Loading...
HomeMy WebLinkAboutOrdinance 6873 ORDINANCE NO., AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF Dallas Avenue AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: UNIT I: DALIAS AVENUE From E. Lancaster Ave. to Canton Dr., known and designated as Unit I, Project No. 104- 22000-145, a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. UNIT I-A: DALLAS AVENUE From Canton Dr. to I.H. 820, known and designated as Unit I-A, Project No. 104-22000-145, a seven- inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. UNIT II: SOUTH HAMPSHIRE BLVD. From Weiler Blvd. to Canton Dr., known and designated as Unit II, Project No. 104-22000-145, reconstructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty-six foot roadway. Six-inch thick concrete driveways will be constructed where specified. together with concrete curbs, gutters, driveways and incidentals to such improvements on proper grade and line where same are not already so constructed, together with storm sewersiand drains and other necessary incidentals and appurtenances; all of said im- provements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; contract therefore has been made and entered into with Tarrant Paving Corp. and Haws & Garrett Gen Con., Inc. and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been examined, NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of streets, avenues, and public places hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting pro- perty and the owners thereof, are as follows, to-wit: UNIT I• DALLAS AVENUE From E. Lancaster Ave. to Canton Dr., known and designated as Unit I, Project No. 104-22000-145. The estimated cost of improvements is $ Included in Unit I-A the estimated amount per front foot to be assessed against abutting property and the owners thereof for superimpose concrete curb zmAmyMZMW is $ 1.06 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 20.19 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for six-inch thick concrete driveway is $ 1.18 per square foot; the total estimated amount per front foot to be as against abutting property and the owners thereof is $ 21.25 plus the cost incurred for concrete driveway construction where specified. III, A hearing be given and held by and before the City Council of the City of Fort Worth, Texas, to all owning or claiming any property abutting upon said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such pro erty. Such hearing shall be given and held on the 13`th day of Augus f 19 73 , at 9:30 A.M, in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and the City Secretary is hereby directed to give or cause to be given notice ,of the time and place of such hearing and of other 'matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1, emergency effective May 12, 1967. Such notice shall be.by advertisement -inserted at least three (3) times in a newspaper published in the pity of Fort Worth, Texas, the first publication to be made at least twenty-one (21) days before the date of said hearing; Said notice shall comply with and be in accordance with the terms and provisions of said Act as amended. The City Secretary is further directed to give or cause to be given personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such personal notice shall be in writing and shall be given or caused to be given by the City Secretary by depositing such written notice in the United States, Mail at least fourteen (14) days before the date of the hearing, postage prepaid, in envelopes addressed to all persons owning or claiming any interest in the respective properties abutting the high- ways, streets, avenues and public places or portions thereof to be improved, as the names bf such persons are shown on the current rendered tax rolls of the City of Fort Worth and at the addresses so shown, or if the name of such respective owners do not appear on such rendered tax rolls, then address to ,such owners as their names are shown on the current unrendered tax rolls of the City of Fort Worth at the addresses shown thereon. In those cases in which an owner of property abutting a highway, street, avenue or public place or portion or portions there- of which is to be ,improved is listed as "unknown" on the then. current City of Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth tax rolls but no