WHEREAS, the City of Fort Worth (City) and HDR Engineering, Inc.
(Engineer) made and entered into City Secretary Contract No. 33506 (the
Contract) which was authorized by the City Council by M&C &21422; and
WHEREAS, the Contract involves engineering services for the following
project:
Pavement Reconstruction and Water and Sanitary Sewer
Replacement on Geddes Avenue (Horne Street to Littlepage Street),
Halloran Street (Libbey Avenue to South Dead End)
WHEREAS, it has become necessary to execute Amendment No. 3 to
said Contract to include an increased scope of work and revised maximum
fee;
NOW THEREFORE, City and Engineer, acting herein by and through
their duly -authorized representatives, enter into the following agreement
which amends the Contract:
1.
Article I of the Contract is amended to include the additional
engineering services and provide additional contract time as specified in a
proposal letter dated October 17, 2007, a copy of which is attached hereto
and incorporated herein. The cost to City for the additional services to be
performed by Engineer total $17,199.00.
2.
Article II of the Contract is amended to provide for an increase in the
maximum fee to be paid to Engineer for all work and services performed
under the Contract, as amended, so that the total fee paid by the City for all
work and services shall not exceed the sum of $140,835.00,
3.
ti �, „i'''- � ]' �f��je provisions of the Contract which are not expressly amended
N v� ��� ��r main in full force and effect. � 1 'K K
Contract Amendment No. 3
ORIGINAL
Page 1 of 2
Executed on this the � +h day of 2008, in
Fort Worth, Tarrant County, Texas.
APPROVAL RECOMMENDED:
A. Douglas Rademaker, P.E.
Director, Department of
Engineering
HDR Engineering, Inc.;
ENGINEER
By:
Name: Dennis Schulze, P.E.
Vice President
210 E. 3rd Street, Suite 300
Fort Worth, TX 76102-4002
APPROVED AS TO FORM AND LEGALITY:
Amy R
Assists t ity Attorney
�������1��� �1� � ��
�C��l'� tj� �:R�g�pQ
rjj� i��;'�Il :!� �a l�G��
APPROVED:
Fernando Costa
Assistant City Manager
ATTEST:
Marty Hendry, City Secretary
�; ;�.�,
-.
'�� ' � ;
"�' -�� � ��� Contract Amendment No. 3
Page2of2
October 1 i , 2007
Mr. Richard Argomaniz, P.E.
Project Manager
City of Fort Worth
Engineering Department
1000 Throckmorton Street
Fort Worth, Texas 76102
REF; Geddes/Halloran Roadway Project
Request for Additional Services
i_.i!�� n� a . annex .
1 ILJl I 1 I V�Gt.i NWE 'TLvYDV -
Qear Mr. Argomaniz:
HDR Engineering, Inc. is requesting the following additional _scope .and fee for the 2004
IF _ Contract 34 Project.
GEDDES/HALLORAN ROADWAY PROJECT
2004 CIP — CONTRACT 34
CITY OF FORT WORTH
PROFESSIONAL ADDITIONAL SERVICE FEE SUMMARY
CITY.PROJECT NO. 00291
DOE NO. 5148
Scope of Services &Fee:
The original City /HDR contract had provisions for sanitary sewer replacement in the
three, alleys within the existing right-of-way only. After discussions with the City it was
determined that the sewer should be replaced from existing manhole to existing manhole
(beyond the right-of-way. limits). T ne. originai swNc eras fir u total of 1AO feet of.
replacement of 6-inch sewer with new 6-inch PVC main: This change will revise the
scope to include replacement of 928 feet of existing 6-inch sewer with 928 feet of new &
inch DIP main and replacement of 594 feet of existing 6-inch sewer with 594 feet of new
8-inch PVC main. ' Also included would be the addition of 7 new manholes.
HDR is requesting additional .fees for:
SURVEY
Additional design/topographic survey from manhole to manhole..
• Approximately 60 additional landowner information.
• Approximately 60 additional locations of service connections_ .
al utilities in the alleys.
DESIGN
• Re -analyzing and re -design the sanitary sewer main.
• Revising the construction plans.
These tasks would be provided with the following personnel manhours and fees:
SURVEY
• Field & Office Work 1,342 feet x $4.50 per foot = $6,039
DESIGN
Project Manager, 24 hours x $195 per hour = $4,680
• Professional 32 hours x $125 per hour = $4,000
• Technical Support 32 hours x $ 70 per hour = $22240
• Clerical 4 hours x $ 60 per hour = $240
- TOTAL ADDITIONAL FEE _ $17,199
Thank you for your consideration in this matter.
Sincerely,
HDR Engineering,.lnc.
IL
t'c�c PC
Dennis Schulze, P.E.
Vice President