Loading...
HomeMy WebLinkAboutContract 50172-AR1 CFW Construction Allowance Request Approval CAAppr-01 Page 2 of 3 RECEIVED CITY SECRETARY JUL � � 2019 conTRAcr No. 501 7 �I C CRART WORTH„ Cityof Fort Worth C'IYSECRETARY Construction Allowance Request Approval _ (Construction Allowance Breakdown Available in Links) For Construction Allowance Submittal No.: 1 Construction Allowance Request Approval No.:ECAAppr-01 Date Started: 2� 018-10-22 Date Due: i, 018-12-11 City Sec. No.: ,50172 Project Name: 2014 CIP Year 3 - Contract 7 :c02965 'DOE Numbers: Project Numbers: Project !This- is a combined paving, water/sanitary sewer main, Description: stormwater and box culvert improvements project in Eastern Hills and Lakewood addition neighborhoods. Project/Contract Compliance Mary Hanna City Inspector: Christopher Bell Manager: __.. __ __-_. -- Contractor: tCircle C Construction Company COST AND DAYS SUMMARY: Requested Department: Cost($) Fund Account Center: Days: TPW $ 63,612.00 `34014-0200431-5740010-c02695-ct 0 _ Stormwater ;$ 31,165.00 :52002-0200431-5740010-c02695-cQ 0 Total Cost:',$ 94,L7�.00 Total Requested Days: Approval Status: M AL RECORDSECRETARYORTH,TX https://projectpoint.buzzsaw.com/ bz web/Forms/ForinPrint.aspx?SiteId=51500&ProcessI... 11/7/2018 CFW Construction Allowance Request Approval CAAppr-01 Page 3 of 3 ,Approved: Yes Comments: User: Lane Zarate Date: 2018-10-23 7:19 PM Approved: Yes `.Comments: User: Ricardo Matute Date: 2018-10-23 2:25 PM Approved: Yes Comments: User: Signing for TPW Director Role Approvals Date: 2018-10-23 3:47 PM Approved: Yes Comments: User: Doug Black Date: 2018-10-25 5:19 PM Approved: Yes Comments: User: Susan Alanis Date: 2018-10-27 8:16 AM Action Required: Please review and approve _J OFFICIAL RECORD CITY SECRETARY ET WORTH,Tat https://projectpoint.buzzsaw.com/ bz web/Forms/FonnPrint.aspx?SiteId=515OO&ProcessI... 11/7/2018 FORT WORTH, City of Fort Worth -- 111 - Construction Allowance Request Breakdown Construction CA# Date 10/11/2018 City Sec# 1 50172 —� Client Project#(s)l c02695 FAC#(s) 59601/59607/34014/52002-0600430/0700430/0200431-5740010-c02695-c01783/c02483 Project Name 2014 CIP Year 3 Contract 7- This is a combined paving,water/sanitary sewer main,stormwater and box culvert Description improvements project in Eastern Hills and Lakewood addition neighborhoods. Contractor Circle C Construction CompanyI City Inspector I Christopher Bell Funding TPW Stormwater Water&Sewer Contract Time Allocation Account Totals CD Original Contract Amount $1,713,542.00 $1,057,636.00 $2,700,863.50 $5,472,041.50 450 Extras to Date $301,946.00 $79,045.50 $380,991.50 120 Credits to Date Current Contract Amount $2,015,488.00 $1,136,681.50 $2,700,863.50 $5,853,033.00 570 Amount of Proposed Allocation $63,612.00 $31,165.00 $0.00 $94,777.00 0 Original Allowance Available for Allocation $100,000.00 $80,000.00 $200,000.00 $380,000.00 Allowance Funds Previously Allocated Remaining Funds Available for this Allocation $100,000.00 $80,000.00 $200,000.00 $380,000.00 IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request:This construction allowance add Metal Beam Gurd Fence end treatments to the guardrail in front of the culverts in Meadowbrook Drive. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. FORT WORTH,a City of Fort Worth Construction Allowance Request Breakdown Construction FOA# Date 10/11/2018 City Sec# 50172 Client Project#(s)l c02695 FAC#(s)1 59601/59607/34014/52002-0600430/0700430/0200431-5740010-c02695-001783/c02483 Project Namel 2014 CIP Year 3 Contract 7- This is a combined paving,water/sanitary sewer main,stormwater and box culvert improvements project in Desciptionl Eastern Hills and Lakewood addition neighborhoods. Contractorl Circle C Construction Company City Inspector Christopher Bell ADDITIONS ITEM DESGKIII[ION ep y Unit ni s I o a rot 7 3217.2103 REFL Raised Marker TY II-A- PW A rotSingle Guardail TerminalM w teelPost) W A 5, 5. Unit T-47 Metal Beam Guard Fence ownstraem Anchor Terminal DATwtwoodPost) 5 . Unit - Concrete Sidewalk Stormwater rid - Concrete curb and gutter tormwater rot - emove sidewalk tormwater nit - op soil Tto-nwater Y 5. nitConcrete Pavement Repair tormwater Y 5. rot Unclassified Excavation tormwater 5. Y 5. Unit - 5 Borrow(FlexibleBase) tormwater 40.00 CY TPW 63,612.00 Stormwater $31,165.00 Water&Sewer $0.00 ub otal Additions $94,///.UU FORT WORTH- City of Fort Worth Construction Allowance Request Breakdown Construction FOA# 1 Date 10/11/2018 City Sec# 50172 Client Project#(s) c02695 FAC#(s) 59601159607134014/52002-06004301070043010200431-5740010-c02695-cOl7831c02483 Project Namel 2014 CIP Year 3 Contract 7- This is a combined paving,water/sanitary sewer main,stormwater and box culvert improvements project in Descdpdonj Eastern Hills and Lakewood addition neighborhoods, Contractorl Circle C Construction Company City Inspector Christopher Bell GUNSTRUCTIUN ALLOWANCE ITEMS TU BE REDUCED ep y unit UnitCost Total -77777 Construction Allowance(Paving) W L nit Construction Allowance tormwater) tormwater L TPW $63,612.00 Stormwater $31,165.00 Water&Sewer $0.00 Sub Total Deletions M/WBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA Total $0.00 Previous Construction Allowance Requests CO# DATE AMOUNT Total $0.00