address for such owner is shown,' no notice need be mailed. In those cases where the owner is shown to be an estate, the mailed notice may be addressed to such estate. In this connection, the City Secretary shall prepare and file or cause to be prepared -and filed with these proceedings a list of the_ properties to be as,sessed,, the names of those persons owning or claiming any interest in said properties to whom the notice was mailed,' together with the last known addresses determined as aforesaid of the respective owners and those per4 sons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties in said list whose address is shown on the then current rendered or unrendered tax rolls of the City of Fort Worth was mailed a copy ,of the notice of hearing and shall further certify the date or dates , on which said notice was mailed. A copy of each notice shall be attached to such certificate. The certificate of the City Secretary will be con- clusive evidence of the facts therein recited. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. Passed and approved this day o"41 19�. APPROVED AS TO FORM AND LEGALITY: City Attorney ' w UNIT I A: D&LIAS AVENUE From Canton Ave. to I.H. 820, known and designated as Unit I A, Project No. 104-22000-145. The estimated cost of improvements is $ 127,122.63* ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for super- mposed concrete curb amdaqgm=Kx is $ 1.06 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $26.93 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $-0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ 1.18 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 27.99 plus the cost incurred for concrete driveway con- struction where specified. UNIT II: SOUTH HAMPSHIRE BLVD. From Weiler Blvd. to Canton Dr., known and designated as Unit II, Project No. 104-22000-145. The estimated cost of improvements is $ 42,162.51 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.08 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- _ wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ 1•18 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 3.08 plus the cost incurred for concrete driveway con- struction where specified. The estimated cost of improvements is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ , plus the cost incurred for concrete driveway con- struction where specified. *Includes properties in Units I & I-A 4 .. i 1 FORT WORTH, TEXAS July 9 ,1973 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, Gentlemen and Mrs. Rimmer: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of Dallas Avenue and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to- wit: PROJECT NO, 104-22000-145, UNIT I: DALLAS AVENUE FROM EAST LANCASTER AVENUE TO CANTON DRIVE, to be improved by constructing a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high superimposed concrete curb on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Seven-inch reinforced concrete pavement (Residential Zoning) . .................... ............$ .5.44/L.F. (Commercial Zoning) ............... .................. .$20.19/L,F, (Owner Occupied). ....................................$12.82/L,F, Seven-inch superimposed curb................... .............$ 1.06/L,F, Six-inch concrete driveway... . .......... . ..... ..... ..... ....$ 1.18/S,F, The assessments result in the following division of cost: Total Cost to Property Owners.... . ................$18,860.61 Total Cost to City of Fort Worth..................(Included in Unit I-A) Total Estimated Construction Cost.................(Included in Unit I-A) a 1 . PROTECT NO, 104-22000-145, UNIT I-A; DALLAS AVENUE FROM CANTON DRIVE TO I.H, 820, to be improved by constructing a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high superimposed concrete curb on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Seven-inch reinforced concrete pavement (Residential'Zoning). ................... .................. .$5.44/L.F. (Commercial Zoning) .. .....................................$26.93/L.F. (Owner Occupied) ......... .... ... ... ........ .......... ...16.18/L.F. Seven-inch superimposed curb.... ... ........ oo.o....0000.00..o.o... 1.06/L.F. Six-inch concrete driveway. ....... . . ........ .........0....o..... .. 1.18/S,F. The assessments result in the following division of cost: Total Cost To Property Owners... . ..... .......:..