Loading...
HomeMy WebLinkAboutOrdinance 6075 ORDINANCE NO.AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF ARTHUR STREET AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: PROJECT NO. 104-24000-187 1. ARTHUR STREET From the north line of Kansas Street to the south line of White Settlement Road, known and designated as Unit No. 1, Project No. 164-24000-187: a seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade on a 36-foot roadway, and five-inch thick concrete side- walks where specified. 2. N.W. TWENTIETH STREET From the west line of Francis Avenue to the west line of Prairie Avenue, known and desig- nated as Unit No. 2, Project No. 104-2/+000- 187: a six-inch thick hot-mix asphaltic con- crete pavement on a six-inch thick lime sta- bilized subgrade on a 30-foot roadway, and five-inch thick concrete sidewalks where specified. 3. BUFORD STREET From the east line of Haskell Street to 200' east, known and designated as Unit No. 3, Project No. 104-24000-187: a six-inch thick hot mix asphaltic concrete pavement on a six- inch thick cement stabilized subgrade on a 30- foot roadway. 4. BILAGKSTONE DRIVE From the east line of Isbell Road to the east end of Blackstone Drive (Cul-de-sac), known and designated as Unit No. 4, Project No. 104-24000-187: a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade on a 30- foot roadway. 5. YALE STREET From the north line of Roberts Cut-off to the south line of Columbia Avenue, known and designated as Unit No. 5, Project No. 104-24000-187: a six-inch thick hot mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade on a 30- foot roadway. 6. N.W. TWENTY-THIRD STREET From 65' south of the south line of Rock Island Street to the south line of McCandless Street, known and designated as Unit No. 6, Project No. 104-24000-187: a six-inch thick hot mix asphaltic concrete pavement on a six- inch thick cement stabilized subgrade on a 30-foot roadway. 7. LINCOLN AVENJE From the south property lines of Lot 3, Block 49, and Lot 19, Block 48, M. G. Ellis Addition, to the south line of N.W. Twenty- Eighth Street (Hwy. 183), known and desig- nated as Unit No. 7, Project No. 104-24000- 187: a six-inch thick hot-mix asphaltic con- crete pavement on a six-inch thick lime sta- bilized subgrade on a 30-foot roadway. 8. NORTH HOUSTON STREET From the north line of N.W. Thirty-Seventh Street to the south line of N.W. Thirty- Eighth Street, known and designated as Unit No. 8, Project No. 104-24000-187: a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade on a 30-foot roadway. 9. NORTH CRUMP STREET From the north line of N.E. Thirty-Sixth Street to the south line of N.E. Thirty- Seventh Street, known and designated as Unit No. 9, Project No. 104-24000-187: a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade on a 30-foot roadway. 10. NORTH CRUYP STREET From the north line of N.E. Thirty-Seventh Street to the south line of N.E. Thirty- Eighth Street, known and designated as Unit No. 10, Project No. 104-24000-187: a six- inch thick hot-mix asphaltic concrete pave- ment on a six-inch thick lime stabilized subgrade on a 30-foot roadway. 11. LULU STREET From the north line of N.E. Twenty-Eighth Street to the south line of Loraine Street, known and designated as Unit No. 11, Project No. 104-24000-187: a six-inch thick hot mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade on a 30-foot roadway. 12. CHENAULT AVENUE From the east line of Baurline Street to the west line of Judkins Avenue, known and desig- nated as Unit No. 12, Project No. 104-24000- 187: a six-inch thick hot-mix asphaltic con- crete pavement on a six-inch thick lime sta- bilized subgrade on a 30-foot roadway. 13. LA SALLE STREET From the east line of Sylvania Avenue to the west line of Baurline Street, known and desig- nated as Unit No. 13, Project No. 104-24000- 187: a six-inch thick hot-mix asphaltic con- crete pavement on a six-inch thick cement sta- bilized subgrade on a 26-foot roadway, and five-inch thick concrete sidewalks where specified. 14. FINLEY STREET From the east line of Baurline Street to 4841 east (dead end), known and designated as Unit No. 14, Project No. 104-24000-187: a six-inch thick hot mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade on a 30-foot roadway. 15. OHIO GARDEN ROAD From 100' west of the west line of Isbell Road to the West City Limits (11801 ), known and designated as Unit No. 15, Project No. 104-24000-187: a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade on a 36- foot roadway. 16. WEST BROADWAY AVENUE From the west line of Eleventh Avenue to the east line of Fifteenth Avenue, known and designated as Unit No. 16, Project No. 104- 24000-187: a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade on a 36-foot roadway. together with concrete curbs, gutters, driveways and incidentals to such improvements on ptoper 'grade -and line where sam� .are :got already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said' im- provements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; contract therefor has been made and entered into with AUSTIN ROAD COMPANY & WORTH CONSTRUCTION COMIFANY ; and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been examined, NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of streets, avenues and public places hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting pro- perty and the owners thereof, are as follows, to-wit: 1. ARTHUR STREET From the north line of Kansas Street to the south line of White Settlement Road, known and designated as Unit No. 1, Pro- ject No. 104-24000-187. The estimated cost of improvements is $ 22,381.15 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.01 : the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 8.54 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4-foot wide concrete sidewalk is $ 2.54 the estimated amount per square foot to be assessed against abutting property and the owners there- of for 6-inch thick concrete driveway is $ .74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 14.09 plus the cost incurred for concrete driveway construction where specified. 2. N.W. TWENTIETH STREET From the west line of Francis Avenue to the west line of Prairie Avenue, known and designated as Unit No. 2, Project No. 104-24000-187. The estimated cost of improvements is $ 9,171.25 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.01 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 6.61 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4—foot wide concrete sidewalk is $ 2.54 the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 12.16 plus the cost incurred for concrete driveway construction where specified. 3. BUFORD STREET From the east line of Haskell Street to 200' east, known and designated as Unit No. 3, Project No. 104-24000-187. The estimated cost cf improvements is $ 5,083.10 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ •95 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 6.35 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ —0— ; the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $_ .74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 9.30 plus the cost incurred for concrete driveway con- struction where specified. 4. BLACKSTONE DRIVE From the east line of Isbell Road to the east end of Blackstone Drive (Cul- de—sac), known and designated as Unit No. 4, Project No. 104-24000-187. The estimated cost of improvements is $ 33,357.50 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.95 : the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 6.35 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ —0— ; the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 9.30 , plus the cost incurred for concrete driveway construc- tion where specified. 5. YALE STREET From the north line of Roberts Cut-off to the south line of Columbia Avenue, known and designated as Unit No. 5, Project No. 104-24000-187. The estimated cost of improvements is $ 16,909.75 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3•01 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 6.61 ; the estimated amount per front foot to be assessed against abuttin property and the owners thereof for _ wide concrete sidewalk is $ — ; the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ •74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 9.62 plus the cost incurred for concrete driveway construction where Specified. 6. N.W. TWENTY-THIRD STREET From 65' south of the south line of Rock Island Street to the south line of McCandless Street, known and designated as Unit No. 6, Project No. 104-24000-187. The estimated cost c,7 improvements is $ 21,802.00 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.95 ; the estimated amount per front foot to •35 be assessed against abutting property and the owners thereof for pavement is $ 6 the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ —0— ; the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $_ .74 _ per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 9.30 plus the cost incurred for concrete driveway con- struction where specified. 7. LIECULN AVENUE From the south property lines of Lot 3, Block 49, and Lot 19, Block 48, M. G. Ellis Addition, to the south line of N.W. Twenty- Eighth Street (Hwy. 183), known and desig- nated as Unit No. 7, Project No. 104-24000- 187. The estimated cost of improvements is $ 5,654.00 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.01 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 6.61 the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ —0— ; the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 9.62 plus the cost incurred for concrete driveway construc- tion where specified. 8. NORTH HOUSTON STREET From the north line of N.W. Thirty-Seventh Street to the south line of N.W. Thirty- Eighth Street, known and designated as Unit No. 8, Project No. 104-24000-187. The estimated cost of improvements is $ 14,253.25 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.95 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 6.35 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ -0- the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $_ 9,30 plus the cost i,nctiirred for concrete driveway construction where specified. 9. NORTH CRUMP STREET From the north line of N.E. Thirty-Sixth Street to the south line of N.E. Thirty- Seventh Street, known and designated as Unit No. 9, Project No. 104-24000-187. The estimated cost cr. improvements is $ 16,922.95 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.01 ; the estimated amount per front foot to be assessed against abutting property and the owners hereof for pavement is $ 6.61 Lhe estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ -0- the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ •74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 9.62 plus the cost incurred for concrete driveway con- struction where specified. 10. NORTH CRUMP STREET From the north line of N.E. Thirty-Seventh Street to the south line of N.E. Thirty- Eighth Street-, known and designated as Unit No. 10, Project No. 104-24000-187. The estimated cost of improvements is $ 16,073.75 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.01 the estimated amount per front foot6to6ibe assessed against abutting property and the owners thereof for pavement is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ -0- the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 9.62 , plus the cost incurred for concrete driveway construc- tion where specified. 11. LULU STREET From the north line of N.E. Twenty—Eighth Street to the south line of Loraine Street, known and designated as Unit No. 11, Pro— ject No. 104-24000-187. The estimated cost of improvements is $ 14,201.00 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.01 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 6.61 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ —0— the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 9.62 plus the cost i.ncurred for concrete driveway construction where specified. 12. CHENAULT STREET From the east line of Baurline Street to the west line of Judkins Avenue, known and designated as Unit No. 12, Project No. 104- 24000-187. The estimated cost cf improvements is $ 9,882.95 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ .01 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 6.61 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ —0— ; the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 9.62 plus the cost incurred for concrete driveway con- struction where specified. 13. LA SALLE STREET From the east line of Sylvania Avenue to the west line of Baurline Street, known and designated as Unit No. 13, Project No. 104-24000-187. The estimated cost of improvements is $ 23064.00 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.95 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.37 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for _foot wide concrete sidewalk is $ 2.54 ; the esti- mated amount per square food: to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 10.86 plus the cost incurred for concrete driveway construc- tion where specified. 