Loading...
HomeMy WebLinkAboutContract 35439-A4 CITY SECRETARY CONTRACT NO. a fL �q - ►�`� AMENDMENT NO. 4 (No MSC Needed) STATE OF TEXAS S COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Neel Schaffer, Inc. , (Engineer) made and entered into City Secretary Contract No. 35439, (the Contract) which was authorized by the City Council by MSC - C-22156 on the 5tn day of June, 2007; and WHEREAS, the Contract involves engineering services for the following project: Academy Boulevard Extended Drainage Study and Grassland Court Extended Drainage Design Project, Project No. 00479 WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1 . Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated September 21, 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer total $29,390. 2 . Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $487,680. ------------ City of Fort Worth,Texas LOFFICIAL RECORDAmendment to Engineering AgreementPMO Official Release Date:10.01.2010 CRETARYPage 1 of 2RTH,TX 1 U 1 7-1 1 PO 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the �`� day of 0Ci1>b-e--,C , 2011, in Fort Worth, Tarrant County, Texas. AT-TEST: ,o'a� to OOp0000 YAl Jimq � Li Marty Hendrix was o° 0 City Secretary o NO M&C REQUIRED o ��4� APPROVAL RECOMMENDED: D: Douglas W. Wiersig, P.E. 9vrector, Fernando Costa Department of Transportation/Public Assistant City Manager Works Neel-Schaffer, Inc. ENGINEER By: Name: James P. Amick, /P.E. Engineer Manager 512 Main Street, Suite 415 Fort Worth, Texas 76102 APPRO AS TO FORM AND LEGALITY: 1 Assistant City Attorney City of Fort Worth,Texas Amendment to Engineering Agreement P Page 2Officialo Release Date:6.18.2010 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Additional Budget to be added: P227 531200 2072800479 30 $ 8,450.00 P227 531200 2072800-479 80 $20,940.00 14L NEEL-SCHAFFER = Solutions you can build upon September 21, 2011 Mr. J. Felipe Pulido, P.E. Project Manager TPW- Stormwater 900 Monroe, 4th Floor Fort Worth, Texas 76102 Reference: Amendment 44 for Grassland Court Water Line and Construction Management Dear Mr. Pulido: Neel-Schaffer, Inc. (NSI) is pleased to offer additional services for the above referenced project in this amendment to the agreement dated June 22, 2007. This request is for the additional work required to coordinate incorporating the 8" waterline in Quail Ridge into our Grassland Court drainage plans, for the extra work necessary to coordinate the acquisition of additional easements and finally for construction management services. Detailed Scopes of Services are attached to this letter. This Letter Amendment, consisting of one page, and the attached Scopes of Services, consisting of two pages, represents the entire amendment to the agreement between the City of Fort Worth and Neel-Schaffer, Inc. If the terms of this Amendment are acceptable, please execute the original and the copy and return the copy to our office to continue the project. All services were or will be performed in accordance with the original agreement. We are requesting compensation as a lump sum fee of $8,450.00 for the water line work and a lump sum fee of$20,940.00 for the construction management services. This Amendment contains no M/WBE work as the services were or will be performed exclusively by Neel-Schaffer. The change in contract amount is tabulated as follows: Current Total Contract This Amendment New Total Contract $458,290 $29,390 $487,680 Neel-Schaffer appreciates the opportunity to continue to provide services to you and looks forward to working with you again. If you have any questions, or if we may be of further service to you in any way,please call me at 817/909-2807 or Lynn Hilburn at 817/307-2279. Sincerely, NEEL-SCHAFFER, INC. ACCEPTED: CITY OF FORT WORTH BY: Signature James P. Amick, P.E. Engineer Manager Printed Name TITLE: DATE: 512 Main Street, Puite 415, Fort Worth, TX 76102, 817.870.2422, Fax 817.870.2489 O:Vobs\6638-FW Drainage-Grassland&Academy\Admin\Contract\Amendment 4\Amendment 4 Grassland Water Line and CM.doc ATTACHMENT A Amendment 4 Scope of Services for: Grassland Court Water Line Design and Construction Phase Services Water Line Design Additional services were required on Grassland Court to coordinate incorporating the 8" waterline in Quail Ridge into the Grassland Court drainage plans and to coordinate the acquisition of additional easements. The following were specifically included for the water line: • Review and offer suggestions on the Water portion of the plans, especially the tie-in location • Revise the Contract and Specifications Book and the bid items four times because there were three different methods being considered for how the street was going to be repaired,re- surfaced or rehabilitated; for how the project was going be separated into pay Units; and for how the work was going to be compensated • Put off putting together the final plans for a few weeks waiting for the decision on where the tie-in point for the waterline was to be located • Review and offer suggestions about pay items and quantities four times on the Water portion of the Opinion(s) of Probable Costs • Perform and prepare six