$ 54,579.89 (Unit 1) Total Cost To Property Owners.........0.0­0.00.. 73,440.50 (Unit I & I-A) Total Cost To City of Fort Worth. .. .............. 53,682.13 (Unit I & I-A) Total Estimated Construction Cost. ... ........ ...$127,122.63 (Unit I & I-A) PROJECT NO,' 1"04-22000-145, UNIT IT: SOUTH HAMPSHIRE BLVD, RECONSTRUCTION FROM WEILER BLVD. TO CANTON DRIVE, to be improved by reconstructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty-six foot roadway. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter..... .... .................$3.08/L.Fo Eighteen-inch gutter only... .......00000. 000000000000000000000*o.0 1.54/L.F. Six-inch concrete driveway....o........... ....... ..o. o. ..o....00.. 1.18/S.F. The assessments result in the following division of cost: Total Cost To Property Owners. .. .... ........ .. ...$ 2,999.98 Total Cost To City of Fort Worth. ....... ..... .... 39,162.53 Total Estimated Construction Cost... ...... .... o .. 42,162.51 PROTECT NO, 104-22000-145, DAL.IAS AVENUE & SOUTH HAMPSHIRE BLVD., TOTAL COST TO PROPERTY OWNERS (STREET IMPROVEMENTS FOR ALL UNITS).........$ 76,440.48 TOTAL COST TO CITY OF FORT WORTH (STREET IMPROVEMENTS FOR ALL UNITS)......$ 92,844.66 TOTAL ESTIMATED CONSTRUCTION COST (STREET IMPROVEMENTS FOR ALL UNITS) . ... .$169,285.14 TOTAL ESTIMATED CONSTRUCTION COST (STREET IMPROVEMENTS AND STORM DRAIN)......... $287,554.62 .TACK GRAHAM, P.E. CITY ENGINEER PROJECT NO. 104-22000-145 W S = EA Q EA ROOK ;I(w 6500a MORRIS WOUD _ o F ,J N MA HIG z s 1,10 o a T o S z 1 SI NORMA RiNcfak Sf i SI r,RE1N OR 3 GREENIEE ' •'`:'.' qAn BEApY SI n ATl lE ?PARK', All NAIIA fnES avE qiy z el ..,. ;. .i BE r i CASTF H I A l Y SCHM LL. CRAIG OR Sr ' CRgII INSON r AV�. q qv a Jr NORTH UNIT I �� Sr nA�� n ��,��; RO Tr .kAl4u a B1VD21 SOUTH lipiiYr fy`rt NO J, Rr> » v_, ,r Z--�►'..I1E11 I i I ' '�� Q "' Z CHURCH WINZT a KlNO CT Q+ V.S. r. 0 1Rrl W PARK- MarAR[Hll f II I 4INWk1Gr1 RAO Itif NHIiW( P LEGEND in z PAII,),V DU AR AI(aAND(N q(i IA 1973 mI� I � I�I■ Jr h TkUAMAN k Sr. m a 3 Ri)Nf, D z B RI " BAR ' J _ PRE U em m RICK N PI w t UNIT T: DALLAS AVENUE FROM E. LANCASTER AVE. TO CANTON DR. UNTT I-A: DALLAS AVENUE FROM CANTON DR. TO I.H. 820 UNIT II: SOUTH HAMPSHIRE BOULEVARD FROM WEILER BLVD. TO CANTON DR. CITY OF FORT WORTH PUBLIC WORDS DEPARTMENT ENGINEERING DIVISION ASSESSMENT PAVING AT DALLA.S AVENUE AND SOUTH HAMPSHIRE BOULEVARD PROJECT NO. 104-22000-145 On Monday, June 25, 1973, a Neighborhood Meeting was conducted by the Engineering Division of the Public Works Department at the West Handley Elementary School; for the Assessment Paving at Dallas Ave. and S. Hampshire Blvd. Procedures concerning proposed improvements, owner participation in cost and methods of pay- ment were explained by Odell Schmidt to the twenty-seven property owners present. After this explanation, the meeting was opened for questions and answers. Unit Is Dallas Avenue from E. Lancaster Avenue to Canton Drive. Mr. Halaire Rutowski, owner of Lot W92.6-11, Block 1, West Handley Addition and Tract 9, G.N. Butts Survey,rinquired about the benefits to his property on Lot W92.6-1, Block 1, West Handley Addition. Mr. Schmidt answered there would be no benefit and therefore no assess- ment has been levied. Mr. J. W. Patterson, owner of Lots 3 and 4, A.J. Wilkinson Addition, inquired about the curb ad 'gutter on his properties and where it began on the West end. Mr. Schmidt explained the c and gutter began at the west side of Lot 4. Unit I-Ao ba�s Avenue from Canton Drive to I.H. 820. A representative for Mrs. Elizabeth Pierce, owner of hots 3 through W20-6, Block 3, West Handley Addition, inquired about the independent appraisal report and wanted to know if the report was available for view before the council received it. Mr. Schmidt explained the report is privileged information prior to the Benefit Hearing. However, information as to adjusted assesbments will be available in the Assessment Paving office two weeks before the Benefit Hearing. Mx�. H.E. Farrell, representing his mother, Mrs. W. S. Farrell, owner of Lots 2 through 5, Block 5, West Handley Addition, asked why the land was being taken off of the north side of the street when the south side would profit more from the paving. Mr. Schmidt explained that the land on the north side