Loading...
HomeMy WebLinkAboutContract 52620 Received Date: 08/06/19 Received Time: 1:32 PM Developer and Project Information Cover Sheet: Developer Company Name: Forestar(USA)Real Estate Group,Inc. Address, State,Zip Code: 2221 E.Lamar Blvd. Suite 790,Arlington,TX, 76006 Phone&Email: 972-702-8699,danielbartokaforestargroup.com Authorized Signatory, Title: Dan Bartok, CEO Project Name: Trails of Elizabeth Creek Phase 2 Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights Project Location: 132.826 acres out of the Charles Tydings Survey,Abstract No. 1276 in the City of Fort Worth I Plat Case Number: FP-17-138 Plat Name: Trails of Elizabeth Creek Mapsco: Council District: 7 CFA Number: CFA18-0150 City Project Number: 101880 City of Fort Worth,Texas OFFOC AL RECORD Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 2 CITY SECRETARY CFA Official Release Date:02.20.2017 Page 1 of 11 FT. WORTH,TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 52620 WHEREAS, Forestar (USA) Real Estate Group, Inc. , ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Trails of Elizabeth Creek Phase 2 ("Project")within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate in the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA:is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is.hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the; Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction ,n the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas _ - .I Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 2 OFFICIAL RECORD CFA Official Release Date:02.20.2017 Page 2 of 11 CITY SECRETARY FT. WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) ®, Sewer(A-1) 0, Paving(B) P, Storm Drain(B-1) ®, Street Lights & Signs (C) M. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured,licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 2 CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s)it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other stage-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-:issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict wi th any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 2 CFA Official Release Date:02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such iniuries, death or damages are caused, in whole or in Part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its of i ers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 2 CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. .Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastewater inspection fees and material testing fees equal to two percent(2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent(4%) and material testing fees equal to two percent (2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of street]ights or if the city is not installing the streetlights, inspection fees equal to four percent (4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be-extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agrc ement(and any extension period) the Improvements have not