HomeMy WebLinkAboutContract 35857-A3 (2) AMENDMENT NO. 3 STATE OF TEXAS S CITY SECRETARY CONTRACT NO. 53 65-1 -1(3 (No M&C Needed) COUNTY OF TARRAN'T S WHEREAS, the City of Fort Worth (City) and AECOM USA, Inc. (formerly TCB, Inc. ) , (Engineer) made and entered into City Secretary Contract No. 35857, (the Contract) which was authorized by the City Council by M&C C-22390 on the 18th day of September 2007; and WHEREAS, the Contract involves engineering services for the following project: Provine Drainage Improvements, Project No. 00703 WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 , Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated March 28, 2011 , a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $22 ,565. 00 . 2 , Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $170,335 . 00 . City of Fort Worth,Texas Amendment to Engineering Agreement PMO Official Release Date:10.01.2010 OFFICIAL RECORD Page 1 of 2 CITY SECRETARY FT.WORTH,TX 10-17-11 PO4 : 43 IN 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of b eir 2011, in 1� Fort Worth, Tarrant County, Texas . ATTEST: �tt�Q0op0000po044t�� D AC o4� "no o�0 O Marty Hendrix °o� o° City Secretary 00000000 000 *`y NO M&C RE QUIRED APPROVAL RECOMMENDED: APPROVED: G55 IL 0. �j Douglas W Wiersig, P.E. Fernando Costa Director, Transportation and Public Assistant City Manager Works AECOM USA, Inc. ENGINEER By: Name: Don D'Adam Vice President 400 West 15t' Street, Suite 500 Austin, TX 78701 APPRO - AS TO FORM AND LEGALITY: Assistant City Attorney City of Fort Worth,Texas Amendment to Engineering Agreement PMO Official Release Date:6.18.2010 Page 2 of 2 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX AECOM AECOM 817.698.6700 tel 1200 Summit Avenue, 817.698.6701 fax Suite 600 Fort Worth,Texas 76102 www aemm com Memorandum To Chad Simmons, PE Page 1 cc File Provine Outfall Drainage Improvements Subject Supplemental Authorization#3 From Greg Crews, PE Date March 28,2011 AECOM was selected by the City of Fort Worth to prepare design plans to replace an existing storm drain between Provine Street to Fosdic Lake. The existing pipeline is undersized and should be upsized to increase the carrying capacity. The existing pipeline currently connects to a system on Provine Street and outfalls into an existing 54-inch storm drain that connects to Fosdic Lake. As authorized in SA#2, AECOM presented a revised conceptual design utilizing Other Than Open Cut methods of construction. Additionally, recommendations on methods and materials required for this type of installation were evaluated and presented within the Technical Memorandum submitted January 24, 2011. Subsequent to the City review of said Tech Memo a site meeting was held on March 4, 2011. The result of this site visit was the direction that the existing alignment is to be abandoned. A new alignment was determined that would allow open cut installation. AECOM is prepared to move forward with the redesign to incorporate this newly identified alignment. The new alignment will require efforts that are additional to the current contract including SA#1 & SA#2. The purpose of this memorandum is to enumerate these additional efforts and to request additional services and fees. This memorandum describes the tasks that are necessary for the revised design of the storm drain that are considered additional effort to the original contract, SA#1 or SA#2. These tasks are provided in detail below, the total fee to perform the work described below is $22,565. A total fee breakdown associated with the tasks is shown in Attachment 1. Attachments 2 shows a breakdown of costs associated with the additional surveying and SUE for the amended project alignment. Exhibit 1 shows the modified corridor as discussed in the March 4, 2011 site meeting. Task 1.0 Project Management • Task 1.1 &1.2 -Project Management—AECOM will provide on-going project management throughout the project to coordinate components of the project with the City and with the subconsultants. Part of the coordination will consist of AECOM preparing and submitting a revised schedule in Microsoft Project. For the purposes of this SA#3 it is assumed that 3 �O O a N 7 H 0 tl W r r W O O 00 0 0 0 0 0 b 0 0 0� O O O 0 0 b W w W C C N N N» N NNN� cNN 00 t� N N M O N 7 E a _`m 1��0 y 0 w 6" M N N NN � U y I-°r mama'o F F U N W m e Ixm>m eQ 3 F v o Q z n W K W � C ~ W x W m N M N M M M M � C p7 Z C °u m o 0 ? W O O N N N o O O O O O po O O O 1�10 b 0 O O O b� O m o N OI W M M M OO N a n m rn m m w n n m m b m + A N N»N N N M N p M N N M N m U C7 p O o 0 0 0 o O o y u > N Z C, v3 0 o c tnQ 2OZ W t d' y C y $ o 0 0 o e e o 0 uj W 7 Maa cat m =0 V F m m o a m 101 J fA F N � W F O L G W a{ V N N O O O O 10 W NN o`w r b fb'f N �O m m m N t+l N O O O O W» W W O C rN o o e o 0 o e N U O� a`o W a � g o W ~ L � � a W C W Z m m a a c u c 3 d W 6 `m •� w OE A O N d N W G ca"�m >t m ° h c N u W o c a W u °rn 3 m d E a°'ibm7� wa. d c t btu w W �m W E W W O W C O W W b .t.. � w� O w L m� c L W e = c n d o b �£F °�pp c a`�m� W F wU ° c o y 2 ww m W 75 E W ~ O O't A ` A m m W C O W c f m w W mEr C°' E cLit> d •O C.S p°.2 0 a d fn d C d O W O W O O 7 N a J a a� U U❑O(n❑ IL U d' MD ' o �Nmv u�mn 3� V z N N N N N IV N O m —ryv W Ep W O O N N n N(V O O O O ID `p L f eV tll O N wi �' i�¢a A=COM additional months of project management efforts will be required(6 months total). This item is accounted for in subtasks 1.1 & 1.2. The fee required to perform this task is$6,940. • Task 1.3-Prepare Tech Memo on Other Than Open Cut(OTOC)—Under SA#2 AECOM was to evaluate