Loading...
HomeMy WebLinkAboutContract 35847 AMENDMENT N MER 1 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (CITY) and Transystems Corporation Consultants (ENGINEER) made and entered into City Secretary Contract No. 35341, (the CONTRACT) which was authorized by the City Council by M&C C- 22140 on the 29th day of May, 2007; WHEREAS, the Contract involves engineering services for the following project: Hemphill Street Connection from Vickery Boulevard to Lancaster Avenue; WHEREAS, it has become necessary to execute Amendment No. 1 to said Contract to include a revised scope of work; NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the revised scope of engineering services specified in the proposal letter dated August 22, 2007, copies of which are attached hereto and incorporated herein. There is no additional cost to the City for the revised design services to be performed by Engineer. 2 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. y Page -1- E)MONAL EXECUTED on this the _ ji` day of 2007 in Fort Worth, Tarrant County, Texas. ATTEST: APPROVED: Marty HendriQ ar4Ott City Secretary Assistant City Manager NO M&C REQUIRED APPROVAL RECOMMENDED: �j Robert Goode, P.E. Director, Transportation/Public Works Department TRANSYSTEMS CORPORATION CONSULTANTS ENGINEER Raul f ena III, P Regional Vice Preside t APPROVED O FORM EGALITY: Amy Ramsey Assistant City Attorney Page -2- :IIJL� U .G�o l August22, 2007 --------- -- Mke Weiss, PE City of Fort Worth Transportation and Public Works Department 1000 Throckmorton Fort Worth, Texas 76102 Reference to: Hemphill- Lamar-Taylor Connector Amendment 1 Request Contract No. 35341 Dear Mr. Weiss, I am writing this letter to request an amendment to our contract. This amendment will not impact compensation; it will only reflect scope modifications that were negotiated but weren't revised in the executed contract. The below scope revisions are requested to be reflected in our contract. 1. Public Involvement—meetings were reduced from 4 (four) meetings to 1 (one) meeting 2. Subsurface Utility Engineering - Quality Level of Service A was reduced from 7 (seven) locations to 2 (two) locations. 3. Subsurface Utility Engineering - Mapping of existing overhead utilities was eliminated. 4. Subsurface Utility Engineering - instead of a lump sum fee; this work will be invoiced based on time and materials not to exceed $73,575.00. Please fell free to contact me with any questions you may have. Sincere)i, Ra Pena III, E Principal