HomeMy WebLinkAboutContract 37131COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 31 13 l
WHEREAS, FW RIVER PLAZA, L.P., hereinafter called "Developer", desires
to make certain improvements to WEST BEND (Lot 3R Block 1 River Plaza
Complex), an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section,II, paragrain� f the
Policy.
t� U;;,�i Rudy
Project Name — West Bend River Plaza Complex 1 --
'FA
Number — 2008432
Date: May 14, 2008
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph S, Section II, of the
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such injuries, death or
damas;es are caused, in whole or in part, by the alleged ne IiQence of
the City of Fort Worth, its officers, servants, or employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, speccations
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned bybe�telap��� 'r�q>�ired to
Project Name — West Bend River Plaza Complex 2
:FA Number — 2008-032
Date: May 14, 2008
construct current and future improvements provided for in this
agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A4) None; Paving (B)Attached;
Storm Drain (B4) Attached; Street Lights and Signs (C) None.
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developers) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibit B &Exhibit B-1.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibit B &
Exhibit B-1. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to $14,263.15,
Project Name —West Bend River Plaza Complex 3
CFA Number — 2008-032
Date: May 14, 2008
SUMMARY
OF COST
Project Name West Bend -River Plaza Complex
DOE # 5955
Item
Developer
Cost
City Cost
Total Cost
A. Construction
$ -
1. Streets
$ 10,308680
$ 105308480
2. Storm Drainage
$ 3,147.00
$ 3,147.00
3. Street Lights-
4. Street Name SignsB.
Engineering Design
$
C. Construction Engineering
and Management by DOE 4%
$ 538.23
$ 538.23
D. Materials Testing by DOE 2%
$ 269.12
$ 269.12
TOTALS
$ 14,263.15
$ -
$ 14,263215
Project Name —West Bend River Plaza Complex q.
CFA Number — 2008-032
Date: May 14, 2008
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
Project Name —West Bend River Plaza Complex 5
CFA Number — 2008-032
Date: May 14, 2008
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, With the corporate seal of the
executed this instrument in triplicate, at Fort Worth,
, 2008.
Approval Recommended:
ATTEST:
Marty Hendrix
City Secretary
Corporate Secretary
', r
City affixed, and said Developer has
Texas this the day of
Transportation and Public Works
City of Fort W/orth /
wdO a.[. ----
Fernando Costa
Assistant City Manager
DEVELOPER
FW RIVER PLAZA, L.P.
By: Trademark River Plaza, L.P.
Its: General Partner
By: TRP Genpar, L.L.C.
Its: General Partner
%7iwq �=7w9 ii: wll
RICK KNIGHT
CHEF FlIVAM(_`IA1_
Project Name —West Bend River Plaza Complex
CFA Number — 2008-032
Date: May 14, 2008
0
30
COLLINSWORTH ST
W ROSEDALE ST
FoR,�R � SU BJECT
PROPERTY
w
z
Cf)
W BERRY ST
N TS
(MAPSCO GRID 76N & P)
COUNCIL DISTRICT NO. 9
ng
Jim
LJ
slit Ila
f= s 1I Fif y7'li�i�Ii z
a ��.���j Sty ¢b o B a (u
Yj U
t
S? �a ��6§� HOA
3. 4
dazljlj2� �o Y i g z j ��i_g�H•- o Jp .
ia'� ""'` €I#a�F#a*ff• ° =t F• f e ¢ �°2 3 bNa daf L ti3S Pa:
le{al ' i4;;zia��i�� ¢
ad
will
I r•� w
M, Newel
"a. fib"" �\ '�� ; ; e sk :�az5$ gY @�$ � a^
co
gj IUD
�`��
add.\,add, a
Ia
6I�3 3b
PIda T:s
/ L 6rrrt i a+0=3 r/ .
ro 3
i�
a
: �¢ar;.��3
04
ao
12
If
r - ---- I Ed
IN IM
W , `\ gfr 3
'' "I „ s
�f� �o Naga a9r%a
g y�''� it ! '1 °•. OJ n� \ �.`, ,
ah bed IRS bw
U
\ OB
laaa
r "•.MS
im
1.• \ F
g_
,
R�'y 1 ku ! �~ \ yy f F
dood
ddF k ap
v000d��• I : A
a•
x .
