HomeMy WebLinkAboutContract 37047COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No.
WHEREAS, HULEN RISINGER LTD., hereinafter called "Developer", desires
to make certain improvements to HULEN MEADOWS LOTS 1R-SR BLOCK 63, an
addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
Project Name — Hulen Meadows
CFA Number — 2008-023
Date —April 15, 2008
o�-o�-oo P03:38 ins
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
Policy.
F. The contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub -contractors,
officers, agents or employees, whether or not such iniuries, death or
damages are caused, in whole or in Part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
Project Name — Hulen M
CFA Number — 2008-023
Date —April 15, 2008
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A4) None; Paving (B)Attached
Storm Drain (134) None; Street Lights and Signs (C) None..
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developers) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B, B 1 and C.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B, B 1
and C. The estimated total cost of current improvements and related
support services specified in this agreement, including design,
construction and inspection is estimated to IS (91,097.91)
,Oilhi
Project Name — Hulen Meadows 3
CFA Number — 2008-023
Date —April 15, 2008
SUMMARY OF
COST
Project Name Hulen Meadows Lots 1R-5R
DOE # 5892
Item
Developer
Cost
City Cost
Total Cost
A. Construction
$ -
1. Streets
$911601,80
$ 91,601,80
2. Storm Drainage
$0.00
$ -
3. Street Lights
$0.00
$ -
4. Street Name Signs
$0.00
$
B. Engineering Design
$ -
$ -
C. Construction Engineering
and Management by DOE
4%
$ 31664,07
$ 3,664,07
D. Materials Testing by DOE
2%
$1, 832.04
$1, 832.04
TOTALS
$ 97,097,
$ -
$ 97, 097, 91
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
Z. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
Project Name — Hulen Meadows 4
CFA Number — 2008-023
Date —April 15, 2008
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the
executed this instrument in triplicate, at Fort Worth,
2008.
Approval Recommended:
ATTEST:
Marty He�dri�
City Secretary
ATTEST:
Corporate Secretary
Project Name — Hulen M'adb�dj�p �,,,� � r� 5
CFA Number — 200&023
Date —April 15, 2008 ��, c
u L `\.
City affixed, and said Developer has
Texas this the `� day of
Transportation and Public Works
City of Fort Wo h
Fernando Costa
Assistant City Manager
VLANNER / ENGINEER / L4ND5GAPE ARGHI TEGT
COT-1 K
A 5500A TES. LL C
L/�ND DEVELOPMENT DESIGN CONSUL T�4NT5
LAND PLANNING "CIVIL ENGINEERING 'I LAND%APE MGHITEGTURE
005 G Hest Park Row Drive, Arlington, Texas 76013
Phone: (0/7) 274-3g55 Fax: (0/7) 7q5-1051
Emoil: 0AL L G O T TER<9SB6 0L OBAL . NET
SURI/EYOR:
ICEETON SIR COMPANY
H.B. KEETON M.5. 5TEVE" KEE TON
REGISTERED PROFE55IONAL LAND 5URVEYOR5
2 257 OALI^IORTH 5TREE T, GRAND PRAIRIE, 7 EXA5 75050
PHONE.• (q72) 64I-0843 FAX.• (q72) 647-0154
E-MAIL: KSG401c1033G0LOBAL,NET
OWNER/DE1/ELOPER: HULEN Rl5/LAGER, L TD.
20/2 E RANDOL MIL ROAD, 5UITE 2/I1 ARLIN6TON, TEXA5 76011
PHONE: 017-870 2020, EAX.• 017-870-2025
EMAIL: NIGK96LEAREORKPROPERTIE5.60M
i ► r
AN AD�DI TIoN To TNT �� � o� �o� T Wo�TN, TARI�ANT �oUNn ; T�X�S
BEING A RE1/15ION of ALL of LorS 3 AND 4, BLoGK 63 of THE HULEN
MEADOW ADDITION AS RECORDED IN �/OLUME 388 2/5, PA6E P 9, P.R. T.G.T.
5
COMMERCIAL Lois
MARCH 2O08
1 .0
I� STONE I-�A0.7W GOIM�RGI.1L ADDITION
/ \ GAB. A, SLIDE IBJJ, P.RTG.T.
/ Y
\ SMCv P,LWl1EFSgf6Y1AL
/ I
e LOT 9
\� g$
i
,jouth fjuLn �jtreet��-c�
wazo-
I _
x�. 0
Q
sm aE ra BOC
S cl
° Ap" AS,
a' am CpOf lAIDA
is
�.1
GARDEN SF'R/ 65 /♦DDI
N
'-�
GAB. A, .Y IOE IS'!, P.RTG.T•
6LGG 5
I
� I
I
I
XMG+Ri; IND
1
I
LOT 6
LOT �
LOT B
LOT 4 1
I
I LOT 10
1
L,ot Z, ]3�oc�c
63 ""/,d
r" n/%eaciow
f�o r--t X /`/o
r--t 1i
�X"181 T s 8 • P�PA VI NG
UNIT 1 - WATER
ITEM
APPROXIMATE
UNIT ITEM DESCRIPTION "D" ITEM REFERENCE
UNIT
TOTAL
NO,
QUANTITY
MEASURE
PRICE
AMOUNT
(Furnish and Install, including all appurtenant work, complete and in place ,the following items)
1 185 L.F.
