HomeMy WebLinkAboutContract 37059 (2)COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS §
City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, Riverside Villas Apartmetnts, L.P., hereinafter called
"Developer", desires to make certain improvements to Riverside Villas Addition, an
addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph e
Policy. 1 ,:j,D
Project Name: Riverside Villas
CFANumber: 2008-009 4' V4
Date: March 892008
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such iniuries, death or
damages are caused, in whole or in part, by the alleged ne�li�ence of
the City of Fort Worth, its officers, servants, or employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required=;��
��9
1-S i{ !a ��( lyi
^,.1
Project Name: Riverside Villas 2 �'; ``.,
CFA Number: 2008-009 _
Date: March 28, 2008
construct current and future improvements provided for in this
agreement.
AMENDMENTS TO THE FOLLOWING SECTIONS AS
NECESSARY PER PROJECT SPECIFICATIONS
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A4) None; Paving (B)Attached
Storm Drain (B-1) Attached; Street Lights and Signs (C) None..
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developers) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B and B 1.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B and
B 1.. The estimated total cost of current improvements and related support
services specified in this agreement, including design, construction and
inspection is estimated to $ 50,006.750
"i j Zd
J, a A
Project Name: Riverside Villas 3
CFA Number: 2008-009
Date: March 28, 2008
Project Name Riverside Villas
CFA 2008-009
DOE 5801
Item
Developer
Cost
City Cost
Total Cost
A. Construction
$ -
1. Streets
$11,915,75
$ 111915,75
2, Storm Drainage
$38,091,00
$ 38,091,00
3, Street Lights
$ -
4. Street Name Signs
$
B. Engineering Design
$ -
C. Construction Engineering
and Management by DOE (4%)
$ 21000,27
$ 21000,27
D. Materials Testing by DOE
(2%)
$ 11000,14
$ 11000,14
TOTALS
$ 531007,16
$ -
$ 53, 007,16
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
IL
�l ) 7
I � ; � � tlr� 2•. �.
Project Name: Riverside Villas 4`^r7
CFA Number: 2008-009
Date: March 28, 2008
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the City affixed, nd said Developer has
executed this instrument in triplicate, at Fort Worth, Texas this they day of
2008.
Approval Recommended:
ATTEST:
City Secretary
Approved
Assistant
ATTEST:
Form:
Transportation and Public Works
Cit of Fort Wo�,th�
Fernando Costa
Assistant City Manager
DEVELOPER
Riverside Villas Apartments, L.P.
By: Riverside Villas Apartments I, LLC
a Texas limited liability company
its General Partner
B
Y•
J. ark Wolcott, Manager
Project Name: Riverside Villas
CFA Number: 2008-009
Date: March 28, 2008
5
IV
S
VICINITY IV1AP
�, . _ - - " i
RIVERSIDE VILLAS ADDITION
FORT WORTH, TEXAS
PROPOSED IMPROVEMENTS
CITY PROJECT NO, 008841 X-202731 W4995
DOE 5801
ENGINEER'S COST ESTIMATES -JAN. Z008*
PAY ITEM DESCRIPTION
QUANTIT UNI1 UNIT PRICE TOTAL PRICE
TEMPORARY DITCH ITEMS
1 Ditch Excavation 1600 CY $3.50 $51600.00
29 Rock Rip Rap 330 CY $35.00 $111550600
TEMPORARY DITCH TOTAL $17,150.00
STORM SEWER ITEMS
3 27" RCP 131 LF $48.00 $6,288.00
4 30" RCP 126 LF $52.00 $6,552.00
17 Single 27" Sloped End Section 1 EA $11500.00 $1,500400
17 Double 27" Sloped End Sect. 2 EA $1,500400 $3,000000
18 Double 30" Sloped End Sect. 2 EA $1,800.00 $31600.00
28 Trench Safety 1 EA $1.00 $1.00
STORM SEWER TOTAL $20,941.00
PAVING ITEMS
3 6" Lime Stab. Subgrade 485 SY $2.25 $1,091.25
2 Lime Material (271b/SY) 6.5 TON $105.00 $682.50
6 6" Reinf. Concrete Pavement 461 SY $22.00 $101142.00
PAVING TOTAL $11,915.75
TOTAL $50, 006.75
ABOVE PRICING BASED ON UNIT PRICES IN ORDINANCE NO 14552
SEPARATE CHECKS REQUIRED
CITY INSPECTION FEE (4%)
CITY MATERIALS TESTING FEE (2%)
p 20 40
N.T.S.
Future Commercial
1
EXHIBIT "B"
LAVING AND SIDEVdALK
SHEET 1 of 3
Single Family
i 5„0l0, SHIVER ROAD
::::::::
..j
--
-- -- --
::.f:::
Proposed Public Park
2 .0' :2�D':97. '
.0':::4::
I ,
a:::: I
I j ll n
O , i•71G-. 1i�VlJJ,. JJ
r 01,,
I �' 2c'
:I::
o
0 20 40 i> 0 ::::::
:::i:;:;:::
N.T.S.
