Loading...
HomeMy WebLinkAboutOrdinance 4077 dF° v GRDINANCE NO. 4 AN ORfICNANCE APPROVING THE REPORT OF THE PUBLIC WGM DEPARTMENT: AWARDING THE CONTRACT OF THE IMPROVEMENT OF THE EAST BERRY STREET EXTENSION IN THE CITY OF FCRT WORTH, TEXAS, AND AUTHORIZING ITS EXECUTION; AND DIRECTING THE CITY ENGINEER TO PREPARE ESTIMATES WHEREAS, by Ordinance No. 4030 passed and approved by the City Council of the City of Fort Worth, the City Council determined the necessity for and ordered the improvement of a portion of the East Berry Street Extension, to-wit: EAST BERRY STREET EXTENSION: from the easterly line of Glen Garden Drive to the easterly line of Cobb Park and being part of both the' North Leg and the South Leg of Berry Street Exten- sion, known and designated as Unit No. 2. EAST BERRY STREET EXTENSION: The South Leg of Berry Street Extension from the easterly line of Cobb Park to the westerly line of Mitchell Boulevard, known and designated as Unit No. 3- EAST BERRY STREET EXTENSION: The North Leg of Berry Street Extension from the easterly line of Cobb Park to the west line of Southport Addition, which is in the east line of E. S. Terrell Survey, 552.7 feet north of its southeast corner, known and designated as Unit No. 4. WHEREAS, subsequent to the passage and approval of said Ordinance, Plans and Specifications for said improvements were submitted by the Public Works Director and said Plans and Specifications were;,,approved and adopted by the City Council; and, T�MREAS, Notice to Bidders was given as required by the City Charter; and, AiEREAS, the bid of Texas Bitulithic Company was found to be the lowest and best bid for the making and construction of said improvements, to wit; Excavation of present streets and 10" crusher-run crushed limestone flexible base course and AN hot mix asphaltic concrete binder course with combined curb and gutter and necessary appurtenances, and placing lj* hot mix asphaltic concrete surface, all as provided by said Plans and Specifications; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That the work of making and constructing such improvements and contracts therefor is hereby awarded to Texas Bitulithic Company, at and for the prices stated in the proposal of the said Company and as reported and recommended by the Public Works Department. The City Manager and City Secretary are, hereby directed to execute the said contract in the name of the City of Fort Worth, Texas, and to impress the corporate seal of the City thereon, the said contract embracing therein, among other things, the prices for the work. SECTION 2. That to provide for the payment of the indebtedness incurred by the City, of Fbrt Worth by said Contract, there is hereby appropriated out of available funds, which have been set aside for said purpose an amount sufficient to pay said indebtedness so incurred. SECTION 3. That the Public Works Director of the City of Fort Worth be, and he is hereby ordered and directed to file with the City Council estimates of the cost of such improvements in accordance with the terms of the powers and provisions of Chapter 106 of the acts of the First called session of the Fortieth legislature of the State of Texas, now Shown as Article 1105b of Vernon's Civil Statutes of the State of Texas, Annotated, which law has been adopted as an amendment to and made a part of the Charter of the City of Fort Worth. APPROVED AS TO F Ass tart City Attorney TO THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: Referring to the Report of the Public Works Department in connection with bids for the improvement of a portion of the East Berry Street Extension in the City of Fort Worth, Texas, and to the proposed Contract therefor, it appears that the amount which the City will pay in connection with such Contract and improvements is the sum of Two Hundred Thirty-Five Thousand Dollars ($235,000.00). I do certify to the City Council of the City of Fort Worth that the money required for such contract and expenditures which will be in- curred thereby is in the Treasury to the credit of the Street Improvement Fund and not appropriated for any other purpose. Director of Finance REPORT OF THE PUBLIC WORKS DEPARTMENT TO THE HONORABLE MAYOR AND CITY COUNCIL OF THE CITY OF FORT WORTH: Your Public Works Department, to which you referred the Bids for the improvement of a portion of the East Berry Street Extension, hereby respectfully reports to your Honorable Body that it recommends the acceptance of the Bid of Texas Bitulithic Company for the performance of said work at and for the follow- ing prices, to-wit: ITEM AND DESCRIPTION QUANTITY UNIT PRICE AMOUNT 1. Clearing and Grubbing 10.67 Acres $ 90.00 960.30 3. Unclassified Trench Excavation 2,310 C.Y. 1.80 4,158.00 4. Unclassified Channel Excavation 100 C.Y. 1.20 120.00 5. Comb. 8" Curb & 21 Gutter 9,780 L.F. 2.00 19,560.00 6. Comb. 6" Curb & lT Gutter 4,186 L.F. 1.50 6,279.00 7. Triple Asphalt Surface Treatment 1,623 S.Y. 0.50 811.50 8. Std. 18" Reinf. Cone. Culv. Pipe 268 L.F. 3.50 938.00 9. Std. 21" Reinf. Cone. Culv. Pipe 338 L.F. 4.00 1,352.00 10. Std. 24" Reinf. Cone. Culv. Pipe 921 L.F. 5.00 4,605.00 11. Std. 30" Reinf. Cone. Culv. Pipe 481 L.F. 6.00 2,886.00 12. Std. 78" Reinf. Cone. Culv. Pipe 460 L.F. 28.00 12,880.00 13• Std. 51 Concrete Storm Drain Inlet 7 Ea. 210.00 1,470.00 14. Std. 101 Concrete Storm Drain Inlet 11 Ea. 240.00 2,640.00 15. Std. 51 Square Reinf. Cone. Manhole 2 Ea. 400.00 800.00 16. Structural Concrete for Stm. Dr. Structures 49.62 C.Y. 85.00 4,217.70 17. Reinforcing Steel 7,438 Ib. 0.16 1,190.08 18. 4" Ceramic Traffic Markers 727 Ea. 1.25 908.75 19. Foundation Course (Crushed Stone) 959 C.Y. 3.60 3,452.40 20. Hot mix Asphaltic Concrete Surface 480 Tons 7.50 3,600.00 21. Cradle Concrete 40.02 C.Y. 30.00 1,200.60 27. Remove Existing Curb & Gutter 26 L.F. 0.50 13.00 28. Under drain in Parkway 800 L.F. 2.00 1,600.o0 29. Under drain under Pavement 200 L.F. 1.80 360.00 2-A. Unclassified Street Excavation 46,737 C.Y. 0.57 26,640.09 22. 10" Flexible Base (Crusher-run) 35,030 S.Y. 1.66 58,149.80 23. 3*" Hot-mix Asphaltic Concrete Base 35,030 S.Y. 1.30 45,539.00 24. 1 Hot-mix Asphaltic Concrete Surface 35,030 S.Y. 0.65 22,769.50 Total Cost of Project (Alternate No. 3.) $229,100.72 Respectfully submitted, PUBLIC WORKS'DEPARTMENT By RECTO ORDINANCE Titl ell- Adopted Final Adoption Published City Secretary r. O.No. 14966-A