been completed and,iccepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 2 CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1)does not boycott Israel; and(2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form(I-9). Upon request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities.Agreement-Trails of Elizabeth Creek Phase 2 CFA Official Release Date:02.20.2017 Page 7of11 Cost Summary Sheet Project Name: Trails of Elizabeth Creek Phase 2 CFA No.: CFA18-0150 City Project No.: 101880 An Engineer's Estimate of Probable Cost is acceptable. However,the construction contract price will ultimately determine the amount of CFA feet; and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 369,458.55 2.Sewer Construction $ 503,924.70 Water and Sewer Construction Total $ 873,383.25 B. TPW Construction 1.Street $ 2,447,346.73 2.Storm Drain $ 2,919,204.10 3.Street Lights Installed by Developer $ 202,252.12 4. Signals $ TPW Construction Cost Total $ 5,568,802.95 Total Construction Cost(excluding the fees): $ 6,442,186.20 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 17,467.66 D. Water/Sewer Material Testing Fee(2%) $ 17,467.66 Sub-Total for Water Construction Fees $ 34,935.32 E. TPW Inspection Fee(4%) $ 214,662.03 F. TPW Material Testing(2%) $ 107,331.02 G. Street Light Inspsection Cost $ 8,090.08 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 330,083.13 Total Construction Fees: $ 365,01 3.45 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 6,442,186.20 x Completion Agreement=100%/Holds Plat $ 6,442,186.20 Cash Escrow Water/Sanitary Sewer—125% $ 1,091,729.06 Cash Escrow Paving/Storm Drain=125% $ 6,961,003.69 Letter of Credit=125%w/2 r expiration p2riod $ 8,052,732,75 City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 2 CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Forestar(USA)Real Estate Group, Inc. r Dana Burghdoff(ALI 1,20191 Dana Burghdoff Interim Assistant City Manager ba�cieL 8a� ic Date: Aug 1,2019 Daniel Bartok(Jut 30,2019) Name: Dan Bartok Recommended by: Title: CEO 9 ( KJ Date: Jul 30,2019 —rv✓Y Evetyn Robe (Jut 30,2019) Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and Approved as to Form &Legality: administration of this contract, including ensuring all performance and reporting requirements. Richard A.Me, --2n(Aug 1,2019) Richard A. McCracken Tan/e Scarle t Morales Assistant City Attorney Janie Scarlett Morales(Aug 1,2019) M&C No. N/A Name: Janie Morales Date: Title: Development Manager Form 1295: _N/A Y�C R r 3 .... 5. ATTEST: C) r Mary J. Kayser/Ronald Gonzales City Secretary/Assistant City Secretary OFFICIAL RECORD City of Fort Worth,Texas CITY SECRETARY Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 2 FT. WORTH,TX CFA Official Release Date:02.20.2017 Page 9 of 11 Check items associated with the project being undertaken: checked items must be included as Attachments to this Agreement Included Attachment Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A:Water Improvements ® Exhibit A-1: Sewer Improvements ® Water and Sewer Cost Estimates ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 2 CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101880 None. City of Fort Worth,Texas Standard Community Facilities Agreement-Trails of Elizabeth Creek Phase 2 CFA Official Release Date:02.20.2017 Page 11 of 11 ATTACHMENT "2" Concurrent CFA Provision City Project No. 101880 The improvements being constructed by Developer pursuant to this Agreement will connect to improvements Developer is constructing under a separate Community Facilities Agreement that have not been completed and accepted by the City. Therefore, this Agreement shall be considered a"Phased CFA"and the provisions contained in this section shall apply to this Agreement. The improvements being constructed by Developer under the separate Community Facilities Agreement shall be defined as the "Parent Project." The improvements being constructed by Developer under this Agreement shall be defined as the"Child Project." Developer acknowledges and agrees that due to Developer's election to construct a Phased CFA,the potential exists for technical, delivery, acceptance or performance problems(hereinafter "Construction Problems"). Construction Problems may include, but are not limited to: failure of the improvements to comply with the approved plans or City Specifications; failure of the improvements in the Parent Project and the Child Project to properly connect to each other; changes to the design or construction of the improvements in the Parent Project that impact the design and construction of the improvements in the Child Project; construction delays, delay claims, or claims for liquidated damages; increased costs for the Developer; failure of the improvements to pass inspection or material testing; or rejection by the City of some or all of the improvements and Developer having to remove and reconstruct the improvements at Developer's expense. In addition, Developer understands and agrees that disputes may arise between Developer's contractors or their subcontractors relating to responsibility for the Construction Problems. Developer shall be solely responsible for resolving disputes between contractors or disputes between contractors and subcontractors. Developer further acknowledges and agrees that Developer has notified all of Developer's contractors for the Project that Developer has elected to construct a Phased CFA, the provisions of this section, the risks associated with a Phased CFA, and that the City shall not bear any responsibility for Developer's decision to proceed with a Phased CFA. Developer shall not make the final connection of the improvements in the Child Project to the improvements in the Parent Project until the improvements in the Parent Project have been constructed and accepted by the City and the City has consented to Developer making the connection. Developer agrees that if this Agreement is for improvements relating to the construction, renovation or modification of one or more single family residential homes or structures, the City will not record the plat related to the