111.11,16,111,
i 3:p:
CIAI
0 I
- -
00
�i
z' •pa
o
I
Future Commercial T I Multi Family
a
o 'I
I
DI
93.
::i::
0 ::2:.:;0 2 .0 :: 7:0::: 17.
0� Ip gal so gal son, 4.0
1.0'• 0'
Ir
19
I +I
a a_
EXHIBIT "B" I
PAVING AND SIDEWALK
SHEET 2 of 3
2
\
>
\
O 2 4
%as
F b@ C mmedd
� E��|S|� "S"
��� �� ��O S|�E���K
(:;:►(((�(;:�:�(
\SK2y / ��
}�� 9
�}�}�|�:�:��;��}��� }�}�}�:���:;}�
22R222G2)
\\\�\/ /\\ \\\\/\�
«<:ee:dSj SSSS2k;
\\(\\/\\�
\\\\/\/\\ \\\\/\}
:;:;��|����}����(}�� (:}�:��������[
..;.i.;.;.;.;.;.;.: .•.............
}�}�}���:�}�}�:�}�:�}�}�'�}�:�}�}���:�:�:;.
�
\\i\/\�% 3Sy2§§Skk2k2;
§\RS§222\d G222G§22�
+.t«S 3 »>«<aa<6.
... _�
\/� \\/\\\\/ /\\/� \���
.�.:�:•:.:.:.:.:.�.:.:.:.;.;.;.;.,.;.;.
�}����|�}��������}�}��������������������.
:}}�:}�}}}}}:�� ��}:}}�:�:�}�}�}
..I...... � .....
:;:;l;:;:;::
� } \
. m
: �
':}������������ ) \
}:�:�:��;:�. �� }};:}:�:;};};}
:�(�:���:(:�:� � :':�:���:(:�:�:
,;.;i:�;�;� o
)�::i;:�:�: \ �
0
'}�}�.�}�}'.. ..}}}����}����:
..•......... ( .............
�'���;�;�;�� �
�����;:;:;:
��(:�:|:;:,�; / / � § ' �:�:�}�:�}���:
| (�:�|:����� , � ���������:(:�:
•. \d]//� ƒ� �\\�
.:;:;:|:;:�:; .:.:•:•:.:.:..
; .D' \�/ƒ D : 2ƒ O' \}// G\}l/ \
����'�|�(�)�:
§ ' :(:�:;���.����
_ �������������
�}�:�}!}���::
1:�:1:�:�:;:;
}}:�}}'}}�:;:
d / [\\�
:;:�:1i;:�:;�
:�:;:�!;.:;:;:
:}'::}|::���:
������}�:�:
�}:;:�i;:�:�:
}�}���|�}�:�:
SA
\/
0
0
Mag � m]y
_ .� � \ �
\{;\ �{\\� j\\
� q\�/�\2« « !
. \}� \� \ \ \� §\
ac. �: � \. .
chur h
S E T 3� 3
PROJECT AREA MAP
w
C10
O
n
O
oy
I
w
0
Z
Q
PROPOSED IMPROVEMENTS
Scale
0 20 40
N.T.S.
Proposed
Public Park
Lot
PROP ED
\ f w
OENroN�
EXHIBIT "B-1" R��D
TEMPORARY DITCH
DRIVES & CULVERTS
SHEET 1 of 3
My(ti Fyri, it y
PROPOSED TEMPORARY
ROADSIDE D/TCH
0 20 40
N.T.S.
4'X 40 LF
o " CONC. CAP
0 VER EXI S T
1 5 " WA TER
coNsrRucT
12" ROCK R/PRAP
CONSTRUCT
2-30" RCP WI TH
SL OPED END SEC TONS
CONSTRUCT
25' CONCRETE
APPROACH
CONSTRUCT
12" ROCK R/PRAP
CONSTRUCT
ROCK RETAININr.; WALL
6" ABOVE FLOWL/NE
Future Commercial
PROPOSED TEMPORAR Y
ROADSIDE DITCH
EXHIBIT "B-1"
TEMPORARY DITCH
DRIVES & CULVERTS
SHEET 2 of 3
� � o
p i I o
� I
i
H
W �
p
p
klll
Multi Family
0 20 40
N . T. S.
CONs T,QUC r
12" ROCK RIPRAP
CONSTRUCT
1-18 " 15 0 BEND
1-SLOPED END SECTION
FL 18 " 9 D/ TCH= 585. 0
coNs rRuc r
6, CONCRETE
APPROACH
CONSTRUCT
2-27" RCP
SLOPED END
Future Commercial
PROPOSED
ROADSIDE
TH
NEC TONS
Wl
CONSTRUCT
12" ROCK RIPRAP
TEMPORAR Y
DI rCH
EXHIBIT "B-1"
TEMPORARY DITCH
DRIVES & CULVERTS
Q I Multi Family
Q �
Cnurc-h -
SHEET 3 of 3