Loading...
HomeMy WebLinkAboutContract 37148Amendment No. 2 STATE OF TEXAS § CITY SECRETARY NO, 3J I L L(D TO (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and LopezGarcia Group (Engineer) made and entered into City Secretary Contract No. 30885 (the Contract) which was authorized by the City Council by M&C C-20281; and WHEREAS, the Contract involves engineering services for the following project: Pavement Reconstruction and Water and Sewer Replacement On Portions of Ida Way, Sun Valley Drive, South Hughes Avenue and Canberra Court said fee s WHEREAS, it has become necessary to execute Amendment No Contract to include an increased scope of work and revised maximum 2 to NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract. 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated May 2, 2008, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $9,100.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $135,195,42, 3. ;;,�z� - ; All other provisions of the Contract, ``�ts�` h_erein', shall remain in full force and effect. which are not expressly amended c)��-30-i) }3 P�%�E : 53 I Contract Amendment Page 1 of 2 ORIGINAL Executed on this the • ro day of LU , Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROVED: A. Douglas Rademaker, P.E. Director, Department of Engineering LopezGarcia Group ENGINEER y Name: Doualas C. Mikeworth, P.E. Vice President Water Gardens Place 100 E. 15th Street, Suite 200 Fort Worth, TX 76102 APPROVED AS TO FO Amy Rs�y Assist t City Attorn AND LEGALITY: Fernando Costa Assistant City Manager ATTEST: 2008, in Marty Hendri City Secretary j, i Contract Amendment No. 2 Page2of2 L ® P � Z @� !� R � i ,4 May 2, 2008 Mr. Richard Argomaniz, P.E. Project Manager City of Fort Worth -Engineering Department Engineering Services Division 1000 Throckmorton Street Fort Worth, Texas 76102 RE. Request for Supplemental Agreement (Amendment No. 2) Street Reconstruction, Water and Sanitary Sewer Replacement on Ida Way, Sun Valley Drive, S_ Hughes Avenue and Canberra Court -Contract No. 7, Project No. 00020 D.O.E. No. 4573 LOPEZGARCIA GROUP Project No. 204148.00 Dear Mr_ Argomaniz This letter is in response to the City's concern with the problem of water seepage out of the joints of the recently constructed concrete pavement on Canberra Court. The City has requested that we contact a geotechnical consultant to review the problem and prepare a report with recommendations to address the seepage problem. 1 contacted Fugro Consulants, Inc., locally and was referred to Mr. Nabil Mikhail, P.E. 1 met with Mr. Mikhail at the site on Monday, April 20, 2008_ He has prepared a proposal for a study of the problem which includes obtaining soil and water samples at the site (3 borings), conducting laboratory testing of the soil and water samples collected, and preparing a letter report of their recommendations for remedial measures, if needed. This Amendment has been prepared, as requested, to modify our contract to include the additional design work by Fugro Consultants, Inc., and .for us to coordinate with the subconsultant and the City. The additional fee to provide the above mentioned services is $9,100.00. Attached is a copy of the proposal prepared for Fugro Consultant, Inc. for their services. Also attached is a summary and detailed breakdown of the labor hour projections for LOPEZGARCIA GROUP'S portion of the work as described above. The additional fee to provide the above mentioned design services are as follows: Geotechnical Report - $ 7 500.00 (See attached sub -consultant proposal) Project administration - $ 750.00 Project coordination - $ 850 00 TOTAL $ 9,100.00* Contract Summary Original Contract Amount $ 123,315.72 Amendment No_ 1 $ 2,779.70 Amendment No. 2 -Requested herein $ 9 100 00 Total Revised Amount $ 135,195.42'`* Iggroup.com Water Gardens Place,100 East 15th Street, Suite 200, Eort Worth,Texas, 76102 (817) 390-1000 (817) 882-9462 Fax May 2, 2008 Mr. Richard Argomaniz, P.E. City of Fort Worth Page 2 of 2 * Fee Breakdown_ UNIT I -Water Project No. P264-531200-605170002030 $ 0.00 UNIT I - Sewer Project No. P274-531200-705170002030 $ 0.00 UNIT II - Street Project No. C200-531200-205400002030 $ 9,100.00 ** M/UVBE participation Original Contract 22.2% Revised Contract after Amendment No. 1 23.7% Revised Contract after Amendment No. 2 22.1 % If you have any questions or need additional information concerning this amendment, please call me