amEP I 4P7 t /Y a 0 f sEcc ccco c'a
Satz 'Aw
adda
dad
a� I S 3 a; o: I ssh . r
b i ktl3: ISy2j ad 8 i n \ad
-.:did
gig Mai
i / I _.> e s I s;• doF a
t r
md
I
d �m
�Y
1 38
aim
a A-8 w §vY
R a e $ z� g�
w e" eqe e m Q 25Z C 6 A�"" ZH
c, s@yny E% gBg EEgtgrz- a z 77'_gggggg3j= c d
b5`.'Sx858 �i$'s t��1 J FEI—
Ig am
J w 9�M9 34� .a4� c
c MA
/ sa Z. 3
i e wiz—FICK
Z•
41
no
Et
lu' dl Z �' D \ ¢> g
i Jgy / ;J \ Ja
/
Cot
I.°"'..,:*r, y / i /ram •h\ 1.'�v,a
/ / / *iD'aiD``�\. 5u dye
Ca���J"� Pe \� � /' % •yii' '�au""lo�i �\ � \ / x`�2�• Aa8 j,
to
\3Kcl,Ago
VjF
At
I got Sd
/ Iry 66
5, `� /�u %a
�2 SI i9 or gipp
2 �n
�D� 41
W eilga
S•i �t : 6'S ti Q
3 big
)VIViFo=I
n 7
l
�I j e \ g3 4
I > t
`s j / r
Malawi lox vie \� e
It
0 a� \\ 1Y/ 1$$JIM �: V.
m na
VIA not 09
ad
33q
ey t`tt i
yaeaysyy;
; ti i #� y/ j�" tdtit
'�j t�ii�� iIn
iltisjfFiEil{{t
i/ f !il'@j5ie1s�li Jy jilts€ i f3ijFJ
I x th 3 (i{i FJ lL V.
ai S€ 4j2i1
ri
2i�fF�jiii egg
a s ip S,:R / 3iia�i �4ii�?iiit�� i� atf[3iti
Hk Fl;fi F�s5l?2{� {iJ it°
i�;iI On tPs3�Iij ttlJj 2
j$ iYl D2; / „fLE i:;'{,t9
Fb kyx. JJsI: 1VL
sJ g�f
s3 o z-yI i s7 )[i 4' s RIFa
$`5t'fi€ a�' ii ss tiF 2 lE 13 Ito
2
-�i I e Be j liJt 6� {(= l�i+iit f� tlDi'F { E ii
SAT s a ti i� ;il'F { t•'-Jilt
--� I
j I Ey l t R+{t 1 ptl�; Rit t ii( �5ik l� p2;R t '' T� 2E44 eftJ j1 I F9 p y�S S 3 9 !
S.'s $ `3 E f�-bjff ' F JE Jt � .+;j} +1 6f1
4Ji�iiJ$ �J��Jt�li,�{,sgF it ?I �3:snit �;i �i� 3{i
/ "
J � 1
d
IL
Y 0O G go 7� o
Ile
a> 33 pgga o
a r a owwill d jfl�, 3 8
o i
aEsa Eae
fi y 33ppT j� i
CC
JAE
€Lu
= cvso
U
or 3
0 a a
o4zfrfifi E G
%-TE 3gE E
a 0
Hof=€5 =MEN
- a Esw
;:'2MV
a
'Hon§
a Ow
�ssoo��mno
z ° 55 Y�SLoEa>"v 5°bop o5i
zoo e:. _ ;25r
s6 r5$48Ya gEQa5 j5 55 eE_
Eo�`frsb:=sE$(6e55. T.eo Sa•�Y.. l5 Eg -
i''Y.=��v 8( S�Lp:S�bo �Sq Soo =2p y65E Y
3F'max - b aYBG,o �°'EE;ss `-eEBs tl
SLF crEoiSw�L�frov6ao385gg•-:a.5 > Tos�;
` €<` tb Yfrb4 _ EEg •-65a6Ew �E °J yby
€w..S JSIRilt i c cg'n•°Yc'E°-E=`"F E Z 55so —
�r•O>3^-cw H
5q°yei=.aaw Im�E:€.es:'`'r aE= a
.� or.fiESEaEfrf55Ecafr9ocs.e- € g s`=e
e Br'. 5Fi'fr5fL �6 �s_'E'6 a'.f;; S`E 9^° S Yo5 „ 6
E s�o�`f!III a o8:Ls00% on C - 6 °"0 a
s4 65 € a's'e_�8 e5 :`•1. 9v3Doo�. onbb=" LRI 0
• P.
