Loading...
HomeMy WebLinkAboutContract 52565 y, CITY SECRETARY CONTRACT NO. Jra c5�05 DOE # RECEIVED JUL 23 2019 CITY OF FORT WORTH STORMWATER FACILITY CITY SECRETARY MAINTENANCE AGREEMENT THIS AGREEMENT, made and entered into this day of Ju14 a3 , 0019_, by and between SPCH Fort Worth 345, LLC, acting by and through SPCH Fort Worth 345, LLC, hereinafter referred to as "Landowner",the SPCH Fort Worth 345, LLC, hereinafter referred to as "Association' and the City of Fort Worth, hereinafter referred to as "City". WITNESSETH WHEREAS, the Landowner is the owner of certain real property described as an approximately 25.484 acre tract located in the James Smith Survey, Abstract 1149, Denton County, Texas according to the deed recorded in 2019-35508, Deed Records, Denton County, Texas, hereinafter called the "Property". WHEREAS, the Landowner is proceeding to build on and develop the Property according to the Site Plan/Subdivision Plan known as Speedway 1 Industrial Park hereinafter called the "Plan', which is expressly made a part hereof, as approved or to be approved by the City and the Landowner and Association provides for management of Stormwater within the confines of the Property; and WHEREAS, the City and the Landowner and Association, and their successors and assigns, agree that the health, safety and welfare of the residents of the City of Fort Worth, Texas require that on-site Stormwater Management Facilities be constructed and maintained on a portion of the Property; and WHEREAS, the City requires that on-site Stormwater Management Facilities ("Facility") as shown on the Plan be constructed and adequately aintamQ0 by the 0FF115CsAL R EC0RD STORMWATER FACILITY MAINTENANCE AGREEMENT Uff S �'RETgR' Rev.11/17/2016 FT WORTHt TX Landowner, its successors and assigns, including Association, the location and dimensions of which is shown and more particularly described by metes and bounds in the attached Exhibit"A" ("Facility Property"); and WHEREAS, Landowner agrees to convey the Facility Property to the Association and the Association agrees to accept the Property where the Stormwater Facility is located. NOW, THEREFORE, in consideration of the foregoing premises, the mutual covenants contained herein, and the following terms and conditions, the parties hereto agree as follows: 1. The Landowner and Association, its successors and assigns, shall adequately construct and maintain the on-site Stormwater Management Facility ("Facility") at no expense to the City of Fort Worth in accordance with the design specifications for the Facility, attached as Exhibit "B", and the current standards then in force and effect in the City of Fort Worth and with the Operations and Maintenance Plan attached to this Agreement as Exhibit "C". The Stormwater Facility includes all pipes, channels or other conveyances built to convey stormwater to the facility, as well as all structures, improvements, and vegetation provided to control the quantity and quality of the stormwater. Adequate maintenance is herein defined as good working condition so that these facilities are performing their design functions. The Stormwater Structural Control Maintenance Checklists, attached to this Agreement as Exhibit "D", are to be used to establish what good working condition is acceptable to the City. 2. The Landowner and Association, its successors and assigns, shall inspect the Facility and submit an inspection report to the City annually. The purpose of the inspection is to assure safe and proper functioning of the Facility. The inspection shall cover the entire Facilities, berms, outlet structure, pond areas, access roads, etc. Components of the Facility, which need maintenance or STORMWATER FACILITY MAINTENANCE AGREEMENT 2 Rev.11/17/2016 replacement to perform their design function, shall be noted in the inspection report along with the corrective actions to be taken. 