Loading...
HomeMy WebLinkAboutOrdinance 6377 ORDINANCE NO, _ (0 3 7��.. ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF raiiIfnrd-Rrvant. Irvin Road AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH Texas Bitulithic Company FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO- PRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with Texas Bitulithic Company for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in -said City, to-wit: UNIT 1: GUILFORD-BRYANT IRVIN ROAD From the north line of Helmick Avenue to 18' south of the south line of Wellesley Avenue, known and designated as Unit 1, Project No. 104-23000-118. UNIT II: GUILFORD-BRYANT IRVIN ROAD From 280' north of Vickery Boulevard to south line of Helmick Avenue, known and designated as Unit II, Project No. 104- 23000-118. UNIT 2A: RIDGLEA LANE From 357' south of the south line of Guilford Road to the south line of Guilford Road, known and designated as Unit 2A, Project No. 104- 23000-118. UNIT 2B: MANHATTAN DRIVE From the east line of Guilford Road to the west line of Littlepage Street, known and designated as Unit 2B, Project No. 104- 23000-118. WHEREAS, by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No.6126 & 6199portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and igljg gegjjj n credits against some one or more of the assessments levied by Ordinance No. b1 , and WHEREAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. II. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: III. When each of the certifiactes has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS day of , 19 APPROVED AS TO FORM AND LEGALITY: Cit Attorney UNIT NO. 1, PROJECT NO. 104-23000-118: GUILFORD - BRYANT IRVIN ROAD FROM THE NORTH LINE OF HELMICK AVENUE TO 18 FEET SOUTH OF THE SOUTH LINE OF WELLESLEY AVENUE, to be improved by constructing a six-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one forty-four foot wide roadway and by constructing five-inch thick concrete sidewalks and six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NW. CORNER OF GUILFORD ROAD AND HELMICK AVENUE - RIDGLEA LANE EXTENSION WES1 SIDE OF STREET CHAMBERLIN ARLINGTON HEIGHTS SECOND FILING OMOC Building Residue of 510 51.58' Pavement $2.86 $ 147.52 Corporation 17, 18, 19, Res. 51.58' Curb &Gdler 2.54 131.01 P.O. Box 13244 and 20 $ 278.53 City of Fort Worth Residue of 456 328' No Assessment 21 and Res, $ -0- portion of closed street RIDGWAY MANORS NO. 2 F.H.A. 113-42062 1661.2' Adjusted to Multifamily Apt. 1175' Pavement $12.85 $15,098. 75 Mortgage Section 1175' Curb & Gutter 2,54 2,984.50 Comptrollers Div. $18,083.25 Washington, D.C. 20412 RIDGWAY MANORS NO. 1 F.H.A. 113-42061 676' Pavement $12.85 $ 8,686.60 Multifamily Apt. 676' Curb & Gutter 2.54 1,717.04 Mortgage Section $10,403.64 Comptrollers Div. Washington, D.C. 20412 RIDGWAY MANORS NO. 3 Westridge Villa Apts. B 633.2' Pavement $12,85 $ 8,136.62 c/o R. T. Cox Apt. 633.2' Curb & (utter 2.54 1,608.33 3805 Westridge $ 9,744.95 RIDGLEA APARTMENTS Westridge Villa Apts. 4 less NE, 374' Adjusted to c/o R. T. Cox 50X190 354' Pavement $12.85 $ 4,548.90 3805 Westridge Apt. 374' Curb & Gutter 2.54 949.96 $ 5,498.86 UNIT NO. 1, PROJECT NO. 104-23000-118: GUILFORD - BRYANT IRVIN ROAD - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WELLESLEY AVENUE INTERSECTS EAST SIDE OF STREET CHAMBERLIN ARLINGTON HEIGHTS, SECOND FILING Cabe Griffin 20 277 125' Side Lot Adjusted to 5937 Wellesley Res. 100' Pavement $2.86 $ 286.00 100' Curb & Gutter 2.54 254.00 125' Sidewalk 2.76 345.00 $ 885.00 Gus Newman 21 277 125' Pavement $12.85 $ 1,606.25 5800 Bonnell Apt. 