Project until the improvements are constructed and accepted by the City. Developer agrees that if this Agreement is for improvements relating to the construction, renovation or modification of one or more commercial buildings or structures, the Developer shall not receive a Certificate of Occupancy from the City for the building(s)related to the Project until the improvements in this Agreement are constructed and accepted by the City. Developer further understands and agrees that completion of the improvements under this Agreement does not entitle Developer to obtain a final plat of the property until all other requirements of Federal law, State law, or the City Code relating to the filing and recording of a final plat have been met by Developer. BY CHOOSING TO CONSTRUCT A PHASED CFA, DEVELOPER ASSUMES ALL RISKS AND DEVELOPER SHALL BE LIABLE AND RESPONSIBLE FOR ANY AND ALL DAMAGES, INCLUDING BUT NOT LIMITED TO ANY AND ALL ECONOMICDAMAGESPROPERTYLOSS,PROPERTYDAMAGESANDPERSONAL INJURY, (INCLUDING DEATH), OFANYKIND OR CHARACTER, WHETHER REAL OR ASSERTED. DE VELOPER HEREBYEXPRESSL YRELEASESAND DISCHARGES CITY FROM ANY AND ALL LIABILITY FOR DAMAGES, INCLUDING, BUT NOT LIMITED TOANYAND ALL ECONOMICDAMAGES,PROPERTYLOSS,PROPERTY DAMAGE AND PERSONAL INJURY(INCL UDING DEATH)ARISING OUT OF OR IN CONNECTION WITH,DIRECTLY OR INDIRECTLY, THE CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S DECISION TO CONSTRUCT A PHASED CFA. DEVELOPER,A TITS SOLE COST AND EXPENSE,A GREES TO AND DOES HEREBY INDEMNIFY, DEFEND PROTECT, AND HOLD HARMLESS CITY, AND CITY'S OFFICERS, REPRESENTATIVES, AGENTS, EMPLOYEES, AND SERVANTS FOR, FROMAND AGAINSTANYANDALL CLAIMS(WHETHERA ILA W OR INEQUITY), LIABILITIES, DAMAGES (INCLUDING ANY AND ALL ECONOMIC DAMAGES, PROPERTYLOSS, PROPERTYDAMAGES AND PERSONAL INJURIESINCLUDING DEATH), LOSSES, LIENS, CAUSES OF ACTION, SUITS, JUDGMENTS AND EXPENSES (INCLUDING, BUT NOT LIMITED TO, COURT COSTS, ATTORNEYS' FEES AND COSTS OF INVESTIGATION), OF ANY NATURE, KIND OR DESCRIPTION ARISING OR ALLEGED TO ARISE BY OR IN ANY WA Y RELATED TO CONSTRUCTION OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A PHASED CFA, OR (2) BY REASON OF ANY OTHER CLAIM WHATSOEVER OFANY PERSON OR PARTY OCCASIONED OR ALLEGED TO BE OCCASIONED IN WHOLE OR IN PART BY THE CONSTRUCTIONS OF THE IMPROVEMENTS OR DEVELOPER'S CHOICE TO CONSTRUCT A PHASED CFA WHETHER OR NOT SUCH INJURIES DEATH OR DAMAGES ARE CAUSED, .l:' WHOLE OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH,ITS OFFICERS, SERVANTS, OR EMPLOYEES. DEVELOPER: tAwuw&Lfak Daniel Bartok(Jul 30,2019) Name: Damiel Bartok Title: CEO SECTION 00 42 43 P..r 1.f6 Developer Awarded Projects-PROPOSAL FORM Trails of Elizabeth Creek-Phase II UNIT PRICE BID Project Item 11115omation Bidders Pmpinal Bidiist Item No. Description Specification Section No Umt of\Iea ure Bid Quantity Unit Rica Bid Value UNIT I-WATER I PROVEMENTS 3305.0109 Trench Safety 33 0510 LF 6,609 S0.10 $660.90 3311,0001 Ductile Iron Water Fittings w!Restraint 33 11 11 TON 4 $6150.00 S26 020.65 3311.0241 8"Water Pie 33 11 10 33 