3. The Landowner and Association, its successors and assigns, hereby grant permission to the City, its authorized agents and employees, to enter upon the Property and to inspect the Facility Property whenever the City deems necessary. The purpose of inspection is to follow-up on reported deficiencies and/or to respond to citizen complaints. The City shall provide the Landowner, its successors and assigns, copies of the inspection findings and a directive to commence with the repairs if necessary. 4. In the event the Landowner and the Association, its successors and assigns, fails to maintain the Facility in good working condition as specified herein, the City, its authorized agents and employees, may enter upon the Facility Property and take whatever steps necessary to correct deficiencies identified in the inspection report and to charge the costs of such repairs to the Landowner, its successors and assigns. It is expressly understood and agreed that the City is under no obligation to routinely maintain or repair said Facility, and in no event shall this Agreement be construed to impose any such obligation on the City,such obligation is Landowner's. 5. The Landowner and the Association, its successors and assigns, will perform the work necessary to keep the Facility in good working order as appropriate. In the event the City pursuant to this Agreement, performs work of any nature, or expends any funds in performance of said work for labor, use of equipment, supplies, materials, and the like, the Landowner, its successors and assigns, shall reimburse the City upon demand,within thirty (30) days of receipt thereof for all actual costs incurred by the City hereunder. In the event that Landowner or its successors or assigns fail to pay the City for the costs incurred under this section, the City shall impress a lien for the costs of such work upon other lots owned by the Landowner or the Association. Such lien shall be perfected by filing in the office of the County Clerk of Tarrant County, Texas an affidavit identifying the property to be charged with such lien, stating the amount thereof, and making reference to this Agreement. STORMWATER FACILITY MAINTENANCE AGREEMENT 3 Rev.11/17/2016 6. This Agreement imposes no liability of any kind whatsoever on the City. THE LANDOWNER AND ASSOCIATION AGREES TO HOLD THE CITY HARMLESS FROM ANY LIABILITY IN THE EVENT THE FACILITY FAILS TO OPERATE PROPERLY. LANDOWNER AND ASSOCIATION COVENANT AND AGREE AND DOES HEREBY INDEMNIFY HOLD HARMLESS AND DEFEND THE CITY OF FORT WORTH, ITS AGENTS, SERVANTS AND EMPLOYEES FROM AND AGAINST ALL COSTS, EXPENSES, LOSSES, DAMAGES, CLAIMS OR CAUSES OF ACTION WHATSOEVER ARISING, OR WHICH MIGHT ARISE, FROM THE FAILURE OF LANDOWNER OR ANY FUTURE OWNERS OF THE FACILITITY PROPERTY TO MAINTAIN THE FACILITY, INCLUDING, BUT NOT LIMITED TO THE BED AND BANKS OF THE DETENTION POND; ANY DAMAGES CAUSED TO PERSON OR PROPERTY DUE TO (1) FLOODING OF THE POND AND ITS BANKS, (2) SLOPE FAILURE OF THE BANKS OF THE POND, OR(3) FAILURE OF THE POND OR ITS BANKS TO OPERATE IN A MANNER CONSISTENT WITH CITY OF FORT WORTH CRITERIA; OR FAILURE TO PERFORM ANY OTHER DUTIES OR OBLIGATIONS HEREUNDER. 7. Landowner and Association covenants and agrees that no habitable building shall be erected within the drainage easement outlined on Exhibit "A" but this paragraph shall not preclude construction of other improvements within the drainage easement, which do not impede drainage. Landowner and Association covenants and agrees that no habitable building shall be erected on the above property abutting such easement which shall have a finished floor at an elevation less than two feet above the maximum depth of water in the detention pond which would occur during a 100 year frequency flood. 