 $280.00 $217.00 $289.00 $224.00 $298.00 $235.00 $313.00
Deputy Program Manager $200.00 $245.00 $206.00 $253.00 $213.00 $261.00 $224.00 $274.00
Sr. Project Manager $200.00 $245.00 $206.00 $253.00 $213.00 $261.00 $224.00 $274.00
Project Manager $165.00 $215.00 $170.00 $222.00 $176.00 $229.00 $185.00 $240.00
Senior Engineer $165.00 $215.00 $170.00 $222.00 $176.00 $229.00 $185.00 $240.00
Project Engineer $150.00 $185.00 $155.00 $191.00 $160.00 $197.00 $168.00 $207.00
Design Engineer $135.00 $165.00 $140.00 $170.00 $145.00 $176.00 $152.00 $185.00
Engineer-In-Training $95.00 $115.00 $98.00 $119.00 $101.00 $123.00 $106.00 $129.00
ROW Coordinator $110.00 $135.00 $114.00 $140.00 $118.00 $145.00 $124.00 $152.00
Senior Engineer Tech $110.00 $140.00 $114.00 $145.00 $118.00 $150.00 $124.00 $158.00
Engineer Tech $95.00 $115.00 $98.00 $119.00 $101.00 $123.00 $106.00 $129.00
Senior Environmental $175.00 $215.00 $181.00 $222.00 $187.00 $229.00 $196.00 $240.00
Manager
Senior Environmental/Planner $145.00 $180.00 $150.00 $186.00 $155.00 $192.00 $163.00 $202.00
Environmental/Planner IV $120.00 $150.00 $124.00 $155.00 $128,00 $160.00 $134.00 $168.00
Environmental Planner $95. 00 $115.00 $98.00 $119.00 $101.00 $123.00 $106.00 $129.00
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:B.09,2012
Page 1 of 5
B-1
ATTACHMENT B
COMPENSATION
Contract Rate Contract Rate Contract Rate Contract Rate
Labor/Staff Classification 2017 2018 2019 2020
Field Office Field Office Field Office Field Office
Graphic Designer $80.00 $100.00 $83.00 $103.00 $86.00 $107.00 $90.00 $112.00
Senior Public Involvement $130.00 $165.00 $134.00 $170.00 $139.00 $176.00 $146.00 $185.00
Specialist
Public Involvement Specialist $95.00 $115.00 $98.00 $119.00 $101.00 $123.00 $106.00 $129.00
Project Controls Manager $130.00 $160.00 $134.00 $165.00 $139.00 $170.00 $146.00 $179.00
Senior Project Controls $100.00 $125.00 $103.00 $129.00 $107.00 $133.00 $112.00 $140.00
Senior Document Controls $115.00 $145.00 $119.00 $150.00 $123.00 $155.00 $129.00 $163.00
Specialist
Document Controls Specialist $75.00 $95.00 $78.00 $98.00 $81.00 $101.00 $85.00 $106.00
Senior Scheduler $175.00 $215.00 $181.00 $222.00 $187.00 $229.00 $196.00 $240.00
Scheduler IV $130.00 $165.00 $134.00 $170.00 $139.00 $176.00 $146.00 $185.00
Senior Project Analyst $80.00 $100.00 $83.00 $103.00 $86.00 $107.00 $90.00 $112.00
Project Analyst $70.00 $85.00 $73.00 $88.00 $76.00 $91.00 $80.00 $96.00
Senior Network Engineer $90.00 $115.00 $93.00 $119.00 $96.00 $123.00 $101.00 $129.00
Network Engineer $75.00 $95.00 $78.00 $98.00 $81.00 $101.00 $85.00 $106.00
Admin/Clerical )) $70.00 $85.00 $73.00 $88.00 $76.00 $91.00 $80.00 $96.00
Admin/Clerical ) $55.00 $70.00 $57.00 $73.00 $59.00 $76.00 $62.00 $80.00
Senior GIS Analyst $95.00 $120.00 $98.00 $124.00 $101.00 $128.00 $106.00 $134.00
GIS Analyst $75.00 $95.00 $78.00 $98.00 $81.00 $101.00 $85.00 $106.00
3-D Visualization Manager $95.00 $120.00 $98.00 $124.00 $101.00 $128.00 $106.00 $134.00
3-D Visualization Specialist $85,00 $100.00 $88.00 $103.00 $91.00 $107.00 $96.00 $112.00
Senior Utility Coordinator $110.00 $135.00 $114.00 $140.00 $118.00 $145.00 $124.00 $152.00
Utility Coordinator $90.00 $110.00 $93.00 $114.00 $96.00 $118.00 $101.00 $124.00
SUE Field Manager $85.00, $105.00 $88.00 $109.00 $91.00 $113.00 $96.00 $119.00
Senior Resident Engineer $170.00 $210.00 $176.00 $217.00 $182.00 $224.00 $191.00 $235.00
Resident Engineer $145.00 $180.00 $150.00 $186.00 $155.00 $192.00 $163.00 $202.00
Senior Field Rep $100.00 $125.00 $103.00 $129.00 $107.00 $133.00 $112.00 $140.00
Field Rep $85.00 $105.00 $88.00 $109.00 $91.00 $113.00 $96.00 $119.00
Environmental Inspector $80.00 $100.00 $83.00 $103.00 $86.00 $107.00 $90.00 $112.00
ROW Coordinator $120.00 $150.00 $124.00 $155.00 $128.00 $160.00 $134.00 $168.00