the installation of the storm drain by OTOC methods. The original SA#2 request contained scope and fee to prepare a tech memo on OTOC.This item was requested to be removed from SA#2; AECOM removed this item as requested. Subsequent to the approval of SA#2 it was requested that AECOM submit a Technical Memorandum on the evaluation and recommendation of OTOC. Therefore, AECOM request that this additional effort be included in the scope of SA#3. The total effort for this service is maintained as per previous request and the required is$1,790. Task 2.0—Preliminary Design (60%) • Task 2.3-SUE Analysis—AECOM has retained a SUE-specialized firm for this analysis which will be conducted for the alignment between Provine and the outfall. This work will include a Level B SUE to locate the horizontal and vertical locations of the utilities. The fee required by the SUE firm to perform this task is$5,000 (Attachment 2). The total fee to provide this service is$5,895,which includes coordination efforts through AECOM. • Task 2.4-Revise Storm Drain Alignment from Provine to Ederville—AECOM will revise the proposed storm drain alignment from Provine to Ederville based on the amended alignment as discussed during the field review meeting referenced above. A revised alignment will be presented for approval prior to progressing the preliminary design for the revised alignment. The deliverable for this phase of work will conform to the requirements of the existing design scope. AECOM estimates that the additional fee required to perform this task is$2,065. Task 3.0—Final Design Task 3 effort remains unchanged. Task 4.0—Construction Phase Services Task 4 effort remains unchanged. Task 5.0—ROW/Easement Services Task 5 effort remains unchanged. Task 6.0—Survey Task 6 consists of field investigations which will assist the design of the modified alignment.The following items will be included in the field investigation: • Task 6.1 —Design Survey—AECOM will retain its surveyor to obtain additional survey for the realignment of the storm drain. This survey will include a detailed survey of revised alignment from the existing connection point on Provine to the newly identified outfall location, including trees, utilities, curbs, creek and 100-ft of a jogging path. The fee required to perform this task is$5,200(Attachment 2). The total fee to provide this service is$5,805,. which includes coordination efforts through AECOM A=COM Conclusion The total fee to perform the work described above is$22,565, which includes 10%sub markup. As previously mentioned, this fee breakdown is shown in Attachment 1. Attachment 2 shows a breakdown of costs associated with the additional surveying and SUE for the project AECOM is grateful for the opportunity to work with the City of Fort Worth and looks forward to preparing design plans for this project. If you have any questions or comments, please contact Greg Crews, PE. at 972.735.3031. Gorrondo"a & Associates, Inc. GA March 22, 2011 Turner, Collie & Braden, Inc. Attn: Mr. Steven Real, P.E. 1200 Summit Avenue, Suite 600 Fort Worth, Texas 76102-4409 Re: Proposal for City of Fort Worth, 2004 CIP Project No. 00170 - Survey of new alignment for Storm Drain Outfall Dear Mr. Real: Gorrondona & Associates, Inc. (G&AI) is pleased to submit this proposal for professional land surveying services for the above referenced project. The following itemiz6d surveying services are to be provided by Gorrondona & Assoc., Inc.: Extra Storm Drain Survey Item No. I - Topographic design surveying 1. Provide additional topographic survey of the proposed storm drain outfall as shown in E-mails from AECOM dated March 18, 2011. The topographic survey shall include spot elevations and grade breaks to produce an accurate contour map that will cover the requested survey area. The topographic survey shall include, but not limited to, locating all existing features such as water valves, curb & gutter, asphalt, property comers, buildings, sidewalks, medians, fences, driveways, storm & sewer manholes, trees 6" and larger, tops and toes of slope, power poles, mailboxes, signs, telephone risers and other visible features. 2. Locate SUE Level B pin-flags/paint markings. 3. Deliverables shall include an AutoCAD drawing file showing the topographic survey features located in the field. Provide copies of the survey field notes, a hardcopy of the coordinates and an ASCII file of the coordinates for the points located. AMOUNT $5,200.00 t 7524 Jack N@well Blvd. So.•Fort Worth,Texas 76118.817.496.1424•Fax 817.496.1768•www.ga-inc.net Item No. II — Subsurface Utility Engineering 1. SUBS RFACE UTILITY ENGINEERING QL"B" — G&AI will utilize geophysi al prospecting equipment to designate the horizontal position of existing Underground utilities within the project limits. This level of work includes acquiring "as-built' documentation from utility companies and making the initial contact with their representatives AMOUNT $5,000.00 The quoted daily rates; for SUE include field work, all necessary equipment, CAD and a signed and sealed final deliverable. Gorrondona & Associates, Inc. can provide the above professional land surveying services for a lump sum fee of $10,200.00. If you have any questions or require additi nai information please contact me at (Ell7) 496-1424. Sincerely, GORRONDONA & ASSOCIATES, INC. lid W. Truett Wilson, RPLS Survey Director 2 C C ~W o U z WLU Q W o o W �O Z p a Wh z — ' LL Z_ ]3 _ zI y a Uo i I "�`G 33 y3y3 4 a pp �E s�' 1s9 o� yv \ i„a ♦ a \\ �id pY� 6 � N♦a� \\ yo a r b \ ! o S 6 4� � \ a b g" I E � _ t