8. This Agreement shall be recorded among the land records of Tarrant County, Texas, shall constitute a covenant running with the land, and shall be binding on the Landowner, its administrators, executors, assigns, heirs and any other successors in interests, including any property owners association. STORMWATER FACILITY MAINTENANCE AGREEMENT 4 Rev.11/17/2016 9. Notwithstanding anything to the contrary contained or implied elsewhere herein, it is expressly agreed and understood that the liabilities, indemnities and obligations of SPCH Fort Worth 345, LLC as Landowner hereunder shall expire and be of no further force or effect upon the transfer ("Transfer") by SPCH Fort Worth 345, LLC to the Association of legal title to the Facility Property, save and except for any liabilities, indemnities and obligations of SPCH Fort Worth 345, LLC as Landowner hereunder which have accrued and are due, payable and/or performable as of the date of the Transfer and which shall expressly survive the Transfer. Executed this20day of 2L�� Landowner CSC SPCH Fort Worth 345, LLC City of Fort Worth By: Marc Pfleging, Manager of Scannell Properties Assistant City Manager Approved as to Form and Legality 1 Association SPCH Fort Worth 345,LLC _ Assistant City Attorn y ATTEST Marc Pfleging Manager of Scannell Properties City Se e rFITOFFMAL RECORD TY SECRETARY Rev. FACILITY MAINTENANCE AGREEMENT a.eAe��p'R48/ _- YY V!� 77 1/i STATE OF TEXAS § COUNTY OF TARRANT § -)V This instrument was acknowledged before me on �h�a ' Y vs CAWz'),, Assistant City Manager of the City of Fort 4iorthron beha f of the City of Fort Worth. Jg.-,66490 frdb'v 19,2021 Notary Public, State of Texas DJJC A tiJ A,- STATE OF-TE*A-S--- § COUNTY OF-TA lie NT-- § W Ar'-�o I`-/ This instrument was acknowledged before me oil bf- Lj 17 2019 by Marc Pfleging, Manager of SPCH Fort Worth 345, LLC, a Delaware limited liability company. SHANNON PARKHURST NOTARY PUBLIC-OFFICIAL SEAL State of Indiana,Marion County My Comm.Expires Dec-ember 28,2019 Nj�t6 Public, State of ZTW-kg7'4-KjA STATE OF T*X467- § COUNTY OF TARRANT- § U-1 This instrument was acknowledged before me on, L 2019 by Marc Pfleging, Manager of SPCH Fort Worth 345, LLC, as Delmvare limited liability company. SHANNON PARKHURST 'T NOTARY PUBLIC-OFFICIAL SEAL Nbt4v Public, State of Tvx�&) State of Indiana,Marion County My comm.Expires Der-ember 28,2019 OFFICIALT Y RECORD STORMWATER FACILITY MAINTENANCE AGREEMENT CI Rev.11/17/2016 FT. WSECRETARYORTA,TX Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Ashraf Ibrahim --� Management Analyst II N EXHIBIT "A" INSERT LEGAL DESCRIPTION STORMWATER FACILITY MAINTENANCE AGREEMENT 7 Rev.11/17/2016 EXHIBIT "A " PUBLIC DRAINAGE EASEMENT STATE OF TEXAS: COUNTY OF DENTON: BEING a tract of land situated in the James Smith Survey, Abstract No. 1149, City of Fort Worth, Denton County, Texas, being a portion of Tract II as described in deed to SPCH Fort Worth 345, LLC, recorded in 2019-35508, Official Records, Denton County, Texas (ORDCT), and being more particularly described as follows: COMMENCING at a 1/2" rebar found at a southeast corner of Petty Place (226.61 R.O.W, Dedication Deed, 201O-22890 & Amended Dedicatory Certificate, 201O-34605, ORDCT), being the northeast corner of Lot 4, Block 3 of the final plat of Lot 3, Block A & Lot 4, Block 3, Speedway Distribution Center, an addition to the City of Fort Worth, Denton County, Texas as recorded in 2012-139,ORDCT, and the northwest corner of Tract III as described in deed to SPCH Fort Worth 345, LLC, recorded in 2019-35508, ORDCT, said point lying in a south line of Texas Motor Speedway, an addition to the City of Fort Worth, Denton County, Texas as recorded in Cabinet V, Page 493. Plat Records, Denton County, Texas; THENCE S 00'24'49" E. along the east line of said Lot 4, Block 3 and the west line of Tracts I. II, and III as described in deed to SPCH Fort Worth 345, LLC, recorded in 2019-3550B. ORDCT, a distance of 910.83 feet to a 1/2" rebar capped Goodwin & Marshall set at the southwest corner of said SPCH Tract II and the northwest corner of a tract of land as described in deed to Charles Clyde Bellinghausen, recorded in Volume 5314, Page 2779. Deed Records, Denton County, Texas, from which a 5/B" rebar found bears N 89'35'11" E, 30.79 feet, and a 1/2" rebar capped found bears S 02'52" E. 3.41 feet; THENCE N 89'35'11" E. along the south line of said SPCH Tract II and the north line of said Bellinghausen tract, a distance of 30.00 