14. FINLEY STREET From the east line of Baurline Street to 484' east (dead end), known and designated as Unit No. 14, Project No. 104-24000-187. The estimated cost of improvements is $ 13,939.20 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.95 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 6.35 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ —0— ; the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 9.30 plus the cost incurred for concrete driveway construction where specified. 15. OHIO GARDEN ROAD From 100' west of the west line of Isbell Road to the West City Limits, known and designated as Unit No. 15, Project No. 104- 24000-187. The estimated cost cf improvements is $ 33,330.00 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.95 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 7.81 the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ —0— ; the esti- mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 10.76 plus the cost incurred for concrete driveway con- struction where specified. 16. WEST BROADWAY AVENUE From the west line of Eleventh Avenue to the east line of Fifteenth Avenue, known and designated as Unit No. 16, Project No. 104-24000-187. The estimated cost of improvements is $ 40,682.40 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.01 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 8.13 the estimated amount per front foot to be assessed against abuttin property and the owners thereof for wide concrete sidewalk is $ — — ; the esti mated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .74 per square foot; the total estimated amount per front foot to be assessed against abutting property and the own- ers thereof is $ 11.14 , plus the cost incurred for concrete driveway construc- tion where specified. z III. A hearing be given and held by and before the City Council of the City of Fort Worth, Texas, to all awning or claiming any property abutting upon said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such hearingg shall be given and held on the 5th day of Mai , 19 69 , at 9:30 A.M. in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and the City Secretary is hereby directed to give or cause to be given notice of the time and place of such hearing and of other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1, emergency effective May 12, 1967. Such notice shall be by advertisement inserted at least three (3) times in a newspaper published in the City of Fort Worth, Texas, the first publication to be made at least twenty-one (21) days before the date of said hearing. Said notice shall comply with and be in accordance with the terms and provisions of said Act as amended. The City Secretary is further directed to give or cause to be given personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such personal notice shall be in writing and shall be given or caused to be given by the City Secretary by depositing such written notice in the United States Mail at least fourteen (14) days before the date of the hearing, postage prepaid, in envelopes addressed to all persons owning or claiming any interest in the respective properties abutting the high- ways, streets, avenues and public places or portions thereof to be improved, as the names of such persons are shown on the current rendered tax rolls of the City of Fort Worth and at the addresses so shown, or if the name of such respective owners do not appear on such rendered tax rolls, then address to such owners as their names are shown on the current unrendered tax rolls of the City of Fort Worth at the addresses shown thereon. In those cases in which an owner of property abutting a highway, street, avenue or public place or portion or portions there- of which is to be improved is listed as "unknown" on the then current City of Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth tax rolls but no address for such owner is shown, no notice need be mailed. In those cases where the owner is shown to be an estate, the mailed notice may be addressed to such estate. In this connection, the City Secretary shall prepare and file or cause to be prepared and filed with these proceedings a list of the properties to be assessed, the names of those persons owning or claiming any interest in said properties to whom the notice was mailed, together with the last known addresses determined as aforesaid of the respective owners and those per- sons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties in said list whose address is shown on the then current rendered or unrendered tax rolls of the City of Fort Worth was mailed a copy of the notice of hearing and shall further certify the date or dates on which said notice was mailed. A copy of each notice shall be attached to such certificate. The certificate of the City Secretary will be con- clusive evidence of the facts therein recited. - » w IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. - } Passed and approved this /lam day of A 19 . APPROVED AS TO FORM AND LEGALITY: 0 ♦ f V / City Attorney City of Fort Worth, Texas Mayor and Council Communication DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE NUMBER 4/7/69 Paving at 16 Locations North lof 3 C-1457 qi de Council action is requested on the project described b1plow: Project Description Nature of Work: Assessment Paving at 16 Locations on the North Side. Roadway Unit Street Limits Width R.O.W. 1 Arthur Street Kansas Street to 36 50 White Settlement Road 2 NW. Twentieth Street Francis Avenue to 30 60 Prairie Avenue 3 Buford Street Haskell Street to 30 40 200' East 4 Blackstone Drive Isbell Road to East 30 50 End (Cul-de-sac) 5 Yale Street Roberts Cut-Off to 30 50 Columbia Avenue 6 NW. Twenty-Third Street 65' South of Rock Island 30 60 Street to McCandless Street 7 Lincoln Avenue Lot 3, Block 49, and Lot 19, 30 60 Block 48, M. G. Ellis Add. to NW. Twenty-Eighth Street (Hwy. 183) 8 North Houston Street NW. Thirty-Seventh Street to 30 55 NW. Thirty-Eighth Street 9 North Crump Street NE. Thirty-Sixth Street to 30 50 NE. Thirty-Seventh Street 10 North Crump Street NE. Thirty-Seventh Street to 30 50 NE. Thirty-Eighth Street 11 Lulu Street NE. Twenty-Eighth Street 30 60 to Loraine Street 12 Chenault Avenue Baurline Street to 30 60 Judkins Avenue 13 La Salle Street Sylvania Avenue to 26 35 Baurline Street `14 Miley Street Baurline Street to 30 50 484' East (Dead End) 15 Ohio Garden Road 100' West of Isbell Road 36 55 to West City Limits (1180') 16 West Broadway Avenue Eleventh Avenue to 36 55 Fifteenth Avenue Petitions were submitted for Units 1, 2, 3, 4, 5, 6, 8, 9, 10, 11, 12, 13, and 14 Unit 7, Lincoln Avenue, initiated by the City, is a half--block section serving a business and three residences. It was originally planned to pave this street an additional one and one-half blocks from NW. Twenty-Sixth Street to NW. Twenty- Eighth Street; however, it would have been necessary to build a retaining wall along a great portion of the street and the prohibitive cost of building the wall limits the construction to the above stated limits of one--half block at this time. Unit 15, Ohio Garden Road, initiated by the City was included to tie in DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE 4/7/69 NUMBER Paving at 16 Locations North 2 3 C-1457 or Sid with the present construction on Isbell Road and Ohio Garden Road and also to correct a serious drainage problem in the area. Unit 16, West Broadway Avenue, was initiated by the City at the request of the Water Department. Submission of Bids Plans developed for these streets include sidewalk on Units 1, 2, and 13 in keeping with the just recently adopted City policy on location and construction of sidewalks. The following bids were received for the paving project: Bidder Amount Austin Road Company and Worth Worth Construction Company $270,007.50 Texts Bitulithic Company $275,695.50 'Glade, Inc. $277,355.50 General Construction Co. $306,855.50 Working Days Allotted: 200 Project Cost and Financing Based on the low bid, approximately $142,520.55 will be assessed against abutting property owners. The cost to the City-at-large will be approximately $154,487.70, including engineering and miscellaneous expenses. Recommendations It is recommended: 1) That the following Bond Fund Transfers be approved: Amount From To Reason $142,520.55 Revolving Fund 16 Locations North Side Property Owners' 042-09724-901 042-10424-187 portion of construc- tion cost. $155,000.00 Unspecified 16 Locations North Side City's portion of Projects 104-24000-187 construction, en- 104-24000-901 gineering and mis- cellaneous costs. 2) That an ordinance be adopted: (a) Declaring the necessity for and ordering the improvements; (b) Making provisions for levying of assbssments; (c) Directing the Public Works Department to prepare estimates of colt and amounts to be Assessed; DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE 4/7/69 NUMBER Paving at 16 Locations North 3 or 3 Side (d) Awarding,a contract to Austin Road Company and Worth Construction Company in the amount of $270,007.50; (e) Making appropriations to cover the indebtedness thereby incurred for improvements of the project named above. 3) That an ordinance be adopted: (a) Approving the estimates of cost and amounts proposed to be assessed; and, (b) Setting May 5, 1969, as the date of the Benefit Hearing. HDM:jp Attachments: "A" - Map of Project "B" - Report of Poll Card Survey with attached location maps "C" - Engineers Preliminary Rolls 11 SUBMITTED BY: DISPOSITIO Y COUNCIL: PROCESSED BY Z ROVE% ❑ OTHER (DESCRIBE) " C1 ��f' �u,LLG! CI�S +ETARX Z DATE r o IC val r CITY MANAGER 60 �� FORT WORTH, TEXAS 19 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS. Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of ARTHUR STREET and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: UNIT NO. 1. PROJECT NO. 104-24000-187: ARTHUR STREET FROM THE NORTH LINE OF KANSAS STREET TO THE SOUTH LINE OF WHITE SETTLEMENT ROAD, to be improved by constructing a seven-inch thick hot mix asphaltic concrete pavement on a six-inch thick lime stabi- lized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-six foot wide roadway, and by constructing five-inch thick concrete sidewalks and six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot . gutter.. ... . . ... . . . . ..... . . . ... 3.01/L.F. Seven-inch H.M.A.C. Pavement ndustrial Zoning).. . . . . . . . . . . . . . . . .. . 8.54/L.F. Five-inch concrete sidewalk... .. . . . .. . .. ... .. . .. .. ... .. . . ... ... . .. . . 2.54/L.F. Six-inch concrete driveway.. . . . . . . .. ... .. . .. .. . .. . . .. . . ... .... .. ... . .74/S.F. UNIT NO. 2. PROJECT NO. 104-24000-187: N.W. TWENTIETH STREET FROM THE WEST LINE OF FRANCIS AVENUE TO THE WEST LINE OF PRAIRIE AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by construc- ting five-inch thick concrete sidewalks and six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . •. . . .. . . . . . . ... . .. . . ....... . .$ 3.01/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning with credit granted for existing penetration).. . . . . . .. . . . ... 2.12/L.F. Five-inch concrete sidewalk.......... . .. . .... .... . ... ... .. . . ...0.. . 0 2.54/L.F. Six-inch concrete driveway. .. . . . .. . . . . . . . . . .. ... .. . . .. . .. . . . .. . . . . . . .74/S.F. UNIT NO. 3, PROJECT NO. 104-24000-187: BUFORD STREET FROM THE EAST LINE OF HASKELL STREET TO 200' EAST, to be improved by constructing a six-inch thick hot-mix asphal- tic concrete pavement on a six-inch thick cement stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing a six-inch thick concrete driveway where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . ... . . . . . . . . . . . . . .. .. . . . . . . .$ 2.95/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning).. . . . . . .. . . . . . . . . . . . . 2.45/L.F. Six-inch H.M.A.C. Pavement (Apartment Zoning with credit granted for owner-occupied residence) . . .. . . . . . . . 4.40/L.F. Six-inch concrete driveway. . . . . . . . . . . . . . . ... . .. . . . . . . . . . . . . . . . . . . .74/S.F. UNIT NO. I,, PROJECT NO. 10404000-187: BLACKSTONE DRIVE FROM; THE EAST LINE OF ISBELL ROAD TO THE EAST END OF BLACKSTONE DRIVE (CUL-DE-SAC), to be improved by constructing a six-inch thick hot mix asphaltic concrete pavement on a six-inch thick cement sta- bilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter.. . . . . . . . . . . . .. . . . . . . . . . . . . .. .$ 2.95/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning) . . . . . . . . . . . . . . . . . . . . . 2.45/L.F. Six-inch concrete driveway.. . . . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . .74/S.F. UNIT NO. 5, PROJECT.' NO. 104-24000-187: YALE STREET FROM THE NORTH LINE OF ROBERTS CUT-OFF TO THE SOUTH LINE OF COLUMBIA AVENUE, to be improved by constructing a six- inch thick hot mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by con- structing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . .. . . .. . . . . .. . .. . . . . . .1 3.01/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning). . . . ... . . . . . . .. . . .. . . 2.39/L.F. Six-inch concrete driveway. . . . . . .. . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . .. . .74/S.F. UNIT NO. 6. PROJECT NO. 104-24000-187: N.W. TWENTY-THIRD STREET FROM 65' SOUTH OF THE SOUTH LINE OF ROCK ISLAND STREET TO THE SOUTH LINE OF MCCANDLESS STREET, to be improved by constructing a six-inch thick hot-:nix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . .. . . . . . .$ 2.95/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning). . . . . . . . . . . . . . . . . . . . . 2.45/L.F. Six-inch concrete driveway. . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74/S.F. The assessments result in the following division of costs: Total Property Owners' Cost for curb & gutter, sidewalk, driveways. . . . . . . . . . . . . . . . . . . . . . . . .$ 64,2.56.18 Total Property Owners' Cost for improvements other than above. . . . . . . . . . . . . . . . . . . . .. . . . . . . 4 TOTAL PRCPERTY OWNERS' COST $142,520.55 Total City of Fort Worth Cost for curb & gutter, sidewalk, driveways. . . . . . .. . . . . . . . . . . . . . . . .$ 12,064.02 Total City of Fort Worth Cost for improvements other than above. .. . . . . . . . . . . . .. . . .. . . . . . . . . TOTAL CITY OF FORT WORTH COST $1643487.70 TOTAL ESTIMATED CONSTRUCTION COST $297.008.25 JJ K X. GRAHAM, P.E. OTY ENGINEER �11� 111�1�1 � ■■ � - /i �, � '''�''�♦,�♦'�,� �1�4��l11®IIIIII Lo11sMINOR FIBER -010111 wall 11:11► @BI . � ♦• �♦♦♦♦♦♦♦�..I��11�!�� 1�¢��i11 ��t111111®®� �����it � �� -. NNW 160 INS §0 SIR K S F(EMETERY �■ + �11111:!1 111111': � ���►�� � � .�s��� IM MINIMUM Glob -. _- _ ��+ .. ■ '��� ,��� �L©��'%;��`.� _- ■�■rig-------------- -i 'o ■i■■�■ c� • ►.t3�fili. Ea.!:s.�.n •�.. ees, y, n>■1�R F�rgoals:��►��b�e d� ` �< ALIInc Jm a�e� �f.■■� {�/T N _ fir. Arms OWN err /f!Rf��®► T�w�.t mi►/ ���®1lILleg,1��® �' I I 0 m�■�ii�:i�, !I I�. It �!.C'!!f•�_��/'1� ®�■�c �� 1■_gym a•■b ■■■ *7�r.►"..E _ _ yy� � �� ��,����.gl1111i�^!!Ei7i��i iiii ,��E.-�■����s.: �-�`�. ©C7 VIM f/ice. �.�■ 9�i : ®� ■�y�RI��R��,■■u■.u�r /�MIMI��rs�■■s, ■fir!.. "��Ir! sue■ �! ffIDWN F1-iiilY■EB n» A ��■t r� CITY OF FORT WORTH PUBLIC WORKS DEPARTMENT ENGINEERING DMSION ASSESSMENT PAVING AT 16 LOCATIONS NORTH SIDE PROJECT NO. 104-24000-187 A Neighborhood Meeting was conducted by the Engineering Division at 7:30 P.M. on March 24, 1969, at Circle Park Elementary School, 708 N.W. 21st Street. This meeting was for the purpose of acquainting the 45 property owners present with the improvements proposed for the assessment paving of 16 Locations on the North Side, Project No. 104-24000-187. Mr. Odell Schmidt, Assessment Paving Supervisor, opened the meeting by out- lining the procedures concerning owner participation in the cost of the pro- posed improvements. He explained the methods and policies used to determine assessments and the various payment schedules available to the property owners. In connection with the explanation concerning the street construction standards, Mr. Schmidt outlined the policy pertaining to the location and construction of sidewalks, which are proposed on three units of this project. The meeting was then opened for a question and answer period. Unit 1, Arthur Street: Mr. H. L. Harvey, 207 N.E. 21st Street, owner of Lots b-R and 1, Block 1 , and Lots 22 thru 26, Block 18, Evans Pearson Westwood Addition, explained that he was in the process of constructing a building on Lot 1, Block 14, and the contractor was supposed to put in curb and gutter, sidewalk and driveways during the construction. Mr. Harvey's question was: If this was completed before construction of the street began, would he be allowed credit against his assessment for these improvements? Mr. Schmidt assured him that if these improvements met city specifications, he would be given credit for them. He pointed out, however, that they would have to be completed before the work order for construction of Arthur Street was issued. Unit 2 N.W. Twentieth Street: Mr. Gillespie, representing the Faith Baptist Church, 1600 N.W. Twentieth, Lot 11, Block 17, Baker Heights Addition, ques- tioned the construction of sidewalk along the south side of the church building and commented that when it was finished there would be only two-three feet be- tween the building and the inside edge of the sidewalk. It was explained to him the sidewalk was being constructed at this point for two reasons: 1) to give the people a safe place out of the street to walk, and 2) to tie in with existing sidewalk. Unit 3, Buford Street: T. G. Leach, Administrator of Fort Worth Osteopathic Hospital, 1000 Montgomery Street, Lots 1 thru 5, Block 3, Zihlman's Addition and Tract 3, Montgomery and Pyle Survey, asked if it was possible for Buford Street construction to be done last since the hospital is in the process of constructing an addition to the hospital on the Buford Street side and quite probably the two construction schedules might conflict. Mr. Schmidt stated he would advise the Engineering Division and the contractor of this and see if this could be arranged. k Unit 4,, Blackstone Drive: Will Wright, 4415 Blackstone Drive, owner of Lot 22, Block 2, Brookside Annex Addition, asked about driveway approaches. He ex- plained that he had an asphalt double drive at the side of his property, which he shaxes with the owner of Lot 23, and wondered if the concrete approach would tie in to it. He further commented that this driveway was put in before he sold Lot 23 to the present owner and this was why they shared this driveway. Mr. Schmidt explained that it was shown on the plans to be a double drive approach and would be tied in to the existing asphalt. Mr. D. M. Wilks, 4325 Blackstone Drive, owner of Lot 19, Block 2, Brookside Annex Addition, asked why an 11' drive approach was being constructed when he had only an 8' wide driveway. It was explained that present construction stan- dards required single drives to be 11' wide and the approach would be tied in to his drive. Unit 5 Yale Street: Mr. J. T. Finley, 2109 Yale Street, owner of Lot 91 Block Castleberry Gardens Addition, stated that he had looked at the stakes set in his yard and wondered if the curb and gutter would set up above the yard level. He also stated he needs and wants a double drive and his letter showed he was being charged only for a single drive. Mr. Schmidt explained that as a general rule, the curb and gutter were not constructed above yard level, but if the opposite side of the street set higher, it was possible the curb and gutter might be constructed slightly higher than yard level to insure proper drainage. Mr. Schmidt also stated he would check on the driveway and let him know about it later. Unit 6, N.W. Twenty-Third Street: No questions or objections. Unit 7, Lincoln Avenue: No questions or objections. Unit 8 North Houston Street: Mrs. Raymond Gonzales, 3509 North Houston, owner of Lot 4, Block 2, Washington Heights Addition, asked why'she was being charged full rate for pavement when some of the other people on the street were given a cheaper rate. Mr. Schmidt explained the zoning of this block was industrial and only the property owners actually occupying a residence in this block were given the cheaper rate and since her property contained a rent house, she would have to pay full rate. Unit 9 North Crump Street: Waide D. Little, 3707 North Crump Street, owner of Lot 16, Block 15, Fostepco Heights Addition, was the spokesman for a group of property owners, all of whom were concerned about driveway widths, curb returns between drives, and policies pertaining to the construction of driveways. He stated that he and Mr. W. L. Petrey, 3709 North Crump, had shared a common driveway for a number of yeaxs and they did not understand why each was being given a single drive with a curb return between. Mr. Schmidt explained the usual procedure of constructing single drives on residential property with curb returns between, except where people had double garages and needed the wider driveways, but as a general rule the City did not like to construct double driveways abutting two lots unless they were commonly owned. After much dis- cussion about the matter, Mr. Schmidt stated it might be permissible to build such a drive, but not advisable. He further stated he would check into it further and get a ruling on it and asked that all the property owners interested in getting their driveways changed leave their names and addresses with the clerk and they would be notified at a later date about whether or not the changes could be made. Unit 10, North Crump Street: No questions or objections. Unit 11, Lulu Street: No questions or objections. Unit 12, Chenault Avenue: No questions or objections. Unit 13, La Salle Street: Allen Koontz, 2624 La Salle, owner of Lots 7 and 8, Block 2, Martindale Addition, appeared as the spokesman for a group of eight property owners - all of whom attended the meeting - and asked several ques- tions about the paving and other construction. The main focus of attention was again the construction of the driveways with particular emphasis on the narrow width of the street (26 feet wide) and the close proximity of the houses to the fronts of the lots. There was a question also about the side- walk being constructed on this unit. It was explained that the newly adopted City policy on sidewalk construction stated that sidewalks should be con- structed within two blocks in any direction from a school and this street was within the two block limit of an elementary school. Mr. Schmidt further stated that he would check into the driveway situation and let them know if some of the driveways could be combined. Unit 14, Finley Street: No questions or objections. Unit 15 Ohio Garden Road.: Lem J. Bray, 4513 Ohio Garden Road, owner of Lot 4., Tidwell Subdivision, asked why he was being charged for only 60, pave- ment when his lot is 80' wide. It was explained that the West City Limits of Fort Worth crossed the street in front of his property at a point 201from his west property line and therefore we could only charge him for the portion of paving inside the City Limits. C. E. Matheus, 4321 Ohio Garden Road., Lot 6, Block 79, Westside Acres Addition, and Charles Callaway, 4327 Ohio Garden Road, Lot 7, Block 79, Westside Acres Addition, asked if it would be permissible to have adjoining single drives be- tween the two lots without any curb returns between. Again Mr. Schmidt stated it might be permissible but not advisable to do this, but he would check with engineering and notify them of the decision. Unit 16, West Broadway Avenue: Mr. Charles Kyser, 1916 West Broadway, owner of Lot 22, Block 9, Crawford Addition, stated that approximately two years ago he had been approached by someone from the City Land Department about buying his lot, and the two adjoining lots immediately to the east of his which are owned by his brothers, and he felt that if the City still wanted to buy these lots that it was unfair for him and his brothers to have to pay any assessments for street improvements from which they would not benefit. Mr. Schmidt stated that he felt the City might still be interested in these lots for expansion of Water Department use, but he did not know this for a fact and referred Mr. Kyser to the Land Department and suggested he discuss the proposed assessments with them when he inquired about the possible purchase of these lots. A few additional general questions were answered, and after thanking those present for attending, the meeting was adjourned. F achment "B" 16 Locations on the North Side e 1 of 17 Project No. 104-24000-187 ROADWAY UNIT STREET LIMITS WIDTH R.O.W. 1 Arthur Street Kansas to White Settlement 36 50 2 Twentieth Street Francis To Prairie 30 6') 3 Buford Street Haskell To 200 feet east 30 41'i 4 Blackstone Drive Isbell To east end 30 30 5 Yale Street Roberts Cut-Off To Columbia 30 5D 6 NW. Twenty-Third Street Rock Island To McCandless 30 60 7 Lincoln Avenue Twenty-seventh To Twenty-eighth 30 60 8 North Houston Street Thirty-seventh To Thirty-eighth 30 55 9 North Crump Street Thirty-sixth To Thirty-seventh 30 50 10 North Crump Street Thirty-seventh To Thirty-eighth 30 50 11 Lulu Street Twenty-eighth To Loraine 30 :i0 12 Chenault Avenue Baurline To Judkins 30 60 13 LaSalle Street Sylvania To Baurline 26 35 14 Finley Street Baurline To east end 30 50 15 Ohio Garden Road Isbell To west City Limits 36 55 16 West Broadway Avenue Eleventh To Fifteenth 36 55 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 12832.5* 8034.8** PER CENT 100.0 62.6 See Individual PARCELS OF PROPERTY 169 102 Sheets PER CENT 100.0 60.4 All results shown are NO. OF PROPERTY OWNERS 156 92 from cards received PER CENT 100.0 60.0 through 3/25/69. OWNERS LIVING ON STREET 79 62 PER CENT 100.0 78.5 OWNERS LIVING ELSEWHERE 77 30 PER CENT 100.0 39.0 * Does not include 319.8' owned by Tarrant County Water Board, or 61.7' owned by City. **For petitioned streets only. a i Attachment "B" Unit No. 1 - Arthur Street Page 2 of 17 Kansas Street to White Settlement Road T ALL I- co ss -so- - c5 w cri ;a- so 5 4 3 2 1 5 4 3 . /Vr �_in _r.__J 4�q. 1 :_ 1.