HomeMy WebLinkAboutContract 37105COMNIUUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
City Secretary
COUNTY OF TARRANT § Contract No. � / I O )
WHEREAS, L.Q. Development, LLC hereinafter called
"Developer", desires to make certain improvements to Landmark Quebec Phase II, an
addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I.
General Requirements
A.
C.
D.
The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
Landmark Quebec Ph. II 1
CFA 2007113 05-'I G-0 B P03 � 24 I ii
Rev. 4/16/2008
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
Landmark Quebec Ph. II 2
CFA 2007113
Rev. 4/16/2008
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A4) None; Paving (B)Attached
Storm Drain (B4) Attached; Street Lights and Signs (C) Attached..
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developers) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B. B 1 and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B 1,
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $ 1,895,677.82.
Landmark Quebec Ph. II 3
CFA 2007113
Rev. 4/16/2008
SUMMARY OF COST
Project Name Landmark Quebec Phase 2
DOE # 5764
Item
Developer
Cost
City Cost
Total Cost
A. Construction
$ -
1. Streets
$1,0251484.00
$ 11025,484000
2. Storm Drainage
$668,613000
$ 668,613000
3. Street Lights
$99,200000
$ 99,200000
4. Street Name Si ns
$735.00
$ 735.00
B. Engineering Design
$
C. Construction Engineering
and Management by DOE (4%)
$ 67,763088
$ 67,763088
D. Materials Testing by DOE
(2%)
$ 33,881.94
$ 337881.94
TOTALS
$ 11895,677,82
-
$ 11895,677082
Notes:
1. All Preliminary Plats filed after July 2000 nu sidewalks on all streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
Landmark Quebec Ph. II 4
CFA 2007113
Rev. 4/16/2008
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its SSISLaL ity Manager, attested by
its City Secretary, with the corporate seal of the City affixed, and said Developer has
executed this instrument in triplicate, at Fort Worth, Texas this the Oday of
200713
Approval Recommended:
ATTEST:
Marty Hend
City Secretary
Approved
ATTEST:
to F
Attorney
Corporate Secretary
Landmark Quebec Ph. II
2007113
01M II'LU08
Transportation and Public Works
Department
Rob
City of Fort Wort
DEVELOPER
Developer Entity Name}
{Registered Agent Name and Tiile)
wAQ14 _
Scale
CONSULTING CIVIL ENGINEERS ■ SURVEYORS
(972) 490-7090 FAX (972) 490-7099
Date
Drown W.A.I.
Dwg. File 47401 WS-E
Project No. 47401.01
MAPSCO PAGE 46-X/W
J.M. BASOUES SURVEY ABSTRACT N0.85
CITY OF FORT WORTH
7ARRANT COUNTY, TEXAS
°YNEk LO DEVELOPMENT, LlC
325 MIRON, SUITE 110
SOUTHLAKE, TX 76092
VICINITY MAP
LANDMARK Q UEBEC
ADDITION (PH 2)
FORT WORTH, TARRANT COUNTY, TEXAS
SHEET
OF
5
mft
\m
PROP. 68' CON
PAVEMENT
PROP. ADA
� RAMP PROP. NW CENTER DR.
0
z3
Z O
Q�
O
a0
a
CONSULTING CIVIL ENGINEERS a SURVEYORS
(972) 490-7090 FAX (972) 490-7099
0
PROP. 4'
SIDEWAU<
PROP. 68'
PAVEMENT
LOT 2
BLOCK 3
PROP. 54'
PAVEMENT
LOT 1
I(rOCFC 3
a a G�Q�i1
PROP. 4'
SIDEWALK
ti00 � wp�
N
�0
\N
SHEET
o' zoo' aoo'
I � I
SCALE: 1"= 400'
Scele 1 400" Date 12/03/OI J.M. BASOUES SURVEY ABSTRACT N0.85 PHASE II PAVING EXHIBIT
Design M.D.C. CITY OF FORT WORTH EXHIBIT B
TARRANT COUNTY, TEXAS A
Drawn : w.A.l. LANDMARK UEBEC
LID DEVELOPMENT, LLC OF
Dwg. File 47401CFA.dwg 325 MIRON, SUITE 110
ADDITION H 2)
Project No. 47401.01 20 SOUTHLAKE, TX 76092 FORT WORTH, TARRANT COUNTY, TEXAS
$
Community Facilities Agreement
for
Landmark Quebec (Ph-2)
January 02, 2008
Exhibit B- Paving
Description
Quantity
unit
unit Price
Total
A.
