HomeMy WebLinkAboutOrdinance 7074 1
ORDINANCE NO.
AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE-
MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF
MONY STREET
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE
CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE
OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING
THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE
CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE
CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING
THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE
CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the
hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im-
proved by raising, grading and filling same and by constructing thereon the following, to-wit:
UNIT 1: MONY STREET From Pharr Street to east property line of
Lot 1, Block 1, Ford Addition, known and
designated as Unit 1, Project No. 104-24000-
253, a seven-inch thick reinforced concrete
pavement on a six-inch thick lime stabilized
subgrade with seven-inch high superimposed
concrete curb on a forty foot roadway. Six-
inch thick concrete driveways will be cony-
structed where specified.
UNIT 2: PHARR STREET From 10' west of the southeast corner of Tract
1-B, William H. Little Survey to West Service
Road of I-35, known and designated as Unit 2,
Project No. 104-24000-253, a seven-inch thick
reinforced concrete pavement on a six-inch
thick lime stabilized subgrade with seven-inch
high superimposed concrete curb on a forty foot
roadway.
UNIT 4: PHARR STREET From Gilvin Street to 223' west, known and de-
signated as Unit 4, Project No. 104-24000- 253,
a seven-inch thick reinforced concrete pavement
on a six-inch thick lime stabilized subgrade
with seven-inch high superimposed curb on a
forty foot roadway.
P.
together with concrete curbs, gutters, driveways and incidentals to such improvements
on proper grade and line where same are not already so constructed, together with storm
sewers/ and drains and other necessary incidentals and appurtenances; all of said im-
provements to be constructed as and where shown on the Plans and in strict accordance
with the Plans and Specifications therefor; contract therefore has been made and
entered into with AUq TTN ROAD COMPANY ;
and
WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public
Works Director to prepare and file estimates of the cost of such improvements and
estimates of the amount per front foot proposed to be assessed against abutting property
and the owners thereof, and such estimates have been examined, NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT;
I.
Such estimates be, and they are hereby adopted and approved.
II.
It is hereby found and determined that the cost of improvements on each portion of
streets, avenues, and public places hereinafter described, with the amount or amounts
per front foot proposed to be assessed for such improvements against abutting pro-
perty and the owners thereof, are as follows, to-wit:
UNIT 1; MONY STREET From Pharr Street to east property line of
Lot 1, Block 1, Ford Addition, known and
designated as Unit 1, Project No. 104-
24000-253.
The estimated cost of improvements is $ 167, 887.50 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for superimpose'
concrete curb HOWM E is $ 1.06 ; the estimated amount per front foot to
be assessed against abutting property and the owners thereof for pavement is $ 26.78
the estimated amount per front foot to be assessed against abutting property and the
owners thereof for -0= wide concrete sidewalk is $ -0- ; the estimated
amount per square foot to be assessed against abutting property and the owners thereof for
six-inch thick concrete driveway is $ 1.59 per square foot; the total
estimated amount per front foot to be as against abutting property and the owners
thereof is $ 27.84 plus the cost incurred for concrete driveway construction
where specified.
III,
A hearing be given and held by and before the City Council of the City
of Fort Worth, Texas, to all owning or claiming any property abutting upon said
portions of highways, streets, avenues and public places, as well as to all
owning or claiming any interest in any such property. Such hearing shall be
given and held on the 4th day of November , 19 74 , at 9:30
in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and
the City Secretary is hereby directed to give or cause to be given notice ,of the
time and place of such hearing and of other 'matters and facts in accordance with
the terms and provisions of an Act passed at the First Called Session.of the
Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts
of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes
as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1,
emergency effective May 12, 1967. Such notices shall be. by advertisement inserted
at least three (3) times in a newspaper published in the -City of Fort Worth,
Texas, the first publication to be made at least twenty-one (21) days before
the date of said hearing: Said notice shall comply with and be in accordance with
the terms and provisions of said Act as amended. The City Secretary is further
directed to give or cause to be given personal notice of the time and place of
such hearing to all owning or claiming any property abutting on" said portions of
highways, streets, avenues and public places, as well as to all owning or claiming
any interest in any such property. Such personal notice shall be in writing and
shall be given or caused to be given by the City Secretary by depositing such
written notice in the United States, Mail at least fourteen (14) days before the
. date of the hearing, postage prepaid, in envelopes addressed to all persons