was decided on because of location of existing buildings along the right-of-way. Mr. Farrell also wanted to know how the land being bought would be valued. Mr. Schmidt explained that the land appraisal would be unbiased and fair market value would be paid for the required R.O,W. Mr. Farrell asked if there was any way to stop the traffic from cutting across their property to get to E. Lancaster Ave. from the service road of I.H. 820. Mr. Schmidt suggested to him to contact the Traffic Engineering Department and he (Mr. Schmidt) would also bring it to the attention of Public Works and Traffic Engin- eering. Mrs. Louise Firmin, owner of E76-Tract 21-C, G.N. Butts Survey, asked if there was any land being taken off the south side. Mr. Schmidt said there was some land to be bought and the owners will be paid fair market value. NEIGHBORHOOD MEETING, PROJECT NO. 104-22000-145, CONTINUED.: Unit II: South Hampshire Blvd. Several of the property owners inquired about the assessment on the driveways. Mr. Schmidt explained that they would only be charged for the difference of their existing driveways, and the wider ones to be constructed to meet current driveway requirements. After a brief general discussion, the meeting was adjourned. FORT WORTH, TEXAS July 9 ,1973 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, Gentlemen and Mrs. Rimmer: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of Dallas Avenue and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to- wit: PROJECT NO, 104-22000-145, UNIT I: DALLAS AVENUE FROM EAST LANCASTER AVENUE TO CANTON DRIVE to be improved by constructing a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high superimposed concrete curb on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Seven-inch reinforced concrete pavement (Residential Zoning). ........ ............ ..... .......$ .5.44/L.F. (Commercial Zoning) ..................................$20.19/L.F. (Owner occupied).. ... ........... . .... ................$12.82/L.F. Seven-inch superimposed curb........ ........ ... ........ . ....$ 1.06/L.F. Six-inch concrete driveway. .. ..... ....0..... .. . ......... ....$ 1.18/S.F. The assessments result in the following division of cost: Total Cost to Property Owners..... ............ .. ..$18,860.61 Total Cost to City of Fort Worth..................(Included in Unit I-A) Total Estimated Construction Cost.................(Included in Unit I-A) PROJECT NO, 104-22000-145, UNIT I-A: DALLAS AVENUE FROM CANTON DRIVE TO I.H. 820, to be improved by constructing a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high superimposed concrete curb on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Seven-inch reinforced concrete pavement (Residential Zoning) . ... .... .......................... .....$5.44/L.F. (Commercial Zoning).... ............. ..... .......... .......$26.93/L.F. (Owner occupied).,. . .o .o_._ oo. _....o.o ....o .0000 .o.o....l6ol8/LoFo Seven-inch superimposed curb.... o..000000000000000000c000000000000 1.06/L.F. Six-inch concrete driveway......... . @000*oQo6*G000 *ooQ*w*oo**&a **o 1.18/S.F. The assessments result in the following division of cost: Total Cost To Property Owners.... ..... ..........$ 54,579.89 (Unit 1) Total Cost To Property Owners....... ............. 73,440.50 (Unit I & I-A) Total Cost To City of Fort Worth.... . ...*. 000.0.. 53,682.13 (Unit I & I-A) Total Estimated Construction Cost. . . . ..... ......$127,122.63 (Unit I & I-A) PROJECT NO.' 1:04-22000-145, UNIT IIo SOUTH HAMPSHIRE BLVD, RECONSTRUCTION FROM WEILER BLVD. TO CANTON DRIVE, to be improved by reconstructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty-six foot roadway. Six-inch thick concrete driveways will be constructed where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter..... . ....... .............$3.08/L.F. Eighteen-inch gutter only....... ... 1.54/L.F. Six-inch concrete driveway. .... ...............................v... 1.18/S.F. The assessments result in the following division of cost: Total Cost To Property Owners....o...oo— 000 —ov$ 210999.98 Total Cost To City of Fort Worth........ ......... 39,162.53 Total Estimated Construction Cost.........oo...o. 42,162.51 PROJECT NO, 104-22000-145, DAL.IAS AVENUE & SOUTH HAMPSHIRE BLVD., TOTAL COST TO PROPERTY OWNERS (STREET IMPROVEMENTS FOR ALL UNITS).........