at (817) 390-1061. Sincerely, LOPEZGARCIA GROUP 91 b '! , , Theron Darr, P.E. Associate Principal FUGRO CONSULTANTS, INC. Proposal No. PO4.4008-1077 April 29, 2008 Lopez Garcia Group 100 East 15�' Street, Suite 200 Fort Worth, Texas 76102 Attention: Mr. Theron Darr, P.E. Associate Principal PROPOSAL FOR GEOTECHNICAL ENGINEERING CONSULTING CANBERRA COURT FORT Vi/ORTFi, TEXAS Dear Mr. Darr: 2880 Virgo Lane Dallas, Texas 75229 Tel: 972-484-8301 Fax: 972-620-7328 Fugro Consultants, Inc. is pleased to submit this proposal to perform geotechnical engineering consulting services for the referenced projects. You requested this proposal on April 28, 2008 during our site visit. PRO.IECTS DESCRIPTEOI<: It is our understanding that water is seeping on the subject street, and your concern, as well as the city engineer's, is that pavement distress may occur in the future. PROPOSED FUGRO SERVICES Fugro proposes to provide the following services with respect to the pavement issues at the two sites: A. Performing a quick review of the applicable documents provided to us; B. Advancing three borings within the street alignment and where water is observed; C. Performing lab testing on samples from the soils and water collected in order to better characterizing the issues; D. Providing a letter. report of our findi gs and providing recommendations for remedial measures, if Peeled. ,�U�1�D �; A member of the Fugro group of companies with offices throughout the world_ Canberra Court Proposal No. 04.4008-1077 April 29, 2008 Page 2 COST PROPOSAL AND SCHEDULE We estimate that the cost of this investigation will be on the order of $7,500.00. We can begin our services within one week from the notice to proceed (NTP) and will provide you the initial report within 3 weeks from the NTP. TERMS AND CONDlTlONS Our services will be performed in accordance with the attached Genera/ Conditions for Engineering and Technical Services, Schedule 40.01(Rev. Jan. 07), Enclosure 2. To indicate acceptance of our proposal and the terms and conditions, please have a duly authorized person (referred to as "Client") sign in the spaces provided and return the attached copy to us for our files_ Canberra Court Proposal No. 04.4008-1077 April 29, 2008 Page 3 Fugro appreciates the opportunity to submit this proposal and looks forward to working with you on this project. Please feel free to contact us if you have any questions or need additional information. NM/SMH/kp Enclosures CLIENT Authorizing Signature Name and Title Company Date Sincerely, FUGRO CONSULTANTS, INC. Nabil Mikhail, P.E. Senior Project Manager OZ2e✓v Saad M. Hineidi, P.E. Senior Vice President Ui'r�(�li'�J��� �LL�, City of fort Worth Amendment No. 2 Contract No. 31601 LGG No. 204148,00 Street.Reconst, Water & San.Sewer Replace. - Ida Way, Hughes Av., Sun Valley Dr. &Canberra Ct. 05/02/08 LopezGarcia Group Direct Labor -- Summary Item Labor Category Hours Rate Labor Cost 1 Project Manager 5 $ 170.00 $ 850.00 2 Civil Engineer -In -Training 0 $ 85.00 $ - 3 CADD Technician 0 $ 75.00 $ - 4 Clerical/Project Admin. 0 $ 60.00 $ - 5 Surveyor - RPLS 0 $ 140.00 $ - 6 Senior Survey Technician 0 $ 85.00 $ - 7 Two -Person GPS Survey Crew 0 $ 160.00 $ - 8 Two -Person Survey Crew 0 $ 125.00 $ - Subtotal for Direct Labor 850.00 Overhead (if applicable) Rate: 0.00% $ - Professional Fee (if applicable) Rate: 0.00% $ - Total Direct Labor $ 850.00 Direct Costs --Summary Subcontractor Costs Unit of Description Measure Quantity Rate Totals Fugro Consultants, Inc. Lum sum 1 $ 70500.00 $ 7,500.00 Subtotal of Subcontractor Costs $ 7,500.00 Subtotal of Direct Costs $ 7,500.00 Professional Fee (if applicable) Rate: 10.00% $ 750.00 Total Direct Costs $ 8,250.00 Project Totals Total Labor Costs $ 850.00 Total Direct Costs $ 8,250.00 TOTAL DELIVERY ORDER COST $ 911100.00 U i= .n co N Q (D 1� a3 ca (a CD C a) U) ❑ Y w cb4r o aCL r 6 ED oo 'p ` C O O pC U 10 O Z a) J i a V 0 X o a+ co C Z N N m m C 0 N O CL N _G J K I I , I i f I i I i I i I I I 1 of C) o r; v: u>, I 1 1 i i o I t 1 O • i I i I i 1 I I j O I � I 0 O 0 0 O 0 O O FA � 0 rn 0 ra to 0 O O °Q I O O — r u I H o 0 p i p i Q U i I I � � I � O E I O � m 0 m C C cO O C Wr I c j U I � H I � O O G m m m O ' a` » w dmm yE Iy'm� jc G C a m toi c _ 10 L c I v c m m o m (p m m m 3 g - m J 0 U- U 3 c c Wc L U m o F- omm mm mlmorn -Ioa CD �L L m —" O n` C; N m O O C m r U._ c w m c: rnL = E L 3 Z F w �nr Um ��vy ci�nm; FMI N O N