HomeMy WebLinkAboutContract 37108COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No._El I o �
WHEREAS, Town Center Mall, L.P., hereinafter called "Developer", desires to
make certain improvements to Fiesta Marl 44 — La Gran Plaza, an addition to the City of
Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section 11, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
Project Name -- Fiesta Grocery (a) LaGran Plaza
CFA ]dumber — 2008-029
llate@ May 14, 2008 N�
F
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such iniuries, death or
dama,aes are caused, in whole or in part, by the alle,:;ed negligence of
the City of Foist Worth, its officers, servants, or employees.
H. Developer shall install or adjust all of the required utilities to seine the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104,100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104,100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
i
Project Name -•• Fiesta Grocery �tJ LaGran Plaza 2 U •, „ ;
CFAPlumber-2008-029� r,l
Date: May 14, 2008 " 'r t GL,
construct current and future improvements provided for in this
agreement.
AMENI>MI N"TS TU TI11"s FOL[.,OWING
NECESSARY PER PROJECT SPECIFICATIONS
SECTIONS AS
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)Nones Sewer (A -I) None; Paving (B)None Storm
Drain (13-1) Attached; Street Eights and Signs (C) None.
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibit B l .
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibit B 1. The
estimated total cost of current improvements and related support services
specified in this agreement, including design, construction and inspection
is estimated to $ Y 2,529.20
Project Name —fiesta Grocery (n7 LaGran Plaza
CfA NumUer— 2008-029
Date: May 14, 2008
SUMMARY OF
COST
Project Name Fiesfa Grocery at LaGran Plaza
DOE # 5850
Item
Developer
Cost
Clfy Cost
Total Cost
A.
Construction
$
-
1. Streets
$
-
2. Storm Drainage
$
111820M
$
117820M
3, Street Lights
$
-
$
-
4, Street Name Signs
$
-
$
B.
Engineering Design
$
C. Construction Engineering
and Management by DOE 4%)
$
472080
$
472180
D.
Materials Testing by DOE 2%
$
236.40
$
236040
TOTALS
$
12,529.20
$ -
$
12152910
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees, The City will pay additional inspection fee over 4%.
3, City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing,
Project Name —siesta Croce�y @ LaGr�n Plaza
CTA Number — 2008-029
Date: May 14, 2008
IN TESTIMONY WHEREOF, Inc City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the
executed this instrument in triplicate, at Fort Worth,
, 2008.
Approval Recommended:
ATTEST:
Project Name — ricsta Grocery @ LaCran Plaza
CP'A Number-2008-029
Date: May 14, 2008
City affixed, and said Developer has
Texas this the �a day of
Transportation and Public Works
Cit of Fort Worth„
Fernando Costa
Assistant City Manager
ATTEST:
Corporate Secretary
DEVELOPER:
Town Center Mall, L.P.
A Texas limited partnership
By: Town Center Property, L.L.C.
A Texas limited liability company
By: LGP Property, L.L.C.
A Texas limited liability company
its managing member
By:
r
Project Name— siesta Grocery (� LaCran Plaza
C1�A Number— 2008-029
Date: May 14, 2008
0
0
N
CONSULTING CIVIL ENGINEERS • SURVEYORS
(972) 490-7090 FAX (972) 490-7099
Scale N.T.S. Date
Design T.C.Y.
Drawn W.A.I.
Dwg. File : 31533CFA.dwg
Project No. : 31533.01(20)
MAPSCO PAGE 91-E
N.T.S.
J.F. ELLIS SURVEY ABSTRACT N0.490
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
ow+eR: LA GRAN PLAZA
4200 S. FREEWAY, SUITE 2500
FORT WORTH, TX 76155
VICINITY MAP
FIESTA MART 44
FORT WORTH, TARRANT COUNTY, TEXAS
RESTAURANT AND PARKING
RECONFIGURATION AREA
CONSULTING CIVIL ENGINEERS ■ SURVEYORS
(972) 490-7090 FAX (972) 490-7099
Scale 1 = 5UU Date U5/ 15/Ut5
Design : T.C.Y.
Drawn W.A.I.
Dwg. File : 31533CFA.dwg
Project No.: 31533.01 20
J.F. ELLIS SURVEY ABSTRACT N0.490
CITY OF FORT WORTH
TARRANT COUNTY, TEXAS
°*'°" LA GRAN PLAZA
4200 S. FREEWAY, SUITE 2500
FORT WORTH, TX 76155
'^ r#Ivy U is �Ua
0' 250' S00'
I I I
SCALE: 1 "= 500'
STORM DRAIN EXHIBIT
EXHIBIT B-1
FIESTA MART 44
FORT WORTH, TARRANT COUNTY, TEXAS
SHEET
OF
2
Community Facilities Agreement
for
FIESTA 44 - LA GRAN PLAZA
April 23, 2008
Description
Quantity
1 Unit
I Unit Price
Total
Exhibit B-1 * Storm Drain
1
Connect to Ex. 111 RCP
1
Ea.
$ 9,500.00
$ 91500000
2
Remove Existing 15"
20
LF.
$ 24.00
$ 480.00
3
30" CL III RCP
20
LF.
$ 91.00
$ 1,820.00
4
Trench Safety
20
LF.
$ 1200
$ 20.00
Subtotal $ 11,820.00
4% Inspection fee $ 472.80
2% Testing Fee $ 236A0
Total Insp /Test Fee
Total Construction Cost $
125% Total Const. Cost $
iva.zu
11,820.00
14,775.00
O:\WORK\315\33\31533 CFA-STORM SPEC 4-23-08.x1s31533 CFA-STORM SPEC 4-23-08.x1s
A WNW 0o V OCi,A W N-► ijd�'
-i W x7 0 '0 D
O
zC�ZzM ZzoC7i�z�<
n OC m n 0 m r r 0 0 0 A
=—mC) =C)> m0mm
cn;aM �AZ0)Z�
m �m mmm D�c�j
-< G) � -< � m T �l
zj 0 1
to Z mFoul
D D i-I
r a 0
3 �
O O
C C
i;
O
m
-v X
C
W a
m
iiiD rr1>DT�Di'n Z
;C
i
0 CO
OOOO40
_aUlCll
CO W C;;.
Z
�o o,0m"o 44 `mom
U C 0 0 a 0 0 0 0 0 0 0
0 0 0 0 O O O O o 0 0 0 j
fA"I 4G9 _
CEO A w N C
D
00 -69 "Co �A Ut 0 rQ (0 to (0 -P 169
tN N N w O N C) coW co k 0)00000-•OOcn0)00o0
P O C) CD CU 0 0 0 0 C) 0 0 O a
OOOCDO CD00000000