feet to the POINT OF BEGINNING of the herein described tract of land; THENCE departing the north line of said Bellinghausen tract, across said SPCH Tract II, as follows: N 44035'11" E. a distance of 35.36 feet; N 00'24'49" W. a distance of 148.98 feet; N 44'35'11" E. a distance of 56.57 feet; N 89'35'11" E. a distance of 577.00 feet; N 00'24'49" W. a distance of 55.00 feet; N 89*35*11" E. a distance of 238.45 feet; S 00'1525" W. a distance of 179.44 feet; S 89'44'35" E. a distance of 294.10 feet; S 00'12'25" E, a distance of 86.12 feet to the south line of said SPCH Tract II and the north line of said Bellinghausen tract, from which a 1/2" rebar capped Goodwin & Marshall set at the southeast corner of said SPCH Tract II and the northeast corner of said Bellinghausen tract bears N 89'35'11" E. 15.00 feet; THENCE S 89'3511" W. along the south line of said SPCH Tract II and the north line of said Bellinghausen tract, a distance of 1172.12 feet the POINT OF BEGINNING and containing 221.121 square feet or 5.076 acres of land. NOTE: Bearings are referenced to the final plat of Lots i & 2, Block A & Lot 2, Block 1, Speedway Distribution Center as recorded in 2009-31, Official Records, Denton County, Texas - NAD 83 (1993) datum. OF Scale : NONE P�G�STERTF+ Sheet GOODWINI A,�AMHAL L. Y .,�. Date I ........... ........ OML ENGINEERS—PLANNERS—SURVEYORS � Job N o . 110 7 61 .....................o 'eArrnoN � O�.GMPOWN.TX.7=1 Drafted : T . J . M . Y:� 91 .. of MWO(817)s�s7s � -.ZS s%op °•yoi 3 TBPLS FIRM No.100217W Checked : J . S . B . 9�O sua�� E:\1078i - SPEEDWAY 2\COGO\FPLAT PH i\ESMTS\LOT i DE.Pro EXHIBIT "A " GRAPHIC SCALE 1"=100' CAB' MOTOR I PETTY PLACE—� o 10o 200 B' V, PG. 493, AY (1; R.O.W. 2019-3483. OA.D.C.T.) PEA �CCc.r. ll Cl ON 6.61- i ` I TEXAS MOTOR SPEEDWAY RA.W AhEl p HIRCATOM;2 O.R r i CAB. V, PG. 493, P.RD.C.T. 2010- CERTIFICATE oA-n.C.T. _ _ 9 LOT 4. BLOCK 3 TRACT IIIOF SPCH FORT WORTH 345, LLC SS�� \ LOT 3, BLOCK A t P.O.C. 20 i9-35508. O A.D.0.T. �Sy�0. \% LOT SPEEDWAY 3 I 1/219.F. DISTRIBUTION I � W,F 85)ATCE \ 20-09 NTERI A 0.R D.C.T. 5 P Av LINE DATA APPRLINE BEARING DISTANCE �� A9 15' SOUTHWESTERN GAS PIPELINE.T INC. Li N89 *35'11"E 30.00' \ RIGHT OF WAY AND EASEMENT \ 0 I m 2005-i560i2, OAD.C.T. L2 N44 *35'11"E 35.36' 0o AFFECTED BY PARTIAL RELEASE p 2011-934B8 OAD.C.T. L3 N00 °24'49"W 148.98' m L4 N44 *35'11"E 56.57' w L5 N00 °24'49"W 55.00'II \ 120' accEss EASEMENT L6 S00 12'25"E 86.12' --�� 2ois-2eiB9 OAD C.T. L7 N89 '35'11"E 1 15.00' LOT BLOCK i I " SPEEDWAY \ Cu TRACT II DISTRIBUTION 1 \ I SPCH FORT WORTH AD. LLC CENTER \ rf1 p 2019-35508, OD.0 C.T. O.R D.0 . cn( • (I D► N 89 35 11 E 577.00 co o� \ �. -J �Vrn \I LOT 4X, BLOCK i I b V DWAY DISTRIBUTION I I W CENTER PUBLIC DRAINAGE EASEMENT 2012-163 m 221.121 SQUARE FEET OA.D.C.T. I J 5.076 ACRES I 20' WATER EASEMENT W 2012-139, OAD.C.T. w 20' SANITARY SEWER EASEMENT 2012-IM, OAD.C.T. APPROXIMATE LOCATION I — S 89!35! " U72 A2-- — 15' SOUTHWESTERN GAS PIPELINE. INC. P.O$. 15' SOUTHWESTERN GAS RIGHT OF WAY AND IPELINE RD.W. & EASEMENT 2006-106043. DAD.C.T. 2005-156013 AFFECTED BY 2006-21070 2008-15955. 2008-31523. 1/219.C.S. OAD.C.T. i5933,oAD DD.O AND0- T. i (5/8'AF. AT N 89 35'11" E: 30.79) CHARLES CLYDE BELLINGHAUSEN (1/279.CF. AT S 0252' E: 3.41) VOL. 5314, PG. 2779 VOL. 1066. PG. 449 DAD.C.T. GOODVANI Scale 1 "=100 ' P�G%••••ERT. Sheet MAMH T1. 9 Date 7/11/2019 ..........................• � � N. 2 CML ENGINEERS—PLANNERS—SURVEYORS Job N o . 10781 ,IOEL .. BARTON "• of •4914 a'°6r Metro Txreo6l Drafted ) T . J . M . �'•.0FEss��?oQ TSPLS FIRM No.10021700 Checked ; J . S . B . 