Furnish and Install 8" C-900 Water Pipe, Per linear Foot
Thirty Dollars and No Cents
Furnish and Install 8" Ductile Iron Water Pipe, Per linear Foot
Fifty six Dollars and No Cents
Bore, Per Linear Foot 8" Casing.
Two hundred nine Dollars and No Cents
Connect to Exsiting 36" Waterline, Per Each.
Eight thousand two hundred Dollars and No Cents
Connect to Exsiting 8" Waterline, Per Each.
Three hundred fifteen Dollars and No Cents
Cast Iron Fittings for Water Lines, Furnish and install Complete
in Place including Concrete Blocking, Per Ton
Three thousand seven hundred forty Dollars and No Cents
Trench Safety, Per Linear Foot
One Dollar and thirty five Cents
TOTAL AMOUNT BID WATER IMPROVEMENTS
$30.21 $5,588.85
$56.00 $3,080.00
$209.00
$11,495.00
$8,200.00 $8,200.00
$315.00 $315.00
$3,740.00 $1,870.00
$1.35 $249.00
$30,797.85
UNIT II -SEWER
ITEM
NO.
1
2
APPROXIMATE UNIT ITEM DESCRIPTION "D" ITEM REFERENCE UNIT
QUANTITY MEASURE PRICE
(Furnish and Install, including all appurtenant work, complete and in place ,the following items)
Furnish and Install 8" Ductile Iron Sewer Pipe, Per
linear Foot
67 L.F.
Thirty five Dollars and No Cents
Bore, Per Linear Foot 8" Casing.
20 L.F.
One hundred fifty three Dollars and fifty Cents
Furnish and Install 1' Clay Dam, Per Each
1 Ea No Dollars
No Cents
1 Ea
Furnish and Install 4' Sanitary Sewer Manhole,
Per Each
One thousand nine hundred fifty six Dollars and
No Cents
Trench Safety, Per Linear Foot
One Dollar and fifty Cents
TOTAL AMOUNT BID SEWER IMPROVEMENTS
� 0
I1t 1UI ;7
TOTAL
AMOUNT
$35.00 $2,345.00
$153.50 $3,070.00
$0.00 $0.00
$1,956.00 $1,956.00
$1.59 $31.89
7402.89
$ ,
UNIT II - STREET IMPROVEMENTS
(Furnish and Install, including all appurtenant work, complete and in place ,the following items)
ITEM APPROXIMATE UNIT ITEM DESCRIPTION "D" ITEM REFERENCE UNIT TOTAL
NO, QUANTITY MEASURE PRICE AMOUNT
UNIT II - STREET IMPROVEMENTS
11.5" Reinforced Concrete Pavement (4,000) PSI, Per
Square Yard`
1 11255 S.Y.
Four Dollars and fifty Cents
$4.50 $ 51648
7" Reinforced Concrete Pavement (4,000) PSI, Per
Square Yard*
1 142 S.Y.
Four Dollars and No Cents
$4.00 $ 568
6" Lime Stabilized Subgrade, Per Square Yard*
2 1540 S.Y.
Six Dollars and eighty five Cents
$6.85 $ 10,549
Hydrated Lime (36#/SY), Per Ton
3 28 Ton
One hundred nineteen Dollars and NO Cents
$119,00 $ 31332
6" Concrete Curb, Per Linear Foot
4 900 L.F.
Four Dollars and forty five Cents
$4.45 $ 4,005
Sawcut Remove & Dispose of 1,096 L.F. of Curb &
Gutter, Per Lump Sum
5
Five thousand four hundred eight Dollars and No
cents $5,480,00 $ 51480
Type II-CR4 Pavement Markers, Per Each
6 68 Ea
Nine Dollars and ten Cents
$9.10 $ 619
Type II-W4 Pavement Markers, Per Each
7 130 Ea
Nine Dollars and ten Cents
$9.10 $ 1,183
Phase I Traffic Control & Channeling Devices, Per
Lump Sum
8 1 L.S.
Four thousand nine hundred thirty Dollars and No
Cents $4,930.00 $ 4,930
Compliance with NPDES SWPPP, Per Lump Sum
9 1 L.S.
Six hundred fifty Dollars and No Cents
$650,00 $ 650
Construction Entrance, Per Each
10 1 Ea
One thousand eight hundred Dollars and No Cents
$1,800,00 $ 11800
Sediment Barrier, Per Linear Foot
11 0 L.F.
One Dollar and fifteen cents
$1.15 $ -
v ' -T TAL AMOUNT BID STREET IMPROVEMENTS $ 38,763,30
U �LSLU
SUMMARY
TOTAL AMOUNT BID WATER IMPROVEMENTS
TOTAL AMOUNT BID SEWER IMPROVEMENTS
TOTAL AMOUNT BID STREET IMPROVEMENTS
GRAND TOTAL AMOUNT BID
;
$ 30,797.85
7.402.89
$ 38,763.30
76.964.04