Loading...
HomeMy WebLinkAboutContract 34093-A4AMENDMENT NO. 4 STATE OF TEXAS § CITY SECRETARY CONTRACT NO (M&C Needed) COUNTY OF TARRANT § 109 3- ALI- WHEREAS, the City of Fort Worth (City) and Dunaway Associates, L.P., (Engineer) made and entered into City Secretary Contract No. 34093, (the Contract) which was authorized by the City Council by M&C C-21712 on the 26`h day of September 2006; and WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services: Street Reconstruction, Storm Drain Design on College Avenue (Page St. to W. Capps St.), Orange Street (Stanley Avenue to Townsend )r.), Lipscomb Street (W. Capps St. to W. Berry St.) and Wayside Avenue (N. Dead End to W. Cantey St.), 2004 CIP Year 4 & 5, Contract 53, Project No. 00455; DOE No. 5411 WHEREAS, it has become necessary to execute Amendment No. 4 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly - authorized representatives, enter into the following agreement which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services as specified in a proposal letter dated October 2nd5 2008, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $24,750. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $ 2085357 + $ 15,510 (Amendment No. 1) + $ 4,440 (Amendment No. 2) + $ 105570 (Amendment No. 3 + $ 24,750 Amendment No. 4 = $ 263,6270 r CITY SECRETARY FT: WORTH, TX Contract Amendment No. 2 Page 1 of 2 3. A11 other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. Executed on this the +K day of — , 2008, in Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: Greg Simmons, P.E. Acting Director, TPW Dunaway Associates, L.P. ENGINEER B, Ye Toby Ford, P.E. Vice President 1501 Merrimac Circle, Suite 100 Fort Worth, Texas 76107 APPRO Assistant Ci TO APPROVED: Fernando Costa Assistant City Manager ATTEST: 7 Marty Hend , City Secretary cgntract Authoxizatioa gal I o2 pate LEGALITY: Contract Amendment No. 2 Page2of2 ®1=FICIAL �:�CORD CITY SECRETARY F?: WORTH, TX DA No. 2006151 October 2, 2008 Ms. Dena Johnson, P.E. Program Manager City of Fort Worth Department of Engineering Fort Worth, Texas 76102 Reference: Amendment No. 4-Revised v3 2004 CIP Project Yrs 4 & 5 -College Ave, Orange St, Lipscomb St and Wayside Ave. Contract 53 Project No. 00455 Dear Ms. Johnson: Dunaway Associates, L.P. is pleased to present this Amendment No. 4 for additional engineering design services requested by the City that are beyond our original scope of services. The general scope of these additional services is as follows. Task 1 —Work within BNSF RR ROW on Lipscomb Street Our scope of services currently calls for ending roadway pavement design at the RR ROW line on Lipscomb Street. Based on comments from the 90% City review, it was requested that we continue the design of improvements through the RR ROW. This effort involved the following additional work items. 1. Coordination Meetings 2 coordination meetings are anticipated; one at the project site with City staff and BNSF representatives and one in-house meeting with City TPW and DOE staff. 2. Roadway and drainage design a. Design of the street profile grade within the BNSF ROW and redesign of the Lipscomb profile grade outside the RR ROW to create smooth transitions. b. Design of sidewalk crossing RR ROW c. Drafting of proposed RR ROW improvements on roadway plan/profile sheet d. Assistance in preparation of 2 RR Permit applications (1 —Utility crossing, 1- Work Within RR ROW (roadway)). e. Preparation of an "Exhibit A" for the RR Permit f. Addition of pay items to laid Proposal g. Additional quantity take -off and construction cost estimate items h. Addition of Special Work in RR ROW notes to plan and contract documents 1501 Merrimac Circle, SuBe 100 3 �cri Worth, Texas 76107 � Tel: 017.335.1 121 a Meho: 817.429.2135 r Fcnc: 817.335.7437 r vnvw.dunawavassoGates.com • Amendment No. 4-Revised va October 2, 2008 Page 2 Task 2 — Redesign of Orange Street Profile (approximately 9b0 LF) Our scope of services currently calls for design of sidewalks on both sides of Orange Street. Plans were prepared and submitted for 90% review with street profiles and driveway connections designed for the construction of sidewalks. Because sidewalk construction would result in conflicts with existing structures encroaching into the street ROW, and because the resulting street cross -slopes would be excessive due to the amount of curb -split necessary to create smooth connections to existing driveways, the City instructed that new sidewalks should not be constructed in this segment of street where there are no existing sidewalks. This request is for the additional effort involved in eliminating the sidewalks from the construction plans: a. Redesigning the profile grade lines to fit existing driveways without the sidewalk. b. Redrawing the plan/profile sheets with the revised profiles and eliminating the proposed sidewalks. c. Revising the quantity take -off and construction cost estimate d. Revising the Bid Proposal Task 3 —Preparation of Addenda Documents (Up to four) This task included the preparation and distribution of multiple addenda to address changes to the City's standards with regards to the "Green Cement" policy and Traffic Control Plan requirements. This request involves the following tasks: a. Coordination with City addendum content. b. Preparation of the addendum document. c. Preparation of fax sheet with all of the plan holders d. Distribution of addendum documents. e. Confirmation calls to follow up with each plan holder receipt of addendum. Task 4 —Preparation of Traffic Control Plans for utility construction at the intersection of Beny and Lipscomb St only per Special Condition D-8. This request will involve the following tasks: a. Site visit to determine existing pavement joint patterns, pavement markings and lane widths. b. Preparation