4�O sua��y 3 EA1078i - SPEEDWAY 2\COGO\FPLAT PH i\ESMTS\LOT i DE pro EXHIBIT "A " GRAPHIC SCALE 1"=100' 0 100 200 LINE DATA LINE BEARING DISTANCE L 1 N89 °35'11"E 30.00' L2 N44 °35'11"E 35.36' 'K L3 N00 °24'49"W 148.98' �g1A9 L41 N44 °35'11"E 56.57' L5 N00 °24'49"W 55.00' L6 S00 °12'25"E 86.12'�o. L7 N89 °35'11"E 15.00'—� / R ~a ~ R a L; TRACT II SPCH FORT WORTH 345, LLC / I a >Q 2019-35508, O.R D.C.T. I r —I x m a I a U N 89 '35'111" E 238.45' J I 3C CITY OF FORT WORTH GAS SITE PERMIT No. GST04-0076 N Q PAD SITE PERMIT — — D2172176BI �+ 9 � Q OP.R.T.C.T. Y '-' In Uo Z �I �� ~ mNn W O� w �I � I m�o~aci. x I S 89 044'35" E 294.10' m J _CC � I WW REE� S L)PUBLIC DRAIN GE EASEMENT P � Q�221,121 SO ARE FEET (D I cvo J5.076CRES I o L7 J L72.12' ---- P IDE _—— GAS VALVE RICER I-,- SOUTHYESTERN GAS 112'n.C.S. J (TYPICAL) PIPELINE R.O.W. 6 EASEMENT (1/2'R.CF. AT CHARLES CLYDE BELLDMAUSEN 2005-156013 N 85.02' E 5.25) 070 VOL. 5314. PG. 2779 �.C.T. VOL. 1066. PG. 449 D.RD.C.T. Scale I 1 "=100 ' PEE °••E•.TF Sheet ��D� NI Date � 7/11/2019 �`•�`' � �°•'9 � STR'' I iVfiAIl�HAI L 9 .: CML ENGINEERS-PLANNERS-SURVEYORS Q� �. Job No . 1 10781 �oa..�.�enaTON 2MMu"QEre,&SpWkMTx7=1 O- - Drafted : T . J . M . Y •4914 �'` of Metro(817)320 4373 �q TMS FIRM No.IOM117W Checked I J . S . B . �� su'R�;°��y E:\10781 - SPEEDWAY 2\COGO\FPLAT PH i\ESMTS\LOT i DE pm IQQP� Q }N '•` 6 a J W } 6 K W LLJ Qom Qf m® g oOc, b 0. 8B $l N All ^ F ---------- ---- -- Be R.GaN V � S1yt' .VB0L6 3..0.ZL.00 5 i3 of EE A2E r i Ira I W I I ssm I I I , �m4 it d4 I I ��e N i l l ad Ia R rn N� �R i i i Z NAY jl �' I I � I �� I I L�tp[p[ I jig dry 1n yy�IY_R ..i Ul (—y .LtE9Y 3 6R.VZ.00 5 ';o6 __M.66OD auo Aez —6o9=v ,r_C Imn lei 41 17 pep m� to N 0 lV w LU o :' p u p ¢b aw § a 666 � �� g� gygygy MpM '1 oil ILI J H J WR RQ S b p S$ L "qb bg A$ z W All! Mpg®9 E lis bI IH S , 7E H CO a "YG gE �§bb�s• a EE� BE "�g5b$$ �L aB "Ts e • o 5-1 igg 11g1, 95019p s lfig H 1' sg H� pit ! !'tlS €g Cg5l�a�$ e � �� AA9 g ggTE ❑8 ���_. g!g ! gyy pp5 g$$ 6 pp 8. " AE Psb 6!y8 E5 X �66 I ti 6 py yg � � 6ip¢ � � ELI]9 y G$4�8 q�9 $�$� �h ����gfi k y $���� Cga�g • � yi k 144 Mph K 8'G �' TIN gIpgi$ sob 5€{ b a� rim.; i y [ R b ps @!s ssg ges s R iglti® s a g �'B b i9f�. 961y�15�«�� g ��8��p�f•�• � $ !'•F $� , ��gEg b gi6�i� 1 y 8 s �bgY a qs� �sSssgs E� ® g E5" $!!g� LLL444lhy g ss �i �^ i• 97� B Jsp d , 8 Hg6 Rb 6�5 gip 6s��yse gB�S6j1 � • i SllgS Ss ro� ggg g 6 a Aga e p p • 51y -Y@ pp s y� I gill g'$fi {s 4TI, $ gg $ 8 ��ilP 58B�m S 'z4a 5 .. Lai s h• 9y.. M% s; e g6 gg @ fJgi2 C 6P 5e �•A �.g 9 g � � g' 1g.,z5��P § ®5Q3g 86N xt e b �g"g $ S $B i ` F � fl-1 1 s55a 6 €E !jq `$� s6kR p5l yas sPl� @vgHpst. § a yne Milli F C �HRCCH H ® PE �lB� &� 85 dB 5 E �' G W87d� Y -p j HB�A�i Ell. sg &"e J-Vg5s SRZ �=171G Y T — 7j ILD W b ``l I o b 1 LLJ b � bII 1 ICI � WI 0 — r� . CID O CD n o M M O / C> J a4 I v co O N- mh CD ( o I CI Ri G N N I w JAIQd hV#i I ^ Q / b U W 0 / I I c' CL / 0 � CD H W V CD (9 I` v Q Q CD r,) N m II i) Q 0 1 i � N rn o � o �l) / I I z CD Q O T II b Sri J✓ ICco I J � III v , oN - cflrn o o � N � / �` — o N Ili N r z � l W / I U) I � L cn 6 m — z cn N >' c0 b e I I o / LD I� J� J� J LO �C OD 30 k O L °W � W J° I �J = w° iI w w C ocr) IIII w � IIII o �o w43 r, I IIII w� Cl) II I II I III ill I III III � II � o LO I 11QQ IIII ® Z N I III � IIII III ® z IIII `� N III � IIII III `� IIII ° II a II II � I III II m II III I o III IIII LO z III IIII K Wo }Li � �� � n a� coo p q Z 3 O w SEE WEIR TOP OF BARK DETAIL ABOVE CONCRETE WEIR ELEV=683.00 TOP OF CONCRETE WEIR=661.65 _ •:•:.:;:.._:•:= 100-YR WSEL -681.93 0.5'ROCK LIP SCOURSTOP I OO 5-YR WSEL TRANSITION MAT 2 Op =681.01 1 4:l MAX l_YR WSEL4- PROPERTY LINE I �OGOOO�OGO ROCK RF-RAP 4,I MAX L I \�iy7jYc I Ua��o V U NORMAL POOL oOoOOOO WSEL =679.70 0 a �7 \ � J BOTTOM ELEV OTTOM OF CONCRETE LOWEST ELEV. AT-1 WIDTH PER PLANS =675.00 WEIR=679.85 PROPERTY LINE =±679.50 I00-YR WSEL F _ =681.93 SEMONA A _ =6B/.O/ NTS 5-YR WSEL 100-YR WSEL PROPERTY LIA�E� I R WSEL I CONCRETE WEIR /_y =68/.93 �•I = TRANSITION DOWN = RB L SEE WEIR TO EX. GROUND 5-YR WSEL DETAIL ABOVE I NORMAL POOL I I 679.70 679.70 =681.0/ ' WSEL=6 79.70 l-YR WSEL TOP OF CONCRETE _ 679.20 _ =6B0.45 WEIR=6 79.70 I PROPOSED GROUND r�'4 NORMAL POOL SCOURSTOP :- WSEL =679.70- TRANSITION MAT - - - 117r vl LENGTH PER PLANS F r TRANSITION DOWN LOWEST ELEV. AT PROPOSED GROUND TO EX. GROUND 411 PROPERTY LIA�E =±679.50 679.70 679.70 BOTTOM ELEBOTTOM OF 675.0000NCRETE WE#?