Senior RPLS $145.00 $180.00 $150.00 $186.00 $155.00 $192.00 $163.00 $202.00
RPLS $125.00 $155.00 $129.00 $160.00 $133.00 $165.00 $140.00 $173.00
Mobility Coordinator $120.00 $150.00 $124.00 $155.00 $128.00 $160.00 $134.00 $168.00
Contract Administrator $100.00 $125.00 $103.00 $129.00 $107.00 $133.00 $112.00 $140.00
ii. Non-Labor Expenses. Non-labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 2 of 5
B-2
ATTACHMENT B
COMPENSATION
Direct Expenses (non-labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall
be reimbursed at cost to CONSULTANT plus a markup of ten percent (10%).
iv. Budgets. CONSULTANT will make reasonable efforts to complete the work
within the budget and will keep the City informed of progress toward that end so
that the budget or work effort can be adjusted if found necessary.
CONSULTANT is not obligated to incur costs beyond the indicated budgets, as
may be adjusted, nor is the City obligated to pay CONSULTANT beyond these
limits.
If CONSULTANT projects, in the course of providing the necessary services, that
the PROJECT cost presented in Article 2 of this Agreement will be exceeded,
whether by change in scope of the project, increased costs or other conditions, the
CONSULTANT shall immediately report such fact to the City and, if so instructed
by the City, shall suspend all work hereunder.
When any budget has been increased, CONSULTANTS's excess costs expended
prior to such increase will be allowable to the same extent as if such costs had
been incurred after the approved increase.
B. The CONSULTANT shall be paid monthly payments as described in Section 11 -
Method of Payment.
II, Method of Payment
A. The CONSULTANT shall be paid by the City based upon an invoice created on
the basis of statements prepared from the books and records of account of the
CONSULTANT, based on the actual hours and costs expended by the
CONSULTANT in performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the CONSULTANT.
C. CONSULTANT shall prepare and submit invoices in the format and including
content as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
City of Fort Worth,Texas
Attachment B
PMO,Official Release Date:6.09.2012
Page 3 of 5
B-3
ATTACHMENT B
COMPENSATION
III. Progress Reports
A. The CONSULTANT shall prepare and submit to the designated representative of
the Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount %
Prime Consultant
BGE, Inc. Program/Project Management $2,475,000 100
TOTAL $2,475,000 100%
Project Number& Name Total Fee MBE/SBE Fee MBE/SBE
Full-Time Program/Project Management $2,475,000 $0 0%
Staff Extension Services
City MBE/SBE Goal = 0% Consultant Committed Goal = 0%
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 4 of 5
B-4
EXHIBIT"B-1"
CONSULTANT INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth,Texas
Attachment B
PMO Official Release Date:8.09.2012
Page 5 of 5
B-5
r
r��\� Official site of the City of Fort wcxth,Texas
�`� FoRTWoRTij
CITY,�OUPbit� DA
COUNCIL ACTION: Approved on 6/11/2019
REFERENCE ,* 20BROWN AND GAY ENGINEERS
DATE: 6/11/2019 NO.: C-29144 LOG NAME: AMENDMENT NO. 3
CODE: C TYPE: CONSENTPUBLIC NO
HEARING:
SUBJECT. Authorize Execution of Amendment No. 3 to City Secretary Contract No.49326, a
Professional Services Agreement with Brown &Gay Engineers, Inc. in an Amount Not to
Exceed $600,000.00 and an Additional Term of 12 months for Staff Extension Services in
Managing Transportation and Public Works Capital Projects(ALL COUNCIL DISTRICTS)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of Amendment No. 3 to City
Secretary Contract No. 49326, a Professional Services Agreement with Brown &Gay Engineers, Inc.
in an amount not to exceed$600,000.00 and an additional term of 12 months for staff extension
services in managing Transportation and Public Works Capital Projects.