owning or claiming any interest in the respective properties abutting the high-
ways, streets, avenues and public places or portions thereof to be improved, as
the names bf such persons are shown on the current rendered tax rolls of the City
of Fort Worth and at the addresses so shown, or if the name of such respective
owners do not appear on such rendered tax rolls, then address to ,such owners as
their names are shown on the current unrendered tax rolls of the City of Fort Worth
at the addresses shown thereon. In those cases in which an owner of property
abutting a highway, street, avenue or public place or portion or portions there-
of which is to be ,improved is listed as "unknown" on the then current City of
Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth
tax rolls but no address for such owner is shown,- no notice need be mailed. In
those cases where the owner is shown to be an estate, the mailed notice may be
addressed to such estate. In this connection, the City Secretary shall prepare
and file or cause to be prepared and filed with these proceedings a list of the_
properties to be a4sessed,, the names of those persons owning or claiming any
interest in said properties to whom the notice was mailed, together with the last
known addresses determined as aforesaid of the respective owners and those per,
sons owning or claiming any interest in said property. a
The City Secretary shall certify that each of the parties in said list whose
address is shown on the then current rendered or unrendered tax rolls of the City
of Fort Worth was mailed a copy .of the notice of hearing and shall further certify
the date or dates, on which said notice' was mailed. A copy of each notice shall be
attached to such certificate, The certificate of the City Secretary will be con-
clusive evidence of the facts therein recited.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance
by copying the caption of same in the Minute Book of the City Council and by
filing the complete ordinance in the appropriate Ordinance Records of this City.
V.
This ordinance shall take effect and be in full force and effect from and
after the date of its passage.
Passed and approved this day of 19
APPROVED AS TO FORM AND LEGALITY:
City Attorney
UNIT 2: PHARR STREET From 10' west of the of the southeast corner of
Tract 1-B, William H. Little Survey to West Service
Road of I-35, known and designated as Unit 2, Project
No. 104-24000-253.
The estimated cost of improvements is $ 70,869.61 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for super-
imposed concrete curb -Wl/~ is $ 1.06 ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $26.78 ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -()- _ wide concrete sidewalk is $ -0- ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $_ -0- per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 27.84 plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 4: PHARR STREET From Gilvin Street to 223' east, known and
designated as Unit 4, Project No. 104-24000=
253.
The estimated cost of improvements is $ 28,756.65 _; the estimated amount
per front foot to be assessed against abutting property and the owners thereof for super-
imposed concrete curb ########## is $ 1.06 ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ 26.78 ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for -0- _ wide concrete sidewalk is $ -0- ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ -0- per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 27.84 plus the cost incurred for concrete driveway con-
struction where specified.
The estimated cost of improvements is $ the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ _; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ ;
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for wide concrete sidewalk is $ ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ ` per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ _, plus the cost incurred for concrete driveway con-
struction where specified.
r �
City of Fort Worth, Texas
LINE Mayor and Council Communication
.A,Luw
GRAMAM DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE
NUMBER Paving and Storm Drain, Ford Addition
10/7/74 C-2936 i or —4—
As a result of City Council approval of a community facilities contract with
the Malja Corporation (M&C C-2846, June 28, 1974) , bids have been received
for the construction of pavement and storm drains to serve a new truck
terminal facility being constructed on Lot 1, Block 1, Ford Addition, as
shown on the attached map. In addition to this work, bids were also
received for improvement of Pharr Street from the west frontage road of I-35W
west for two blocks to Gilvin Street and from the east frontage road of I-35W
east approximately 700 feet to an intersection of the proposed Greenway Park
Drive which has not yet been platted by the owners of the undeveloped
property abutting Pharr Street on the north. Greenway Park, owned by the
City of Fort Worth, abuts Pharr Street on the south.
Bid plans and bid documents provided for the submission of bids in four
units. Unit I is Mony Street from Pharr Street north approximately 1,100
feet and then east approximately 1,200 feet to an intersection with the
west frontage road of I-35W. The Mara Corporation property is located on
the north side of Mony Street where it makes a right angle turn to the east as
shown on the attached map. The McLean Trucking Company building is presently
under construction on this site with the scheduled completion date for early
in 1975. In order to provide paved access to this trucking terminal, it is
necessary as a minimum to improve that portion of Mony Street from Pharr
Street northward 1,100 feet.