$ 76,440.48 TOTAL COST TO CITY OF FORT WORTH (STREET IMPROVEMENTS FOR ALL UNITS) ... ...$ 92,844.66 TOTAL ESTIMATED CONSTRUCTION COST (STREET IMPROVEMENTS FOR ALL UNITS).....$169,285.14 TOTAL ESTIMATED CONSTRUCTION COST (STREET IMPROVEMENTS AND STORM DRAIN)......... $287,554.62 JACK GRAHAM, P.E. CITY ENGINEER PROJECT NO. 104-22000-145, UNIT I: DALLAS AVENUE FROM EAST LANCASTER AVENUE TO CANTON DRIVE, to be improved by constructing a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNERS LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF EAST LANCASTER AVENUE AND DALLAS AVENUE SIORTH SIDE WEST HANDLEY ADDITION Halaire M. Rutowski W92.6-1 1 No Assessment (No Benefit - 5708 Dallas Avenue Comm. Depth Factor) -0- 76112 Barney Holland Oil Co. E199.6-1 1 202.79' Pavement *$8.84 $1,792.66 2809 N. Main Street Comm. 202.79' Curb * .46 93.28 76106 402 Sq. Ft. Drivewy * 1.18 474.36 * 43.8% Depth Factor $2,360.30 Lee H. Stubbs 0,1 thru 4 2 355.6' Pavement $20.19 $ 717.96 5800 E. Lancaster Comm. 348' Curb 1.06 368.88 76112 $10086.84 Four Star Invest. Co. 5 & W40-6 2 91.44' Adjusted to P.O. Box 1718 Comm. 84.8' Pavement $20.19 $1,712.11 76101 74.8' Curb 1.06 792.88 173 Sq. Ft. Driveway 1.18 204.14 $2,709.13 CANTON DRIVE INTERSECTS SOUTH SIDE RAMSEY ADDITION John H. Davis 8A Res. 118.6' Side Lot Adjusted to 2501 Poly Webb Rd. 85' Pavement $ 5.44 $ 462.40 #917 69' Curb 1.06 73.14 Arlington, Texas 140 Sq. Ft. Driveway 1.18 165.20 76016 $ 700.74 1. PROJECT NO, 104-22000-145, UNIT I: DALLAS AVENUE. CONTINUED: BLOCK OWNERS LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH_SIDE RAMSEY ADDITION John H. Davis 8D Res. 50' Pavement $ 5.44 $ 272.00 2501 Poly Webb Rd. 50' Curb 1.06 53.00 #917 $ 325.00 Arlington, Texas 76016 Cecil Burford 8E Res. 50' Pavement $ 5.44 $ 272.00 5812 Dallas Ave. 50' Curb 1.06 53.00 76112 85 Sq. Ft. Driveway 1.18 100.30 $ 425.30 H. E. Shamburger 8F & E'k-8G Res. 75' Pavement $ 5.44 $ 408.00 5808 Dallas Ave. 75' Curb 1.06 79.50 76112 140 Sq. Ft. Driveway 1.18 165.20 $ 652.70 Cleo Stephens 8H & W'k-8G Res. 75' Pavement $ 5.44 $ 408.00 c/o Bill R. Reynolds 75' Curb 1.06 79.50 7366 Meadowbrook 140 Sq.Ft.Driveway 1.18 165.20 76112 $ 652.70 Clinton D. Wright 9 Apt. 97' Adjusted to (easement) Realtors Assn. 85' Pavement $20.19 $1,716.15 6145 Wedgwood Dr. 85' Curb 1.06 90.10 76133 155 Sq. Ft. Driveway 1.18 182.90 $1,989.15 2. PROJECT NO. 104-22000-145, UNIT I: DALIAS AVENUE, CONTINUED: BLOCK OWNERS LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE RAMSEY ADDITION Clinton D. Wright 10 Comm. 97' Pavement $20.19 $1,958.43 Realtors Assn. 97' Curb 1.06 102.82 6145 Wedgwood Dr. 85 Sq. Ft. Driveway 1.18 100.30 76133 $2,161.55 Gs N. BUTTS SURVEY Halaire M. Rutkowski Tr. 9 Comm. (Owner Occupied) 5708 Dallas Avenue 133' Pavement $12.82 $1,705.06 76112 133' Curb & Gutter 1.06 140.98 85 Sq. Ft. Driveway 1.18 100.30 $1,946.34 D, J. WILKINSON ADDITION J. W. Patterson 3 Comm. 85' Pavement $20.19 $1,716.15 5658 E. Lancaster 85' Curb 1.06 90.10 Apt. 106 76112 $1,806.25 J. W. Patterson 4 Comm. 85' Pavement $20.19 $1,716.15 5658 E. Lancaster 85' Curb 1.06 90.10 Apt. 106 202 Sq. Ft.Driveway 1.18 238.36 76112 $2,044.61 UNIT I -TOTAL COST TO PROPERTY OWNERS. .. .. .. ... . . . . .. . . . .. .$18,860.61 3. PROJECT NO. 104-22000-145, UNIT I-A: DALLAS AVENUE FROM CANTON DRIVE TO I.H. 820, to be improved by constructing a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK D_WRS LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF CANTON DRIVE AND DALLAS AVENUE. 1IORTH SIDE WEST HANDLEY ADDITION South Central Oil Co. 1 & 2 3 100' Adjusted to P.O. Box 2039 Comm. 70' Pavement $26.93 $1,885.10 Tulsa, Okla. 70' Curb 1.06 74.20 74102 $1,959.30 Elizabeth S. Pierce 3 thru 3 170' Pavement $26.93 $4,578.10 3703 Harymount Dr. W20-6 Ind. 170' Curb 1.06 180.20 San Antonio, Texas $4,758.30 Herbert A. Webber E30-6 & 3 65' Pavement $26.93 $1,750.45 1600 Newsome Court W35-7 Ind. 65' Curb 1.06 68.90 Arlington, Texas 171 Sq. Ft. Driveway 1.18 201.78 $2,021.13 K.D. Middleton 8 & E154 3 65' Pavement $26.93 $1,750.45 5929 Dallas Ave. Ind. 65' Curb 1.06 68.90 76112 $1,819.35 C.M. Cantrell 0 4 49.99' Pavement $26.93 $1,346.23 7005 Robinhood Lane Ind. 49.99' Curb 1.06 52.99 76112 116 Sq. Ft. Driveway 1.18 136.88 $1,536.10 4. PROJECT NO. 104-22000-145, UNIT I-A: DALLAS AVENUE, CONTINUED: BLOCK OWNERS LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH H SIDE WEST HANDLEY ADDITION Columbus M. Cantrell S137.5-1& 4 73' Pavement $26.93 $1,965.89 5932 E. Lancaster S137.5-Wk-2 Ind. 73' Curb 1.06 77.38 76112 85 Sq. Ft. Driveway 1.18 100.30 $2,143.57 P.E. Mokszyckle S137.5-E'k-2& 4 75' Pavement $26.93 $2,019.75 & R.C. Hunsaker S137.5-3 Ind. 75' Curb 1.06 79.50 6005 S. Hampshire 155 Sq. Ft.. Driveway 1.18 182.90 76112 $2,282.15 Ft. Worth Pressed 4-5 4 100' Pavement $26.93 $2,693.00 Steel Mfg. Co. Ind. 100' Curb 1.06 106.00 5929 S. Hampshire 155 Sq. Ft.Driveway 1.18 182.90 76112 $2,981.90 Nobia Taylor S120-6 4 (Owner Occupied) 6025 Dallas Ave. Ind. 50' Pavement $16.18 $ 809.00 76112 50' Curb 1.06 53.00 85 Sq. Ft. Driveway 1.18 100.30 $ 962.30 Ft. Worth Pressed S120-7&8 4 100' Pavement $26.93 $2,693.00 Steel Mfg. Co. Ind. 100' Curb 1.06 106.00 5929 S. Hampshire 155 Sq. Ft. Driveway 1.18 182.90 76112 $2,981.90 J.C. STOUGHTON SUBDIVISION Ft. Worth Pressed B Ind. 100' Pavement $26.93 $2,693.00 Steel Mfg. Co. 100' Curb 1.06 106.00 5929 S. Hampshire 155 Sq. Ft. Driveway 1.18 182.90 76112 $2,981.90 5 . PROJECT NO, 104-22000-145, UNIT I-A: DALLAS AVENUE, CONT VJED: BLOCK OWNERS LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE WEST HANDLEY ADDITION W. S. Farrell 2 thru 5 5 200'Adjusted to 621 S. Sargent Ind. 125' Pavement $26.93 $3,366.25 76103 125' Curb 1.06 132.50 233 Sq. Ft. Driveway 1.18 274.94 $3,773.69 I.H. 820 INTERSECTS SOUTH H SIDE G. N. BUTTS SURVEY Pete Mokszyckle Trs. 21-L,21-E, 227' Adjusted to 5929 S. Hampshire 21-E-1,21-E-2, Ind. 208' Pavement $26.93 $5,601.44 76112 21-K 208' Curb 1.06 220.48 290 Sq. Ft. Driveway 1.18 342.20 $6,164.12 W. D. BARTON SUBDIVISION Ft. Worth Pressed 1 & 4 185' Pavement $26.93 $4,982.05 Steel Mfg. Co. Ind. 185' Curb 1.06 196.10 5929 S. Hampshire 630 Sq. Ft. Driveway 1.18 743.40 76112 $5,921.55 JAMES & FLANAGAN ADDITION Ft. Worth Pressed A & B 207' Pavement $26.93 $5,574.51 Steel Mfg. Co. Ind. 207' Curb 1.06 219.42 5929 S. Hampshire 866 Sq. Ft. Driveway 1.18 1,021.88 76112 $6,815.81 G. N. BUTTS SURVEY Louise M. Firmin E76-Tr.21-C Ind. (Owner Occupied) 5932 Dallas Ave. 66' Pavement $16.18 $1,067.88 76112 66' Curb 1.06 69.96 85 Sq. Ft. Driveway 1.18 100.30 $1,238.14 6 . PROJECT NO, 104-22000-145, UNIT I-A: DALLAS AVENUE, CONTINUED: BLOCK aWaERS LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE G. N. BUTTS SURVEY V. G. Cook E76-W152-Tr. 21-C (Owner Occupied) 5912 Dallas Ave. Ind. 66' Pavement $16.18 $1,067.88 76112 66' -Curb 1.06 69.96 85 Sq. Ft. Driveway 1.18 100.30 $1,238.14 Ft. Worth Pressed W76-Tr. 21-C 66' Pavement $26.93 $1,777.38 Steel Mfg. Co. Ind. 66' Curb 1.06 69.96 5929 S. Hampshire $1,847.34 76112 A. S. JAHREN ADDITION A. S. Jahren A 152' Pavement $ 5.44 $ 826.88 5900 Dallas Avenue Res. 152' Curb 1.06 161.12 76112 140 Sq. Ft. Driveway 1.18 165.20 $1,153.20 UNIT I-A - TOTAL COST TO PROPERTY OWNERS. .. . .. ... . .... .. . .. . . .$54,579.89 UNIT I & I-A - TOTAL COST TO PROPERTY OWNERS. . . .. . . .... ... ... .$73,440.50 UNIT I & I-A - TOTAL COST TO CITY OF FORT W0RTH. . .. ... ... . . . . .$53,682.13 UNIT I & I-A - TOTAL ESTIMATED CONSTRUCTION C0ST. . .. .. .. . .. ..4127,122.63 7 PROJECT NO. 104-22000-145, UNIT II: SOUTH HAMPSHIRE BLVD. RECONSTRUCTION FROM WEILER BLVD. TO CANTON DRIVE, to be improved by reconstructing a six-inch thick hot-mix asphaltic concrete pave- ment on a six-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen- inch wide concrete gutter on a thirty-six foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNERS LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF WEILER BLVD. AND SOUTH HAMPSHIRE BLVD. NORTH SIDE GRANDE VISTA HEIGHTS J. W. Patterson D-1 170' Curb and Gutter $3.08 $523.60 5658 E. Lancaster Apt. $523.60 Apt. 106 76112 J. W. Patterson D-2 No Assessment - Existing Facilities 5658 E. Lancaster Apt. Apt. 106 76112 D, J. WILKINSON ADDITION J. W. Patterson 1R 18 Sq. Ft. Driveway $1.18 $ 21.24 5658 E. Lancaster Res. Apt. 106 $ 21.24 76112 Patric Blood 2 18 Sq. Ft. Driveway $1.18 $ 21.24 P.O. Box 215 Res. Bedford, Texas $ 21.24 G. N. BUTTS SURVEY Frank McClure Tr. 9-A 44 Sq. Ft. Driveway $1.18 $ 51.92 911 Macon Res. 76102 $ 51.92 8. PROJECT NO. 104-22000-145, UNIT II: SOUTH HAMPSHIRE BLVD. RECONSTRUCTION, CONTINUED: BLOCK OWNERS LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE G. N. BUTTS SURVEY Mrs. Janie