Loading...
HomeMy WebLinkAboutContract 37105COMNIUUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. � / I O ) WHEREAS, L.Q. Development, LLC hereinafter called "Developer", desires to make certain improvements to Landmark Quebec Phase II, an addition to the City of Fort Worth, Texas; and WHEREAS, the said Developer has requested the City of Fort Worth, a municipal corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do certain work in connection with said improvements. NOW, THEREFORE, KNOW ALL BY THESE PRESENTS: For and in consideration of the covenants and conditions contained herein, the City and the Developer do hereby agree as follows: I. General Requirements A. C. D. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth and subsequently amended, is hereby incorporated into this Community Facilities Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder. The requirements of the Policy shall govern this Community Facilities Agreement, provided, however, that any conflict between the terms of this Community Facilities Agreement and the Policy shall be resolved in favor of this Agreement. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy. Developer acknowledges that there shall be no reduction in the amount of financial security prior to project completion and acceptance by the City. Landmark Quebec Ph. II 1 CFA 2007113 05-'I G-0 B P03 � 24 I ii Rev. 4/16/2008 E. The Developer shall award all contracts for the construction of community facilities in accordance with Section II, paragraph 7 of the Policy. F. The contracts for the construction of the public infrastructure shall be administered in conformance with paragraph 8, Section II, of the Policy. G. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character, whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, his contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said DEVELOPER, his contractors, sub -contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. H. Developer shall install or adjust all of the required utilities to serve the development or to construct the improvements required herein. I. In the event that City participation exceeds $25,000, Developer agrees that no street construction or storm drainage will begin prior to City Council approval of this Community Facilities Agreement. (Article 104.100, Ordinance 7234). J. Developer agrees that no lot shall be occupied under a certificate of occupancy until the improvements required herein have been constructed (Article 104.100, Ordinance 7234). Landmark Quebec Ph. II 2 CFA 2007113 Rev. 4/16/2008 K. Developer hereby releases and agrees to indemnify and hold the City harmless for any inadequacies in the preliminary plans, specifications and cost estimates supplied by the Developer for this contract. L. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer required to construct current and future improvements provided for in this agreement. M. Developer agrees to construct proposed improvements as shown on the exhibits attached hereto. The following exhibits are made a part hereof: Water (A)None; Sewer (A4) None; Paving (B)Attached Storm Drain (B4) Attached; Street Lights and Signs (C) Attached.. N. City shall not be responsible for any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. II. Street and Storm Drain Facilities A. The Developers) agree to install or to cause to have installed, the street, storm drainage, street lighting, street name sign and other community facilities improvements shown as "current improvements" on the attached Exhibits B. B 1 and C. B. As shown below in the "Summary of Cost for Street and Storm Drain Facilities", the Developer shall fund