11 12 LF 6,609 $23-00 $152 007.00 3312.0001 Fire Hydrant 33 12 40 EA 10 $3 520.00 $35 200.00 3312.0117 Connection to Existing 4'-12"Water Main 33 12 25 EA 7 $500,00 $3 500.00 3312.2003 1"Water Service 331210 EA 166 $770,00 $127 820.00 3312.2103 1 1/2"Water Service 33 1210 JEA 1 1 $1.210.00 $1 210.00 3312.3003 8"Gate Valve&Box 1331220 JEA 1 18 $1,280,001 S23.040.00 TOTALUNIT1:WATER MPROVEM TS $369,458.55 Burnsco Construction, Inc. 00 4.438id P.,.I_DAP xis SECTION 00 42 43 e.Se:4 e Developer Awarded Projects-PROPOSAL FORM Trails of Elizabeth Creek-Phase II UNIT PRICE BID Project item inronnation Bidders Proposal Bidlim Item No. D<criptton Sped fication Section No. Unit c(1.Taistva Bid Quantity Unit Price Bid Value UNIT 11:SANITARY SEWER IMPROVEMENTS _ 3301.0101 Manhole Vacuum Testing 33 01 30 EA 31 $110 00 $3 410.00 3301.0002 Post-CCTV Inspection 3301 31 LF 6,992 $1.50 $10 488.00 3305.0109 Trench Safety 33 05 10 LF 6.992 $1.00 $6 992.00 3305.0113 Trench Water Stops 33 05 15 _ EA 19 $300.00 $5 700.00 3331.3101 4"Sewer Service(SDR-26,ASTM D3034) 3331 50 _ EA 163 $650,00 $105 950.00 3331.4115 8"Sewer Pipe(SDR-26,AST D3034) 33 11 10,33 31 12,33 31 20_ LF 6,427 535.10 $225 587.70 3305.0107 Manhole Adjustment,Minor 33 05 14 EA 1 $470.00 $470.00 3339.D001 Epoxy Manhole Liner Warren Coati 33 39 60 VF 44 $220.00 $9 680.00 3339.1001 4 Manhole 133 3910 33 39 20 EA 31 $2 590.00 $80 290.00 3339.1002 4'Drop Manhole 33 3910,33 39 20 EA 1 $4 740.00 $4,740.00 3339.1003 4 Extra Depth Manhole(>6') 33 3910 33 39 20 VF 147 $150,00 $21 975.00 3331.4116 8"Sewer Pipe,CSS Backfill. 33 11 10,33 31 1 33 31 20 LF 474 $43,00 520,382.00 9999.0001 8"Sewer Pipe,Concrete Encasement 33 11 10,33.3) 12,33 31 30 LF 91 $60.00 S5,460.00 9999.0002 Connect to Existing Manhole 00 00 00 EA 2 5700.00 S1 400 00 9999.0003 External Drop Connection 00 00 00 EA 1 $1 300.00 $1 300.00 9999.0004 End&Plug 00 00 00 EA 5 $20.00 $100.00 TOTALUNIT It:SANITARY SEWER IMPROVEMENTS 5503,924.70 Burnsco Construction, Inc. PO l727 Did Raoaal D:�P.xls SECTION 00 42 43 ""3 46 Developer Awarded Projects-PROPOSAL FORM Trails of Elizabeth Creek-Phase II UNIT PRICE BID FToject Itan hnomiation Bidder's Pmposdl Bidlist Item No. DNefiption Specification Section No. Unit orhfe.%ure Bid Quantity Unit Rice Bid Value UNIT 11:DRAINAGE IMPROVEMENTS 02414401 RemoveHeadwalUSET 024114 EA 1 S800.00 S800.00 3125.0101 SWPPP2:1acre 31 2500 LS 1 $500.00 $50000 3305.0109 Trench Safety 33 05 10 LF 8621 S0.50 $4 310,50 3137.0102 Large Stone Riprap,dry 31 37 00 SY 1452 S43 00 $62,436.00 3305.0112 Concrete Collar 33 05 17 EA 1 S400 00 $400.00 3339.1001 4'Manhole 33 39 10,33 3920 EA 3 S4,000,00 $12,000.05 3339.1101 5'Manhole 33 39 10.33 39 20 EA 1 $4,900.00 S4,900.00 3349.0104 4 Stacked Manhole 3349 In EA 10 $1,300.00 $13,000.00 3341.0201 21"RCP,Class III 3341 10 LF 834 $56.00 $46,704 00 3341.0205 24"RCP,Class 111 3341 10 LF 902 $65.00 $58.630.00 3341.0208 27"RCP,Class 111 33 41 10 LF 561 $73,00 $40 953.00 3341.0302 30"RCP,Class III 3341 10 LF 541 S76.60 S41 440.60 3341.0309 36"RCP,Class 111 3341 10 LF 312 $112.00 $34,944,00 3341.0402 42"RCP,Class 111 33 41 10 LF 42 S145.00 $6 09000 3341.0409 48"RCP,Class III 3341 10 LF 148 $158.00 $23 384.00 3341.1102 43 Box Culvert 3341 10 LF 211 S188.00 $39 668.00 3341.1201 5x3 Box Culvert 3341 10 LF 1787 S254.00 $453 898.00 3341.1302 6x3 Box Culvert 3341 10 LF 303 $281.00 $85143.00 3341.1501 8x4 Box Culvert 3341 10 LF 831 $421.00 $349 851.00 3341.1502 8x5 Box Culvert 3341 10 LF 545 $481.00 S262145.00 3341.2002 10x5 Box Culvert 3341 10 LF 540 $640.00 $345 600.00 3341.2003 10x6 Box Culvert 3341 10 LF 1061 $672,00 $712 992,00 3349.5001 19 Curb Inlet 33 49 20 EA 27 $3,600.00 $97 200.00 3349.6001 10'Recessed Inlet 334,920 EA 4 $3 70000 $14 800.00 3349.5002 15'Curb Inlet 33 49 20 EA 1 $4 900.00 $4 900.00 3349.5003 20'Curb Inlet 33 49 20 EA 3 $6,000.00 $18 000.00 3349.7001 4 Drop Inlet 33 49 20 EA 2 $4100.00 $8 200.00 9999.0005 CH-PW-0 Wingwall(10'X6'RCB) 00 00 00 EA 1 $27 000.00 S27 000.00 9999.0006 CH-PW-0 Wingwall(42"RCP) 00 00 0p EA 1 S9 000.00 $9 000.00 9999.0007 CH-PW-0 Wirgwall(30"RCP) 00 00 00 EA 1 $8.900.00 $8 900.00 9999.0008 CH-PW-0 Wi all(5'XT RCB) 00 00 00 EA 2 S25 600.00 $51 200,00 9999.0009 CH-PW-15 Wingwall(30"RCP) 00 00 00 EA 1 $9.400.00 S9 400.00 9999.0010 SW-0 Wingwall(6X3 RCB) 00 00 00 EA 1 $12 500,00 $12 500.00 3349,4001 SET,Type I for Box Culverts 33 49 40 EA 2 $11,500.00 $23,000.00 3349.4105 24"SET;1 pipe 33 49 40 EA 1 $2,200.00 $2.200.05 3349.4107 30"SET,1 pipe 33 49 40 EA 2 $2,800.00 $5,600.00 9999.0011 Recyclex TRM-V 1000000 SY 365 525.0 999, 0 $9125.00 90012 Concrete Apron 00 00 00 SY 158 $81.00 S12 798.00 9999.0013 Erosion Control Blanket 1000000 ISY 699 S8.001 $5 592.00 TOT LU IT It:DRAINAGE IMPROVEMENTS S2.919,204.10 Burnsco Construction, Inc. 004243_B.d Prap"_al_OA Ax SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM Trails of Elizabeth Creek-Phase II UNIT PRICE BID .Item. Bidders Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value NIT IV:PAVING IMPROVEMENTS 3211.0400 Hydrated Lime(30#/SY) 32 11 29 TN 369.93 $155.00 $57,339.15 3211.0400 Hydrated Lime(36#/SY) 32 11 29 TN 448.42 $155.00 $69,504.48 3211.0501 6"Lime Treatment 3211 29 SY 24,662 $2.40 $59 188.80 3211.0502 8"Lime Treatment 32 11 29 SY 24,912 $2.50 $62,280.00 32 33.0101 6"Conc Pvmt 32 13 13 SY 23 289 $32.60 $759,221.40 3213.0101 7.5"Conc Pvmt 32 13 13 SY 21 317 $38.10 $812,177.70 3213.0105 10"Conc Pvmt 32 13 13 SY 2,219 $63.50 $140,906.50 3213.0301 4"Conc Sidewalk 32 13 20 SY 3,883 $47.25 $183,477.00 3213.05D4 Barrier Free Ramp,Type M-2 32 13 20 EA 7 $1.950.00 $13 650.00 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 73 $1,350.00 $98 550.00 3213.0510 Barrier Free Ramp,Type C-3 32 13 20 EA 3 $2 000.DO $6 000.00 9999.0014 10"Colored/Stamped Conc Pvmt 32 13 13 SY 549 $156.50 $85 918.50 3217.0001 4"SLD Pvmt Marking HAS(W) 32 17 23 LF 751 $1.30 $.976.30 3217.0002 4"SLD Pvmt Marking HAS(Y) 32 17 23 LF 382 $1.30 $496.60 3217.0003 4"BRK Pvmt Marking HAS(W) 32 17 23 LF 106 $1.30 $137.80 3217.0201 8"SLD Pvmt Marking HAS(W) 32 17 23 LF 129 $3.50 $451.50 3217.0202 8"SLD Pvmt Marking HAS(Y) 32 17 23 