HomeMy WebLinkAboutContract 37149AMENDMENT N0.2 STATE OF TEXAS §CITY SECRETARY CONTRACT NO. � 1149 (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Transystems Corporation Consultants (Engineer) made and entered into City Secretary Contract No. 34116 (the Contract) which was authorized by the City Council by M&C C-21715 on the 26th day of September, 2006; and WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services; Street Reconstruction, Water and Sewer Replacement on Fain Street (N. Beach St to Airport Fwy), Fairview Street (Airport Fwy to Maurice Avenue), Harper Street (S. Dead End to Parrish Road), Karnes Street (Airport Fwy to Race Street) and Primrose Ave (Gwynn St to Eagle Dr), 2004 CIP Contract Year 4 & 5, Contract 46, Project No. 00445; DOE No. 5398 WHEREAS, it has become necessary to execute Amendment No. 2 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal dated March 135 20083 a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $19,580.00 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $247,207.00 3. All other provisions of the contract, which are not expressly amended herein, shall .-.--- -- -remain in-�rxl force and effect. It "�'� 41 �I"�`"ZJ ORIGINAL -`) rC� EXECUTED on this the day of Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: A.Douglas Rademaker, P.E. Director, Department of Engineering TranSystems Corporation Consultants ENGINEER sy: Name: Raul Pena III, P.E. Regional Vice -President APPROVED�AS TO FORM AND LEGALITY: ty APPROVED: Fernando Costa Assistant City Manager ATTEST: 2008_, in Marty Hendrix, City Secretary �yS�2�115 Page 2 of 2 February 22, 2008 Construction Cost X ASCE Curve "A" X 8570 Construction costs for the proposed improvements are summarized in attached eSUmate. The calculated fee for engineering design is as follows: Or!g!nal Contract (T&PW &Water Qept) Basic Services Fee $2,8031767 X 6.7% X 85% _ $159,675 Amendment 2 Construction Costs = $182,540 Revised Construction Costs = $2,986,307 Revised Calculated Fee IAith New Cun./e A. Percentage $2,986,307 X 6.7% X 85% = $170,070 Amendment 2 Basic Services is difference between original contract value and revised calculated fee $170,070 - $159,675 = $10,395 Basic Se:vlces Teta!: Additional Services: Sui Jey — Additlona! Hai Ner Street Storm Drain Easement Preparation (2) Subsurface Utility Engineering (SUE) Level B (Harper Street) Administrative (10%) Fee on MWBE Firms Total Additional SerViCcS CuSiS: Total Contract Amendment No. 1 Value: Contract value revisions areas follows: Original Contract Fee: Amendment No. 1: Amendment No. 2: TOTAL CONTRACT $215967.00 , $ 11,660.00 19 580.00 $247,207.00 $103gK _ $ 1,400 _ $ 3,850 = 835 .�1 9, 1 8 J Thank you for your consideration. Please contact me should you require any additional infomaiion. Sincerely, TranSystems Corporation Consultants i 1VsD dunicipal PSchellbach, P.E. Services Team Leader,Ld Attachments G:IFW06103801ProectMgmtlProposaMmendment 21Letter amendmert_2_2008-2-19.doc