its share of "current improvements" and shall pay to the City for its share of the cost of street, storm drainage, street lighting, street name signs as shown on the attached Exhibits B, B 1, and C. The estimated total cost of current improvements and related support services specified in this agreement, including design, construction and inspection is estimated to $ 1,895,677.82. Landmark Quebec Ph. II 3 CFA 2007113 Rev. 4/16/2008 SUMMARY OF COST Project Name Landmark Quebec Phase 2 DOE # 5764 Item Developer Cost City Cost Total Cost A. Construction $ - 1. Streets $1,0251484.00 $ 11025,484000 2. Storm Drainage $668,613000 $ 668,613000 3. Street Lights $99,200000 $ 99,200000 4. Street Name Si ns $735.00 $ 735.00 B. Engineering Design $ C. Construction Engineering and Management by DOE (4%) $ 67,763088 $ 67,763088 D. Materials Testing by DOE (2%) $ 33,881.94 $ 337881.94 TOTALS $ 11895,677,82 - $ 11895,677082 Notes: 1. All Preliminary Plats filed after July 2000 nu sidewalks on all streets. 2. Developer's column for Item C represents four percent (4%) cost for construction inspection fees. The City will pay additional inspection fee over 4%. 3. City not preparing plans and specifications. 4. Developer's column for Item D represents two percent (2%) of paving and storm drain costs for materials testing. Landmark Quebec Ph. II 4 CFA 2007113 Rev. 4/16/2008 IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be executed in triplicate in its name and on its behalf by its SSISLaL ity Manager, attested by its City Secretary, with the corporate seal of the City affixed, and said Developer has executed this instrument in triplicate, at Fort Worth, Texas this the Oday of 200713 Approval Recommended: ATTEST: Marty Hend City Secretary Approved ATTEST: to F Attorney Corporate Secretary Landmark Quebec Ph. II 2007113 01M II'LU08 Transportation and Public Works Department Rob City of Fort Wort DEVELOPER Developer Entity Name} {Registered Agent Name and Tiile) wAQ14 _ Scale CONSULTING CIVIL ENGINEERS ■ SURVEYORS (972) 490-7090 FAX (972) 490-7099 Date Drown W.A.I. Dwg. File 47401 WS-E Project No. 47401.01 MAPSCO PAGE 46-X/W J.M. BASOUES SURVEY ABSTRACT N0.85 CITY OF FORT WORTH 7ARRANT COUNTY, TEXAS °YNEk LO DEVELOPMENT, LlC 325 MIRON, SUITE 110 SOUTHLAKE, TX 76092 VICINITY MAP LANDMARK Q UEBEC ADDITION (PH 2) FORT WORTH, TARRANT COUNTY, TEXAS SHEET OF 5 mft \m PROP. 68' CON PAVEMENT PROP. ADA � RAMP PROP. NW CENTER DR. 0 z3 Z O Q� O a0 a CONSULTING CIVIL ENGINEERS a SURVEYORS (972) 490-7090 FAX (972) 490-7099 0 PROP. 4' SIDEWAU< PROP. 68' PAVEMENT LOT 2 BLOCK 3 PROP. 54' PAVEMENT LOT 1 I(rOCFC 3 a a G�Q�i1 PROP. 4' SIDEWALK ti00 � wp� N �0 \N SHEET o' zoo' aoo' I � I SCALE: 1"= 400' Scele 1 400" Date 12/03/OI J.M. BASOUES SURVEY ABSTRACT N0.85 PHASE II PAVING EXHIBIT Design M.D.C. CITY OF FORT WORTH EXHIBIT B TARRANT COUNTY, TEXAS A Drawn : w.A.l. LANDMARK UEBEC LID DEVELOPMENT, LLC OF Dwg. File 47401CFA.dwg 325 MIRON, SUITE 110 ADDITION H 2) Project No. 47401.01 20 SOUTHLAKE, TX 76092 FORT WORTH, TARRANT COUNTY, TEXAS $ Community Facilities Agreement for Landmark Quebec (Ph-2) January 02, 2008 Exhibit B- Paving Description Quantity unit unit Price Total A. 7" Pavement 26,761 S.Y. $ 28.00 $ 749,308,00 B. Lime Stabilized Subgrade 289100 S.Y. $ 2000 $ 56,200000 C. Lime (30 Ibs/SY) 442 Ton $ 115.00 $ 50,830.00 D. Saw Cut-18" Full Depth 54 L.F. $ 10.00 $ 540.00 E. Metal Guard Rail 136 L.F. $ 50.00 $ 61800600 F. 4' Side walk 6844 L.F. $ 10.00 $ 68,440000 G. Sidewalk Ramp (Type III) 8 Ea. $ 19000000 $ 81000000 H. Bottons/Striping/Sinage 1 L.S. $ 10,000000 $ 10,000000 I. Remove Ex.Sign/Metal Guard 1 L.S. $ 19000000 $ 13000600 J. ISaw Cut