Unit II provides for the improvement of Pharr Street from the west frontage
road of I-35W to Mony Street; Unit III provides for improvement of Pharr
Street from the east frontage road of I-35W to the proposed future Greenway
Park Drive; and Unit IV provides for the improvement of Pharr Street from
Mony Street to Gilvin Street adjacent to the C R I & G Railroad. Bids
received for this work are as follows:
Unit Austin Road Company Texas Bitulithic Company
I $ 271,737.62 $ 289,408.60
II 64,426.92 69,505.34
III 58,022.46 64,162.90
IV 26,142.41 28,743.22
i
Total $ 4209029.41 $ 451,820.06
Deletion of a Portion of Unit I
Subsequent to the execution,, of the Community Facilities Contract and during
the design of the project, it was determined by the7Department of'Public Works
that the consulting engineer's proposed alignment and cost estimate of the
proposed drainage system to serve the section of Mony Street located east of
the Mara property was insufficient. The bid price for the relocated storm
DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE
NUMBER
10/7/74 C-2936 Paving and Storm Drain, Ford Addition 2 orb_
drain, which is required to cross under I-35W is approximately $70,000, as
opposed to the original cost estimate of $11,715. It is proposed to delete
from the contract the construction of approximately 820 feet of..Mony Street
from the east property line of the Malja Corporation.to I-35W including the
drainage facility. The City is not involved in a contract with the owners of
the property adjacent to the proposed deletion. In addition, the deleted
section is not required to serve the Malja Corporation who entered into a
Community Facilities Contract although somewhat better access would be provided.
The proposed deletion has been discussed with representatives of Malja
Corporation and they agreed to the deletion provided construction work could
proceed without delay on the remainder of Mony Street.
Additionally, during the evaluation of the higher cost of draining the portion
of Mony Street located east of the Malja Corporation property, it was learned
by the staff that multiple ownership of the adjoining property did not exist
in fact at the time of Council authorization of the Community Facilities
Contract and therefore, this section of Mony Street was not eligible for
assessment paving under the City Council adopted policy for such projects.
Unit III, Pharr Street from East Frontage Road of I-35W to Proposed,
Greenway Park Drive
The Council was advised in M&C C-2846 (June 28, 1974) that the Brants
Company has requested by letter the paving of Pharr Street east of I-35W
based on anticipated plans for the development of the abutting property.
At this time, however, no final plat has been submitted to the City by the
Brants Company nor has any community facilities contract relative to the
proposed development of this property been executed. Unless and until the
Brants Company is in fact developed, the improvement of this portion of
Pharr Street will serve no useful public purpose, and it is therefore
proposed that award of contract on this section be deferred pending further
discussions and negotiations with the Brants Company relative to their future
plans.
Summary of Recommended Award
Unit Amount
Unit I - from Pharr Street to east property line of
Marja Corporation property $ 152,625.00
Unit II - Pharr Street from west frontage road of
I-35W to Mony Street 64,426.92
Unit IV - Pharr Street from Mony Street to Gilvin
Street 26,142.41
Total $ 243,194.33
This is a reduction of $177,135.08 from the total bid received from all
four units.
DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE
NUMBER
10/7/74 C-2936 Paving and Storm Drain, Ford Addition 3 or 4
Project Cost and Financing
Based on the recommended award, approximately $128,954.63 will be assessed
against abuting properties under standard policy, to be provided for by
a Bond Fund transfer from the Revolving Fund Unspecified Account,
total construction, design engineering, inspection engineering, admin-
istration and miscellaneous costs to the City is approximately $158,915,
which will require a Bond Fund transfer of $99,000 from the 104-24000-901
Unspecified Assessment Paving Account to supplement the approximately
$60,000 in project Account No. 104-24000-253.
Recommendations
It is recommended that:
1) The following bond fund transfers be approved:
Amount From To Reason
$128,954.63 Unspecified Revolving Ford Addition To provide funds
Fund 042-09724-901 Revolving Fund for property owners'
042-10424-253 share-of construction
cost.
$ 99,000 Unspecified Assessment Ford Addition To provide for the
Paving, 104-24000-901 Assessment balance of City's
Paving share of construction
104-24000-253 cost, design engineering,
inspection, and admini-
stration and miscellaneous
expenses (supplement to
the $60,000 in the pro-
ject account.)