N. Whitehurst Tr.20-E 77' Curb & Gutter $3.08 $237.16 2523-A Anzio Res. Dallas, Texas $237.16 0. C. Leddy Tr.20-F 100' Curb & Gutter $3.08 $308.00 3154 Sabine St. Res. 96 Sq. Ft. Driveway 1.18 113.28 76119 $421.28 RAMSEY ADDITION James L. Ward, Jr. 1 5' Curb & Gutter $3.08 $ 15.40 6570 Locke Res. 18 Sq. Ft. Driveway 1.18 21.24 76107 $ 36.64 Frank Burchell 2 26 Sq. Ft. Driveway $1.18 $ 30.68 1608 Watauga Rd. Res. $ 30.68 76131 Mrs. Rose Cowan 3 18 Sq. Ft. Driveway $1.18 $ 21.24 c/o John H. Kadleck, Jr. Res. $ 21.24 800 Northwood 76107 E. E. GASS 4 30' Curb & Gutter $3.08 $ 92.40 2400 Forest Ave. Res. 26 Sq. Ft. Driveway 1.18 30.68 76112 $123.08 Freeman L. Chambers 5 50' Curb & Gutter $3.08 $154.00 5817 S. Hampshire Res. $154.00 76112 9. PROJECT NO. 104-22000-145, UNIT II: SOUTH HAMPSHIRE BLVD. , CONTINUED: BLOCK RS LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE RAMSEY ADDITION Pete_ V. Hernandez 6 26 Sq. Ft. Driveway $1.18 $30.68 5821 S. Hampshire Res. $ 30.68 76112 Luther H. Ashley 7 No Assessment - Existing Facilities 5825 Res. 76112 CANTON DRIVE INTERSECTS SOUTH SIDE H. L. HIETT SUBDIVISION M. N. Ray 5 10 72' Adjusted to 5828 S. Hampshire Res. 55' Curb & Gutter $3.08 $169.40 76112 96 Sq. Ft. Driveway 1.18 113.28 $282.68 Velma Vick 4 10 67' Curb & Gutter $3.08 $206.36 5824 S. Hampshire Res. 18 Sq. Ft. Driveway 1.18 21.24 76112 $227.60 C. 0. Roberts 3 10 67' Curb & Gutter $3.08 $206.36 5808 S. Hampshire Res. 96 Sq. Ft. Driveway 1.18 113.28 76112 $319.64 Jerry Wayne Hamm 2 10 67' Gutter Only $1.54 $103.18 5804 S. Hampshire Res. 26 Sq. Ft. Driveway 1.18 30.68 76112 $133.86 10. PROJECT NO, 104-22000-145, UNIT II: SOUTH HAMPSHIRE BLVD,. CONTINUED: BLOCK OWNERS LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE H. L. HIETT SUBDIVISION C. D. Hart, Jr. 1 10 18 Sq. Ft. Driveway $1.18 $ 21.24 5800 S. Hampshire $ 21.24 76112 G. N. BUTTS SURVEY W. L. Roberson Tr. 20-C 70 Sq. Ft. Driveway $1.18 $ 82.60 5724 S. Hampshire Res. $ 82.60 76112 H. L. HIETT SUBDIVISION Edward L. McGowan, Jr. 3 4 18 Sq. Ft. Driveway $1.18 $ 21.24 104 East Allen Res. $ 21.24 76110 Don Richardson 2 4 26 Sq. Ft. Driveway $1.18 $ 30.68 5704 S. Hampshire Res. $ 30.68 76112 George E. Geron, Sr. 1 4 No Assessment - Existing Facilities 5700 S. Hampshire Res. 76112 OSBORNE LANE INTERSECTS Alfred C. Englehardr 2 3 No Assessment - Existing Facilities 5628 S. Hampshire Res. 76112 11. PROJECT NO, 104-22000-145, UNIT II: SOUTH HAMPSHIRE BLVD., CONTINUED: BLOCK OWNERS LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE H. L. HIETT SUBDIVISION OSBORNE LANE INTERSECTS Virgil Barker, Jr. 1 3 26 Sq. Ft. Driveway $1.18 $30.68 5624 S. Hampshire Res. $30.68 76112 G. N. BUTTS SURVEY Thomas C. Harrison Tr. 20-G 18 Sq. Ft. Driveway $1.18 $21.24 5620 S. Hampshire Res. $21.24 76112 H. L. HIETT SUBDIVISION Terry D. McClain 5 18 Sq. Ft. Driveway $1.18 $21.24 2317 Sargent Res. $21.24 76103 C. D. Hickey 4 1 26 Sq. Ft. Driveway $1.18 $30.68 5612 S. Hampshire Res. $30.68 76112 Edwin Richard Hardin 3 1 35 Sq. Ft. Driveway $1.18 $41.30 5608 S. Hampshire Res. $41.30 76112 Leldon V. Kennedy 2 1 18 Sq. Ft. Driveway $1.18 $21.24 5604 S. Hampshire Res. $21.24 76112 12. PROJECT NO, 104-22000-145, UNIT II: SOUTH HAMPSHIRE BLVD,. CONTINUED: BLOCK OWNERS LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE H. L. HIETT SUBDIVISION Eddie Lammon 1 1 35 Sq. Ft. Driveway $1.18 $41.30 4051 S. Hampshire Res. $41.30 76112 UNIT II: TOTAL COST TO PROPERTY OWNERS.. . .. . .... . .. . . .. . .$ 2,999.98 TOTAL COST TO CITY OF FORT WORTH. . . . ... . .. .. . . ..$39,162.53 TOTAL ESTIMATED CONSTRUCTION COST. . ... . . . . . . . . . .$42,162.51 0. City of Fort Worth, Texas Mayor and Council Communication LINE DATE REFERENCE SUBJECT: Award of Contract - Street and PAGE CAM NUMBER Storm Drain Improvements Dallas Avenue 7/16/73 C-2565 and South Hampshire Boulevard 1of 3 pliwcocK Council action on the project described below is requested: PROJECT DESCRIPTION Roadway R.O.W. Width Width Street Limits Feet Feet Dallas Avenue E. Lancaster 30 47 (Unit I) to Canton Dallas Avenue Canton to 40 60 (Unit I-A) IH-820 S. Hampshire Blvd. Weiler to 36 60 (Unit II) Canton Storm Drain Limits Dallas Avenue Vicinity of Dallas Avenue and South Hampshire Boulevard The 1973-75 Capital Improvements Program (page A-27) provides for the improvement of Dallas Avenue from East