of a detailed traffic control plans including advance warning signs. c. One meeting with the TPW Traffic Engineering Department. d. Prepare Quantity Estimate. e. Reproduction of Plan sheets for distribution. • Amendment No. 4-Revised v3 October 2, 2008 Page 3 A summary of the proposed budget for this contract amendment is as follows: Basic Fee Task 1 Coordination Meetings $ 600.00 Roadway & Drainage Design 61500,00 RR Permit application 22000.00 Task 2 Redesign Orange Street Profile 7,700.00 Task 3 Addenda preparation and distribution 21580,00 Task 4 Traffic Control Plan $ 59370600 TOTAL PROPOSED AMENDMENT ; 24 75nM A summary of the total project is as follows: Contract Descri tion Fee Original Contract Paving and Utility Reconstruction - 4 Streets $208,357,00 Amendment No, 1 Geotechnical Engineering Services $15 510.00 Amendment No, 2 Storm Drain Design $4 440.00 Amendment No. 3 Additional Water Line Design $10 570.00 Amendment No. 4 Design in RR ROW; Redesign of Orange Street, Traffic Control Plan for Utilities $24,750,00 TOTAL_ PROJECT $263,627,00 MMBE Participation GM Enterprises provided soil borings as a part amendment #1 and Gorrondona &Associates provide topographic surrey services as a part amendment #3. MNVBE Goal — 20% M/WBE %Provided: Original Contract Amendment No. 1 —11 Amendment No. 2 — 0% Amendment No. 3 — 11 % Amendment No. 4 — 0% ($40,672 / $208,357) ($0 / $4,440) ($11200 / $10,570) ($0 / $24,750) Revised M/WBE % (Original contract +Amendments) — 17% • Amendment No. 4-Revised v3 October 2, 2008 Page 4 Please review the enclosed information and do not hesitate to call me if you have any questions or require additional information regarding this proposal. Sincerely, DUNAWAY ASSOCIATES Kervin Campbell, E. Project Manager— Public Sector Services 2006151 Amendment#4-Rev3_DJohnson_08-?002-mam City of Fort Worth, Texas Mayor and Council Communication COUNCIL ACTION: Approved on 12/9/2008 DATE: Tuesday, December 09, 2008 LOG NAME: 20AMEND4COLLEGE REFERENCE NO.: **C-23218 SUBJECT: Authorize Amendment No. 4 in the Amount of $24,750.00 to City Secretary Contract No. 34093 an Engineering Agreement with Dunaway Associates, L.P., for Street Reconstruction and Water and Sanitary Sewer Main Replacement on College Avenue, Orange Street, Lipscomb Street and Wayside Avenue RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute Amendment No. 4 to City Secretary Contract No. 34093 with Dunaway Associates, L.P., in the amount of $24,750.00 to provide additional engineering services and plan preparation for street reconstruction and water and sewer replacement on College Avenue, Orange Street, Lipscomb Street and Wayside Avenue, thereby increasing the contract amount to $263,627.00. DISCUSSION: The 2004 Capital Improvement Program (CIP) includes funds for reconstruction of neighborhood streets including College Avenue, Orange Street, Lipscomb Street and Wayside Avenue. On September 26, 2006, (M&C C-21712) the City Council authorized the City Manager to execute an engineering agreement with Dunaway Associates, L.P., in the amount of $208,357.00 for street reconstruction and water and sanitary sewer replacement on College Avenue, (Page Street to West Capps Street), Orange Street (Stanley Avenue to Townsend Drive), Lipscomb Street (West Capps Street to West Berry Street) and Wayside Avenue (North Dead End to West Cantey Street). The contract has previously been amended three times to provide additional services not included in the original contract as follows: Amendment No. 1 $15,510.00 - Geotechnical Services Amendment No. 2 $4,440.00 -Additional Storm Drainage Design Amendment No. 3 $10,570.00 -Additional Water Lines Total Amount $30,520.00 Amendment No. 4 to the project consists of the preparation of additional plans and specifications for the street and sidewalks design, a railroad crossing, a Railroad Permit Application and Traffic Control Plans. All of the requested items are beyond the limits defined in the initial Project Scope. The railroad crossing, a 100-foot width crossing of two tracks in the Burlington Northern Santa Fe (BNSF) Railroad right-of-way at Lipscomb Avenue, was not included in the original CIP Project. During design of the project, it was determined that the deteriorated condition of the crossing, combined with the need to extend the sidewalk across the tracks, warranted its replacement. BNSF agreed to furnish and install aconcrete-panel crossing at the location. In conjunction, the City of Fort Worth agreed to construct the hot -mixed -asphaltic - concrete infield between the tracks and the pavement interface at each end of the crossing as part of the Logname: 20AMEND4COLLEGE Page 1 of 2 CIP Project. To be compliant with ADA, the west sidewalk had to be extended across the BNSF right-of- way. The work within the railroad right -of way, not anticipated in the 2004 CIP Project, requires a permit from BNSF. In addition, the requirement for a more comprehensive Traffic Control Plan for the neighborhood streets was added to the project immediately prior to advertisement. Dunaway Associates, L.P., proposes to perform the additional necessary work for a lump sum fee of $24,750.00. City staff considers this fee to be fair and reasonable for the scope of services proposed. In addition to the contract amount $5,198.00 is required for project management by the Transportation and Public Works Department. This project is located in COUNCIL DISTRICT 9, Mapsco 76U, 76V, 76Z and 90B. FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Street Improvements Fund. TO Fund/Account/Centers Submitted for City Manager's Office b� Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers C200 531200 209400045533 Fernando Costa (8476) Greg Simmons (7862) Joseph Bergeron (2384) $24.750.00 Logname: 20AMEND4COLLEGE Page 2 of 2