HomeMy WebLinkAboutContract 35857-A4 AMENDMENT No.4 TO CITY SECRETARY CONTRACT No. 3S8 - A LI WHEREAS, the City of Fort Worth (CITY) and AECOM USA, Inc. (formerly TCB, Inc. ) , (ENGINEER) made and entered into City Secretary Contract No. 35857, (the CONTRACT) which was authorized by M&C C-22390 on the 18th day of September, 2007 in the amount of $ 37, 400 . 00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $10, 600 . 00 which was administratively authorized on February 27, 2008, Amendment Number 2 in the amount of $99, 770 . 00 which was authorized by M&C #C-24228 on May 18, 2010, Amendment Number 3 in the amount of $22, 565 . 00 which was administratively authorized on October 19 , 2011; and WHEREAS, the CONTRACT involves engineering services for the following project : Provine Drainage Improvements, Project No. 00703 ; and WHEREAS, it has become necessary to execute Amendment No. 4 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated December 14, 2012, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $12, 760 . 00 . (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $183 , 095 . 00 . 3 . OFFICIAL RECORD CITY SECRETARY City of Fort Worth FT.WORTI'I,'�( Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 1 of 3 12-20-12 P03 : 17 IN All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: City of Fort Worth ENGINEER .AEC U Inc. Fernando Costa Mich el h. Hegarty, P.E. Assistant City Manager Vice President DATE: � „ DATE: ��- APPROVAL RECOMMENDED: 6�) b'/� L-;. 'j- - Dougla W. Wiersig, P. . Director, Transportat ' n and Public Works Department .APPROVED AS TO FORM AND LEGALITY: M&C: A)IA Date: Douglas W. Black Assistant City Attorney ATTEST: ,- - � Ay *FOAr RT GAO a-A) - ��G pz0. Mary J. Ka s j TWW o 00 City Secret y ' ��44 °Qoo00pp GOO°° Ay 44. ba OFFICIAL RECORD City Fort Worth CITY SECRETARY Professional Services Agreement Amendment Template Page 22 of 3PMO a1 Release 8/1/2012 9 FT, WORTHS TX FUNDING BREAKDOWN SHEET City Secretary No. Amendment No . 4 Department Fund-Account-Center Amount T/PW P227 531200 208280070330 $12 , 760 . 00 Total : $12 , 760 . 00 City of Fort Worth Professional Services Agreement Amendment Template PMO Official Release 8/1/2012 Page 3 of 3 A=COM AECOM 972 735 3000 tel 16000 Dallas Parkway 972 735 3001 fax Suite 350 Dallas,Texas 75248 www.aecom.com December 14, 2012 Mr. Chad Simmons, PE City of Fort Worth c/o CH2MHILL 900 Monroe Street, Suite 404 Fort Worth,Texas 76102 Subject: Project No. 00703 Provine Outfall Drainage Improvements Supplemental Services Request#4 Dear Mr. Simmons: At the 90%design review meeting on May 29, 2012, it was determined that additional services outside the current scope of work are needed to be performed on this project. The following services are required to complete the design of this project: 1.0 GEOTECHNICAL INVESTIGATION AECOM will contract with Mas-Tek Engineering&Associates, Inc. (MTE)to conduct a geotechnical investigation and present a geotechnical report with recommendations. MTE's proposal is included as Attachment 1. Below is a summary of the scope of the geotechnical investigation: • Utility clearance and traffic control plan; • Two (2) borings to 35'depth—one located in Provine ROW, one located west of Ederville Road ROW on City-owned park property; • Groundwater observations; • Laboratory testing, including Atterberg Limits, moisture content, unconfined compression, swell, sieve analysis, unit weight, and sulfates; and • Report with recommendations for open cut construction and trench shoring,tunneling considerations, and construction considerations related to tunnel adjacent to existing residences. ASSUMPTIONS • The City will provide access to the park property located west of Ederville Road. • No lane closures on Ederville Road will be required. AECOM will evaluate the recommendations provided in the geotechnical investigation and incorporate necessary changes into final construction documents. 