2) An ordinance be .adopted:
a) Declaring the necessity for and ordering the improvements;
b) Making provisions for levying assessments;
c) Directing the Public Works Department to prepare estimates
of costs and amounts to be assessed;
d) Awarding the contract to Austin Road Company, in the amount
of $243,194.33 as specified in the above summary of Recom-
mended Award, and
e) Making .appropriations to cover the indebtedness thereby
incurred for improvements of the project named above.
DATE REFERENCE suBJEcr: Award of Contract - Assessment PAGE
NUMBER
10/7/74 C-2936 Paving and Storm Drain, Ford Addition 4
3) An ordinance be adopted:
a) Approving the estimates of costs and amounts proposed-
to be assessed; and
b) Setting November 4, 1974, as the date for the Benefit
Hearing.
4) Authorization be granted to proceed immediately with construction
of drainage facilities in Pharr Street and the north-south portion
of Mony Street in advance of the public hearings in order to
expedite access to the McLean Trucking Company facility.
A`=At
5) That the community facilities contract with Malja Corporation be amended
to delete street and drainage improvements on Mony Street from east line
of Malja Corporation property to I-35W and that Unit No. III be deferred
until development of the adjacent property indicates a need for street
improvement.
SUBMITTED BY: DISPOSITIO COUNCIL: PR SSED BY
PPROVED ❑ OTHER (DESCRIBE)
Adopted Ordinance No.7G�� - Declaring the neces SECRETARY
v� for & Ordering the improvements; Adopted Ordina ILQATE
CITY MANAGER No. )07 - Setting 11- -
Hearing.
PROJECT NO. 104 -24000 - 253
aQ.
ya9
OR-tNS\�� �rQ
i
s
,a N
e�4�NP��P�QPo
BPS
7tA ST.
F T. WORTH- DALLAS TURN
LANCASTER LANCAST
CR
FORD ADDITION
Mony Street Pharr Street
£5Z-000VZ-Vol •ON 103f 0ad
N011loab aa0zi
N Ibaa W801S aNb SNIAbd 1N3WSS3SSd 'NO AM AVMN33aJ 03SOdOad
W jr
W
f- W e 3
Z m w
• _ t8M � = r v �
ti rhh, /N
Y
K G x ��
O H ;
3 J
W
W
Z
W W �• •y� � i
O m
0 O }
W y
Ir Z Q ¢¢
z LL
W
z 0
0
W W
W 0 IJ y
o ir
,� W
J a H ```,j/.
Q (A � c —� O v U~f,
_ w U V �
►- Q
cr
to
4 m
Fir
N Z Q Q J a
Q
0 x o`c 9 a
W
J � 1 < W
O J Q
•
a Z • W
lt W N ~ O
FW- Q F.. - Ir
O.
cr
W
Z w : z
Q 2 Wix cr
:* O
W
0[
p G (n in ..
o y o ` m •1 JLINn AN-Oh
O IW U' W
(n Z (A
U O N 0 Z
a W a a N « ce
4a ' z J a'
m
. N•yF
FORT WORTH, TEXAS
October 7 , 1974
TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS,
Gentlemen and Mrs, Rimmer;
In accordance with the proceedings of your Honorable Body, I have proposed
estimates of the cost of street improvements as shown below;
Estimates of the total cost of improvements on a portion of MONY STREET and portions
of sundry other streets, avenues and public places in the City of Fort Worth, Texas,
and esti.nated amounts per front foot to be assessed against abutting property and
the owners thereof, on each portion of street, avenue and public place are as follows,
to-wit;
PROJECT NO. 104-24000-253, UNIT 1, MONY STREET FROM PHARR STREET TO EAST PROPERTY LINE
OF LOT 1, BLOCK 1, FORD ADDITION to be improved by constructing a seven-inch thick
reinforced concrete pavement on a six-inch thick lime subgrade with seven-inch high
superimposed curb on a forty foot roadway,, Six-inch thick concrete driveways will be
constructed where specified,
The following assessment rates have been established;
Seven-inch reinforced concrete pavement. . . .. ...*.,, ,..$26.78/LF
Seven-inch superimposed concrete 1.06,LF
Six-inch concrete driveways. . . . . . . . . ... . .. . ... ........$ 1,59/SF
The assessments result in the following division of cost;
TOTAL COST TO PROPERTY OWNERS. . . . .. . . ,. 82,253.67
TOTAL COST TO CITY OF FORT WORTH.. . .. . . . . . . . . .. .... ..$ 85,633.83
TOTAL ESTIMATED CONSTRUCTION COST.. .. . .. . .. .. .. .......$167,887,50
PROJECT NO. 104-24000-253, TWIT 2 PHARR STREET FROM 10° WEST OF THE SOUTHEAST CORNER OF
TRACT 1-8, WILLIAM H. LITTLE SURVEY TO WEST SERVICE ROAD OF 1-35, to be improved by con-
structing a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabil-
ized subgrade with seven-inch high superimposed concrete curb on a forty foot roadway,
The following assessment rates have been established;
Seven-inch reinforced concrete pavement. , . .. .. ... .$26.78/L.F.