__•. en I co_ so � � e_� s. to-. ---tG ~ Ol 26 7 25r ts 15 25 24 I 24 �--24 —23 , — -23 8-R 2z I1 xz l - _ P --- - - - -- - 4 9 1 �, a Y: �r l z1 �' J z1 1 -9- tt —Zo- - t --- 1 -� U 20- - - }� 17 10 W 20 13 19 k p( 19 67 16 n W —'9 --14 Ia - � - - —� - 15 W - ---1 --- ---- -- -- r —'� --- — r 15 12 � I IS Ci 11 — 11 1 14 13 111 1G Ic 15 U 16 I ,..6A I JAS ST nit 1 ; Arthur Street rom Kansas St. to White Settlement Rd. -- SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1372 1022 -0- 300 1072 PER CENT 100.0 74.5 -0- 28.0 72.0 PARCELS OF PROPERTY 11 7 -0- 3 8 PER CENT 100.0 63.6 -0- 27.3 72.7 NO. OF PROPERTY OWNERS 6 3 -0- 2 4 PER CENT 100.0 50.0 -0- 33.3 66.7 OWNERS LIVING ON STREET -0- -0- -0- -0- -0- PER CENT -0- -0- -0- -0- -0- OWNERS LIVING ELSEWHERE 6 3 -0- 2 4 PER CENT 100.0 50.0 -0- 33.3 66.7 a ; ttachment "B" Unit 2 - Twentieth Street Page 3 of 17 Francis Avenue to Prairie Avenue ' r N ' eJ CN!/LCN e o °+ it s s s .. ,.. s : � i �: a ► ; e dl r r u d 14 N N C lye t T ! is t H ! Q Ex §� i : a 2 Q is a c Is 4 • I .r r`r u a • s • Unit 2: Twentieth Street 'O�R�� NA Francis Avenu to P a'ri AvenueT_ SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 276.0* 200 —0— -0- 276 PER CENT 100.0 72.5 -0- -0- 100.0 PARCELS OF PROPERTY 3 2 —0— —0— 3 PER CENT 100.0 66.7 -0- -0- 100.0 NO. OF PROPERTY OWNERS 3 2 —0— —0— 3 PER CENT 100.0 66.7 -0- -0- 100.0 OWNERS LIVING ON STREET 2 2 —0— —0— 2 PER CENT 100.0 100.0 -0- -0- 100.0 OWNERS LIVING ELSEWHERE 1 —0— —0— —0— 1 PER CENT 100.0 -0- -0- -0- 100.0 *41.7' City-Owned Property Not Included A. S Attachment "B" Unit 3 - Buford Street Page 4 of 17 Haskell Street to 200' East 10 Ap 1 4 ,rC 7 I M 4 (' v r ' 11 27 26 /7 nit 3: Buford Streetttreat o 2001 East T FT ' SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 460 295 -0- 115 345 PER CENT 100.0 64.1 -0- 25.0 75.0 PARCELS OF PROPERTY 3 2 -0- 1 2 PER CENT 100.0 66.7 -0- 33.3 66.7 NO. OF PROPERTY OWNERS 2 1 -0- 1 1 PER CENT 100.0 50.0 -0- 50.0 50.0 OWNERS LIVING ON STREET 2 1 -0- 1 1 PER CENT 100.0 50.0 -0- 50.0 50.0 OWNERS LIVING ELSEWHERE -0- -0- -0- -0- -0- PER CENT -0- -0- -0- -0- -0- Attachment "B" Page 5 of 17 Unit 4 - Blackstone Drive Isbell Road to Cul-de-sac x L I H. A-Z CIT 10 X [SIT DRIVE X .0 Unit 4: Blackstone Drive From Isbell Rd. to east end. EEEE1EE1111 SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FORAGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 2195.2* 1102.8 400.0 401.0 1394.2 PER CENT lou.0 50.2 18.2 18.3 63.5 PARCELS OF PROPERTY 21 11 4 3 14 PER CENT 100.0 52.4 19.0 14.3 66.7 NO. OF PROPERTY OWNERS 21 11 4 3 14 PER CENT 100.0 52.4 19.0 14.3 66.7 OWNERS LIVING ON STREET 14 9 3 3 8 PER CENT 100.0 64.3 21.4 21.4 57.2 OWNERS LIVING ELSEWHERE 7 2 1 -0- 6 PER CENT 100.0 28.6 14.3 -0- 85.7 *Does Not Include 319.8'Owned By Tarrant County Water Board _ s Attachment "B" Unit 5 - Yale Street Page 6 of 17 Roberts Cut-Off to Columbia Avenue tr �u, I Z Ia 4 .� .. f r . .3 a eo .1 r nit 5= Yale Street Ir, rom Roberta Cut—off to Columbia Ave. a SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1150.3 612.0 80.0 -0- 1070.3 PER CENT 100.0 53.2 7.0 -0- 93.0 PARCELS OF PROPERTY 9 6 1 -0- 8 PER CENT 100.0 66.7 11.1 —0— 88.9 NO. OF PROPERTY OWNERS 9 6 1 —0— 8 PER CENT 100.0 66.7 11.1 -0- 88.9 OWNERS LIVING ON STREET 6 5 1 -0- 5 PER CENT 100.0 83.3 16.6 -0- 83.5 OWNERS LIVING ELSEWHERE 3 1 -0- -0- 3 PER CENT 100.0 33.3 -0- -0- 100.0 Attachment "B" Unit 6 - NW. 23rd Street Page 7 of 17 65' S. of Rock Island to McCandless „1�• I E.vrr• .recb vo a rsyEarr• riY/�O 7 � 1 h n o Unit 6: NW Twenty—third Street ,o From Rock Island St. ',o McCandless S SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1360.0 910.0 -0- 100 1260.0 PER CENT 100.0 66.9 -0- 7.4 92.6 PARCELS OF PROPERTY 13 7 -0- 1 12 PER CENT 100.0 54.6 -0- 7.7 92.3 NO. OF PROPERTY OWNERS 10 4 -0- 1 9 PER CENT 100.0 40.0 -0- 10.0 90.0 OWNERS LIVING ON STREET 4 2 -0- -0- 4 PER CENT 100.0 50.0 -0- -0- 100.0 OWNERS LIVING ELSEWHERE 6 2 -0- 1 5 PER CENT 100.0 33.3 -0- 16.6 83.3 ttachment "B" Unit No. 7 - Lincoln Street Page 8 of 17 183' S. of NW. 28th Street to NW. 28th Street C, d T. 7W 1,33 r 14 fq 114T, 1. ,5 T 9 94^4^ Unit 7: Lincoln Avenue S. of 28th St. to 28th Ste bwi* ifi" SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION_ PAVING PAVING SUBMITTED NO. OF FRONT FEET 302.8 -0- -0- -0- PER CENT 100.0 -0- -0- -0- PARCELS OF PROPERTY 3 -0- -0- -0- PER CENT 100.0 -0- -0- -0- NO. OF PROPERTY OWNERS 3 A -0- -0- -0- PER CENT 100.0 -0- -0- -0- E-1 H OWNERS LIVING ON STREET -0- -0- -0- -0- PER CENT -0- t:H -0- -0- -D- OWNERS LIVING ELSEWHERE 3 -0- -0- -0- PER CENT lou.0 -0- -0- -0- Attachment "B" Unit No. 8 - North Houston Meet Page 9 Of 17 NW. 37th Street to NW. 38th Street V,YJy1ClPK4 38 e4. .10 V 2 k IS 17 D AT-111 L03 t3 10 3 7tk. 4r L Al 17 143 rom Thirt -seventh St. to Thirty- nit 8: N. Houston Street ebb"eighth -St SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1000 550 -0- 300 700 PER CENT 100.0 55.0 -0- 30.0 70.0 PARCELS OF PROPERTY 16 10 -0- 3 13 PER CENT 100.0 62.5 -0- 18.7 81.3 NO. OF PROPERTY OWNERS 15 10 -0- 3 12 PER CENT 100.0 66.7 -0- 20.0 80.0 OWNERS LIVING ON STREET 8 8 -0- -0- 8 PER CENT 100.0 100.0 -0- -0- 100.0 OWNERS LIVING ELSEWHERE 7 2 -0- 3 4 PER CENT 100.0 28.6 -0- 42.8 57.2 t Attachment "B" Unit No. 9 - North Crump Street Page 10 of 17 NE. 36th Street to NE. 37th Street 10 IS 10 IS I 15 10 IS 11 14 11 K 11 14 11 K 12 13 2 13 12 13 L2 13 w t ` T 3 37T~• ST. ° 1 Z4 1 24 24 ° I 24 ° 2 Z-5 2 23 2 2 23 3 22 3 22 3 2 3 22 4 ZI 4 21 4 4 21 3 ZO B 20 5 Q S 20 15 6 to 6 to - z - 6 9 V 6 1 19 J his 1e a /e � � Z � 1b F- Q a 17 a 17 = a a 17 9 /6 9 16 9 9 16 Z 10 IS 10 15 10 10 15 11 14 11 14 11 14 H 14 12 13 ,�, l2 13 Unit 9: N. Crump Street M 36T"' s"T, From Thirty-sixth St. to Thirty-sevent St. SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1200 700 300 -0— 900 PER CENT 100.0 58.3 2/5.0 —0— 75.0 6 PARCELS OF PROPERTY 23 13 —0— 17 PER CENT 100.0 56.5 26.1 -0- 73.9 NO. OF PROPERTY OWNERS 23 13 6 —0— 17 PER CENT 100.0 56.5 26.1 —0— 7p3.9 p OWNERS LIVING ON STREET 11 3 —0— PER CENT 100.0 72.7 27.3 -0- 72.7 OWNERS LIVING ELSEWHERE 12 5 3 —0— 9 PER CENT 100.0 41.7 25.0 -0- 75.0 Attachment "B" Unit No. 10 - North Crump Street Page 11 of 17 NE. 37th Street to NE. 38th Street ST. us so. ° 1 24 1 24 ,°, ° 1 24 ° e 1 2 2 23 2 23 2 3 2 2 d 22 3 22 5 TV- 73 2 4 21 4 21 4 I 4 21 5 20 S 20 S O 5 6 19 6 19 6 6 19 �) 7 19 7 18 7 7 J8 a 17 a 17 N 8 7 U) a 17 9 16 9 16 9 9 16 �( 10 IS to IS 10 II 4II 14 ,° exi / ,) 11 K V 12 13 12• IS � 1Q� ° !2 !j ; •� ° !2 /3 K V S 3 377'N. ST./ )I ) LFr 10. N N. Crump Street Thirt -seventh St. to Thirty- 2 z5 2 23 eighth St. SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1200 650.0 50 50 1100 PER CENT 100.0 54.2 4.2 4.2 91.6 PARCELS OF PROPERTY 18 8 1 1 16 PER CENT 100.0 44.4 5.6 5.6 88.8 NO. OF PROPERTY OWNERS 18 8 1 1 16 PER CENT 100.0 44.4 5.6 5.6 88.8 OWNERS LIVING ON STREET 5 5 1 -0- 4 PER CENT 100.0 100.0 20.0 -0- 80.0 OWNERS LIVING ELSEWHERE 13 3 -0- 1 12 PER CENT 100.0 23.1 -0- 7.7 92.3 s r ' Attachment "B" UNIT NO. 11 - LULU STREET Page 12 of 17 NE. 28TH STREET TO LORAINE STREET DIA . 62 a 6/ ,. V. 4 -? , , e •� + = Ice f—ci tee /tI / 3ts • O ! � S O t j 1 ' to 7 � �/7oil •� x � x 6S 66 6 7 r f �. r, , iz . , , :� .. , i —_ 7_-- rS 8 . J / _ q a 4 « so 3 ;c ^ � _ a., a=.=e� 3 a .:i,-',row � � e � � , /a� •� �k' r# •t . �~'on ALP4 Unit 11: Lulu Street 28th Street to Loraine Street SIGNED RIAULT OF 1.0tTCAWD ILLymKT ORIGINAL FOR AGAINST NO OAJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 887.5 543.0 200 —0— 687.5 PER CENT 100.0 61.2 22.5 -0— 77.5 PARCELS OF PROPERTY 15 10 4 —0— 11 PER CENT 100.0 66.7 26.7 —0— 73.3 NO. OF PROPERTY OWNERS 14 10 4 —0— 10 PER CENT 100.0 71.4 28.6 -0— 71.4 OWNERS LIVING ON STREET 5 4 1 -0— 4 PER CENT 100.0 80.0 20.0 -0— 80.0 OWNERS LIVING ELSEWHERE 9 6 3 -0— 6 PER CENT 100.0 66.7 33.3 -0- 66.7 Attachment "B" Unit No. 12 - Chenault Avenue P e 13 of 17 Baurline Street to Judkins Avenue 9 3 4 r W ' _12 W L1 a8 _�� :12 11 to 9 8 7 A 9 —to - In I �. r. 3 10 • C.yE ULT 2 I � 2 3 4 Y'-S- -6'' "✓1 ;/ t 7 Ir f � �_ ,� 5 ---8-- - ,� 12 11 10 9 8 7 l+ a Q I 1 w STREET 1 12 j ''i +c 2 I I I 273 T 10 i �j nit 12: Chenault Street rom Baurline St. to Judkins St. SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 600 500 150 -0- 450 PER CENT 100.0 83.3 25.0 -0- 75.0 PARCELS OF PROPERTY 10 8 3 -0- 7 PER CENT 100.0 80.o 30.0 -0- 70.0 NO. OF PROPERTY OWNERS 10 8 3 -0- 7 PER CENT 100.0 $0.0 30.0 -0- 70,0 OWNERS LIVING ON STREET 5 5 2 -0- 3 PER CENT 100.0 100.0 4o.0 -0- 60.0 OWNERS LIVING ELSEWHERE 5 3 1 -0- 4 PER CENT 100.0 60.0 20.0 -0- 80.0 • a Attachment "B" Unit No. 13 - La Salle Street "rage 14 of 17 Sylvania Avenue to Baurline Street / 2 J -/ J 6 1 7 H 9 // /Z /J M R T/ i.(_D I I �o L9 !B 27 I6 25 IH 23 22 1./ 20 /9 I/9 /7 /6 h ,I / 3 1 J Y s 6 1 6' 9 //3 ? /J /V /J 1 14 z p — — - --- — - r RIVERS/D z6 2J 1Y 11 z2 z� 30029 16 2/ D —� lV 20 •/9 /H /7 /6 �I y I f l • Ise I C ti J !f 1 N J /9 Is /7 /6 `< PA Jr 11 if 7 ti JeT Tr TTT' f9C� ND nit 13: LaSalle Street - From S lvania Ave. to Baurline St. so 1=> >° SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 1428.5* 950.0 428.5 -0- 1000 PER CENT 100.0 66.5 30.0 -0- 70.0 PARCELS OF PROPERTY 27 18 7 -0- 20 PER CENT 100.0 66.7 25.9 -0- 74.1 NO. OF PROPERTY OWNERS 25 16 6 -0- 19 PER CENT 100.0 64.0 24.0 -0- 76.0 OWNERS LIVING ON STREET 17 13 4 —0— 13 PER CENT 100.0 76.5 23.5 -0- 76.5 OWNERS LIVING ELSEWHERE 8 3 2 -0- 6 PER CENT 100.0 37.5 25.0 -0- 75.0 * 20' City-Owned Property Not Included Attachment "B" Unit No. 14 - Finley Street Page 15 of 17 Baurline Street to 484' East i ' - --- c' I ADA{'.,S YE/RS 1. I 3 T. "- G el 444 - .2 1 1 1 a i S►IJ$. — 1 POP — I '¢ I .--�- r• --- - 4 1 � � - s � - _= a ,'; 'GAP,,LA,VD .5U3. L t 14: Finle Streetm Baurline St. to east end. + S SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 918.5 509.3 300 109.3 509.2 PER CENT 100.0 55.4 32.7 11.9 55.4 PARCELS OF PROPERTY 15 9 6 1 8 PER CENT 100.0 60.0 40.0 6.7 53.3 NO. OF PROPERTY OWNERS 14 8 5 1 8 PER CENT 100.0 57.1 35.7 7.1 57.2 OWNERS LIVING ON STREET 8 6 3 0 5 PER CENT 100.0 75.0 37.5 0 62.5 OWNERS LIVING ELSEWHERE 6 2 2 1 3 PER CENT 100.0 33.3 33.3 16.7 50.0 Attachment "B" Unit No. 15 - Ohio Garden Road Page 16 of 17 Isbell Road to West City Limits IV WAY d J ti a e 1 20 ( s ° 2 T 21 V 6 Y TABC - 7 L S 4' e ' MTPdB2 W TR.16 16 V Uait 15: Ohio Garden Road � from Isbell Rd. to west City Limits y SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO OBJECTION TOTAL PETITION PAVING PAVING SUBMITTED .ram. NO. OF FRONT FEET 2258•3 528-5 413.2 1316.6 PER CENT 100.0 23.4 18.3 58.3 PARCELS OF PROPERTY 13 3 3 7 PER CENT 100.0 23.1 23.1 53.8 NO. OF PROPERTY OWNERS 10 2 2 6 PER CENT 100.0 r-4 20.0 20.0 60.0 H OWNERS LIVING ON STREET 8 � 2 1 5 PER CENT 100.0 U 25.0 12.5 62.5 OWNERS LIVING ELSEWHERE 2 -0- 1 1 PER CENT 100.0 -0- 50.0 50.0 Attachment "B" Unit No. 16 - West Broadway Avenue Page 17 of 17 1-1th Avenue to 15th Avenue W JARVI,5 4 -5 2 17 .7.9 ?0 22 '14 is W DAr-,6-FTr 57-. to ZJ- le, 17 13 14 15 16 17 18 Zo 121 It Zj 24 A5 Z& L VJ76 7X zz Zd a 7 4 Unit 16: W. Broadway Avenue From Eleventh Ave. to Fifteenth Ave. 19 20 X2 ZJ 84 ZS SIGNED RESULT OF POSTCARD SURVEY ORIGINAL FOR AGAINST NO ONJECTION TOTAL PETITION PAVING PAVING SUBMITTED NO. OF FRONT FEET 2550 100 550 1900 PER CENT 100.0 3.9 21.6 74.5 PARCELS OF PROPERTY 28 rd 2 10 16 PER CENT 100.0 7.1 35.7 57.2 NO. OF PROPERTY OWNERS 21 4-) 2 8 11 .r4 PER CENT 100.0 93 9.5 38.1 52.4 OWNERS LIVING ON STREET 11 2 5 4 PER CENT 100.0 18.2 45-5 36-3 OWNERS LIVING ELSEWHERE 10 -0- 3 7 PER CENT 100.0 -0- 30-0 70-0 FORT WORTH, TEXAS 19.--__ TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS. Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of ARTHUR STREET and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: UNIT NO. 1, PROJECT NO. 104-24000-187: ARTHUR STREET FROM THE NORTH LINE OF KANSAS STREET TO THE SOUTH LINE OF WHITE SETTLEMENT ROAD, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-six foot wide roadway, and by con- structing five-inch thick concrete sidewalks and six- inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . .. . . . . . . . . . ... .$3.01/L.F. Seven-inch H.M.A.C. Pavement (Industrial Zoning) . . . . . . . . . . . 8.54/L.F. Five-inch concrete sidewalk. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.54/L.F. Six-inch concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74/S.F. UNIT NO. 2, PROJECT NO. 104-24000-187: NW. TWENTIETH STREET FROM THE WEST LINE OF FRANCIS AVENUE TO THE WEST LINE OF PRAIRIE AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by construc- ting five-inch thick concrete sidewalks and six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . .$3.01/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning with credit granted for existing penetration. . . . . . . 2.12/L.F. Five-inch concrete sidewalk. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.54/L.F. Six-inch concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74/S.F. 1 UNIT N0. 3, PROJECT N0. 104-24000-187: BUFORD STREET FROM THE EAST LINE OF HASKELL STREET TO 200' EAST, to be improved by constructing a six-inch thick hot-mix asphal- tic concrete pavement on a six-inch thick cement stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing a six-inch thick concrete driveway where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . .$2.95/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning) . . . . . . . . . . . . 2.45/L.F. Six-inch H.M.A.C. Pavement (Apartment Zoning with credit granted for owner-occupied residence) . . . . . . . . . . . . . . . . . . . . . 4.40/L.F. Six-inch concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74/S.F. UNIT NO. 4, PROJECT NO. 104-24000-187: BLACKSTONE DRIVE FROM THE EAST LINE OF ISBELL ROAD TO THE EAST END OF BLACKSTONE DRIVE (CUL-DE-SAC) , to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement sta- bilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . .$2.95/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning) . . . . . . . . . . . . 2.45/L.F. Six-inch concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74/S.F. UNIT NO. 5, PROJECT NO. 104-24000-187: YALE STREET FROM THE NORTH LINE OF ROBERTS CUT-OFF TO THE SOUTH LINE OF COLUMBIA AVENUE, to be improved by constructing a six- inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by con- structing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . .$3.01/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning) . .. . . . . . . . . . 2.39/L.F. Six-inch concrete driveway. . . .. . . . . . . . . . . . . . . . . . .. . . . . . . . . . .74/S.F. UNIT NO. 6, PROJECT NO. 104-24000-187: NW, TWENTY-THIRD STREET FROM 65' SOUTH OF THE SOUTH LINE OF ROCK ISLAND STREET TO THE SOUTH LINE OF MCCANDLESS STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot ggutter. . . . . . . . . . . . . . . . . . .$2.95/L.F. Six-inch H.M.A.C. Pavement (Residential�Zoning) . . . . . . . . . . 2.45/L.F. Six-inch concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. .74/S.F. 2 UNIT NO. 7, PROJECT NO. 104-24000-187: LINCOLN AVENUE FROM THE SOUTH PROPERTY 'LINES OF LOT 3, BLOCK 49, AND LOT 19, BLOCK 48, M,G. ELLIS ADDITION TO THE SOUTH LINE OF NW. TWENTY-EIGHTH STREET (HWY. 183) , to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . .$3.01/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning) . . . . . . . . . . . . 2.39/L.F. Six-inch H.M.A.C. Pavement (Industrial Zoning) . . . . . . . . . . . . . 6.61/L.F. Six-inch concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74/S.F. UNIT NO. 8, PROJECT NO. 104-24000-187: NORTH HOUSTON STREET FROM THE NORTH LINE OF NW. THIRTY-SEVENTH STREET TO THE SOUTH LINE OF NW. THIRTY-EIGHTH STREET to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . .$2.95/L.F. Six-inch H.M.A.C. Pavement (Industrial Zoning with credit granted for owner-occupied residence) . . 4.40/L.F. Six-inch H.M.A.C. Pavement (Industrial Zoning) . . . . . . . . . . . . . 6.35/L.F. Six-inch concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74/S.F. UNIT NO. 9, PROJECT NO. 104-24000-187: NORTH CRUMP STREET FROM THE NORTH LINE OF NE. THIRTY-SIXTH STREET TO THE SOUTH LINE OF NE. THIRTY-SEVENTH STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide con- crete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . .$3.01/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning) . . . . . . , . . . . . 2.39/L.F. Six-inch H.M.A.C. Pavement (Commercial Zoning with credit granted for owner-occupied residence), . 4.50/L.F. Six-inch H.M.A.C. Pavement (Commercial Zoning) . . . . . . . . . . . . . 6.61/L.F. Six-inch concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74/S.F. UNIT NO. 10, PROJECT NO. 104-24000-187: NORTH CRUMP STREET FROM THE NORTH LINE OF NE. THIRTY-SEVENTH STREET TO THE SOUTH LINE OF NE. THIRTY-EIGHTH STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick 3 UNIT NO, 10 - CONT, lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide con- crete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curbs and two-foot gutters. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 3.01/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning) . . . . . . . . . . . . . . . . . . . . . 2.39/L.F. Six-inch concrete driveway . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74/S.F. UNIT NO. 11, PROJECT NO. 104-24000-187: LULU STREET FROM THE NORTH LINE OF NE. TWENTY- EIGHTH STREET TO THE SOUTH LINE OF LORAINE STREET, to be improved by constructing a six- inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized sub- grade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing six-inch thick concrete driveways where specified, The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . .$ 3.01/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning), , . . . . . . . . . . . . . . . . . 2.39/L.F. Six-inch H.M.A.C. Pavement (Commercial Zoning with credit granted for owner-occupied residence) . . . . . . . . . . 4.50/L.F. Six-inch H.M.A.C. Pavement (Commercial Zoning) . . . . . . . . . . . . . . . . . . . . . 6.61/L.F. Six-inch concrete driveway. . . _ . . . . . . . . . . . . . . . . . . .. . . . .. . . .74/S,F. VNIT NO. 12, PROJECT NO. 104-24000-187: CHENAULT AVENUE FROM THE EAST LINE OF BAURLINE STREET TO THE WEST LINE OF JUDKINS AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a 'six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing six- inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .$ 3.01/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning). . . . . . . . . .. . . . . . . . . . 2.39/L.F. Two-foot gutter only. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1.51/L.F. Six-inch concrete driveway, . . . . . . . . . - . . . . . . . . . . . . . . . . . . . .74/S.F. UNIT NO. 13, PROJECT NO. 104-24000-187: LA SALLE STREET FROM THE EAST LINE OF SYLVANIA AVENUE TO THE WEST LINE OF BAURLINE STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized sub- grade, with seven-inch high concrete curbs and two-foot wide concrete gutters,so that the finished street will consist of one twenty-six foot wide roadway, and by construct- ing five-inch thick concrete sidewalks and six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. , . . . _ _ . . . . . . . . . . . . . . . . . . . . . . .$ 2.95/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning) , . . . . . . . . . . . . . . . . . . . 2.45/L.F. 4 UNIT NO. 13 - CONT. Six-inch H.M.A.C. Pavement (Commercial Zoning with credit granted for owner-occupied residence) . .$3.91/L.F. Six-inch H.M.A.C. Pavement (Commercial Zoning) . . . . . . . . . . . . . 5.37/L.F. Five-inch concrete sidewalk. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.54/L.F. Six-inch concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74/S.F. UNIT NO. 14, PROJECT NO. 104-24000-187: FINLEY STREET FROM THE EAST LINE OF BAURLINE STREET TO 484' EAST (DEAD END) , to be improved by constructing a six-inch thick hot- mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty foot wide roadway, and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . .$2.95/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning). . . . . . . . . . . . 2.45/L.F. Six-inch concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74/S.F. UNIT NO. 15, PROJECT NO. 104-24000-187: OHIO GARDEN ROAD FROM 100' WEST OF THE WEST LINE OF ISBELL ROAD TO THE WEST CITY LIMITS, (1180') , to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement sta- bilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-six foot wide roadway, and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . .$2.95/L.F. Six-inch H.M.A.C. Pavement (Residential Zoning with credit granted for existing penetration) . . . . . . 2.18/L.F. Six-inch H.M.A.C. Pavement (Apartment and Commercial Zoning with credit granted for existing penetration) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7.54/L.F. Six-inch concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74/S.F. UNIT NO. 16, PROJECT NO. 104-24000-187. WEST BROADWAY AVENUE FROM THE WEST LINE OF ELEVENTH AVENUE TO THE EAST LINE OF FIFTEENTH AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime sta- bilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-six foot wide roadway, and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter. . . . . . . . . . . . . . . . . . . . . . . .$3.01/L.F. Six-inch H.M.A.C. Pavement (Industrial Zoning with credit granted for owner-occupied residence) . . . . . . 5.26/L.F. Six-inch H.M.A.C. Pavement (Industrial Zoning) . . . . . . . . . . . . . 8.13/L.F. Six-inch concrete driveway. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .74/S.F. 5 • 1 The assessments result in the following division of costs: Total Property Owners ' Cost for curb & gutter, sidewalk, driveways. . . . . , o . . . . . . o . . . — . . . o —$64,256.18 Total Property Owners ' Cost for improvements other than above— . — . . . . . o . . . . . . . . . . . . . . . . . . 78,264.37 TOTAL PROPERTY OWNERS' COST $142,520.55 Total City of Fort Worth Cost for curb & gutter, sidewalk, driveways. . . . . . . . . . . o — . . . . . . . . . . . . . . 12,064.02 Total City of Fort Worth Cost for improvements other than above, . . . . . . . . . . . . . . - - — . . . . . . . . .142,423.68 TOTAL CITY OF FORT WORTH COST $154,487.70 TOTAL ESTIMATED CONSTRUCTION COST $297,008.25 6 UNIT NO. 1. PROJECT NO. 104-24000-187: ARTHUR STREET FROM KANSAS STREET TO WHITE SETTLEMENT ROAD, to be improved by constructing a seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-six foot wide roadway and by constructing five-inch thick concrete sidewalk and six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF ARTHUR STREET AND KANSAS STREET WEST SIDE OF STREET EVANS PEARSON WESTWWOOD ADDITION George Levitan 16 14 50' Pavement $8.54 $427.00 4316 Ridgehaven Court Ind. 39' Curb & Gutter 3.01 117.39 50' Sidewalk 2.54 127.00 $ 671.39 Mrs. Anna Carr 15 14 50' Pavement $8.54 $427.00 5500 Jacksboro Hwy. Ind. 50' Curb & Gutter 3.01 150.50 50' Sidewalk 2.54 127.00 $ 704.50 George Levitan 14,13, 14 150' Pavement $8.54 $1,281.00 4316 Ridgehaven Court& 12 Ind. 150' Curb & Gutter 3.01 451.50 150' Sidewalk 2.54 381.00 $2,113.50 H. L. Harvey 8-R 14 200' Pavement $8.54 $1,708.00 207 NE. 21st Ind. 100' Curb & Gutter 3.01 301.00 100' Sidewalk 2.54 254.00 $2,263.00 Louis Klimist 7 & 6 14 100' Pavement $8.54 $854.00 1812 Dakar Road West Ind. 100' Curb & Gutter 3.01 301.00 89' Sidewalk 2.54 226.06 30 S.F. Drive .74 22.20 $1,403.26 H. L. Harvey S 96' 14 96' Pavement $8.54 $819.84 207 NE. 21st of 1 Ind. 96' Curb & Gutter 3.01 288.96 96' Sidewalk 2.54 243.84 $1,352.64 7 CONT. UNIT NO. 1, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EVANS PEARSON WESTWOOD ADDITION H. L. Harvey N. 40' 14 40' Pavement $8.54 $341.60 207 NE. 21st of 1 Comm. 29' Curb & Gutter 3.01 87.29 40' Sidewalk 2.54 101.60 $ 530.49 WHITE SETTLEMENT ROAD INTERSECTS EAST SIDE OF STREET W. W. Grainger, Inc. N. 40' 18 40' Pavement $8.54 $341.60 1923 White Settlement of 5 Comm. 40' Sidewalk 2.54 101.60 Road $ 443.20 W. W. Grainger, Inc. S. 96' 18 96' Pavement $8.54 $819.84 1923 White Settlement of 5 Comm. 76' Sidewalk 2.54 193.04 Road $1,012.88 H. L. Harvey 26,25, 18 250' Pavement $8.54 $2,135.00 207 NE. 21st 24,23, Ind. $2,135.00 & 22 Welding Specialty 21,20, 18 300' Pavement $8.54 $2,562.00 Company, Inc. 19,18, Ind. $2,562.00 217 Arthur Street 17 & 16 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $15,191.86 TOTAL CITY OF FORT WORTH COST $ 7,189.29 TOTAL ESTIMATED CONSTRUCTION COST - UNIT I $22,381. 15 8 UNIT NO. 2. PROJECT NO. 104-24000-187: TWENTIETH STREET FROM FRANCIS AVENUE TO PRAIRIE AVENUE, to be unproved by constructing a six-inch thick hot-mix asphaltic concrete pave- ment on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing five-inch thick concrete sidewalk and a six-inch thick concrete driveway where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHWEST CORNER OF TWENTIETH STREET AND FRANCIS AVENUE NORTH SIDE OF STREET - NORTH POINT ADDITION City of Fort Worth 12 No Assessment Res. -0- ROOSEVELT AVENUE INTERSECTS BAKER HEIGHTS ADDITION Faith Baptist Church 11 17 76' Pavement $2.12 $161.12 2925 Santa Fe Trail Res. 63' Curb & Gutter 3.01 189.63 76' Sidewalk 2.54 193.04 $543.79 PRAIRIE AVENUE INTERSECTS SOUTH SIDE OF STREET NORTH FORT WORTH ADDITION G. A. Wilkerson, Jr. 6 221 100' Adjusted to 1961 Prairie Res. 78' Pavement $2.12 $165.36 100' Curb & Gutter 3.01 301.00 230 S.F. Drive .74 170.20 $636.56 Ray Porter 7 221 100' Pavement $2.12 $212.00 1960 Francis Res. 100' Curb & Gutter 3.01 301.00 $513.00 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $1,693.35 TOTAL CITY OF FORT WORTH COST 7,477.90 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 2 JIL17l.25 9 w UNIT NO, 3. PROJECT NO, 104-24000-187: BUFORD STREET FROM HASKELL STREET TO 200 FEET EAST, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing a six-inch thick concrete driveway where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHEAST CORNER OF BUFORD STREET AND HASKELL STREET NORTH SIDE OF STREET ZIHLMAN'S ADDITION Fort Worth 1 thru 5 3 250' Adjusted to Osteopathic Hospital Apt. 177' Pavement $2.45 $433.65 1000 Montgomery Street $ 433.b5 BUFORD STREET TO THE SOUTH INTERSECTS SOUTH SIDE OF STREET MONTGOMERY AND PYLE SURVEY Fort Worth Tr. 3 95' Adjusted to Osteopathic Hospital Apt. 86' Pavement $2.45 $210.70 1000 Montgomery Street $ 210.70 Bertha S. Koenig Tr. 1 115' Adjusted to 1049 Haskell Apt. 92' Pavement $4.40 $404.80 92' Curb & Gutter 1.95 271.40 50 S.F. Drive .74 37.00 $ 713.20 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $1,357.55 TOTAL CITY OF FORT WORTH COST $3,725.55 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 3 $5,083.10 10 UNIT NO. 4. PROJECT NO. 104-24000-187: BLACKSTONE DRIVE FROM ISBELL ROAD TO EAST END OF BLACKSTONE DRIVE (CUL-DE-SAC), to be improved by constructing a six-inch thick hot- mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHEAST CORNER OF BLACKSTONE DRIVE AND ISBELL ROAD NORTH SIDE OF STREET BROOKSIDE ANNEX ADDITION C. L. Harrison S.75' 3 101.8' Adjusted to 4428 Blackstone Drive of 1 Res. 74' Pavement $2.45 $181.30 74' Curb & Gutter 2.95 218.30 85 S.F. Drive .74 62.90 $ 462.50 J. W. Theobold 2 & 3 3 200' Pavement $2.45 $490.00 4424 Blackstone Drive Res. 200' Curb & Gutter 2.95 590.00 85 S.F. Drive .74 62.90 $1,142.90 W. M. Johnson 4 3 100' Pavement $2.45 $245.00 4400 Blackstone Drive Res. 100' Curb & Gutter 2.95 295.00 85 S.F. Drive .74 62.90 $ 602.90 Clarence Bell 5 3 100' Pavement $2.45 $245.00 4332 Blackstone Drive Res. 100' Curb & Gutter 2.95 295.00 85 S.F. Drive .74 62.90 $ 602.90 Tolbert W. Frizzell 6 3 100' Pavement $2.45 $245.00 3537 Stuart Drive Res. 94' Curb & Gutter 2.95 277.30 $ 522.30 M. W. Carlile 7 3 100' Pavement $2.45 $245.00 4316 Blackstone Drive was. 90' Curb & Gutter 2.95 265.50 85 S.F. Drive .74 62.90 $ 573.40 Clay Martin 8 3 100' Pavement $2.45 $245.00 4308 Blackstone Drive Res. 100' Curb & Gutter 2.95 295.00 85 S.F. Drive .74 62.90 $ 602.90 11 CONT. UNIT NO. 4, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BROOKSIDE ANNEX ADDITION Jack G. Robins 9 3 100' Pavement $2.45 $245.00 9342 Rosstown Way Res. 100' Curb & Gutter 2.95 295.00 . Houston, Texas 85 S.F. Drive . 