b=€ �ny
Sa, CEi' �e€ °o.b- 06 a �a i 5 5 �e p'`fr' 3" a.=,: 'go 'e3^ 'sg° E„eq
=0•w pso€ nsote F,J- 4 -no - am ^6 �5b _ `8da _0°6 iE en w Ebw
o aLL :3E31 �p:.x �� .: S �bs• Y3-`E` e�°99 pgN :e=� -=^€ Sa aw
es vN $ .°§aw c °fr Es
-<a Mpg •£°b •.- a Ea s EO - - --°,c<.. _ _eA<, Ej5 a's$ `<E pp �'33o ba �
ID jig E'c a,s°:�°Ee v4€'.3n - nY 'eUS
R'a - _'o sm gag=e$ E«;u;= °�'O —oE E4e L ox
aw
$�z �9Et9 r a.`1 eErybi= - qn•F s$ EYEZ fr£35
SCE• --=v t5Ffi56 buE W`as p €•• • 6ms<a gwp.rE€ �¢fr� v.. Mev_--b =FY
gE gFi dSS"Fea i Ya :€ fr -€€^' Y5Ea °;' ^a2 gso- °°
� 4fr FE :E `Ep :Ee m'e ® .;w" iwv 'no _tE."°: - E cg .Yng�o
°JW 3a ww �3 w_y- aB J3 °a 1�+-.�.F .�_oa g�-s im=id °� 3^�°u 3�2= -6phg
mo am�5n < Y9 n."�` E o�•E i sr - E am °^�a g` _N� 8^00 84ED -t e� �
� > bon0 a � �a s';Ee Ss" v,; IQ ; $iMv
-EE "k. r3• a „g,g °�Cc n be Lp`0.,8E
`§xoC xE•P GodL In =?'s5- _ = v < 9E8E porb<oo3 „ ab3< .'g .63 s
i F s� fr 19 00 0 10 n2 _ r g-�e°c= 95 z oar
E s`< €4 =€e�-e� a€ '€ge_=�a3a�°` o-p ao;e `aaar $s e�
�'•.. - E E oar.. ., g 5` eSV Rx.oc ° . n n
y p�0 NO
V fist gggui,iE °�ogiti '33tiv z- zi z°a z°a zii5 <j ltyZ�vjE 0a J'n$ tl3� ^ `��$60 iaiwr>_
C; any �e aEes-.��t3ea s `re €a o`e3a €�E `E_at ,._ `pp €8 €�frM^ € as
re
NZ WLSECInotmI
NJ StJ ��� JIM
saauln,d ��f mg 4
ee® E
IF
i
NVId
`JNIAVd
SVX31 'HIHOM LUOA
ON38 1S3M
T
�V
IF IF,i_IF
:-IF 'OF
N" R ". t `~
NEW
It
IF
cpLe r It
L�NSp FF ^,
` For
0 1' `
' ��_.'•,
i�/ , y '`
S `\,• `,` '
`�;:fi
, •t '11�14 t.
tot
IF 4
ca It IF
It
III
aiwov
wat It
Q III It
ki IF
k,. 7,� t 19
:�bv�
IFIF`
IFArt- JrF
It
LL
It
It
h
I IF: IF� )` i. " FF IL I
lit.IF
IF
3 t Fis
IF
F ,
IF
It
IF
IN AIF
FE
WIT
"`£- iL
vv's 'At
` ' , • if
.000
It
`+
k NIX
I III
IF
1 ,\
L_-WIN
"FIR asNu
- -- -- -
CC!f
yItof
14
m
NJ
IN Lj IV
0 IF MINIMUM
m
m
v
x
s
if
i fFFJ
FFIF
�'(I A�
U'_.G:o
W
i
n
n
(? Bury Partners
ENGINEERING SOLUTION S
Bury &Partners-DFW, Inc.