7" Pavement
26,761
S.Y.
$ 28.00
$ 749,308,00
B.
Lime Stabilized Subgrade
289100
S.Y.
$ 2000
$ 56,200000
C.
Lime (30 Ibs/SY)
442
Ton
$ 115.00
$ 50,830.00
D.
Saw Cut-18" Full Depth
54
L.F.
$ 10.00
$ 540.00
E.
Metal Guard Rail
136
L.F.
$ 50.00
$ 61800600
F.
4' Side walk
6844
L.F.
$ 10.00
$ 68,440000
G.
Sidewalk Ramp (Type III)
8
Ea.
$ 19000000
$ 81000000
H.
Bottons/Striping/Sinage
1
L.S.
$ 10,000000
$ 10,000000
I.
Remove Ex.Sign/Metal Guard
1
L.S.
$ 19000000
$ 13000600
J.
ISaw Cut Full Depth (Double Cut)
992
L.F.
$ 8.00
$ 71936600
K.
linstall 12" Flex Base Sub -Grade
758
S.Y.
$ 30.00
$ 22,740.00
L.
8" 4000psi Concrete Paving
758
S.Y.
$ 55.00
$ 41,690200
M.
Traffic Control
1
L.S.
$ 2,000.00
$ 21000000
Subtotal
$ 110257484.00
2% Testing Fee
$ 20,509068
4% Inspection Fee
$ 411019,36
Total
$ 110877013.04
TOTALS
Exhibit A *Water $ 202,033.30
Exhibit A-1 *Sanitary Sewer $ 42,538.00
Subtotal $ 244,571 o30
2% Testing Fee $ 49891.43
2% Inspection Fee 000 $ 4,891.43
Total $ 254,354.15
Exhibit B *Paving $ 1,025,484.00
Exhibit B-1 *Storm Drain $ 668,613.00
Subtotal $ 1,694,097.00
2% Testing Fee $ 333881.94
4% Inspection fee $ 677763.88
Total $ 13795,742.82
h:\officedata\work\474\02-2nd Phase\CFA-PH2\47401cfa-PH2-Conaster
nay
PROP. DITCH
� g PROP. DITCH
PROP. 42' PLUG
PROP. 4' CONC. I PROP. 4'x4'
FLUME SPROPe TORM DRAIN ! DROP INLET
PROP. 54'`I�
STORM DRAIN
PROP. 42'
STORM DRAIN l STORM DRAIN
HEADWALL � "I II�� PROP. DITCH
PROP.
FLUME
PROP. 48'
STORM DRAII
PROP. 21'
STORM DRAIN
PROP, DITCH
PROP. 4'X4'
DROP INLET
PROP. 36'
STORM GRAIN
PROP. 39'
STORM DRAIN
PROP. 42"
STORM DRAIN
PROP. 6'X4"
BOX CULVERT
PROP. 4'X4'
DROP INLET
F
W
0
PROP. 36'
STORM DRAIN
04 O�Ow�•
o�
yQ �Vg1-
CONNECT TO
PH —I
��%Ll�1�iC���Il�1£olII 0' 200' 400'
VV vv I I I
SCALE: 7�= 400'
CONSULTING CIVIL ENGINEERS • SURVEYORS
(972) 490-7090 FAX (972) 490-7099
Scale : 1 = 400 Date : 12103107 J.M. BASQUES SURVEY ABSTRACT NO.85 PH4SE-71 STORM DRAIN EXHIBIT SHEET
CITY OF FORT
Design M.D.C. TARRANT COUNTY,ORTH TE AS EXHIBIT B-1 5
Drawn : W.A.i. LANDMARK QUEB C
°YNER` LO DEVELOPMENT, LLC ADDITION (PH 2 OF
Dwg. File 47401WS—EXH—PH2.dw 325 MIRON, SUITE 110
Pro'ect No. 47401.01 20 SOUTHLAKE, TX 76092 FORT WORTH, TARRANT COUNTY, TEXAS 5
Community Facilities Agreement
for
Landmark Quebec (Ph-2)
January 02, 2008
Exhibit B-1 * Storm Drain
Description
Quantity
Unit
Unit Price
Total
A.