DISCUSSION:
On June.20, 2017, Mayor and Council Communication (M&C C-28291), the City Council approved a
Professional Services Agreement with Brown&Gay Engineers, Inc. (BGE), in an amount not to
exceed$1,500,000.00 to provide full-time project management staff extension services.
The following is a summary of the Contract Amendments to date:
Amendment Amendment Date Revised
No. Amount Contract Justification
(M&C) Amount
1 $0 5/8/2018 Not Additional staffing and updated
(Administrative) Applicable labor rates
�2/5/2019 Staff extension services in
2 $375,000 $1,875,000 managing Transportation and
(C-29022) Public Works Capital Projects
Increased project
3 $600,000 Pending $2,475,000 management staffing needs
and term extension
This M&C will authorize an amendment of the contract for increased project management staffing
needs due to recent City Staff transfers. Services to be provided include project management
services on 2018 identified capital projects. BGE proposes to provide these services in an amount not
to exceed $600,000.00 and an additional term of 12 months.
M/WBE Office-A waiver of the goal for MBE/SBE subcontracting requirements was requested by the
Department and approved by the M/WBE Office, in accordance with the BDE Ordinance, because the
purchase of goods or services is from sources where subcontracting or supplier opportunities are
negligible.
The project is located in ALL COUNCIL DISTRICTS.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funding will be available in various capital projects utilizing the
Professional Staffing Services Agreements from various capital funds on a project by project basis. It
is the participating Department's responsibility to verify the availability of funds prior to the use of
these services or the expenditure of funds.
TO
Fund Department Account Project Program Activity Budget Reference# Amount
ID ID Year Chartfield 2
FROM
F Md ' Department Account Project Program Activity Budget Reference# Amount
ep RW
p _ID _ ear Chartfiel
Submitted for City Manager's Office by_ Susan Alanis(8180)
Originating Department Head: Steve Cooke(5134)
Additional Information Contact:
Ricardo Matute(5498)
Lissette Acevedo(2722)
ATTACHMENTS
Form 1295 Certificate Brown Gay Engineers Staffing Extension 2019-478559 Redacted.pdf
r
City of Fort Worth
Departmental Request for Waiver
of MBE/SBE Subcontracting/Supplier Goal
TPW $600,000.00 04/15/2019
DEPARTMENT NAME; ESTIMATED COST / PROPOSAL DATE
(Please check the appropriate box below)
ORFP (�)RFQ ORFI OCISV Other State Cooperative Program OReverse Auction
NOTE-All support do ion needs to be attached to this request.
Full-Time Program/Project Management Staff Extension NIA
NAME F P JECT DOE/PROJECT NO.
(/JJ"�t! 2722
S GNATURE OF PROJECT.MANAGER EXTENSION DATE NIGP CODE
Prior to adverfisement• the contracting/managing department shall determine whether the bid/RFP .is one which MBE/SBE
requirements should not be applied. MBE/SBE requirements may be waived upon written approval of the MWBE Manager. If one
of the conditions listed below exists;the contracting/managing department shall notify the Manager via this form,stating the specific
reason(s)for requesting a waiver,
If the contracting/managing department aril the Manager are in conflict over the granting of a waiver, either
may appeal to the City Manager, or designee, whose decision is final.
Please Check Applicable Reason:'
A. MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the MWBE or BD
Ordinance, because the public or administrative.emergency exists which requires the goods or
services to be provided with unusual immediacy; or
.�. MWBE Office: A waiver of the.goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the MWBE or BDE
Ordinance, because the purchase of goods or services is from sources where subcontracting or
supplier opportunities are negligible; or
C: MWBE Office: A waiver of the goal for MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office, in accordance with the MWBE or DBE
Ordinance;because the application of the provisions of this ordinance will impose an economic
risk on the City or unduly delay acquisition of the goods or.service's; or
D. MWBE Office: A waiver of the goal for.MBE/SBE subcontracting requirements was requested
by the Department and approved by the MWBE Office; in accordance with the MWBE or DBE
Ordinance, because the MWBE Waiver is based on the stile source information provided to the
MWBE Office by the managing department's project manager.
E. OTHER: .
Justify Commodity or Service Waiver Request:
This waiver is requested for staff extension services not to exceed 12 months.
Please use additional sheets,if needed