=677.70 0) 679.20 N NTS o LEVEL SPREADER DETAIL 0 M N.T.S. 0 100-YR WSEL =681.93 .6' 3.0' q.6' N c 5-YR WSEL TOP OF CONCRETE WEIR=681.85 - l-YR WSEL 0.45 PROPOSED GROUND NORMAL POOL 4,I SLOPE a _ WSEL =6 79.70 24' BOTTOM OF CONCRETE 2' l0- 10 1 c - WEIR=679.85 d #3 BAR , #3 BAR m J.000 PSl 3,000 PS/ BOTTOM OF CONCRETE CONCRETE CONCRETE :..i WEIR=677.70 9' IO.O' .0' I 10.0' #3 BAR #3 BAR Z SHMONC-C 24' #3 BARS #3 BARS T NTS 0 9' C 24' C-C e 24' C-C 3 a = /00 6R WSEL .6' 2.5' .6' #3 BAR #3 BAR 3' L-L / 5-YR WSEL � _ =68/.0I TOP OF CONCRETE l-YR WSEL WEIR 661.B5= _680.45 CONCRETE WEIR DETAIL / NTS N NORMAL POOL - Q a WSEL =679.70 BOTTOM OF CONCRETE c WEIR=679.85 LLJ U� BOTTOM OF CONCRETE WEIR=677.70 CO /0.0, 2 .;10.0' XH JSAISIJ H J..l 7M N 0 MMOND-D / NTS SHEET 3 OF 5 w Pond Report Hydrsllow Hydrographs by Intelisolve v9.1 Sunday,Jun 9,2019 Pond No. 1 - DETENTION POND Pond Data Pond storage is based on user-dellned values. Stage/Storage Table Stage(RI Bevatian(ft) Contour area(salt) kw.8toraw(cut) Total storage(cult) 0.00 679.70 n/a 0 0 0.30 680.00 n/a 41.240 41,246 0.55 680.25 Me 35,052 76,298 0.80 Sao.50 n/a 35,874 111,972 1.05 680.75 Na 36.298 148,270 1.30 631.00 Me 36.922 185,192 1.55 651.25 n/a 37,554 222,746 1.80 681.50 n/a 38,192 260.938 2.05 681.75 n/a 38,831 299,769 230 682.00 n/a 39.472 339,241 Culvert I Orifice Structures Weir Structures [A] [e] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) Inactive Inactive Inactive 0.00 Crest Len(ft) - 442.50 3.75 3.75 0.00 Span(in) . 8.00 0.00 0.00 0.00 Crest B.(ft) .681.85 679.70 679.70 0.00 No.Sarals = 1 1 1 0 Welr Coeft. = 3.33 3.33 3.33 3.33 Invert B.(ft) - 679.70 0.00 0.00 0.00 Weir Type - Red Red Red - L-90(tl) = 20.00 0.00 0.00 0.00 Multi-Stage = No No No No Slope{%) ■ 1.00 1.00 1.00 n/a ON N-Value s .013 .013 .013 n/a Ortlles Coeft. =0.60 0.80 0.60 0.60 EAL(InRu) = 0.000(byNM area) Multl-Stage = Ne No No No TW Bev.(lt) = 0.00 Ih NOW:C.uN#Wffw QAWM UO WWWOLMMOMOC)WA 00dl6:;::-r-N VWf dips d*dwd lac Mko 0MdbW%0c)aM a"':- 0 Stage/Storage/Discharge Table _ Stage Storage Elevation CIvA Clv B Clv C PrMsr Wr A Wr B Wr C Wr D Extil User Tbtal N ft CUR ft CIS CIS CIB Cis CIS cis cis cts cis Cis Cis C 0.00 0 679.70 0.00 - - - 0.00 0.00 0.00 - - - 0.00 0.30 41,246 6W.00 0.00 - - - 0.00 2.05 2.05 - - - 4.10 0.55 78,298 6W.25 000 - - - 0.00 5.09 5.09 - - - 10.19 0.90 111,972 680.50 000 - - - 0.00 8.94 8.94 - -- - 17.87 0 1.05 148,270 6W.75 0.00 - - - 0.00 13.44 13.44 - - - 26.87 a 1.30 185,192 681.00 0,00 - - - 0.00 18.51 18.51 - - - 37.02 1.55 2222,748 681.25 0.00 - - - 0.00 24.10 24.10 - - - 4819 �+ 1.80 260,938 681.50 0.00 - - - 0.00 30.16 30.16 - - - 00.31 2.05 299.769 68135 0.00 - - - 0.00 36A5 36.65 - - - 73.30 2.30 339.241 682.00 0.00 - - - 85.62 43.56 43.56 - - - 172.74 m I O Z T O 3 v a N C _O N r a 3. 0 w w CD HT TM N 10) o_ / SHEET 4 OF 5 w DETENTION SUMMARY POND A A DETENTION FACILITY HAS BEEN DESIGNED TO SERVE THE PROPOSED SPEEDWAY I INDUSTRIAL PARK - BUILDING I DEVELOPMENT. IN ORDER TO CAPTURE THE STORMWATER RUNOFF FROM DRAINAGE AREAS "A-I" - "A-9" "B-I" "C-I" „D-I" "E-I" "F-I" 8 "G-I" . THESE AREAS WILL DRAIN TO DETENTION POND "A " . DETENTION POND "A " WILL THEN OUTFALL ABOVE WSEL = 679.90 VIA A CONCRETE WEIR STRUCTURE. THE DETENTION ANAL PSIS WAS PERFORMED UTILIZING THE U.S. ARMY CORPS OF ENGINEERS NEC-HMS v4.2 UNIT HYDROGRAPH COMPUTATION PROGRAM USING SCS METHODOLOGY. A HYDROGRAPH WAS GENERATED FOR THE DRAINAGE AREA BEING DETAINED AND THEN ROUTED THROUGH DETENTION POND 'A '. THE I00-YE4R DISCHARGE FROM THE PROPOSED POND HAS BEEN CALCULATED TO BE 93.25 CFS. REFER TO THE FINAL ISWM FOR DETAILED CALCULATIONS AND ANALYSIS OF THE DOWNSTREAM SYSTEM CAPACITY. LANDSCAPE NOTES 0 1. THE OWNER SHALL BE RESPONSIBLE FOR THE ESTABLISHMENT, MAINTENANCE, N AND VIGOR OF PLANT MATERIAL IN ACCORDANCE WITH THE DESIGN INTENT AND CC) AS APPROPRIATE FOR THE SEASON OF THE YEAR. 2. LANDSCAPE AND OPEN AREAS SHALL BE FREE OF TRASH, LITTER, AND WEEDS. 