Loading...
HomeMy WebLinkAboutContract 36012 • i AMENDMENT NO. 2 STATE OF TEXAS S CITY SECRETARY CONTRACT NO (No M&C Needed) COUNTY OF TARRANT S WHEREAS, the City of Fort Worth (City) and Stream Water Group, (Engineer) made and entered into City Secretary Contract No. 32125 , (the Contract) which was authorized by the City Council by M&C C-20814 on the 28th day of June 2005; and WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services: Street Reconstruction, Water and Sewer Replacement on Bertrose Ave (Mattison Ave to Dorothy In) , Clarke Ave (Camp Bowie Blvd. To Virginia P1) , and Modlin Ave (Haskell St to West Dead End) , 2004 CIP Contract Year 2, Contract 23, Project No. 00167: DOE No. 4912 Water Project No. P253-0671700167 Sewer Project No. P258-0771700167 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I, of the Contract is amended to include the additional engineering services specified in a proposal letter dated December 12, 2006, copies of which are both attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $3,392.00. 2. Article II, of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $135,458 .00 . e 3. All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the day of 2007, in Fort Worth, Tarrant County, Texas. ATTEST: Marty Hendri �,'D City Secretary APPROVAL RECObIlKENDED: APPROVED: A. Douglas Rademaker, P.E. Marc A. Ott Director, Department of Assistant City Manager Engineering Stream Water Group, Inc. ENGINEER By: Name: Shamsul Arefin, P.E. President 6737 Brentwood Stair Rd, Suite 230 Fort Worth, Texas 76112 APPROVED O ;FORM GALITY Assist t ty Attorney _2_ "�7 c U vo "1 ,�Ril LA, December 12, 2006 Mr.Joseph Bergeron, P.E. Project Manager Department of Engineering City of Fort Worth 1000 Throckmorton St. Fort Worth, TX 76102 Phone: 817 392 2384 RE: Contract Amendment No. 2 Engineering Design Services: Street Reconstruction, Water and Sewer Replacement on Bertrose Ave(Mattison Ave to Dorothy Ln),Clarke Ave(Camp Bowie Blvd to Virginia PI),and Modlin Ave (Haskell St to west dead-end), 2004 CIP Contract Year 2, Contract 23, Project No. 00167; DOE No. 4912 Water Project No. P253-0671700167 Sewer Project No. P258-0771700167 Dear Mr. Bergeron: The following is a summary of additional work requested for Amendment No. 2 to the above referenced project, per recent design meetings with City of Fort Worth officials. The proposed amendment includes additional survey, field check, and modification design documents. The total cost to perform the additional services included in Contract Amendment No. 2 is as follows: Sewer Topographic Surveys S 597.00 Coordination Meeting $ 575.00 Field verification and Design Modification S 2,220.00 Sub-Total Amendment No. 2 $ 3,392.00 6 37 Brentwood Stair Rd • Suite 230 • Fort Worth, 'fX 7 it 12 . Phone. 817 440 4 17 1 • Fax S17.4 6 433i cvu�c. stream watergrour.com Mr.Joseph Bergeron,P.E.,Project Manager December 12,2006 RE: Contract Amendment No. 2 Page 2 of 2 Engineering Design Services: Street Reconstruction, Water and Sewer Replacement on Bertrose Ave (Mattison Ave to Dorothy Ln), Clarke Ave (Camp Bowie Blvd to Virginia PI), and Modlin Ave (Haskell St to west dead-end), 2004 CIP Contract Year 2, Contract 23, Project No. 00167; DOE No. 4912 Water Project No. P253-0671700167; Sewer Project No. P258-0771700167 The current status of the contract between Stream Water Group, Inc and City of Fort Worth for the Street Reconstruction, Water and Sewer Replacement, 2004 CIP Contract Year 2, Contract 23 is as follows: Original Contract Amount= $ 101,476.00 Amendment No. 1 Amount= $ 30,590.00 Amendment No. 2 Amount= $ 3,392.00 Total Contract Amount including Amendment No. 1 = $ 135,458.00 Please process Amendment No. 2,to the Street Reconstruction, Water and Sewer Replacement, 2004 CIP Contract Year 2, Contract 23 in the amount of$3,392.00. If you require any additional information or have any questions regarding this matter,please do not hesitate to give me a call at 817-446-4171 or my cell phone 972-898-5685. We appreciate the opportunity to provide Engineering design services for the City of Fort Worth. Sincerely, Stream Water Group, Inc. *---I- - Shamsul Arefin, P.E. President Copy:File r _ 'ncl (,737 Brentwood Stair Rd • Suite 230 fort Worth, IX 76,112 Prone. 917 440 4171 Fax: Ri7.44h.433> wv�Nx. streamxvatergroup.com