Loading...
HomeMy WebLinkAboutContract 37026-A3 (2)AMENDMENT N0.3 STATE OF TEXAS § CITY SECRETARY CONTRACT NO..316 4 (No M&C Needed) COUNTY OF TARRANT § WHEREAS, the City of Fort Worth (City) and Stream Water Group, Inc. (Engineer) made and entered into City Secretary Contract No. 37026 (the Contract) which was authorized by the City Council by M&C C-22744 on the 20th day of April, 2008; and WHEREAS, the Contract involves engineering services for the following project: Engineering Design Services: for Pavement Reconstruction and Water and Sanitary Sewer Replacements on 7D Hervie Street and Lake Como Drive; 7E Curzon Avenue, Penticost Street and Sanguinet Street and 7F Crestline Road, Dexter Street , Fredrick Street and Sutter Street (Project Nos. 7D-00935, 7&00932, 7F-00934 ). WHEREAS, it has become necessary to execute Amendment No. 3 to said Contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I of the Contract is amended to include the additional engineering services specified in a proposal letter dated June 149 2011, a copy of which is attached hereto and incorporated herein. The cost to City for the additional services to be performed by Engineer total $20,735.00. 2. Article II of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $708,257.00 3. All other provisions of the contract, which are not expressly amended herein, shall remain in full force andl effec . OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX EXECUTED on this the day of �J, 2011 _, Fort Worth, Tarrant County, Texas. APPROVAL RECOMMENDED: APPROV D: D'4 Dougla . Wiersig, P.E. Fernand osta I Director, Transportation and Assistant City Manager` Public Works Department Stream Water Group, Inc. ENGINEER By: Name: Shamsul Arefin, P.E. President 6737 Brentwood Stair Rd; Suite 230 Fort Worth, TX 76112 APPROVED AS TO FORM AND LEGALITY: S'R Assistant City Attorney ATTEST: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX in Group June14,2011 Mr. Gopa l Sahu, P.E. Project Manager Transportation & Public Works Department 1000 Throckmorton St Fort Worth, TX 76102 Phone: (817) 392-7949 )ZE: Contract Amendment No. 3 Engineering Design Services: 2007 Critical Capital Project (Council District 7) Dear Mr. Sahu: The following is a summary of additional work requested for Amendment No. 3 to the above referenced project, per recent design meetings with City of Fort Worth officials. Amendment No. 3: • Lake Como Drive - CD 7D: City Project No. 00935 Amendment Amount: $10,610.00 Relocation of sewer services and abandon existing sewer requested by Water Department Preparation of rights of entry documents Additional survey to locate sewer cleanouts and finish floor elevations to relocate sewer services • Crestline Road & Sutter Street- CD 7F. City Project No. 00934 Amendment Amount:o $2,775.00 Revise sewer alignment and modem design requested by City (8 Plan and Profile sheets) • Crestline Road - CD 7E: Project No. 00932, DOE No. 5857 Amendment Amount: $7,350.00 Revise sewer alignment and modem design requested by City (1 Plan and Profile sheet) Amendment No. 3 Amount (see Exhibit B-3A and 3-B): Sewer Improvements (Water Department): $20,735.00 Total Amendment No. 3 $209735900 The current status of the contract between Stream Water Group, Inc and City of Fort Worth for the above referenced project is as follows: Origi nal nal Contract Amount = $ 6205300*00 Amendment No. 1 Amount = $ 249975.00 Amendment No. 2 Amount = $ 425247*00 Amendment No. 3 Amount = $ 204735.00 Total Contract Amount including Amendment No. 1 = $ 708,257.00 Please process Amendment No. 3, to the Engineering Design Services: 2007 Critical Capital Project (Council District 7) in the amount of $20,737.00. If you require any additional information or have any questions regarding this matter, please give me a call at 817446- 4171. We appreciate the opportunity to provide engineering design services for the City of Fort Worth. Sincerely, Stream Water Grou ,Inc. Shamsul Arefm, P.E. President Copy: File OFFICIAL RECORD 61TY SECRETARY FT. WORTH, TX 6737 Brentwood Stair Rd •Suite 230 •Fort Worth, TX 76l 12 •Phone: 817.446.4171 •Fax: 817.446.4335 \vww. streamwatergroup.com