74 62.90 $ 602.90 Richard Kennington 10 3 100' Pavement $2.45 $245.00 9342 Rosstown Way Res. 100' Curb & Gutter 2.95 295.00 Houston, Texas 52 S.F. Drive .74 38.48 $ 578.48 Andrew W. Winaski 11 3 100' Pavement $2.45 $245.00 4212 Blackstone Drive Res. 100' Curb & Gutter 2.95 295.00 85 S.F. Drive .74 62.90 $ 602.90 John R. Farrell 12 3 90.6' Pavement $2.45 $221.97 4206 Blackstone Drive Res. 90.6' Curb & Gutter2.95 267.27 85 S.F. Drive . 74 62.90 $ 552.14 Tarrant County 13 & 3 No Benefit Water Board portion No Assessment Danciger Bldg. of closed street -0- SOUTH SIDE OF STREET Tarrant County 14 & E. 2 No Benefit Water Board 164.8' No Assessment Danciger Bldg. of 15 -0- C. D. Peavy W. 101' 2 101' Pavement $2.45 $247.45 c/o River Oak of 15 Res. 101' Curb & Gutter 2.95 297.95 Real Estate 85 S.F. Drive . 74 62.90 P.O. Box 10217 $ 608.30 12 CONT. UNIT NO. 4, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BROOKSIDE ANNEX ADDITION Wm. George Martin Huff 16 2 100' Pavement $2.45 $245.00 4305 Blackstone Drive Res. 100' Curb & Gutter 2.95 295.00 140 S.F. Drive .74 103.60 $ 643.60 A. C. Minshew 17 2 100' Pavement $2.45 $245.00 4309 Blackstone Drive Res. 100' Curb & Gutter 2.95 295.00 140 S.F. Drive .74 103.60 $ 643.60 J. E. Parten 18 2 100' Pavement $2.45 $245.00 7401 Ashville Avenue Res. 94' Curb & Gutter 2.95 277.30 85 S.F. Drive .74 62.90 $ 585.20 D. M. Wilks 19 2 100' Pavement $2.45 $245.00 4325 Blackstone Drive Res. 90' Curb & Gutter 2.95 265.50 63 S.F. Drive .74 46.62 $ 557.12 , Betty E. Theobold 20 2 100' Pavement $2.45 $245.00 4424 Blackstone Res. 100' Curb & Gutter 2.95 295.00 $ 540.00 Mrs. Claude Caldwell 21 2 100' Pavement $2.45 $245.00 4104 Kelroy Res. 100' Curb & Gutter 2.95 295.00 $ 540.00 Will Wright 22 2 100' Pavement $2.45 $245.00 4415 Blackstone Drive Res. 100' Curb & Gutter 2.95 295.00 70 S.F. Drive .74 51.80 $ 591.80 J. C. Murry 23 2 100' Pavement $2.45 $245.00 4421 Blackstone Drive Res. 100' Curb & Gutter 2.95 295.00 70 S.F. Drive .74 51.80 $ 591.80 13 CONT. UNIT NO. 4, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BROOKSIDE ANNEX ADDITION 0. V. Snider 24 2 101.8' Adjusted to 4232 Ashmore Res. 74' Pavement $2.45 $181.30 74' Curb & Gutter 2.95 218.30 85 S.F. Drive .74 62.90 $ 462.50 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $12,610.14 TOTAL CITY OF FORT WORTH COST $20,747.36 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 4 $33,357. 50 14 UNIT NO. 5, PROJECT NO. 104-24000-187: YALE STREET FROM ROBERTS CUT-OFF TO COLUMBIA AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pave- ment on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, sc that the finished street will cons is t of one thirty- foot wide roadway, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF YALE STREET AND ROBERTS CUT-OFF WEST SIDE OF STREET CASTLEBERRY GARDENS ADDITION E. H. Spradling A 18 201.7' Adjusted to 2200 Roberts Cut-Off Res. 101.7' Pavement $2.39 $243.06 101.7' Curb & Gutter3.01 306.12 $ 549.18 J. C. Campbell 10 18 176.6' Adjusted to 2105 Yale Street Res. 135' Pavement $2.39 $322.65 135' Curb & Gutter 3.01 406.35 85 S.F. Drive .74 62.90 $ 791.90 J. T. Finley 9 18 80' Pavement $2.39 $191.20 2109 Yale Street Res. 80' Curb & Gutter 3.01 240.80 85 S.F. Drive .74 62.90 $ 494.90 W. P. Cox 8 18 80' Pavement $2.39 $191.20 2113 Yale Street Res. 80' Curb & Gutter 3.01 240.80 85 S.F. Drive .74 62.90 $ 494.90 COLUMBIA AVENUE INTERSECTS EAST SIDE OF STREET J. C. Southerland 9 19 80' Pavement $2.39 $191.20 5717 Malvey Res. 80' Curb & Gutter 3.01 240.80 70 S.F. Drive . 74 51.80 $ 483.80 Levie Ramsey 8 19 80' Pavement $2.39 $191.20 2109 Yale Street Res. 80' Curb & Gutter 3.01 240 .80 70 S.F. Drive . 74 51.80 $ 483.80 15 CONT. UNIT NO. 5, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT CASTLEBERRY GARDENS ADDITION Homer M. Roach 6 & 7 19 160' Pavement $2.39 $382.40 c/o Wanda Singleton Res. 160' Curb & Gutter 3.01 481.60 3828 Lakewood Drive 85 S.F. Drive . 74 62.90 $ 926.90 J. N. Medley 5 19 108.4' Pavement $2.39 $259.08 2324 Roberts Cut-Off Res. 108.4' Curb & Gutter3.01 326.28 170 S.F. Drive .74 125.80 $ 711.16 Inspiration Point 4 19 183.6' Adjusted to Baptist Church Res. 100' Pavement $2.39 $239.00 2104 Roberts Cut-Off 100' Curb & Gutter 3.01. 301.00 85 S.F. Drive .74 62.90 $ 602.90 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $5,539�44 TOTAL CITY OF FORT WORTH COST 11,370.31 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 5 $16,909. 75 16 UNIT NO, 6, PROJECT NO. 104-24000-187: TWENTY-THIRD STREET FROM SIXTY-FIVE FEET SOUTH OF ROCK ISLAND STREET TO McCANDLESS STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six- inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING SIXTY-FIVE FEET SOUTH OF THE SOUTH LINE OF ROCK ISLAND STREET WEST SIDE OF STREET D. W. CAMPBELL SURVEY Rosen and Rosen N. 110' 110' Pavement $2.45 $269.50 P.O. Box 4454 of Tr. 6 84' Curb & Gutter 2.95 247.80 Res. $ 517.30 J. ARMENDARIS SURVEY Rosen and Rosen Tr. 1-A 300' Pavement $2.45 $735.00 P.O. Box 4454 Res. 300' Curb & Gutter 2.95 885.00 $1,620.00 Rosen and Rosen Tr. 1 300' Pavement $2.45 $735.00 P.O. Box 4454 Res. 300' Curb & Gutter 2.95 885.00 $1,620.00 McCANDLESS STREET INTERSECTS EAST SIDE OF STREET ROSEN HEIGHTS SECOND FILING ADDITION A. Korteff 13 & 14 200 100' Pavement $2.45 $245.00 3011 NW. 25th Street Res. 100' Curb & Gutter 2.95 295.00 118 S.F. Drive .74 87.32 $ 627.32 Midway Savings Assn. 15 9.00 50' Pavement $2.45 $122.50 P.O, Box 232 Res. 50' Curb & Gutter 2.95 147.50 Arlington, Texas 118 S.F. Drive .74 87.32 $ 357.32 E. R. Franks 16 200 50' Pavement $2.45 $122.50 3216 NW. 23rd Street Res. 50' Curb & Gutter 2.95 147.50 118 S.F. Drive . 74 87.32 $ 357.32 17 CONT, UNIT NO. 6, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT ROSEN HEIGHTS SECOND FILING ADDITION J. D. Brooks 17 & 18 200 100' Pavement $2.45 $245.00 3212 NW. 23rd Street Res. 100' Curb & Gutter 2.95 295.00 118 S.F. Drive . 74 87.32 $ 627.32 Leonard Jordan 19 & 20 200 100' Pavement $2.45 $245.00 3201 NW. 26th Street Res. 100' Curb & Gutter 2.95 295.00 118 S.F. Drive .74 87.32 $ 627.32 Bobby A. Carroll 21 200 50' Pavement $2.45 $122.50 Route 2, Box 410 Res. 50' Curb & Gutter 2.95 147.50 Alice, Texas $ 270.00, C. W. Collins 22 200 50' Pavement $2.45 $122.50 2007 Brookshire Res. 50' Curb & Gutter 2.95 147.50 Arlington, Texas 118 S.F. Drive .74 87.32 $ 357.32 Lesley Linn 23 200 50' Pavement $2.45 $122.50 3202 NW. 23rd Street Res. 50' Curb & Gutter 2.95 147.50 118 S.F. Drive .74 87.32 $ 357.32 E. R. Franks 24 200 50' Pavement $2.45 $122.50 3216 NW. 23rd Street Res. 50' Curb & Gutter 2.95 147.50 $ 270.00 ROCK ISLAND STREET INTERSECTS 18 CONT. UNIT NO. 6, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT ROSEN HEIGHTS SECOND FILING ADDITION Nancy McClendon 13 177 50' Pavement $2.45 $122.50 3122 NW. 23rd Street Res. 34' Curb & Gutter 2.95 100.30 $ 222.80 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $ 7,831.34 TOTAL CITY OF FORT WORTH COST 13,970.66 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 6 $21,802.00 19 UNIT NO. 7, PROJECT NO. 104-24000-187: LINCOLN STREET FROM THE SOUTH PROPERTY LINFR OF LOT 3, BLOCK 49, AND LOT 19, BLOCK 48, M. G. ELLIS ADDITION, TO THE SOUTH LINE OF NW, TWENTY-EIGHTH STREET (HWY. 183) , to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZUaING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTH PROPERTY LINE OF LOT 3, BLOCK 49, M. G. ELLIS ADDITION WES. SIDE OF STREET M. G. ELLIS ADDITION Lyle Payne 3 49 50' Pavement $2.39 $119.50 2506 Clinton Res. 40' Curb & Gutter 3.01 120.40: $ 239.90 Rufus J. Brown 4 & 5 49 92.8' Adjusted to 915 NW. 28th Ind. 78' Pavement $6.61 $515.58 $ 515.58 NW. 28TH STREET (HWY. 183) INTERSECTS EAST SIDE OF STREET Lela Stewart 17,18, 48 160' Shallow Lot Adjusted to 721 Cliff & 19 Res. 56' Pavement $2.39 $133.84 56' Curb & Gutter 3.01 168.56 236 S.F. Drive .74 174.64 $ 477.04 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $1,232.52 TOTAL CITY OF FORT WORTH COST 4,421.48 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 7 $5,654.00 20 UNIT NO, 8. PROJECT NO, 104-24000-187: NORTH HOUSTON STREET FROM NW. THIRTY-SEVENTH STREET TO NW. THIRTY-EIGHTH STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF HOUSTON STREET AND NW. THIRTY-SEVENTH STREET WEST SIDE OF STREET WASHINGTON HEIGHTS ADDITION William P. Smith 11,12, 3 200' Pavement $6.35 $1,270.00 4401 Westlake Dr. 13 04 Ind. 200' Curb & Gutter 2.95 590.00 $1,860.00 Alfonso Torres 15 3 50' Pavement $4.40 $ 220.00 3709 North Houston Ind. 50' Curb & Gutter 2.95 147.50 96 S.F. Drive .74 71.04 $ 438.54 Estes Real Est. Co. 16 3 50' Pavement $6.35 $317.50 206 Dan Waggoner Bldg. Ind. 36' Curb & Gutter 2.95 106.20 96 S.F. Drive .74 71.04 $ 494.74 Mary Calvillo 17 3 50' Pavement $6.35 $ 317.50 3506 Weber Ind. 48' Curb & Gutter 2.95 141.60 $ 459.10 Raul Flores 18 & 19 3 100' Pavement $4.40 $ 440.00 3717 North Houston Ind. 100' Curb & Gutter 2.95 295.00 96 S.F. Drive .74 71.04 $ 806.04 Alton E. Stephens 20 3 50' Pavement $6.35 $ 317.50 3008 Arrow Ind. 50' Curb & Gutter 2.9j 14/.50 $ 465.00 21 CONT. UNIT NO. 8, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NW. THIRTY-EIGHTH STREET INTERSECTS EAST SIDE OF STREET WASHINGTON HEIGHTS ADDITION Northfield Corporation 1 2 50' Pavement $6.35 $ 317.50 c/o Johnson-Campbell Ind. 50' Curb & Gutter 2.95 147.50 Lumber Company $ 465.00 P.O. Box 10248 Manuel Zarate, Sr. 2 2 50' Pavement $6.35 $ 317.50 4623 Fairmount Ind. 50' Curb & Gutter 2.95 147.50 Dallas, Texas 75219 $ 465.00 Mrs. R. J. Johnson 3 2 50' Pavement $6.35 $ 317.50 Box 217 Ind. 50' Curb & Gutter 2.95 147.50 Newcastle, Texas $ 465.00 Raymond Gonzales 4 2 50' Pavement $6.35 $ 317.50 3509 North Houston Ind. 50' Curb & Gutter 2.95 147.50 96 S.F. Drive .74 71.04 $ 536.04 Primitivo Ramirez 5 2 50' Pavement $4.40 220.00 3712 North Houston Ind. 34' Curb & Gutter 2.95 100.JU $ 320.30 Joe Lopez 6 2 50' Pavement $6.35 $ 317.50 1821 May Street Ind. 50' Curb & Gutter 2.95 147.50 $ 465.00 Leon DeLagarza 7 2 50' Pavement $4.40 $ 220.00_ 3706 North Houston Ind. 50' Curb & Gutter 2.95 A7.50 96 S.F. Drive .74 71.04 $ 438.54 22 CONT. UNIT NO. 8, PROJECT NO. 104-240 00-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WASHINGTON HEIGHTS ADDITION Mauricio and 8 2 50' Pavement $6.35 $ 317.50 Maria Garcia Ind. 50' Curb & Gutter 2.95 147.50 3474 Lovell Avenue $ 465.00 Estes Real Estate 9 2 50' Pavement $6.35 $ 317.50 Company Ird . 50' Curb & Gutter 2.95 147.50 206 Dan Waggoner Bldg. 96 S.F. Drive .74 71.04 $ 536.04 Willie Esparza 10 2 50' Pavement $4.40 $ 220.00 3700 North Houston Ind. 50' Curb & Gutter 2.95 147.50 $ 367.50 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $9,046�84 TOTAL CITY OF FORT WORTH COST 5,206.41 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 8 $14,253.25 23 UNIT NO. 9 - PROJECT N0, 104-24000-187: NORTH CRUMP STREET FROM NE. THIRTY-SIXTH STREET TO NE. THIRTY-SEVENTH STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF NORTH CRUMP STREET AND NE. THIRTY-SIXTH STREET WEST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION Victor Saldivar 13 15 50' Pavement $6.61 $330.50 1761 Corrin Comm. 34' Curb & Gutter 3.01 102.34 $432.84 Irene H. Rodela 14 15 50' Pavement $2.39 $119.50 1617 Beaumont Res, 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $332.90 Juan S. Rodela 15 15 50' Pavement $2.39 $119.50 3705 North Crump Res. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62, 90 $332.90 Waide D. Little 16 15 50' Pavement $2.39 $119.50 3707 North Crump Res. 50' Curb & Gutter 3 ,01 150.50 85 S.F. Drive .74 62.90 $332.90 W. L. Petrey 17 15 50' Pavement $2.39 $119.50 3709 North Crump Res. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive 74 62.90 $332.90 F. B. Jennings 18 & 19 15 100' Pavement $2.39 $239.00 3711 North Crump Res. 100' Curb & Gutter 3.01 301.00 85' S.F. Drive .74 62.90 $602.90 Billie J. Farr 20 15 50' Pavement $2 ,39 $119.50 2106 French Res. 50' Curb & Gutter 3.:01 150.50 85 S, F Drive .74 62,,90 $332.90 24 CONt. UNIT NO. 9, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET FOSTEPCO gEIGHTS ADDITION Fort Worth Savings 21 15 50' Pavement $2.39 $119.50 & Loan Res. 300 West 7th Street $119.50 Manuel Tijerina 22 15 50' Pavement $2 .39 $119.50 3719 North Crump Res. 50' Curb & Gutter 3.,01 150 50 85 S F. Drive .74 62.90 $332.90 Harry M. Embrey,Jr. 23 15 50' Pavement $2.39 $119.50 3815 South Hills Cl. Res, 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $332.90 Claudio M. Zarate 24 15 50' Pavement $2.39 $119.50 3723 North Crump Res. 45' Curb & Gutter 3.01 135.45 85 S.F. Drive .74 62.90 $317.85 NE. THIRTY-SEVENTH STREET INTERSECTS EAST SIDE OF STREET Geneva Sims 1 14 50' Pavement $2.39 $119.50 3722 North Crump Res. 45' Curb & Gutter 3.01 135.45 $254.95 Ray S. Sheppard 50' Pavement $2.39 $119.50 2322 NW. 24th St. 2 14 50' Curb & Gutter 3.01 150.50 Res. 85 S.F. Drive .74 62.90 $332.90 Joe Lopez 3 _14 50' Pavement $2.39 $119,50 % Louisa Ramirez Tee. 50' Curb & Gutter 3.01 150.50 3712 North Houston 85 S.F. Drive .74 62.90 $332.90 Aleene Callaway 4 14 50' Pavement $2.39 $119.50 3420 Denton Hwy. Res. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $332.90 25 CONT. UNIT NO. 9, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION J. T. Covington 5 14 50' Pavement $2.39 $119.50 3104 North Elm Res. 50' Curb & Gutter 3.01 150.50 $270.00 E. �- Callaway 6 14 50' Pavement $2.39 $119-50 3420 Denton Hwy. Res. 50' Curb & Gutter 3 01 150,50 85 S.F. Drive .74 62.90 $332.90 Oliver L. Ridley 7 14 50' Pavement $2, 39 $119.50 3710 North Crump Res. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $332.90 W. R. Walker 8 14 50' Pavement $2.39 $119.50 3708 North Crump Res. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $332.90 J. R. Parker 9 14 50' Pavement $2.39 $119.50 3706 North Crump Res, 50' Curb & Gutter 3 01 150.50 140 S.F. Drive .74 103 60 $373.60 H. B, Haralson 10 14 50' Pavement $2 39 $119 50 3704 North Crump Res 50' Curb & Gutter 3.01 150.50 85 S F. Drive .74 62.90 $332.90 Jewell Stearns 11 14 50' Pavement $2. 39 $119, 50 2433 Moneda Res. 48' Curb & Gutter 3.01 144,48 85 S.F. Drive 74 62. 90 $326,88 26 CONT. UNIT NO, 9, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION L. A. Little 12 14 50' Pavement $4.50 $225.00 3700 North Crump Comm. 36' Curb & Gutter 3.01 108.36 $333.36 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $7,692.48 TOTAL CITY OF FORT WORTH COST 9,230.47 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 9 $16,922.95 27 UNIT NO. 10, PROJECT NO. 104-24000-187: NORTH CRUMP STREET FROM NE. THIRTY-SEVENTH STREET TO NE. THIRTY-EIGHTH STREET, to be 4-roved by constructing a six-inch hot-mix asphaltic concrete paNement on a six-inch thick lime stabilized subgrade, with seven- inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF NORTH CRUMP STREET AND NE. THIRTY-SEVENTH STREET WEST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION J. T. Covington 13 4 50' Pavement $2.39 $119.50 3104 North Elm Res. 45' Curb & Gutter 3.01 135.45 $ 254.95 Pascual Willars 14 4 50' Pavement $2.39 $119.50 3803 North Crump Res. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive . 74 62.90 $ 332.90 DeLores Falcon 15 4 50' Pavement $2.39 $119.50 3805 North Crump Res. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive . 74 62.90 $ 332.90 W. 0. McGechie 16 4 50' Pavement $2.39 $119>50 3301 Sunday Drive Res, 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $ 332.90 Joe Falcon 17 4 50' Pavement $2.39 $119.50 c/o Juan Montez Res. 50' Curb & Gutter 3.01 150.50 3809 North Crump 85 S.F. Drive .74 62,90 $ 332.90 Hipolito Hernandez 18 4 50' Pavement $2.39 $119.50 c/o E. A. Callaway, Jr. Res. 50' Curb & Gutter 3.01 150.50 3420 Denton Hwy. 85 S.F. Drive . 74 62.90 $ 332.90 28 CONT. UNIT NO. 10, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT FOSTEPCO HEIGHTS ADDITION Harold Bergstrom 19 4 50' Pavement $2.39 $119.50 634 College Res. 50' Curb & Gutter 3.01 150.50 Grand Prairie, Texas 75050 $ 270.00 Bernade E. Cortez 20 4 50' Pavement $2.39 $119.50 3703 North Commerce Res. 50' Curb & Gutter 3.01 150.50 $ 270.00 E. C. Cruz 21 4 50' Pavement $2.39 $119.50 3863 Oscar Res. 50' Curb & Gutter 3.01 150.50 $ 270.00 Barden W. Jones 22 4 50' Pavement $2.39 $119.50 7000 Apache Trail Res. 50' Curb & Gutter 3.01 150.50 $ 270.00 Reynaldo Garcia 23 & 24 4 100' Pavement $2.39 $239.00 c/o Johnson-Campbell Res. 100' Curb & Gutter 3.01 301.00 Lumber Co. 85 S.F. Drive .74 62.90 P.O. Box 10248 $ 602.90 NE. THIRTY-EIGHTH STREET INTERSECTS EAST SIDE OF STREET Atlas Subsidiaries 1 3 50' Pavement $2.39 $119.50 of Texas, Inc. Res. 50' Curb & Gutter 3.01 150.50 P.O. Box 2518, Dallas, Texas $ 270.00 Pauline Scott 2 3 50' Pavement $2.39 $119.50 P.O. Box 2043 Res. 50' Curb & Gutter 3.01 150.50 Alhambra, California 85 S.F. Drive .74 62.90 91803 $ 332.90 Barney Williams 3 3 50' Pavement $2.39 $119.50 1212 South Henderson Res. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $ 332.90 29 CONT. UNIT NO. 10, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT FOSTEPCO HEIGHTS ADDITION William Cornstubble 4 & 5 3 100' Pavement $2.39 $239.00 c/o Texas Bank and Res, 100' Curb & Gutter 3.01 301.00 Trust Co. $ 540.00 Dallas, Texas R. C. Smith 6 3 50' Pavement $2.39 $119.50 P.O. Box 163 Res. 50' Curb & Gutter 3.01 150.50 Maypearl, Texas $ 270.00 Roberto Santana 7 & 8 3 100' Pavement $2.39 $239.00 3810 North Crump Res. 100' Curb & Gutter 3.01 301.00 85 S.F. Drive .74 62.90 $ 602.90 Elwood Johnson 9,10,11, 3 200' Pavement $2.39 $47&00 3804 North Crump 12 Res. 200' Curb & Gutter 3.01 602.00 85 S.F. Drive .74 62.90 $1,142.90 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $7,093.95 TOTAL CITY OF FORT WORTH COST 8,979.80 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 10 $16,073.75 30 Z c UNIT NO. 11, PROJECT NO. 104-24000-187: LULU STREET FROM NE. TWENTY-EIGHTH STREET TO LORAINE STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF LULU STREET AND NE. TWENTY-EIGHTH STREET WEST SIDE OF STREET MORGAN HEIGHTS ADDITION J. B. Dooley 10 66 44.5' Pavement $6.61 $294.15 U. S. Court House Comm. 44.5' Curb & Gutter3.01 133.95 Amarillo, Texas $ 428.10 Verna Boydstun 11 66 50' Pavement $4.50 $225.00 2803 Lulu Comm. 50' Curb & Gutter 3.01 150.50 118 S.F. Drive .74 87.32 $ 462.82 A. E. Tyler 12 66 50' Pavement $2.39 $119.50 2805 Lulu Res. 50' Curb & Gutter 3.01 150.50 118 S.F. Drive .74 87.32 $ 357.32 Jack Jennings 13 66 50' Pavement $2.39 $119.50 4124 Knox Res. 50' Curb & Gutter 3.01 150.50 118 S.F. Drive .74 87.32 $ 357.32 Ola L. Barton 14 66 50' Pavement $2.39 $119.50 3468 Cardinal Ridge Rd. Res. 50' Curb & Gutter 3.01 150.50 118 S.F. Drive .74 87.32 $ 357.32 Earl A. Barton 15 66 50' Pavement $2.39 $119.50 203 Cornell Avenue Res. 50' Curb & Gutter 3.01 150.50 Fort Smith, Arkansas 72901 $ 270.00 Louis Parks 16 66 50' Pavement $2.39 $119.50 9970 Witham Res. 50' Curb & Gutter 3.01 150.50 Dallas, Texas 118 S.F. Drive .74 87.32 $ 357.32 31 CONT. UNIT NO. 11 , PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT MORGAN HEIGHTS ADDITION Frank Hopkins 17 & 18 66 100' Pavement $2.39 $239.00 R.R. # 2, Box 308 Res. 100' Curb & Gutter 3.01 301.00 236 S.F. Drive .74 174.64 $ 714.64 LORAINE STREET INTERSECTS EAST SIDE OF STREET Mrs. Maye Cowand 1 & 2 67 100' Pavement $2.39 $239 ,00 2816 Lulu Res. 100' Curb & Gutter 3.01 301.00 $ 540.00 L. W. McEntire 3 67 50' Pavement $2.39 $119.50 3057 Grover Res. 50' Curb & Gutter 3.01 150.50 118 S.F. Drive .74 87.32 $ 357.32 Limmie L. Huston 4 67 50' Pavement $2.39 $119.50 2812 Lulu Res. 50' Curb & Gutter 3.01 150.50 118 S.F. Drive .74 87.32 $ 357.32 C. C. Copeland 5 67 50' Pavement $2.39 $119.50 3225 Fairview Res. 50' Curb & Gutter 3.01 150.50 118 S.F. Drive .74 87.32 $ 357.32 E. E. Bland 6 67 50' Pavement $2.39 $119.50 2808 Lulu Res. 50' Curb & Gutter 3.01 150.50 118 S.F. Drive .74 87.32 $ 357.32 Harris Hoover 7 67 50' Pavement $2.39 $119.50 406 West Central Res. 50' Curb & Gutter 3.01 150.50 194 S.F. Drive .74 143.56 $ 413.56 32 CONT. UNIT NO. 11, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT MORGAN HEIGHTS ADDITION E. E. Bland 8 & 9 67 93' Pavement $6.61 $614.73 2808 Lulu Comm. 93' Curb & Gutter 3.01 279.93 215 S.F. Drive .74 159.10 $1,053. 76 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $6,741.44 TOTAL CITY OF FORT WORTH COST 7,459.56 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 11 $14,201.00 33 R r UNIT NO. 12, PROJECT NO. 104-24000-187: CHENAULT AVENUE FROM BAURLINE STREET TO JUDKINS AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-foot wide roadway, and by constructing six-inch thick concrete driveways where specified - BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF CHENAULT AVENUE AND BAURLINE STREET NORTH SIDE OF STREET RIVERSIDE 1ST ADDITION H. L. Wright 12 3 50' Pavement $2.39 $119.50 2801 Chenault Res, 50' Gutter only 1.51 75.50 $195 00 L. B. Williams 11 3 50' Pavement $2.39 $119.50 3011 East 1st. Res. 50' Curb & Gutter 3.01 150.50 $270,00 Oscar Williams,Jr. 10 3 50' Pavement $2.39 $119 50 2604 La Salle Res. 50' Curb & Gutter 3.01 150.50 $270 00 M. H. Davidson 9 & 8 3 100' Pavement $2.39 $239,00 4509 Rolling Hills Dr. Res. 100' Curb & Gutter 3.01 301.00 118 S.F. Drive 74 87.32 $6.27 .32 ientecostal Church 7 3 50' Pavement $2 39 $119 50 of God in Christ Res. 50' Curb & Gutter 3 01 150 ,50 2821 Chenault $270 00 JUDKINS AVENUE INTERSECTS SOUTH SIDE OF STREET Betty Mebane N. h of 26 100' Pavement $2.39 $239 00 200 South Judkins 5 & 6 Res. 100' Curb & Gutter 3 01 301 ,00 $540..00 May Pearl Flint 4 26 50' Pavement $2.39 $119 50 1201 East Terrell Res. 50' Curb & Gutter 3,01 150.50 $270.00 34 CONT, UNIT NO. 12, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET RIVERSIDE 1ST ADDITION Johnnie Avery 3 26 50' Pavement $2.39 $119.50 2808 Chenault Res. 50' Curb & Gutter 3.01 150.50 118 S.F. Drive .74 87.32 $357.32 E. A. Lewis 2 26 50' Pavement $2.39 $119.50 6531 Roper Res. 50' Curb & Gutter 3.01 150.50 Dallas, Texas 118 S.F. Drive .74 87.32 $357.32 R. T. Glover 1 26 50' Pavement $2.39 $119„50 2800 Chenault Res. 50' Curb & Gutter 3.01 150.50 $270.00 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $3,426.96 TOTAL CITY OF FORT WORTH COST 6,455.99 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 12 $9,882.95 35 x UNIT NO. 13, PROJECT NO. 104-24000-187: LA SALLE STREET FROM SYLVANIA AVENUE TO BAURLINE STREET, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one twenty-six foot wide roadway, and by constructing five-inch thick concrete sidewalk and six-inch thick concrete driveways where specified, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF LA SALLE STREET AND SYLVANIA AVENUE NORTH SIDE OF STREET MARTINDALE ADDITION City of Fort Worth 30 1 No Assessment Ambros Coleman 29 1 50' Pavement $3 91 $195.50 2603 La Salle Comm. 50' Curb & Gutter 2. 