0 N 3. NO PLANT MATERIAL SHALL BE ALLOWED TO ENCROACH ON R. 0. W. , SIDEWALKS, OR EASEMENTS TO THE EXTENT THAT VISION OR ROUTE OF TRAVEL FOR VEHICULAR, PEDESTRIAN, OR BICYCLE TRAFFIC IS IMPEDED. L w 4. TREE MAINTENANCE SHALL BE IN ACCORDANCE WITH THE STANDARDS OF THE INTERNA TIONAL SOCIETY OF ARBORICUL TUBE. 5. TREE STAKING MATERIALS, IF USED, SHALL BE REMOVED AFTER m (I ) GROWING SEASON, NO MORE THAN (I ) YEAR AFTER INSTALLATION (STEEL TREE STAKES, WIRES, AND HOSES ARE PROHIBITED 1. L 6. REMOVE TRASH, SEDIMENT, OR DEBRIS FROM POND AREAS. THE T PONDS ARE DESIGNED TO ACCUMULATE SEDIMENT. REMOVE SEDIMENT 3 WHEN THE DEPTN REACHES 8 TO /0 INCHES. REPAIR DISTURBED AREA WITH SEED AND STRAW. a 7. MOW GRASS TO A HEIGHT NO LOWER THAN 4 INCHES IN THE BOTTOM AND SIDE OF PONDS AND DRAINAGE DITCHES. REMOVE GRASS CLIPPINGS AND a LEA VES. N Q 8. DISPOSE OF ACCUMULATED SEDIMENT, TRASH, AND DEBRIS IN A MANNER o THAT IS PERMITTED BY THE LOCAL, STATE, AND FEDERAL REGULATIONS. w w a cn i co ti EX M HT IB _o SHEET 5 OF 5 w 3�Y�iA7 NYi slozsi ss SV7(31'H1HOM 1H0330"0 clmz wA r>aloa 64l t'ON lOVHISSV O w� `aoE Z 3SVHd H1dON AVMa33dS ri ZAH1SM103NV9Hf1 — s�o.N.0 mozelao :nvo o iR ayRaR�i]RRa R+I I,Z aAnam Res � O ��•'-'Pi �q? W Q \ RR aenenfFF$i D •sl �` 6 H ',,V F y SH __ _•__—_ c�.ow�cn F E�ior°r� O_589=—__ jr ae 1 I- o I( • \`I L lIE J — \ J I r ' LI'I Doss \,aeeel I it I 1 LL I LL a w w — I `�1k E I — EI —� xi i Is B$ / i x a ..8j 3nI60'31Vn I y� �� >�� I�'',A s >!� AAAAA� � •-m•"'�N � _`� a"Y,,hrr� 1 b;� II 'I i `E ' 4w�w��^ •I � z N s. w 0 0 e i w W EE b CO 1 �"�' E N /a's I IF$ a, ea LL I p mx W Q Ix UJ CL CS q T i m'bK is PPs E Fi R6�� / 66 Re E POW N�HLHPW yG\E o � _ GAPE LWF.ill EasEUEM rih.�P. I 3�Y�tONY7 a,ozalao Sb7C31�H1dOM 1H0330 A1IJ cletz :wl wley Arm MYYrr,` Bb l L'ON iovwi39tl r o Z 3SVHd H1HON AVM433dS Z1.H1S3H03Nvoun wrolssro .aws J aA!av4 BIIR9L90 :alo0 Eta WE Upi NA $� 1 i , cXwNl , Z5 Q I \ I ' a s 1 \ I \ I I I \ \ 1 / 000000 I � w � B 8 4 8 cl all I3o wa E ZU I a \ W F ,p / \ I 3n wq d Sd 8 lY Z W — �� O I wn ppy a •1 I 1 / 1 I .. / ... ... .':Y.•:.'::::.. ....... v + a - , - - - LL O w ¢O m cr p K QQ 1 Fapmm ��• U � � 3S ua`"oa ¢� r p� �c ' Y aYYO rn wa�Nan caa�w UOap: Q ° mli�Mom�N,o oyv��iw� d J GNU O�VU / W W"'W 07d' a3iUa �i n7NNU00 �- 1 o N30n NF Z W o 68' PRI WE ROAD. TY 9V PR ¢ w e F I RE L ME, UT"I A.E�.CNT R DRAI NA 3i�1tGNVi 61YLYIW SVX31'HlaOM la0330 A110 eleu as aa!o+d M +r sbL l'oN lOvalsevN=40 + Z 3SVHd H1HON AVM433dS r 'MaaM UMIS3803Nve8n ravol+ssr :.ros J " :ansne„ el@81� :w0 o.0 e lit 12TE Ili --_-----FL-Voo0a-c6 ¢'ll.£sa 'Jd 'n 'evo ----------- -am {3iyE-_ kVM033dg--- S a I ----------------- -------------,Sta0d5 Mj98s _aaIQW SVX31- -- LL ---- - � -=� --- --- _ ----ate-_—_-_ ----- _ _� € ----------- �1. ..d3A V H U ]1vn1. y B_6e7 N $ I $� 0000®o �r 81 8 9 9 10 I Y y 0. w I Qr I I U' � I �Q{ 1 , �¢ QU Se � 1 c;S2 I �ci wc� $4 (� I I �C Ind OU F 2a LL 170' I LA UI X m H 2g1 ? 11 � w ` I = I a A s �U s 5' e F Q i z `Y LJ 1 r VaR + V- M t LO ll4...NVi clozoiao Stl%31'HJ11QMIHO==OAl10 ele1L :oNuowe � v Bh l L'ON lOtltllS9tl C'7 0 aeux�`i�,�or Z3SdHdH1dON.ldM433dS % C 8 I.ve.v�a4J` �"' ZAH1S3H0=Nveun �aoN♦ :o�wu ela-�el�o :aoa 1- >m 1 p? Jic I �gki�Fyt 4 ' �L� / 'I I/WN �W<� � �✓E>�o wd I Iat 81 ^ OWN U� 1 ` m� I U w� I O�n FT� r Z I���O— v aJ I a- O I LO ♦ � a�II II II ri I'A� 1 In Z, m' I- I / rn _O dl»W'o _ I C> ���III I II >O wwoJviWa� ' I 8 - o o � �y Q WOJ=��JJ 30�0>~>>LUO I m �I ♦11 I I �`� � z3o o} I I E I 00 / I I � OOd 8 R a it 3 F N Iw 1000 zz 11000000 I.' >II / ^ I I yy^1wn J 2 Wnp o V 1 N .,.l... i WHO ' p 11 ¢ I ♦ 'll / Jwd� 13�'d K Fo W I aJ�l I �og � yry wI, J DIrI,aji I I —rcc�c�o 8 4 8 a" Z I E E I .90 I O� _ LLI Of Iwo 6 oz ' , / 3• ODm \I I wM%"' :«::>... II I, -------- uj cc -� � ° Ir w W� Q o Y W o Q o a \�� �pZVO�VSZR 0R0 x 00Qc)d aM F ZO 3 mw 3W O � 0 0aO � H N.11 Q-LnMT m000 C) Of Q o 3 w~o / J No '; 0 a 0� , ON W �Lnro I Wp of OfN a QN ; I I 3%��tGNYi ci�ci ao SMC31�H1bJOM 1H0330 A110 clelz al w!ou � K ��,1{ry AL 84L L'ON 1OW1SBtl qqq` $ jc' Z 3SVHd H1HON AVM433dS r N �,�F7 "''�� ZAkl1S3kl03 NVBklfl rwolls sv :ams J i '1'o'0'2i'd LLL 'Od 'H 'SVo NOISWoens bl 3NO