6'x4' Headwall
1
Ea.
$ 4,500.00
$ 41500,00
B.
54" Headwall
1
Ea.
$ 31680900
$ 3,680.00
C.
Drop Inlet (4'x4')
3
Ea.
$ 1,800.00
$ 5,400.00
D.
Storm MH (5'x5')
1
Ea.
$ 21000000
$ 21000,00
E.
IStorm MH (6'x4')
1
Ea.
$ 21500000
$ 21500600
F.
Storm MH (7'x5')
1
Ea.
$ 3,000.00
$ 3,000.00
G.
54" Reinforced Concrete Pipe
655
L.F.
$ 185.00
$ 121,175,00
H.
48" Reinforced Concrete Pipe
689
L.F.
$ 130.00
$ 89,570000
I.
42" Reinforced Concrete Pipe
229
L.F.
$ 109.00
$ 247961.00
J.
39" Reinforced Concrete Pipe
607
L.F.
$ 101.00
$ 61,307000
K.
36" Reinforced Concrete Pipe
716
L.F.
$ 84.00
$ 609144000
L.
21" Reinforced Concrete Pipe
446
L.F.
$ 45.00
$ 20,070000
M.
6'x4" Box Culvert
723
L.F.
$ 325.00
$ 234,975000
N.
Curb Inlet (101)
10
Ea.
$ 2,200.00
$ 229000.00
O.
Rock Riprap
222
S.Y.
$ 45.00
$ 99990800
P.
Trench Safety
31341
L.F.
$ 1.00
$ 32341600
Subtotal
$ 6689613.00
2% Testing Fee
$ 13,372.26
4% InspectionFfee
$ 26,744052
Total
$ 708,729.78
h:\officedata\work\474\02-2nd Phase\CFA-PH2\47401 cfa-PH2-Conaster
.��
NAME
N0. OF POLE
NIN DR.
11
SAN SABA DR.
$
N. WEST CENTRE DR.
12
TOTAL LIGHT POLE
31
0
��
z3
zo
7d'�
�_
0
�o
��
a
�Il��Q���a��
CONSULTING CIVIL ENGINEERS • SURVEYORS
(972) 490-7090 FA% (972) 490-7099
1 = 4UU Date
Ueslgn m.u.�.
Drown W.A.I.
Dwg. File 47401 WS-
Project Nc. : 47402.0
3
LOT 2 O
BLOCK 3 a a �•
mac, ��\i
— — G�Q
PROP. STREET � O•
r.._.� a:�� � �/
PROP. NW CENTER DR.
100' R.O.W. PH -II) r-
,�, ,I � � R R. �o.�
,� ,I ?R(80� R � W � _" ����o
�ti�
PROP. STREET
J.M. @ASOUES SURVEY ABSTRACT N0.85
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
°NYE� LO DEVELOPMENT, LLC
325 MIRON, SUITE 110
SOUTHLAKE, TX 76092
�� .
yOo �0 wa:��
o' zao' aoo'
L I I
SCALE: 1"= 400'
PHASE 17 STREET LIGHT EXHIBIT SHEET
EXHIBIT C G
LANDMARK UEBEC
ADDITION �PH 2) of
FORT WORTH, TARRANT COUNTY, TEXAS 6
s
E