95 147 50 39' Sidewalk 2.54 99 06 36 S.F, Drive ,74 26.64 $468.70 Larmon Kendrick 28 1 50' Pavement $5.37 $268 50 915 East Mulkey Comm. 50' Curb & Gutter 2 95 147 50 50' Sidewalk 2.54 127.00 $543.00 Lester Kendrick 27 1 50' Pavement $3.91 $195,50 2611 La Salle Comm. 50' Curb & Gutter 2.95 147.50 36' Sidewalk 2.54 91.44 36 S F. Drive 74 26.64 $461 ,08 Abbie Patrick 26 1 50' Pavement $5.37 $268.50 1315 East Arlington Comm, 50' Curb & Gutter 2.95 147.50 39' Sidewalk 2.54 99.06 $515.06 Joe R. Wilson 25 & 24 1 100' Pavement $5.37 $537.00 825 Morningside Dr. Comm. 100' Curb & Gutter 2.95 295.00 90' Sidewalk 2.54 203,20 65 SF. Drive 74 48- 10 $1,083,30 36 CONT, UNIT NO. 13, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF LA SALLE STREET AND SYLVANIA AVENUE NORTH SIDE OF STREET MARTINDALE ADDITION Johnnie and Grady 23 1 50' Pavement $2.45 $122.50 Brown Res. 50' Curb & Gutter 2.95 147.50 2629 La Salle 41' Sidewalk 2.54 104.14 29 S.F. Drive .74 21.46 $395.60 Grady Brown 22 1 50' Pavement $2.45 $122.50 2629 La Salle Res. 50' Curb & Gutter 2 A5 147.50 39' Sidewalk 2.54 99.06 36 S.F, Drive .74 26.64 $395.70 Sherman Williams 21 1 50' Pavement $2.45 $122.50 2705 La Salle Res. 50' Curb & Gutter 2.95 $147.50 39' Sidewalk 2.54 99.06 36 S.F. Drive .74 26.64 $395,70 Eddie Smith 20 1 50' Pavement $2.45 $122.50 940 East Marion Res. 50' Curb & Gutter 2.95 147.50 39' Sidewalk 2.54 99.06 36 S.F. Drive .74 26.64 $395.70 Pat Evans, Jr. 19 & W. 1 60' Pavement $2.45 $147.00 2713 La Salle 10' of Res. 60' Curb & Gutter 2.95 177.00 18 49' Sidewalk 2 54 124.46 36 S.F. Drive 74 26.64 $475.10 Christine Robinzine E. 40' 1 45' Pavement $2.45 $110.25 % Joe Lesok of 18 & Res. 45' Curb & Gutter 2.95 132.75 3417 Worth Hills Dr. W. 5' of 17 32' Sidewalk 2.54 81.28 36 S.F. Drive .74 26.64 $350.92 37 CONT. UNIT NO. 13, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF LA SALLE STREET AND SYLVANIA AVENUE NORTH SIDE OF STREET MARTINDALE ADDITION Elijah Bingham E. 45' 1 45' Pavement $2.45 $110.25 % Joe Lesok of 17 Res. 45' Curb & Gutter 2.95 132.75 3417 Worth Hills Dr. 34' Sidewalk 2.54 86.36 36 S.F. Drive .74 26.64 $356.00 Ida Mae Thorpe 16 1 55' Pavement $2.45 $134.75 2725 La Salle Res. 55' Curb & Gutter 2.95 162.25 40' Sidewalk 2.54 101.60 36 S.F. Drive .74 26.64 $425.24 BAURLINE STREET INTERSECTS SOUTH SIDE OF STREET R. V. Cannon 15 2 55' Pavement $2.45 $134.75 2901 Galvez Res. 55' Curb & Gutter 2.95 162.25 $297.00 Riverside Prog. 14 2 50' Pavement $2.45 $122.50 Civic League Res. 50' Curb & Gutter 2.95 147.50 2622 Galvez 39' Sidewalk 2.54 99.06 36 S.F. Drive .74 26.64 $395.70 Clemit Battee 13 2 50' Pavement $2.45 $122.50 2716 La Salle Res. 50' Curb & Gutter 2.95 147.50 39' Sidewalk 2,54 99.06 36 S.F. Drive .74 26.64 $395.70 Clyde F. Schrader 12 2 50' Pavement $2.45 $122.50 2712 La Salle Res. 50' Curb & Gutter 2.95 147.50 39' Sidewalk 2.54 99.06 36 S.F. Drive .74 26.64 $395.70 38 CONT. UNIT NO. 13, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET MARTINDALE, ADDITION Georgia Hubbard 11 2 50' Pavement $2.45 $122.50 Box 37 Res. 50' Curb & Gutter 2,95 147,50 La Grange, Texas 39' Sidewalk 2 ,54 99 06 36 S,.F. Drive .74 26.64 $395.70 Genevieve Weaver 10 2 50' Pavement $2.45 $122.50 1901 Emporia Street Res. 50' Curb & Gutter 2.95 147.50 Muskogee, Oklahoma 39' Sidewalk 2.54 99.06 36 S.F. Drive .74 26.64 $395.70 Cornelius Blair 9 2 50' Pavement $2.45 $122.50 2700 La Salle Res. 50' Curb & Gutter 2.95 147.50 39' Sidewalk 2.54 99.06 36 S.F. Drive .74 26.64 $395.70 Allen Koontz 8 2 50' Pavement $2.45 $122.50 2624 La Salle Res. 50' Curb & Gutter 2.95 147:50 50' Sidewalk 2.54 127.00 $397.00 Allen Koontz 7 2 50' Pavement $3.91 $195.50 2624 La Salle Comm. 50' Curb & Gutter 2.95 147.50 35.5' Sidewalk 2.54 90.17 36 S.F. Drive .74 26.64 $459.81 Oscar Williams 6 2 50' Pavement $5, 37 $268.50 2809 Chenault Comm. 50' Curb & Gutter 2.95 147.50 39' Sidewalk 2.54 99.06 36 S.F. Drive .74 26.64 $541.70 Alma Knox 5 2 50' Pavement $3.91 $195.50 2614 La Salle Comm. 50' Curb & Gutter 2.95 147 50 39' Sidewalk 2.54 99.06 10 S.F. Drive .74 7.40 $449.46 39 CONT. UNIT NO. 13, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STRE$T MARTINDALE ADDITION Susie Shivers 4 2 SO' Pavement $3.91 $195.50 2612 La Salle Comm. 50' Curb & Gutter 2.95 147.50 39' Sidewalk 2.54 99.06 $442,06 Darnell London 3 2 50' Pavement $3,91 $195,50 2608 La Salle Comm. 50' Curb & Gutter 2.95 147,50 39" Sidewalk 2.54 99,06 36 S.F. Drive .74 26.64 $468,70 0. M. Williams, Jr. 2 & 1 2 68,5' Adjusted to 2604 La Salle Comm. 65' Pavement $5A7 $349,05 65' Curb & Gutter 2,95 191,75 55,5' Sidewalk 2,54 140.97 36 S,F. Drive ,74 26,64 $708:41 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $12,399.44 TOTAL CITY OF FORT WORTH COST 10,964.56 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 13 $23,364,00 40 UNIT NO. 14, PROJECT NO. 104-24000-187: FINLEY STREET FROM BAURLINE STREET TO 484 FEET EAST (DEAD END), to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street Mill consist of one thirty-foot wide roadway, and by constructing six-inch thick concrete driveways where specified, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF FINLEY STREET AND BAURLINE STREET NORTH SIDE OF STREET PACE SUBDIVISION Moselle W. Wallace 1 84.7' Pavement $2.45 $207.52 913 Baurline Res. 84.7' Curb. & Gutter 2.95 249.87 $457.30 Charles Caldwell 4 50' Pavement $2.45 $122.50 2805 Finley Res. 50' Curb & Gutter 2.95 147.50 85 S.F. Drive 74 62.90 $332.90 May Pearl Flint 5 50' Pavement $2.45 $122.50 1201 East Terrell Res. 50' Curb & Gutter 2.95 147.50 85 S.F. Drive .74 62.90 $332.90 Tom Hale 6 50' Pavement $2.45 $122.50 2813 Finley Res. 50' Curb & Gutter 2.95 147.50 $270.00 A. J. Blaylock 7 50' Pavement $2.45 $122.50 2817 Finley Res. 50' Curb & Gutter 2.95 147.50 85 S.F. Drive .74 62.90 $332.90 Willis Pace 8 50' Pavement $2.45 $122.50 2821 Finley Res. 50' Curb & Gutter 2.95 147.50 85 S.F. Drive .74 62.90 $332.90 Wm. G. Scott 9 50' Pavement $2.45 $122.50 2825 Finley Res. 50' Curb & Gutter 2.95 147.50 85 S.F. Drive .74 62.90 $332.90 41 CONT. UNIT NO, 14, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF FINLEY STREET ANP PAURLINE STREET NORTH SIDE OF STREET ADAMS HEIRS SUBDIVISION I. M. Mills E.'k of Block 1 74.5' Pavement $2.4.5 $182,53 922 South Retta Res. 74.5' Curb & Gutter 2.95 219.78 $402.31 STREET ENDS - STATION 13+40 SOUTH SIDE OF STREET GARLAND :UBDIVISION Luther Sockwell 8 & 9 100' Pavement $2.45 $245.00 3016 Finley Res, 100' Curb & Gutter 2,95 295,00 310 S.F, Drive 74 229.40 $769,40 Robert Scott 7 50' Pavement $2,45 $122.50 2820 Finley Res, 50' Curb & Gutter 2.95 147.50 85 S.F. Drive .74 62.90 $332,90 Wm. G. Scott 6 50' Pavement $2.45 $122.50 2825 Finley Res. 50' Curb & Gutter 2,95 147.50 85 S.F. Drive .74 62.90 $332.90 Willis Henderson 5 50' Pavement $2,45 $122.50 2816 Finley Res. 50' Curb & Gutter 2,95 147.50 85 S.F, Drive .74 62.90 $332.90 Oscar Williams 4 SO' Pavement $2,45 $122.50 2620 La Salle Res. 50' Curb & Gutter 2,95 147.50 85 S.F. Drive ,74 62,90 $332,90 Rufus L. Loggin 3 50' Pavement $2.45 $122.50 2901 Gipson Res, 50' Curb & Gutter 2.95 147.50 85 S.F. Drive 74 62.90 $332.90 42 l % 4 CONT. UNIT NO. 14, PROJECT NO, 104-24000-1.87 BLOCK OWNER LOT ZONING FIZOiQTAG1? I'AIT': AMOUNT ASSESS, R1ENT STREET ENDS - STATION 13+40 SOUTH SIDE OF STREET GARLAND SUBDIVISION J. V. Spratling N.k of 109.3' Pavement $2.45 $267 .79 1512 Enderly Place 1 & 2 Res. 109.3' Curb & Gutter2.95 322.44 140 S .F. Drive .74 103.60 $693�83 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $5,921..93 TOTAL CITY OF FORT WORTH COST 8,017.27 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 14 $132939.20 43 UNIT NO. 15, PROJECT NO. 104-24000-187: OHIO GARDEN ROAD FROM ISBELL ROAD TO WEST CITY LIMITS, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pave- ment on a six-inch thick cement stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-six foot wide roadway, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF OHIO GARDEN ROAD AND ISBELL ROAD SOUTH SIDE OF STREET WESTSIDE ACRES ADDITION Mann-Tex Corporation 1 79 95' Adjusted to P.O. Box 10188 Comm. 65' Pavement $7.54 $490.10 65' Curb & Gutter 2.95 191.75 56 S.F. Drive .74 41.44 $ 723.29 Mann-Tex Corporation 2,3, 79 360' Pavement $2.18 $784.80 P.O. Box 10188 4 & 5 Res. 360' Curb & Gutter 2.95 1,062.00 82 S.F. Drive .74 60.68 $1,907.48 C. E. Matheus 6 79 75' Pavement $2.18 $163.50 4321 Ohio Garden Road Res. 75' Curb & Gutter 2.95 221.25 41 S.F. Drive .74 30.34 $ 415.09 Charles I. Callaway 7 79 80' Pavement $2.18 $174.40 4327 Ohio Garden Road Res. 80' Curb & Gutter 2.95 236.00 41 S.F. Drive .74 30.34 $ 440.74 H. W. Whitaker 15 & 16 79 218.7' Pavement $2.18 $476.77 4401 Ohio Garden Road Res. 218.7' Curb & Gutter2.95 645.17 74 S.F. Drive .74 54.76 $1,176.70 E. S. -ELLIS SURVEY Thomas M. Penney Tr. 8E 73.5' Pavement $2.18 $160.23 4405 Ohio Garden Road Res. 73.5' Curb & Gutter2.95 216.83 63 S.F. Drive .74 46.62 $ 423.68 44 CONT. UNIT NO. 15, PROJECT NO, 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT E. S. ELLIS SURVEY TYRA LANE INTERSECTS L. M. Armstrong Tr. 8B2 103.5' Pavement $2.18 $225.63 4505 Ohio Garden Road Res. 103.5' Curb & Gutter2.95 305.33 63 S.F. Drive .74 46.62 $ 577.58 Robert 0. Mullen Tr. 8C 75' Pavement $2. 18 $163.50 4509 Ohio Garden Road Res. 75' Curb & Gutter. 2.9.5 221.25 63 S.F. Drive .74 46.62 $ 431.37 TIDWELL SUBDIVISION Lem J. Bray 4 80' Adjusted to 451.3 Ohio Garden Road Res. 60' Pavement $2.18 $130.80 80' Curb & Gutter 2.95 236.00 63 S.F. Drive .74 46.62 $ 413.42 CONSTRUCTION ENDS - STATION 56+82 (WEST CITY LIMITS) NORTH SIDE OF STREET FOUNTAIN MIST APARTMENT ADDITION Housing Development, Inc. JR 240.2' Pavement $7.54 $1,811.11 4600 Republic Bank Tower Apt. $1,811.11 Dallas, Texas TYRA LANE INTERSECTS Housing Development, Inc. ER 93' Pavement $7.54 $701.22 4600 Republic Bank Tower Apt. $ 701.22 Dallas, Texas FAIR HILLS ADDITION Marvin E. Jenkins W. 724' 724' Pavement $7.54 $5,458.96 6462 Floyd Drive of A 724' Curb & Gutter 2.95 2,135.80 Apt. $7,594.76 Developer's Contract Plat 45 < L CONT. UNIT NO. 15, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT FAIR HILLS ADDITION Marvin E. Jenkins E. 90.4' 90.4' Adjusted to 6462 Floyd Drive of A 66' Pavement $7.54 $497.64 Comm. 66' Curb & Gutter 2.95 194.70 Developer's $692.34 Contract Plat TOTAL PROPERTY CWNERS' COST - ASSESSMENTS $17,3o8.78 TOTAL CITY OF FORT WORTH COST 16,021.22 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 15 33,330.00 46 UNIT NO. 16, PROJECT NO. 104-24000-187: WEST BROADWAY AVENUE FROM ELEVENTH AVENUE TO FIFTEENTH AVENUE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-six foot wide roadway, and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE SOUTHWEST CORNER OF WEST BROADWAY AVENUE AND ELEVENTH AVENUE SOUTH SIDE OF STREET CRAWFORD ADDITION City of Fort Worth 1 12 50' Pavement $8.13 $406.50 Water Department Ind. 50' Curb & Gutter 3.01 150.50 Attn: Mr. W. R. Hardy $ 557.00 'S.V.W. Enterprise, Inc. 2 12 50' Pavement $8.13 $406.50 2852 South Hills Avenue' Ind. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $ 619.90 Robert Dean 3 12 50' Pavement $8.13 $406.50 1516 East Cantey Ind. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $ 619.90 J. D. Darnell 4 12 50' Pavement $5.26 $263.00 1913 West Broadway Ind. 50.' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $ 476.40 Lynwood W. Lesikar 5,6, 12 150' Pavement $8.13 $1,219.50 509 Club Oak Drive & 7 Ind. 150' Curb & Gutter 3.01 451.50 85 S.F. Drive .74 62.90 $1,733.90 Alice F.' Dar.nell 8 12 50' Pavement $5 26 $263.00 1913 West Broadway Ind, 50' Curb & Gutter 3.01 150.50 $ 413.50 Houser Ricketts 9 12 50' Pavement $8.13 $406.50 842 West 54th Street Ind- 50' Curb & Gutter 3.01 150.50 Los Angeles, Cal. 90037 $ 557.00 47 CONT. UNIT NO. 16, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT CRAWFORD ADDITION J. P. McGowan 10 12 50' Pavement $8.13 $406.50 1115 Stella Street Ind. 50' Curb &Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $ 619.90 Lynwood W. Lesikar 11 & 12 100' Pavement $8.13 $813.00 509 Club Oak Drive 12 Ind. 100' Curb & Gutter 3.01 301.00 85 S.F. Drive .74 62.90 $1,176.90 F. C. Campbell 13 12 50' Pavement $8.13 $406.50 5321 Wellesley Ind. 39' Curb & Gutter 3.01 117.39 $ 523.89 FOURTEENTH AVENUE INTERSECTS Luna May Allen 1 13 50' Pavement $5.26 $263.00 c/o M. C. Gregory Ind. 50' Curb & Gutter 3.01 150.50 3725 Crestline Road 85 S.F. Drive .74 62.90 $ 476.40 Albert Sims 2 13 50' Pavement $5.26 $263.00 2105 West Broadway Ind. 50' Curb & Gutter 3.01 150.50 22 S.F. Drive .74 16.28 $ 429.78 Lena Guinn 3 13 50' Pavement $5.26 $263.00 2109 West Broadway Ind. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $ 476.40 Floyd Dancer 4 13 50' Pavement $8.13 $406.50 915 East Marion Ind. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $ 619.90 48 CONT. UNIT NO. 16, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSM NT CRAWFORD ADDITION Abbie Johnson 5 13 50' Pavement $5.26 $263.00 2115 West Broadway Ind. 50' Curb & Gutter 3.01 150.50 S 413.50 Floyd Dancer 6 13 50' Pavement $8.13 $406.50 915 East Marion Ind. 50' Curb & Gutter 3.01 150.50 $ 557.00 Buck Hill 7 13 50' Pavement $5.26 $263.00 2201 West Broadway Ind. 50' Curb & Gutter 3.01 150.50 $ 413.50 Estella Thomas 8 13 50' Pavement $5.26 $263.00 2205 West Broadway Ind. 50' Curb & Gutter 3.01 1:)U.50 $ 413.50 Floyd Dancer 9 13 50' Pavement $8.13 $406.50 915 East Marion Ind. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $ 619.90 Julius B. Polk 10 13 50' Pavement $5.26 $263.00 2213 West Broadway Ind. 50' Curb & Gutter 3.01 150.50 85 S.F. Drive .74 62.90 $ 476.40 Elton M. Hyder 11 & 12 13 100' Pavement $8.13 $813.00 516 W. T. Waggoner Bldg. Ind. 84' Curb & Gutter 3.01 252.84 163 S.F. Drive .74 120.62 $1,186.46 49 CONT. UNIT NO. 16, PROJECT NO. 104-24000-187 BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT CRAWFORD ADDITION FIFTEENTH AVENUE INTERSECTS NORTH SIDE OF STREET City of Fort Worth 13 thru 8 600' Pavement $8.13 $4,878.00 Water Department 24 Ind. 600' Curb & Gutter 3.01 1,806.00 Attn: Mr. W. R. Hardy $6,684.00 City of Fort Worth 50' Closed St. 50' Pavement $8.13 $ 406.50 Water Dept. Between Blocks 50' Curb & Gutter 3.01 150.50 Attn: Mr. W. R. Hardy 8 & 9 $ 557.00 Ind. City of Fort Worth 14 thru 9 400' Pavement $8.13 $3,252.00 Water Department 21 Ind. 400' Curb & Gutter 3.01 1,204.00 Attn: Mr. W. R. Hardy $4,456.00 Charles Kyser 22 9 50' Pavement $5.26 $ 263,00 1916 West Broadway Ind. 50' Curb & Gutter 3.01 150.50 $ 413.50 Willie Kyser 23 9 50' Pavement $5.26 $ 263.00 1912 West Broadway Ind. 50' Curb & Gutter 3.01 150.50 $ 413.50 Jack Kyser 24 9 50' Pavement $5.26 $ 263.00 1908 West Broadway Ind. 50' Curb & Gutter 3.01 150.50 $ 413.50 City of Fort Worth 25 & 9 100' Pavement $8.13 $ 813.00 Water Dept. 26 Ind, 100' Curb & Gutter 3.01 301.00 Attn: Mr. W. R. Hardy $1,114.00 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $27,432.53 TOTAL CITY OF FORT WORTH COST $1.3,249.87 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 16 $40,682.40 50