2.0 TECHNICAL SPECIFICATIONS AECOM will prepare technical specifications for vibration monitoring and rock excavation to address project-specific requirements for installing the proposed storm drain in the vicinity of an existing single family residence. These specifications will be incorporated into the contract documents and referenced on the project plans in the final submittal to the City. A:COM Mr. Chad Simmons, PE December 14, 2012 Page 2 COMPENSATION Compensation for the scope of services described above will be provided on a Lump Sum basis in accordance with the terms and conditions of the agreement dated 2 October 2007. A summary of fee is provided below. Exhibit A includes a fee breakdown for the requested supplemental services. Current Contract Value $170,335.00 Supplemental Services 1.0 Geotechnicallnvestigation $8,625.00 2.0 Technical Specifications $3,345.00 10% Markup on Subconsultants $790.00 Total Supplemental Services $12,760.00 Total Contract Amount $183,095.00 We appreciate the opportunity to continue our work on this project with you. Should you have any questions or require additional information, please do not hesitate to contact Greg Crews at 972.735.3031. Sincerely, - 4v- - Brian K. Adams, PE Greg Crews, PE Vice President Project Manager Enclosures: Exhibit A—Level of Effort Spreadsheet Attachment 1 —MTE Proposal A N�ono ino ono 00 o n00000�o 0 (D<O ee}}m Nw wV3 tAn No n owO1 f0 N ON M tp(D O7 00)01 no?n ~ N c6 W wv> w`r nwrz w0 N � a p N Y Vl A F- n0 0 0 0 0� O O O N L9 N C C N c mm� w�nv� winw� E0S �ro� �co0 v r;n n E2� y m m a« y we» w y x W 0 o mU ml-0 F0-o�allo_ o .o r-(n in w o. t' a w w to " c ow ow o co co e O o �3ogr- U O O Z G 0 K 0 0 0 n r w w n w w N > 4 � C ~ Ji W 0 0 0 �w w w w c � m c o c z 0 0 0 0 0 0 0o w w O a W m m m � m in 3 w v�i nw O v�i coo rn 70Oi N� w��G U 00 w v w j tl! C 1- m o 0 0 0 E d Z V > a 3 •- Or> i yp Z � o m w Y 0 w A � .0 w so wU Y = J F" 7 GI r ui a d N cw 0. w �O w A. c 0 0 0 0 V O N O m o`io m w a 0 F C c a � o n .6 ffi C C r w c U C O Y q 00 N p D 0 Y 5 m o o c uma . o O) nd EN c L m N a L m m M'Ai tf > > fn m Vw-OO �r O x Fm.w s _ � c9 w �N N M �N N N N O M M ; LL Q V`o a O i3wa 44 ATTACHMENT 1 MAs-TEK Engineering & Associates, Inc. 1 July 30, 2012 Mr. Nick Batker e-mail: nick.batker _aecom.com AECOM Phn: (817) 698-6700 1200 Summit Avenue, Suite 600 Fax: (817)698-6701 Fort Worth, Texas 76102 Re: Proposal for Geotechnical Investigation Provine Outfall Drainage Tunnel Fort Worth, Texas MTE Proposal No. P12-0603E-R1 Mr. Batker: Transmitted herewith is our proposal for a geotechnical investigation at the site referenced above. Project Requirements • 42 inch storm drain pipe for discharge into lake • Invert depths: 12'to 15' • Open-Cut Construction Proposed Scope of Work • Traffic Control Plan • Site Reconnaissance • Staking of borings • To prevent rutting to park property, either plywood sheeting will be used or the boring will be drilled on Ederville Road requiring lane closure, traffic control and flagmen. The actual boring locations will depend upon existing overhead lines and underground utility lines. • Two(2) Pavement Penetrations/Patching • Mobilization of truck Mounted Rig • Two (2) borings to 20'with truck mounted rig. Rock will be augered and evaluated using cone penetration tests. • Groundwater observations upon completion of each boring and end of day • Laboratory testing (Atterberg Limits (Pis), moisture content, unconfined compression, swell, sieve analysis, unit weight, sulfates) • Report with recommendations for open cut construction and trench shoring, and construction considerations related to open cut construction adjacent to existing residence. Geotechnical Consulting & Materials Testing 5132 Sharp Street Dallas,Texas 75247 972 709-7384 y Provine Outfall Geotechnical Investigation MA%-Ty-c IineeNng Fort Worth,Texas &Associates,Inc. MTE Proposal No. P12-0603E-R1 Page 2 Fee: $7,900.00 Note: Client to obtain permission to access city property and private properties as needed to drill borings. If this proposal meets with your approval, please sign below to authorize MTE to perform the work. We look forward to working with you on this project. Please contact us after reviewing our proposal if you have any questions. Sincerely, MAS-TEK ENGINEERING &ASSOCIATES, INC. �)artkJ4Far , P.E. Senior Principal ACCEPTED BY: Name Date Title