Full Depth (Double Cut) 992 L.F. $ 8.00 $ 71936600 K. linstall 12" Flex Base Sub -Grade 758 S.Y. $ 30.00 $ 22,740.00 L. 8" 4000psi Concrete Paving 758 S.Y. $ 55.00 $ 41,690200 M. Traffic Control 1 L.S. $ 2,000.00 $ 21000000 Subtotal $ 110257484.00 2% Testing Fee $ 20,509068 4% Inspection Fee $ 411019,36 Total $ 110877013.04 TOTALS Exhibit A *Water $ 202,033.30 Exhibit A-1 *Sanitary Sewer $ 42,538.00 Subtotal $ 244,571 o30 2% Testing Fee $ 49891.43 2% Inspection Fee 000 $ 4,891.43 Total $ 254,354.15 Exhibit B *Paving $ 1,025,484.00 Exhibit B-1 *Storm Drain $ 668,613.00 Subtotal $ 1,694,097.00 2% Testing Fee $ 333881.94 4% Inspection fee $ 677763.88 Total $ 13795,742.82 h:\officedata\work\474\02-2nd Phase\CFA-PH2\47401cfa-PH2-Conaster nay PROP. DITCH � g PROP. DITCH PROP. 42' PLUG PROP. 4' CONC. I PROP. 4'x4' FLUME SPROPe TORM DRAIN ! DROP INLET PROP. 54'`I� STORM DRAIN PROP. 42' STORM DRAIN l STORM DRAIN HEADWALL � "I II�� PROP. DITCH PROP. FLUME PROP. 48' STORM DRAII PROP. 21' STORM DRAIN PROP, DITCH PROP. 4'X4' DROP INLET PROP. 36' STORM GRAIN PROP. 39' STORM DRAIN PROP. 42" STORM DRAIN PROP. 6'X4" BOX CULVERT PROP. 4'X4' DROP INLET F W 0 PROP. 36' STORM DRAIN 04 O�Ow�• o� yQ �Vg1- CONNECT TO PH —I ��%Ll�1�iC���Il�1£olII 0' 200' 400' VV vv I I I SCALE: 7�= 400' CONSULTING CIVIL ENGINEERS • SURVEYORS (972) 490-7090 FAX (972) 490-7099 Scale : 1 = 400 Date : 12103107 J.M. BASQUES SURVEY ABSTRACT NO.85 PH4SE-71 STORM DRAIN EXHIBIT SHEET CITY OF FORT Design M.D.C. TARRANT COUNTY,ORTH TE AS EXHIBIT B-1 5 Drawn : W.A.i. LANDMARK QUEB C °YNER` LO DEVELOPMENT, LLC ADDITION (PH 2 OF Dwg. File 47401WS—EXH—PH2.dw 325 MIRON, SUITE 110 Pro'ect No. 47401.01 20 SOUTHLAKE, TX 76092 FORT WORTH, TARRANT COUNTY, TEXAS 5 Community Facilities Agreement for Landmark Quebec (Ph-2) January 02, 2008 Exhibit B-1 * Storm Drain Description Quantity Unit Unit Price Total A. 6'x4' Headwall 1 Ea. $ 4,500.00 $ 41500,00 B. 54" Headwall 1 Ea. $ 31680900 $ 3,680.00 C. Drop Inlet (4'x4') 3 Ea. $ 1,800.00 $ 5,400.00 D. Storm MH (5'x5') 1 Ea. $ 21000000 $ 21000,00 E. IStorm MH (6'x4') 1 Ea. $ 21500000 $ 21500600 F. Storm MH (7'x5') 1 Ea. $ 3,000.00 $ 3,000.00 G. 54" Reinforced Concrete Pipe 655 L.F. $ 185.00 $ 121,175,00 H. 48" Reinforced Concrete Pipe 689 L.F. $ 130.00 $ 89,570000 I. 42" Reinforced Concrete Pipe 229 L.F. $ 109.00 $ 247961.00 J. 39" Reinforced Concrete Pipe 607 L.F. $ 101.00 $ 61,307000 K. 36" Reinforced Concrete Pipe 716 L.F. $ 84.00 $ 609144000 L. 21" Reinforced Concrete Pipe 446 L.F. $ 45.00 $ 20,070000 M. 6'x4" Box Culvert 723 L.F. $ 325.00 $ 234,975000 N. Curb Inlet (101) 10 Ea. $ 2,200.00 $ 229000.00 O. Rock Riprap 222 S.Y. $ 45.00 $ 99990800 P. Trench Safety 31341 L.F. $ 1.00 $ 32341600 Subtotal $ 6689613.00 2% Testing Fee $ 13,372.26 4% InspectionFfee $ 26,744052 Total $ 708,729.78 h:\officedata\work\474\02-2nd Phase\CFA-PH2\47401 cfa-PH2-Conaster .�� NAME N0. OF POLE NIN DR. 11 SAN SABA DR. $ N. WEST CENTRE DR. 12 TOTAL LIGHT POLE 31 0 �� z3 zo 7d'� �_ 0 �o �� a �Il��Q���a�� CONSULTING CIVIL ENGINEERS • SURVEYORS (972) 490-7090 FA% (972) 490-7099 1 = 4UU Date Ueslgn m.u.�. Drown W.A.I. Dwg. File 47401 WS- Project Nc. : 47402.0 3 LOT 2 O BLOCK 3 a a �• mac, ��\i — — G�Q PROP. STREET � O• r.._.� a:�� � �/ PROP. NW CENTER DR. 100' R.O.W. PH -II) r- ,�, ,I � � R R. �o.� ,� ,I ?R(80� R � W � _" ����o �ti� PROP. STREET J.M. @ASOUES SURVEY ABSTRACT N0.85 CITY OF FORT WORTH TARRANT COUNTY, TEXAS °NYE� LO DEVELOPMENT, LLC 325 MIRON, SUITE 110 SOUTHLAKE, TX 76092 �� . yOo �0 wa:�� o' zao' aoo' L I I SCALE: 1"= 400' PHASE 17 STREET LIGHT EXHIBIT SHEET EXHIBIT C G LANDMARK UEBEC ADDITION �PH 2) of FORT WORTH, TARRANT COUNTY, TEXAS 6 s E