l AD Ole T-ICTI-ow NZ-,Lo-1---- � Noole 'f 1`ol ---- -- -_---- ------ I •/ � � \ II �I a '1 � I ' m � I�.a�N � 4 � � 3 i E 000000 5 I moo¢ C5 p i I I nF e I ,Dory 8 R I ¢ / / I n �.I ego I � II ICI��� (f'•'�) II ,.u="s �` 3 l tl i I/ 1 II ¢ttN ff 1 — — — — — — e / 9 zz W jo C9 I � � I / LL Z I ---- I `� D � Q I .I o r W W ht = ci t6 I I ' I 'I J Z ww mod I��Q Li 3 i� qq I In liwN W8 yy N {{ w I ZOr) I "� \ Up I 1 ...:.,.._._....1. .. ... or1) aiY3lONYi s�oierso SVX31'H1HOM 180d d0 A110 °ai�wd 67l l'ON IOVUIS13V O gift 74 � ..nw 00 a o Z 3SVHd H1HON kVM433dS w T o SlIV13O Z AkJ1S3kiO3 NV9Fif1 sinatl B10891-9] asap F a@ a e W N CA R R w R a Y y a Eg $• Fa m t � 5 s \ Z Z £ 4 £ 4 4 W a EE z +� U' Q w o o w w z OCA > \ a z a a a a cr w ' n f Y E 7 LU ¢a 5 s o o L 2 2 a c m s n a n n a s w w \ 3 a ¢ a pqpq�o � gjop RE N ��^ 8 pg �h5{g 's a LLI a a , I € E E 6 a m a s 3 a a e) Z o o LLJ B o S 4 z s a 3 o c c $ _ � e ar LLJ w a =cr Z Z Ni F W a a ❑❑ �00 00®O6�0 co a 5j g5gg¢g a @ pa° 8 $ $ a��� e�F 1 R alS y�y � 9 10114 i'h f ell $1e 1 1,8 z \\ O I(/ N LL N N Z 5 a 3 a zE w E IL i N H J E 0 f C w g J 3 Z 5� a� 1 � 5 Exhibit "C" CITY OF FORT WORTH STORMWATER FACILITY OPERATION AND MAINTENANCE PLAN The only responsibility the City of Fort Worth has in the operation and maintenance of this Facility is inspection. General Maintenance Procedures The structural and functional integrity of the Facility shall be maintained at all times by removing and preventing drainage interference, obstructions, blockages, or other adverse effects into, through, or out of the system. Periodic silt removal shall occur when standing water conditions occur or the pond's storage volume is reduced by more than 10%. Silt shall be removed and the pond/basin returned to original lines and grades shown on the approved engineering plans. In addition, corrective measures are required any time a basin does not drain completely within 72 hours of cessation of inflow. NO STANDING WATER IS ALLOWED in basins designed for dry detention purposes. Accumulated litter, sediment, and debris shall be removed every 6 months or as necessary to maintain proper operation of the basin. Disposal shall be in accordance with federal, state and local regulations. Detention facilities shall be mowed monthly between the months of April and October or anytime vegetation exceeds 12-inches in height. To prevent debris from entering and clogging the downstream storm sewer system a wire mesh screen or similar screening device shall be installed over the outlet until final acceptance. 4. PREVENTIVE MAINTENANCE/INSPECTION • Visual inspections of all components will be conducted every 6 months. • A log shall be kept of maintenance actions, and inspections. The log should document the condition of the detention system's primary components, mowing, and silt, litter and debris removal dates. Document aeration of the basin bottoms and replanting to prevent the sealing of the basin bottom. • Written maintenance and repair records shall be maintained by the party or parties signing the attached Agreement and shall be provided to the City upon request. STORMWATER FACILITY MAINTENANCE AGREEMENT 8 Rev.11/17/2016 Exhibit "D" Stormwater Structural Maintenance CHECKLIST FREQUENT REPAIRS REPAIRS INSPECTION DATE REQUIRED MADE NOTES Mowing Remove Trash and debris Inspect irrigation system operation Remove grass clippings Violations Noted MINOR INSPECTION Condition of Pond Amount of silt in and Amount of silt in flume Amount of ponded water Amount of wetland vegetation Location of Erosion Percent of vegetation Condition of trash uard Location of Erosion MAJOR INSPECTIONS Condition of Stormwater Quality Structure Type of Stormwater Quality Structure Structure type and Condition Condition of Rip- Rap STORMWATER FACILITY MAINTENANCE AGREEMENT (� Rev.11/17/2016 Condition of filtrations stem Berm or Embankment Settlement Location of erosion Evidence of Animals Evidence of Aquatic life Condition of Aeration Foundation STORMWATER FACILITY MAINTENANCE AGREEMENT 10 Rev.11/17/2016