125' Sidewalk 2,76 345.00 $ 1,951.25 FLETCHER AVENUE INTERSECTS Raymond Speed 20 280 125 ' Side Lot Adjusted to 5939 Fletcher Res. 100' Pavement $2.86 $ 286.00 100' Curb & Gutter 2.54 254.00 125' Sidewalk 2.76 345.00 $ 885.00 A. G. Miller, Jr. 21 280 125' Side Lot Adjusted to 5709 Wellesley Res. 100' Pavement $2.86 $ 286.00 100' Curb & Gutter 2.54 254.00 125" Sidewalk 2.76 345.00 $ 885.00 BONNELL STREET INTERSECTS International 20 322 125' Side Lot Adjusted to, Fidelity Ins. Co. Res. 100' Pavement $2.86 $ 286.00 Fidelity Building 100' Curb & Gutter 2.54 254.00 Dallas, Texas 114' Sidewalk 2.76 314.64 96 Sq. Ft. Drive .85 81.60 $ 936.24 Berkowitz Properties, 21 322 125' Pavement $12.85 $ 1,606.25 Incorporated Apt. 117 ' Sidewalk 2.76 322.92 729 NW. 28th Street $ 1,929.17 UNIT NO. 1, PROJECT NO. 104-23000-118: GUILFORD - BRYANT IRVIN ROAD - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT KILPATRICK STREET INTERSECTS CHAMBERLIN ARLINGTON HEIGHTS, SECOND FILING Mrs. B. Wheaton 20 325 125' Pavement $5.71 $ 713.75 5919 Kilpatrick Apt. 125' Curb & Gutter 2.54 317.50 125' Sidewalk 2.76 345.00 $1,376.25 J. A. Franklin 21 325 125' Side Lot Adjusted to 5936 Goodman Res. 100' Pavement $2.86 $ 286.00 100' Curb & Gutter 2.54 254.00 114' Sidewalk 2.76 314.64 96 Sq. Ft. Drive .85 81.60 $ 936.24 GOODMAN STREET INTERSECTS M. Gentry 20 367 125' Side Lot Adjusted to 5937 Goodman Res. 100' Pavement $2.86 $ 286,00 100' Curb & Gutter 2.54 254.00 114' Sidewalk 2.76 314.64 96 Sq. Ft. Drive .85 81.60 $ 936.24 Gus Newman 21 367 125' Side Lot Adjusted to 5800 Bonnell Res. 100' Pavement $2.86 $ 286.00 100' Curb & Gutter 2.54 254.00 114' Sidewalk 2.W 314.64 96 Sq. Ft. Drive .85 81.60 $ 936.24 LIBBEY AVENUE INTERSECTS City of Fort Worth 20 370 125' No Assessment Res. $ -0- City of Fort Worth 21 370 125' No Assessment Res. $ -0- BLACKMORE AVENUE INTERSECTS R. T. Tollerson 20 412 125' Side Lot Adjusted to 5939 Blackmore Res. 100' Pavement $2.86 $ 286.00 100' Curb & Gutter 2.54 254.00 114' Sidewalk 2.76 314.64 96 Sq. Ft. Drive .85 81.60 $ 936.24 UNIT NO. 1, PROJECT NO. 104-23000-118: GUILFORD - BRYANT IRVIN ROAD - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT CHAMBERLIN ARLINGTON HEIGHTS, SECOND FILING F. Hudson 21 412 125' Side Lot Bdjie ted to 5938 Humbert Res. 100' Pavement $2.86 $286.00 100' Curb & Gutter 2.54 254.00 111.5' Sidewalk 2.76 307.74 96 Sq. Ft. Driveway.85 81.60 $ 929.34 HUMBERT STREET INTERSECTS Governor Queen 20 415 125' Side Lot Adjusted to 5933 Humbert Res. 100' Pavement $2.86 $286.00 100' Curb & Gutter 2.54 254.00 125' Sidewalk 2.76 345.00 $ 885.00 R. B. Trentman Co. 21 415 125' Side Lot Adjusted to 3501 Blue Bonnet Res. 100' Pavement $2.86 $286.00 Circle 100' Curb & Gutter 2.54 254.00 125' Sidewalk 2.76 345.00 $ 885.00 FARNSWORTH STREET INTERSECTS J. Dorsey Adams 19 & 456 128.16' Side Lot Adjusted to 1009 Evans Avenue residue Res. 100' Pavement $2.86 $286.00 of 20 100' Curb & Gutter 2.54 254.00 128.16' Sidewalk 2.76 353.72 $ 893.72 City of Fort Worth Residue 456 206.47' No Assessment $ -0- of 23 & Res. 24 and portion of closed street TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $60,195.16 TOTAL CITY OF FORT WORTH COST 124,997.74 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 1 $185,192.90 UNIT NO. 2, PROJECT NO. 104-23000-118: GUILFORD - BRYANT IRVIN ROAD FROM 280' NORTH OF VICKERY BOULEVARD TO SOUTH LINE OF HELMICK AVENUE, to be improved by constructing a seven-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade between Station 3+26 and 9+22.32 and six-inch thick reinforced concrete pavement on a six- inch thick lime stabilized subgrade from Station 9+22.32 to end of unit, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one forty-eight foot wide roadway. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT GUILFORD ROAD STATION 3+26 WEST SIDE OF STREET RIDGLEA PARK ADDITION Ridglea-Park Corporation 8 371.53' No Access 2433 W. Northwest Hwy. Apt. No Assessment Dallas, Texas 75220 $ -0- Attn: Mr. Pat Reed Ridglea Park Corporation 9 325' No Access 2433 W. Northwest Hwy. Apt. No Assessment Dallas, Texas 75220 $ -0- Attn: Mr. Pat Reed Ridglea Park Corporation 10 396.77' No Access 2433 W. Northwest Hwy. Apt. No Assessment Dallas, Texas 75220 $ -0- Attn: Mr. Pat Reed Ridglea Park Corporation 11 332.63' Adjusted to 2433 W. Northwest Hwy. Apt. 130' No Access $ -0- rallas, Texas 65220 202.63' Pavement $12.85 2,603.80 Attn: Mr. Pat Reed 202.63' Curb & Gutter 2.70 547.10 $3,150.90 Ridglea Park Corporation 12 300' Pavement $12.85 $3,855.00 2433 W. Northwest Hwy. Apt. 300' Curb & Gutter 2.70 810.00 Dallas, Texas 75220 $4,665.00 Attn: Mr. Pat Reed Ridglea Park Corporation 13 & 571.09' Pavement $12.85 $7,338.51 2433 W. Northwest Hwy. 14 Apt. 571.09' Curb & Dallas, Texas 75220 Gutter 2.70 1,541.94 ,Attn: Mr. Pat Reed $8,880.45 UNIT NO. 2, PROJECT NO. 104-23000-118: GUILFORD - BRYANT IRVIN ROAD - CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT CHAMBERLIN ARLINGTON HEIGHTS SECOND FILING City of Fort Worth Part of 11 510 140' No Assessment thru 17 & Res. $ -0- portion of closed street RIDGLEA LANE EAST SIDE OF STREET City of Fort Worth Triangle out510 97' No Assessment of SW. portion $ -0- of9 & l0and residue of 11, 12, and 13 RIDGLEA PARK ADDITION Ridglea Park Residue of 270' No Access Corporation 12 and 14 Res. No Assessment 2433 W. Northwest $ -0- Highway Dallas, Texas 75220 Attn: Mr. Pat Reed F. G. BEASLEY SURVEY - ABSTRACT NO. 135 City of Fort Worth Tract 3F5 793' No Assessment Res. $ -0- MANHATTAN DRIVE INTERSECTS City of Fort Worth Tract 3F5 702' No Assessment Res. $ -0- TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $16,696.35 TOTAL CITY OF FORT WORTH COST 275.920.54 TOTAL ESTIMATED CONSTRUCTION COST - UNIT N0. 2 $292,616.89 UNIT NO. 2A, PROJECT NO. 104-23000-118; RIDGLEA LANE 357' SOUTH OF THE SOUTH LINE OF GUILFORD ROAD TO THE SOUTH LINE OF GUILFORD ROAD, to be improved by constructing a six- inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized sub- grade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty-six foot wide roadway. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHWEST CORNER OF RIDGLEA LANE AND RIDGWAY STREET WEST SIDE OF STREET RIDGLEA ADDITION Ridglea Park Corp. 5A 51 150' Side Lot Adjusted to 2433 W. Northwest Hay. Res. 100' Pavement $2.86 $286.00 Dallas, Texas 100' Curb 6 Gutter 2.54 254.00 Attn. : Mr. Pat Reed $ 540.00 City of Fort Worth Portion of 50' No Assessment closed street $ -0- Res. CHAMBERLIN ARLINGTON HEIGHTS SECOND FILING OMOC Building Residue 510 114.08' Shallow Lot Adjusted to Corporation of 17, Res. 58' Pavement $2.86 $165.88 P.O. Box 13244 18, 19 58' Curb & Gutter 2.54 147.32 & 20 $ 313.20 GUILFORD ROAD INTERSECTS EAST SIDE OF STREET City of Fort Worth Residue 510 147' No Assessment of 15, $ -0- 16, 17 and portion of closed street RIDGLEA PARK ADDITION Ridgles Park Corp. 13 210' Pavement $7.64 $1,604.40 2433 W. Northwest Hay. Apt. 210' Curb 6 Gutter 2.54 533.40 Dallas, Texas $2,137.80 Atta. : Mr. Pat Reed TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $2,991.00 TOTAL CITY OF FORT WORTH COST 8,010.70 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 2A $11,001.70 UNIT NO. 2B, PROJECT NO. 104-23000-118: NANHATTAN DRIVE FROM THE EAST LINE OF GUILFORD ROAD TO THE WEST LINE OF LITTLEPAGE STREET. to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick time stabilized subgrade, with seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished street will consist of one thirty--foot wide roadway. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHEAST CORNER OF MANHATTAN DRIVE AND GUILFORD ROAD NORTH SIDE OF STREET F. G. BEASLEY SURVEY - ABSTRACT NO. 135 City of Fort Worth Tract 3F5 150' No Assessment Res. $ -0- WEST VICKERY HEIGHTS ADDITION Seller: Advance Homes Inc. 3537 West Seventh St. Buyer: Robert Ball 1 10 100' No Assessment 4808 Littlepage Res. LITTLEPAGE STREET INTERSECTS SOUTH SIDE OF STREET Seller: Advance Homes Inc. 3537 West Seventh Street Buyer: Burr Gray 11R 8 100' No Assessment 4900 Littlepage Res. $ -0- F. G. BEASLEY SURVEY - ABSTRACT NO. 135 City of Fort Worth Tract 3F5 150' No Assessment Res. $ -0- TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $ -0- TOTAL CITY OF FORT WORTH COST $9,696.72 TOTAL ESTIMATED CONSTRUCTION COST - UNIT NO. 2B $9,696.72 WNE yf _a " 6d ~ Cit o 'Fort Worth, Texas NE M"PH,s Mayor and Council Communication GRAHARA / ✓/ DATE REFERENCE SUBJECT: Final Payment - Paving of PAGE NUMBER Guilford-Bryant Irvin Road, Units I 10/12/70 FP-751and of 2 IT Final Council action on the project described below is requested. Project Descriptiop Name: Guilford-Bryant Irvin Road from Wellesley Avenue to West Vickery Boulevard, Units I and II, Project Number 104-23000-118 Contractor: Texas Bitulithic Company Contract Awarded: June 2, 1969 Work Order Issued: November 5, 1969 Work Order Effective: November 15, 1969 Date of Final Inspec- tion and Approval: August 19, 1970 Working Time Bid: 150 Working Days Working Time Used: 113 Working Days Project Cost and Financing Original Bid Price: $428,105.30 Change Order No. 1: +$ 3,590.60 AR 1-15 2.3.1 Revised Contract Price: $431,695.90 Final Contract Cost: $453,189..28 Partial Payments Pre- viously Made: 11, Amount: $395,210.37 Final Payment Due: $57,978.91 Final Payment to be made from Project Account Number 104-23000-118 Deviation from Bid Price: The final cost of this project is $21,493.38 (slightly less than 5%) over the adjusted bid price, and this overage can be attributed to variations between quantities estimated in the contract documents and quantities actually measured and used at the job site. Compliance with Specifications During testing on this project a total 49 corings were made with the fol- lowing results: Exceeds Even with Under Specs but Below Specs Specs Within Tolerance Tolerance 7" Reinforced Concrete 2 0 0 0 6" Reinforced Concrete 28 3• 10 0 6" HMAC 6 0 0 0 6" Stabilized Sub-grade 12 37 0 0 DATE REFERENCE SUBJECT: Final Payment - Paving of PAGE NUMBER Guilford-Bryant Irvin Road, Units I 2 2 10/12/70 Of and II On this project the average thickness of the specified 7 inch reinforced con- crete is 7.62 inches, the average thickness of the specified 6 inch reinforced concrete is 6.48 inches, the average thickness of the specified 6 inch HMAC is 6.50 inches, and the average thickness of the specified 6 inch lime stabil- ized sub-grade on the entire project is 6.04 inches. Tests made during construction show that materials used were in compliance with contract specifications. Recommendations It is recommended that the project described above be accepted by the adoption of an ordinance and that final payment of $57,978.91 be authorized to Texas Bitulithic Company. HDM/je SUBMITTED BY: DISPOSIT O Y COUN L: PROCESSED BY 7 _� / APPROVED OTHER (DESCRIBE) �/ _ CITY SECR Y l DATE CITY MANAGER 16