Seven-inch superimposed concrete curb. .. . . . . . . .. . .. . . . ... .$ 1.06/L.F.
Six-inch concrete driveways... _ v_ &. . . . o . . . .. . . ... .. ...o .$ 1.59/S,F,
The assessments .result in the following division of cost2
TOTAL COST TO PROPERTY OWNERS, , , . . , . , . . . , , $34,862.32
TOTAL COST 'TO CITY OF FORT' WORTH.. . , _ ._, . .. . , . . . , ,$36,007,"<9
TOTAL ESTIMATED CONST°RtCTTON COST, , . . . ., ,a . , . . ., . . . ,$70,869,61
PROJECT NO, 104-24000-253, 'UNIT 4; PHARR STREET FROM GYLVIN STREET To 223' EAST, to be im-
proved by constructing a seven-inch thick reinforced concrete pavement on a six-inch thick
lime stabilized subgrade with seven-inch high superimposed concrete curb on a forty foot
roadway.
The following assessment rates have been estsblished2
Seven-inch reinforced concrete pavement... . .. . ..... . . ... . $26.78/L.F,
Seven-inch superimposed concrete curb...ovo.op..o...co...o$ 1.06/L.Fo
Sias-inch concrete driveways. . . .. .. .....00..o. , ...,.00.,...$ lo59/S.F,
The assessments result in the following division of cost.
TOTAL COST TO PROPERTY OWNERS., o . o. ,o $ 11,838.64
TOTAL COST TO CITY OF 'FORT WORTH......... . ... . ..... .$ 16,918.01
TOTAL ESTIMATED CONSTRUCTION COST.o 0........ .... ._$ 28,'56.65
TOTAL COST TO PROPE;RI't OWNERS (LINITS 1, 2 & 4).. ... ..... ....... . o..... .$128,954.63
f
TOTAL COST TO CITY OF FORT WORTH (UNITS 1, 2 & 4). . .,o .. ....... . .... ...$138,559.13
TOTAL ESTIMATED CONSTRUCTION COST (T_aNITS 1, 2 & 4). . ..... ..o ... ..$267,513.76
JACK M. GRAHAM, P.E.
CITY ENGINEER
PROJECT NO, 104-24000-253, UNIT 1, MONY STREET FROM PH&RR STREET TO EAST PROPERTY LINE OF LOT 1,
BLOCK 1, FORD ADDITION to be improved by constructing a seven-inch thick reinforced concrete
pavement on a six-inch thick lime stabilized subgrade with seven-inch high superimposed concret4
curb on a forty foot roadway. Six-inch thick concrete driveways will be constructed where
specified.
BLOCK
O1,7NER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMEY..
UEST SIDE WILLIAM H. LITTLE SURVEY
C.R.I. & G. R.R. Tract 1-B 899.1' Pavement $26.78 $24,077.90
Room 805 Ind. 869.1' Curb 1.06 929.25
T & P Bldg. $25,007.1-
FORD ADDITION
H. Clayton Brants, Jr. 2 1 218.6' Pavement $26.78 $ 5,854.11
2307 Continental Life Ind. 198.6' Curb 1.06 210.52
Building - 76102 $ 6,064.6:
NORTH SIDE
Malja Corp. 1 1 399.72 ' Pavement $26.78 $10,704.50
c/o Gordon Swift Ind. 399.72 ' Curb 1.06 423.70
Commerce Building 605 Sq. Ft. Driveway 1.59 961.95
76102 $12,090.11
East Property Line of Lot 1, Block 1, Ford Addition Intersects
SOUTH SIDE
H. Clayton Brants, Jr. 3 1 338.5' Pavement $26.78 $ 9,065.03
2307 Continental Life Ind. 333.5' Curb 1.06 353.51
Bldg. - 76102 $ 9,418.54
PROJECT N0, 104-24000-253, UNIT 1, Continued:
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE FORD ADDITION
H. Clayton Brants, Jr. 3 1 210.6' Pavement $26.78 $ 5,639.87
2307 Continental Life Ind. 205.6' Curb 1.06 217.94
Building - 76102 $ 5,857,81
INTERNATIONAL ADDITION
International Harvester Co. 1 1 307.4' Pavement $26.78 $ 8,232.17
Truck Division Ind. 297.4' Curb 1.06 315.24
1809 Lamar Street
Dallas, Texas 75215 $ 8,547.41
PILGRIM PARK SUBDIVISION
Pilgrim Realty Co. 1 1 251.4' Pavement $26.78 $ 6,732.49
9530 S. Killman Ind. 251.4' Curb 1.06 266.48
Dallas, Texas
75231 $ 6,998.97
WILLIAM H, S LITTLE SURVEY
Ford Leasing Tract 1-C 297.4' Pavement $26.78 $ 7,964.37
Developing Co. Ind. 287.4' Curb 1.06 304.64
P.O. Box 1730
Dearborn, Mich.