Lancaster Avenue to IH 820. Included in this project is an extensive storm drain system and the reconstruction of South Hampshire Boulevard from Weiler to Canton. IMPROVEMENTS The improvements will consist of widening Unit I, Dallas Avenue, East Lancaster to Canton Drive, to a 30-foot width and Unit I-A, Dallas Avenue, Canton to Iti 820 to a 40-foot width by construction of 7" thick reinforced concrete pavement, with 7" high concrete curb, on a 6" lime stabilized subgrade, along with 6" thick concrete driveways and necessary storm drain appurtenances. Unit II, South Hampshire, Weiler to Canton, will be reconstructed by construction of 6" thick hot-mix asphaltic concrete pavement, 7" high concrete curb and 18" wide concrete gutter, on a 6" lime stabilized subgrade, along with 6" concrete driveways and necessary storm drain appurtenances. DATE REFERENCE SUBJECT: Award of Contract - Street and PAGE NUMBER Storm Drain Improvements Dallas Avenue 2 or 3 7/16/73 C-2565 and South Hampshire Boulevard SUBMISSION OF BIDS The following bids have been received: Bidder Amount Tarrant Paving Corp. and $ 261,413.29 Haws & Garrett Texas Bitulithic Company 262,257.79 Austin Road Company 302,672.19 The following contractor took plans, but submitted no bid: Glade, Incorporated Bids Received: June 14, 1973 Working Days Allotted: 110 PROPOSED ASSESSMENTS AND ENHANCEMENT APPRAISALS Adjacent to Unit I and I-A (Dallas Avenue) , there are several unusual conditions as related to assessment costs to adjacent benefitted property. The zoning and use of properties is mixed, with a number of parcels being vacant. Consequently, an indepen- dent land appraiser has been employed to determine the enhancement as a result of the above improvement. The appraiser's report will be available at the Benefit Hearing as well as the appraiser. There is no question of enhancement to properties adjacent to Unit II (Hampshire Boulevard) , since the only assessments prepared are for curb, gutter and driveways where none now exist. PROJECT COST AND FINANCING Based on the low bid and in keeping with standard policy, approxi- mately $76,440.48 will be assessed against abutting property owners, to be provided for by a bond fund transfer from Revolving Fund Unspecified. However, the assessments are subject to change based on appraisals by the independent land appraisers. Sufficient funds in the amount of $328,000 are available in Project No. 104-22000-145 for the City's share of street and storm drain construction costs, right-of-way expenses, inspection engineering and administrative salaries and miscellaneous expenses, which amount to approximately $211,114.04. Of this amount $92,844.66 is for street improvements and $118,269.48 for storm drain construction. The remaining balance in the project account is for right-of-way acquisition. r &DATE REFERENCE SUBJECT: Award of Contract - Street and PAGE NUMBER Storm Drain Improvements Dallas Avenue 3 3 7/16/73 C-2565 and South Hampshire Boulevard of Recommendations It is recommended that: 1) The following bond fund transfer be approved: Amount From To Reason $ 76,440.48 Unspecified Dallas Avenue To provide Revolving and Reconstruc- funds for Fund tion of South property 042-09724-901 Hampshire Blvd. owners' share Revolving fund of construc- 042-10422-145 tion cost of Dallas Avenue from E. Lan- caster to IH 820 and reconstruc- tion of South Hampshire Blvd. from Weiler Blvd. to Canton Dr. 2) An ordinance be adopted: a) Declaring the necessity for and ordering the improvements; b) Making provisions for levying of assessments; c) Directing the Public Works Director to prepare estimates of costs and amounts to be assessed; d) Awarding the contract to Tarrant Paving Corp. and Haws & Garrett in the amount of $261,413.29; and, e) Making appropriations to cover indebtedness thereby incurred for improvements of the project named above. 3) An ordinance be adopted: a) Approving the estimates of costs and amounts proposed to be assessed; and, b) Setting August 6, 1973, as the date of the Benefit Hearing. RNL:cmc Attachments: "A" - Location Map and "B" - Engineers - Preliminary Rolls SUBMITTED BY: DI ITION BY COUNCIL: MOCESSED BY APPROVED ❑ OTHER (DESCRIBE) Adopted ordinance No, declaring the Ctry SECRETARY necessity Oxrea t and inane No. setting DATE -- CITY MANAGER the date for the Benefit Hearing,