different Opinions of Probable Costs,based upon the different street repair/resurfacing scenarios and the different beginning location point of the Water contract • Change the cover sheet of the plans twice because of changes in the sheet count for the Water portion • Review and offer suggestions on the Water portion of the Contract and Specifications Book • Coordinate getting the Plans cover and the Contract and Specifications Book cover signed by the Water consultant • Spend time making the specifications and contract documents look like one homogeneous contract document; assuring that there was clarity of intent and that there was no ambiguity or duplication of terms or phrases Other additional services were required on Grassland Court since the multi-property owner Lake access agreement near the project outfall created the need for additional individual easement documents. This required additional coordination efforts for easement acquisitions. The following were specifically included for the easements: • Review easement documents for the additional easements west of Crosswind Drive • Communicate and coordinate with the Project Manager about moving funding for easements from the Academy Boulevard Detention Pond Project to the Grassland Drainage project • Prepare four or five additional monthly reports due to the approximately six month timeframe waiting on easement acquisitions Finally, additional information was needed regarding an Oncor underground power line at Crosswind and the large culvert crossing,which required additional coordination with Oncor for an extra D-hole. 9/27/2011 0:Uobs\6638-FW Drainage-Grassland&Academy\Admin\Contract\Amendment 4\Amendment 4 Scope.doc Pagel of 2 Construction Phase Services ENGINEER will support the construction phase of the project as follows. 1. Construction Support • The ENGINEER shall visit the project site at requested intervals as construction proceeds to observe and report on progress. • The ENGINEER shall review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. Such review shall not relieve the Contractor from its responsibility for performance in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and submittals is free of errors, inconsistencies or omissions. The ENGINEER shall log and track all shop drawings, samples and other submittals in Buzzsaw. • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract documents, review change orders, and make recommendations as to the acceptability of the work. • The ENGINEER shall attend the "Final" project walk through and assist with preparation of final punch list. 2. Record Drawings • The ENGINEER shall prepare record drawings from information submitted by the inspector and/or Contractor. ASSUMPTIONS A. Make a maximum of ten site visits B. Review a maximum of five Shop Drawings, samples or submittals C. Respond to a maximum of 20 Contractor's Request for Information D. Review a maximum of five Change Orders DELIVERABLES A. Response to Contractor's Request for Information B. Review of Change Orders C. Review of Shop Drawings D. Final Punch List items E. Record Drawings (as per Amendment 3) 9/27/2011 0:Vobs\6638-FW Drainage-Grassland&Academy\Admin\Contract\Amendment 4Wmendment 4 Scope.doc Page 2 of 2 ATTACHMENT B - Amendment 4 Professional Services Fee for: Grassland Court Water Line Design and Construction Phase Services Transportation and Public Works Department Improvements Compensation Drainage $29,390.00 Total Amendment 4 Fee: $29,390.00 Summary of Total Fee Contract Description Fee Original Contract $62,790.00 Amendment 1 $14,600.00 Amendment 2 $64,300.00 Amendment 3 $316,600.00 Amendment 4 $29,390.00 Total Contract Fee $487,680.00 0:\Jobs\6638-FW Drainage-Grassland &Academy\Admin\Contract\Amendment 4\Amendment 4 Fee.xls 9/27/2011 Page 1 of 1 ATTACHMENT B -Amendment 4(Level of Effort) Professional Services Fee for: Grassland Court Water Line Design and Construction Phase Services Water Line Design Classification Engineer Manager Senior Engineer Engineer in Training Technician Administrative Total Hours Total Fee Billable Rate $205.00 $145.00 $110.00 $90.00 $55.00 Task Water Line Coordination 4 20 12 4 2 42 $ 5,510.00 Easement Coordination 1 4 10 2 2 19 $ 2,175.00 Subtotal 5 24 22 6 4 61 Labor Cost $1,025.00 $3,480.00 $2,420.00 $540.00 $220.00 $ 7,685.00 Reproduction/Expenses $ 765.00 Total $ 8,450.00 SAY $ 8,450.00 Construction Phase Services Classification Engineer Manager Senior Engineer Engineer in Trainin Technician Administrative Total Hours Total Fee Billable Rate $205.00 $145.00 $110.00 $90.00 $55.00 Task 12 additional Monthly Invoices, Progress Reports, Project Schedule updates 12 12 24 $ 3,120.00 10 Site Visits 20 20 10 50 $ 5,650.00 Submittals 2 8 16 2 28 $ 3,440.00 Interpretations 2 8 16 4 30 $ 3,550.00 Change Orders 1 4 8 2 15 $ 1,775.00 Final Walk Thru 2 2 2 1 7 $ 975.00 Record Drawings 1 2 4 16 1 24 $ 2,430.00 Subtotal 20 44 66 16 32 178 Labor Costj $4,100.00 1 $6,380.00 1 $7,260.00 1 $1,440.00 $1,760.00 $ 20,940.00 Totall $ 20,940.00 SAY $ 20,940.00 0:\Jobs\6638-FW Drainage-Grassland&Academy\Admin\Contract\Amendment 4\Amendment 4 Fee.xls 9/27/2011 Page 1 of 1