Loading...
HomeMy WebLinkAboutContract 50172-AR2 CFW Construction Allowance Request Approval CAAppr-02 Page 2 of 3 CITY SECRETARY Vf, CONTRACT NO. 5 o 17d-A lZa WORTHcity of Fort Worth crn-o�Fa 201 QRT Construction Allowance Request Approval crTySF�q Ry q PP Fr TH (Construction Allowance Breakdown Available in Links) For Construction Allowance Submittal No.: 12 1 Construction Allowance Request Approval No.: ICAAppr-02 Date Started: 111/7/2018 Date Due: 12/27/2018 City Sec. No.: 50172 Project Name:12014 CIP Year 3 — Contract 7 Project Numbers:1c02695 DOE Numbers: Project 'This is a combined paving, water/sanitary sewer main, stormwater and Description: box culvert improvements project in Eastern Hills and Lakewood addition I neighborhoods. Project/Contract Compliance Manager: ., !a _Han_n_a City Inspector: lChristopher Bell Contractor:JCircle C Construction Company COST AND DAYS SUMMARY: Department: Cost($) Fund Account Center: Requested Days: IStormwater � $ 81$ 064.00 i52002-0200431-5740010-c02& 0 F- _ — --- F-- Total:I$ 18,064.000 Total Requested Days:10-. Approval Status: a RUAL RECORD UTY SECRETARY LT. WORTH,TX https://projectpoint.buzzsaw.com/ bz web/Forms/FomiPrint.aspx?Siteld=51500&Proces... 11/27/2018 CFW Construction Allowance Request Approval CAAppr-02 Page 3 of 3 Approved: Yes Comments: User: Lane Zarate Date: 2018-11-07 10:39 PM Approved: Yes Comments: User: Ricardo Matute Date: 2018-11-07 5:08 PM Approved: Yes Comments: User: Signing for TPW Director Role Approvals Date: 2018-11-08 9:02 AM Approved: Yes Comments: User: Doug Black Date: 2018-11-08 9:14 PM Approved: Yes Comments: User: Susan Alanis Date: 2018-11-11 9:25 PM Action Required: Please review and approve OFFICIAL RECORD CITY SECRETARY FT. WORTH,TX https://projectpoint.buzzsaw.com/ bz web/Forms/FormPrint.aspx?Site1d=51500&Proces... 11/27/2018 FORT WORTH City of Fort Worth Construction Allowance Request Breakdown Construction CA# 0 Date 11/7/2018 City Sec# 1 50172 Client Project#(s)l c02695 FAC#(s) 59601/59607/34014/52002-0600430/0700430/0200431-5740010-c02695-c01783/c02483/c02883 Project Name 2014 CIP Year 3 Contract 7- This is a combined paving,water/sanitary sewer main,stormwater and box culvert Description improvements project in Eastern Hills and Lakewood addition neighborhoods. ContractorF Circle C Construction CompanyI City Inspector I Christopher Bell Funding TPW Stormwater Water&Sewer Contract Time Allocation Account Totals CD Original Contract Amount $1,713,542.00 $1,057,636.00 $2,700,863.50 $5,472,041.50 450 Extras to Date $301,946.00 $79,045.50 $380,991.50 120 Credits to Date Current Contract Amount $2,015,488.00 $1,136,681.50 $2,700,863.50 $5,853,033.00 570 Amount of Proposed Allocation $0.00 $18,064.00 $0.00 $18,064.00 0 Original Allowance Available for Allocation $100,000.00 $80,000.00 $200,000.00 $380,000.00 Allowance Funds Previously Allocated $63,612.00 $31,165.00 $94,777.00 _ Remaining Funds Available for this Allocation $36,388.00 $48,835.00 $200,000.00 $285,223.00 IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request:This construction allowance for some additional concrete work on Jacqueline Rd as pasrt of Stormwater Eastern Hills Phase 3. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary. FORT WORTH City of Fort Worth Construction Allowance Request Breakdown Construction FOA# = I Date 11/7/2018 City Sec# 50172 Client Project#(s) c02695 FAC#(s) 59601/59607/34014/52002-0600430/0700430/0200431-5740010-c02695-c01783/c02483/c02883 Project Namel 2014 CIP Year 3 Contract 7-This is a combined paving,water/sanitary sewer main,stormwater and box culvert improvements project in Descdptionl Eastern Hills and Lakewood addition neighborhoods. Contractorl Circle C Construction Company City Inspector r Christopher Bell ADDITION5 Dept/FAG y Unit Units o a m - Concrete Sidewalk 7 ormwa er mt - Remove sidewalk tormwater 7n1t - Concrete Pavement Repair tormwater 75. 5. Nit - 01— assi ied Excavation tormwater 7. 5. nd - Borrow(FlexibleBase) tormwater UnitConcrete Driveway Stormwater Unit 3-37 Remove Concrete Driveway Stormwater TPW 0.00 Stormwater $18,064.00 Water&Sewer $0.00 Sub Total Additions Change Order Additions Page 2 of 4 FORT WORTH- City of Fort Worth Construction Allowance Request Breakdown Construction FOA# 2 Date 11(712018 City Sec# 50172 Client Project#(s) c02695 FAC#(s) 59601/59607134014/52002-06004301070043010200431-5740010-c02695-c017831c024831c02883 Project Namel 2014 CIP Year 3 Contract 7- This is a combined paving,waterlsanitary sewer main,stormwater and box culvert improvements project in Descriptionj Eastern Hills and Lakewood addition neighborhoods, Contractor Circle C Construction Company City Inspector Christopher Bell CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED ep yUnit Unit Cost o a n -- Construction owance ormwa er ormwa er TPW $0.00 Stormwater $18,064.00 Water&Sewer $0.00 Sub TotalDeletions Change Order Deletions Page 3 of 4 MWWBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA Total $0.00 Previous Construction Allowance Requests co# DATE AMOUNT Total $0.00