48121 $ 8,269.01
TOTAL COST TO PROPERTY OWNERS (UNIT 1). ...............$ 82,253.67
TOTAL COST TO CITY OF FORT WORTH......................$ 85,633.83
TOTAL ESTIMATED CONSTRUCTION COST (UNIT 1)............$167,887.50
PROJECT NO 104-24000-253 UNIT 2: PHARR STREET FROM 10' WEST OF THE SOUTHEAST CORNER OF TRACT
-B WILLIAM H. LITTLE SURVEY TO WEST SERVICE ROPED OF 1-35, to be improved by constructing a
seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade with
seven-inch high superimposed concrete curb on a forty foot roadway.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE WILLIAM H. LITTLE SURVEY
Ford Leasing Tract 1-C 608' Pavement $26.78 $169282.24
Developing Co. Ind. 598' Curb 1.06 633.88
P.O. Box 1730
Dearborn, Michigan $16,916.12
48121
Service Road intersects
SOUSE
Leonard Properties Tract 15 645' Pavement $26.78 $17,273.10
115 W. Seventh St. Ind. 635' Curb 1.06 673.10
76102 $17,946.20
TOTAL COST TO PROPERTY OWNERS (UNIT 2)..............$34,862.32
TOTAL COST TO CITY OF FORT WORTH (UNIT 2)... ........$36,007.29
TOTAL ESTIMATED CONSTRUCTION COST (UNIT 2)..........$70,869.61
PROJECT NO 104-24000-253 UNIT 4.. PHARR STREET FROM GILVIN STREET TO 223' EAST, to be
improved by constructing a seven-inch thick reinforced concrete pavement on a six-inch thick
lime stabilised subgrade with seven-inch high superimposed concrete curb on a forty foot road-
way.
BLOCK
OWNER LOT ZONING FRON7&GE RATE AMOUNT ASSESSMENT
NORTH SIDE WILLI M H, LITTLE SURVEY
C.R.I. & G. R.R. Tr�act^9 80' Pavement $26.78 $ 2,142,40
Room 805 Ind. 80' Curb 1.06 84.80
T & P Bldg. $ 2,227.20
76102
C.R.I. & G. R.R. Tract 9 133' Pavement $26.78 $ 3,561.74
Room 805 � 123' Curb 1.06 130.38
T. & P. Bldg. $ 3,692.12
76102
SOUTH SIDE
Leonard Properties Tract 15 80' Pavement $26.78 $ 29142.40
115 W. Seventh St. Ind. 70' Curb 1.06 74.20
76102 $ 2*216.60
Leonard Properties Tract 1_0 133' Pavement $26.78 $ 3,561,74
115 W. Seventh St. Ind. 133' Curb 1.06 140.98
76102 $ 30702.72
TOTAL COST TO PROPERTY OWNERS (UNIT 4)...............$11,838.64
TOTAL COST TO CITY OF FORT WORTH ( UNIT 4)...........$16,918.01
TML ESTIMATED CONSTRUCTION COST (UNIT 4)...........$28,756.65
TOTAL COST TO PROPERTY OWNERS (UNITS 1, 2, & 4).............$128,954.63
TOTAL COST TO CITY OF FORT WORTH (UNITS 1, 2, & 4)..........$138,559.13
TOTAL ESTIMATED CONSTRUCTION COST (UNITS 1, 2 & 4)..........$267,513.76