5310 Harvest Hill Road, Suite 100
Dallas, Texas 75230
Te1972-991-0011
Fax 972-991-0278
COMMUNITY FACILITIES AGREEMENT ESTIMATE
PROJECT: WEST BEND -FORT WORTH CITY DOE NO: 5955 - PROJ NO 01041
DEVELOPER: Trademark Property Company DATE: Prepared 04-07-08
PAGE 1 of 1
WATER
DESCRIPTION
Unit
Quantit
Unit Price
Total
12-inch DR 14 PVC Water
LF
712
$31.00
$22,072.00
8-inch DR 14 PVC Water
LF
20
$24.00
$480.00
6-inch DR 14 PVC Fire S rinkler Lead
LF
18
$22.00
$396.00
6-inch DR 14 PVC Fire H Brant Lead
LF
24
$22.00
$528.00
12-inch ate valve
EA
5
$1,787.50
$8,937.50
6-inch ate valve
EA
3
$880.00
$2,640.00
4-inch ate valve
EA
4
$770.00
$3,080.00
Fire H Brant
EA
2
$2,007.50
$4,015.00
12" x 12" Ta in Sleeve -Connect to Exist 12" Main
EA
1
$3,740.00
$3,740.00
Cut &Connect to Existin 8" Main
EA
1
$550.00
$550.00
8" Detector Check & Backflow Preventer in Load Bearing Concrete
Vault with H 20 Rated Doors &Gate Valves er Cit Standard Detail
EA
2
$9,240.00
$18,480.00
6" Domestic Service w/ Vault
EA
1
$14,100.00
$14,100.00
4" Domestic Service w/ Vault
EA
4
$11,477.00
$45,908.00
2" Domestic Service
EA
1
$2,796.00
$2,796.00
2" Irri ation Service
EA
1
$2,026.00
$2,026.00
1"Air Release Valve
EA
1
$1,842.50
$1,842.50
FITTINGS
TON
3
$3,300.00
$9,900.00
Remove & Re lace As halt Pavement -North End of River Run
SY
165
$61.05
$10,073.25
Testin
LF
774
$1.10
$851.40
Trench Safe
LF
774
$1.10
$851.40
TOTAL
$153,267.05
SANITARY SEWER
DESCRIPTION
Unit
Quanti
.Unit -Price
Total
Connect 8" PVC to Existin Manhole
EA
1
$1,358.00
$1,358.00
Plu Exisitn 6" Lateral in Manhole
EA
1
$220.00
$220.00
4' Dia Manhole Over Existin 8" Main
EA
2
$2,546.00
$5,092.00
8" SDR 35 PVC Sewer Lateral to New Manhole
LF
20
$30.00
$600.00
6" SDR 35 PVC Sewer Lateral to New Manhole
LF
24
$26.00
$624.00
TOTAL
$7,894.00
TOTAL WATER 8� SANITARY SEWER $161,161.05
STORM -SEWER
DESCRIPTION
Unit
Quanti
Unit Price
Total
24" RCP Storm Pie
LF
12
$56.00
$672.00
Connect 24" RCP to Existin 54" RCP
EA
2
$825.00
$1,650.00
Connect 24" RCP to Existin Manhole
EA
1
$825.00
$825.00
TOTAL
$3,147.00
PAVING -UNIVERSITY DRIVE -DRIVE APPROACHES IN R.O.W.
DESCRIPTION
UNIT
Quantit
Unit Price
Total
Concrete Curb
LF
81
$16.00
$1,296.00
7" 3600 si Concrete Pavement
SY
200
$34.65
$6,930.00
6" Lime Stabilized sub rade
SY
200
$8.65
$1,730.00
H drated Lime - ��,
TON
3.6
$98.00
$352.80
_
_
�' �;w' �'•'
TOTAL
$10,308.80
- - � - � . r��\��� ;TOTAL STORM SEWER &PAVING
.' (I�L�� u��`�� k GRAND TOTAL
F:\30411-06\ENGINEERING\Cost Estimates\08-04-07 Rev CFA Est WestBend Water Sewer Storm.xls
$13,455.80
$174, 616.85
/�5����1$r����b
Page 1 of 1