Loading...
HomeMy WebLinkAboutContract 35765-A3 AMENDMENT NO. 3 STATE OF TEXAS S CITY SECRETARY CONTRACT NO.,tb-J (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Freese and Nichols, Inc. (Engineer) made and entered into City Secretary Contract No. 35765, (the Contract) which was authorized by the City Council by M&C C-22323 on the 21st day of August 2007; and WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services: Meacham Boulevard/Mark IV Parkway Drainage Improvements, Project No. 00666; DOE No. 5689 WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated May 7, 2010, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $21,349.00 . 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $276,394 .00 . OFFICIAL.RECORD CITY SECRETARY 05-07-1 0 A09:23 IN FT.WORTH,TX 3. All other provisions of the Contract and Amendments No. 1 and 2, which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of 2010, in Fort Worth, Tarrant County, Texas. ATTEST: p O� ®R�Vw CLl�.�►o oo���d 0 Marty Hen x ~$ $� City Secretary �f o c 0 0 °0000000°° r� aaaa�q ExRaa APPROVAL RECOMMENDED: William Verke t, .E. Fernando Costa Director, Department of Assistant City Manager Transportation and Public Works Freese and Nichols, Inc. ENGINEER By� LL-�- �® MSC �CQUIR�I7 Name: 17(Atc- per_ (Title) 4055 International Plaza, Suite 200 Fort Worth, Texas 76109 APPROVED AS OTOFORMGALITY: Assistant City Att ___ey L RECORDRETARY -2TH,TIC i 4055 International Plata,Suite 200 Fort Worth,Texas 76109 917.735-7300 . fax$17-735-7491 • www.freese.com May 7,2010 Michael A.Owen,P.E. City of Fort Worth Department of Engineering 1.000 Throckmorton Street Fort Worth,TX 76102-6311 Subject: Amendment No.3 Dear Michael Owen, P.E.: Additional services have been requested for the Future Storm Drain and Channel Improvements at]VIcacham Boulevard,Mark IV Parkway and.Franklin Drive(City Project No. 00666,DOE No.5689). The additional services included consultant utility location and utility relocation coordination efforts along Meacham Boulevard to determine exact locations of existing utilities that may conflict with proposed storm drain improvements. A summary of the original contract and amendments are listed in Table 1, Table 1.Project#00666-Contract and Amendment Summary ContractlAmendment Description Amount M&.0 Original Contract Drainage Study $68,855 C-22323. Amendment 1 Design $17%020 C-23446 Amendment 2 Level A SUE S16,1.70 (No M&C Required—Amendment total<$50K) Proposed Amendment Additional Utility (No M&C Required—Cumulative amendment Coordination $21,349 total<$50K) Proposed New Contract Total $276,394 The scope of work included coordination with Atmos Energy and their subcontractors to locate,excavate,observe and field survey the existing 16" high pressure gas main on the south side of Meacham Boulevard and the existing 6"medium pressure gas main on the north side of Meacham Boulevard. Utility coordination efforts also included AT&T fiber optic and telephone lines relocation which AT&T has offered to relocate at their cost. Efforts also included determining the relocation cost of an existing 6"electric main which Oncor has estimated to be S37,000. These services have been completed and were 44SS international Plaza,Suite 200 - Fork Worth,Texas 761,09 811-735-7300 . fax 817-733-7491 • www.freese.com successful in moving forward with this project, The total effort for the performed services was$21,349 including consultant effort and expenses. A monthly breakdown of labor hours,labor effort and expenses is included in Table 2. Table 2.Amendment#3 Summary of Charges. Period Task Labor Hours Labor Cost Expense Sep-09 Utility Relocation Coordination 8.0 $1,010.74 $371.90 Oct-09 Utility Relocation Coordination 15.0 51,889.97 $352.40 Nov-09 Utility Relocation Coordination 28.0 53,449.69 $266.10 Dec-09 Utility Relocation Coordination 28.5 $3,559.94 $260.75 Jan-10 Utility Relocation Coordination 19.5 $2,433.12 $285.67 Feb-10 Utility Relocation Coordination 12.0 $1,469 26 $89.20 Mar-10 Utility Relocation Coordination 22.0 $2,722.68 $66.20 Amendment Apr-10 Utility Relocation Coordination 25.0 $31099.38 $22.00 #3 Total. Total 1.58.0 $19,634.78 $1,714.22 S 21,349 This brings the total contract amount to$276,394. Please contact me directly at 81.7-735- 7460 if you require additional information. Thank you for your attention to this matter. Sincerely,. Scott Berman,P.E.