LF 26 $3.50 $91.00 3137.0102 Large Stone Ri ra ,dry 31 37 00 SY 61 $75.00 $4,575.60 9999.0015 Pavement Header 00 00 00 LF 496 $10.00 $4 960.00 9999.0016 Construct Type III Barricade with Rip Rap 00 00 00 EA 13 $3 275.00 $42 575.00 9999.0017 Remove 3 Relocate Type III Barricade 3 Connect to Existing Pvmt 00 00 00 EA 3 $1 000.00 $3,000.00 3217.0401 18"SLD Pvmt Marking HAE(W) 32 17 23 LF 120 $11.50 $1 380.00 3217.0501 24"SLD Pvmt Marking HAE(W) 32 17 23 LF 750 $16.00 $12 000.00 3217.1006 Lane Legend Bike 32 17 23 EA 2 $475.00 $950.00 9999.0018 Fumish/Install Alum Sign Ground Mount City Std:Stop 00 00 DO EA 14 $95.00 $1 330.00 9999.0019 Fumish/Install Alum Sign Ground Mount City Std:Street Name Blade Pair 00 00 00 EA 15 $110.00 $1 650.00 9999.0020 Fumish/Install Alum Sign Ground Mount City Std.-W11-2 00 00 00 EA 11 $95,00 $1 045.00 9999.0021 Furnish/Install Alum Sign Ground Mount City Std-W16-7P 00 00 00 EA 8 $95.00 $760.00 9999.0022 Furnish/Install Alum Sign Ground Mount City Std-R1-2 00 00 DO EA 6 $95.00 $570.00 9999.0023 Furnish/Install Alum Sign Ground Mount City Std:R6-4 00 00 00 EA 3 $95.00 $285.00 9999.0024Fumish/Install Alum Sign Ground Mount City Std.-R3-17B 00 00 00 EA 1 $95.00 $95.00 9999,0025 Fumishl Install Alum Sign Ground Mount City Std:R5-1 B 00 00 DO EA 4 $95.00 $380.00 9999.0026 Furnish/Install Alum Sign Ground Mount City Std:R3-17 00 00 OD EA 4 $95.00 $380.00 9999.0027 Furnish/Install Alum Sign Ground Mount City Std:D1-11) 00 00 00 EA 3 $95.00 $285.00 9999.0028 Furnish/Install Alum Sign Ground Mount City Std-W2-6 00 00 00 EA 3 $95.00 $285.00 9999.0029 Furnish/Install Alum Sign Ground Mount City Std:D1-2 00 00 00 EA 3 $95.00 $285.00 9999.0030 Furnish/Install Alum Sign Ground Mount City Std.-W 16-9P 00 00 00 EA 2 $95.00 $190.00 3471.0001 Traffic Control 3471 13 MO 6 $2,50040 $15,000.00 9999.0031 SWPPP Maintenance 00 00 00 LS 1 $5,000.00 $5 000.00 TOTA T PAVING MPR VEM T $2,447,346.73 Ji f 1� ale R. iireath - President Giico Co tracting, Inc. 0o as 3-Ea P, one.l. SECTKM 00 42 43 of f da Deve"AWWW Proleft-PROPOSAL FORM Traits of Elizabeth Cheek-Phase R UMT PRICE BID Project Item h&msaon Bddda Propoal BMW Item No. De-7 0— specification 3achm No. Uait of ldeaatre Bid Qaaotity Uait Price Bid Vaku 2605.3015 r CONDT PVC SCH 80 05 33 LF 262% S37 M*73 3441.3301 lk n Faundabm TY 1 4120 EA 145.00 9999.0032 tWm. TY 11 00 00 EA 93309 9M.0033 1W. TY 11 DotMe LED Fbdure 00 00 00 EA 750.00 3441.3401 6-0 6 T Ahan Ekc Cortcka7or 34 4120 LF i15 825.30 3202 .12 Submitted by: R;lWrd war® Independent UtH4 Construction,Inc. v*443_asw.p.W_tf"... o co x m o LL � z Q W LL 00 N Q 000 04 ITI ~ L owZ U U� 3 E" w o � N t O C r -- O cj an m M o X Y R„ z-It ~ u 30 �Uo =W z ti oZ 3� 0 Q Z 2 6 �- CL WV Q � U)_ H 00 U C) 0- U QZ O U F— z UO W F- OU (ifO 30r8410W GOOC 'Nd LZ:4 6LOZ/0£/6 '6MP's4!4!4x3 V30 03CAZ 0604d 3301\s4!9!4x3 ZOi\ONr 00i\9000\GW—X1N\:S c) co x r o W N u N `D W 00 _0 Q o LL.CDO� W a r_f! �" x 4t � OwZ ww UU 3 U W F- V d U I-- F w o � w j ¢ z Zjz N IW- m W Z O N J J Q Lo D H Z J O W= ~ j = L N = W J UZ�(n > w Zv~ LL. Fw- FW- l+1 = F-DOj Z t z aJ m O '- — 3 0 3 (oU)o aQ � W � @ a 3 d QQ�a 0 o N O 0 cD cD *3�a w zz z = 0 0 0 '- � � u N a s ate. w w w z W Z W � Z FTF d• M QIt/U, w w 3^ 3 C ING C a /� z^ 0 U CO �n z 8• 8" WL6 au co J 8" WL6 W 3 \ ;D O y � V 3 3 O W a7 a 'moo L lM .8 z z �iy u !u �WIn JZ $ a W /v tea° IVr7 3 Z 3 W zz — — zz I Wh p03 I oO3 otW rim a z z U I U i !we440w 900p 'Wd ZZ:4 61OZ/0£/t '6MP'sl!Q!4x3 d30 0301\Z as04d 0301\iq!9!4x3 Z04\ONVI OOti\9000\ONVI-xLN\:S o cD m L o [ N LL W N cD � z LL N 00 00 � xo r z z / O W PZ-� F! / W GN U F cr "" U U� � zLLI a a z ZI U Co C / ^ U M N 3 so 3 z v La. • C o m m O 3 0 ) z o � o N z ta LAJ i N J? '� LL. v zovi E�--V w U~db L,1 � <t Lz-LN- v u) W LU LJ--IL o H m Z�z Q = zN o W �zW-cn z oJ3> 0 a= a W z 3 N O O m� WW Y z ' I 3Z a. �, p Wm 1 War I r 3 W !— U , 0 w Z H U d coL1J w > Q Z o� J J Q ofZ > Na zI-W�wro > = v � Q o 49 d W Li y�j�Nd w of > _ aaav z m 3 cQa LL O H Hi o I � � QQLJ � U^N*a' OQ (N fw V) O Z Z Z F3 O O O 000 �j ao O O O ~ N fn N_ p»> W of w of X X X O z d d d J W W W �- z O U iae4}on eoor 'rid £Z:* 6LOZ/0£/t '6Mp•s}!q!4x3 V30 030AZ e804d 0301\cl!q!4X3 Z04\ONVI 00*\9000\ONVI—XLN\:S O c0 x a 00 cli W L LI N �A 00 I Lon x � o . o w !- (n Q W Q+ C— Z >Q W � U � p w > d o- W3 W a � 3 E' w o r^ W N V } W � C � J Q 0 w J V ` L x Q Q ~ O O Z v 0 LL =1 0 07 m (oU)0 Z CD CD 0 Z (w (w Z_ Z0: 0 _ 3 N w 0_ 0_ H H Fes-- W (n (n 2 t o o 0_ N 0_ X X C0� O N 0_ D_ W W J U U 06 ~ ZIr Z� Z —��— U C xw3'�xj 3w Z tT Z w W W XXa z zcn W U Uco U� Oh Oh� Z� Z Oft O• 000 000 Ob° SS0 � w a �Nla�b7�l� w z )10 C 3 U U W W N O , pZ k X3Nn .9 w co Y O Nn 8 w mw i m m w Z Do 1-9410w a00r 'rid *Z:* 6LOZ/0£/* '6Mp•s}!gL4x3 y30 0301\Z es04d 0301\sl!q!4x3 Z04\ONtlI 004\9000\ONVI—X1N\:S N F O LL W W N � � z d � o�o LL N d oo WaoZW C) w • N owz w , z 0-4U 3 w z J2�" z a it • xx CL NC.) W CO) 111 o0 / O w O r W3 N � N O U co x N m 0 f • O J w Z v �i LL o CU J• f9 U 3 cooin0 N z �" CL w N w V a zco (n z per, Z X�Cz � WU �C,)Oo z � - z Ir U r < QQ o � � F- �c w Z o W m_ z z / _ w" WgNV c0co ao 0 1 z Q W M H uwj�� aaaU \� J2�" NOS jNd J^NNE W w � o»> U O r U W w z Z OD OD I p I Y , w w 3 w 3 ILdV' w / Of � F- I < � ao � z z F _ w U) m z z Df ) ) cD (D o o o z z V) 00 0o NL ~ of of x x 0_ 0_ W W J I-9410W a0op 'Wd 5Z:4 6LoZ/0£/4 'Bmp•sllq!4X3 Vd0 0=1C1\Z eso4d 0301\sl!q!4x3 Z04\ONVI oo*\9000\ONVI—X1N\:S VFo 00 x °° o non O ii I w N C Qcr00 CD II Nd00 w w � w w II I a oowa � a Z U W o J o a^ w0, www — M O 0 3W3 CD � o wN OQ = W v cc� UW w cO LLm J U)WoW 9 0 Zo o o ow P- aT cn LU CDcn QQQ w aoao aQau aw= Ln oQ oa oa o} o } ocu o-o o'o of o-m mom Wpr m 3 0N o �U) W Y W W V a ixW 10 l / 11 lI lI � 11 N / / I 2 Lj U � I — a. I ` _ o Ir N N W O � O I I � 1W041ory aoop 'Wd 9Z:* 61OZ/0£/* 'Bmp•sl!q!4x3 VJ3 0301\Z eso4d 0301\sq!q!4x3 Z04\ONY1 004\9000\ONVI—XLN\:S Z o x �~ 20 LO LO F O LL !7 W N Q o0 i a. o UWXU W W o_ a ULn ) Z - cwW 4 �_ _ cu XU to O W / a / Z F W o N C � C j x M T a a 4Cl H Z v v LL- W O � / o m m 30 ZI wY / cn�o N WOU / LJ �N� U) i ILL A sd o 1 w w II I z z to 3iVa= 3�.. 3�w w m NW 0 N -j 0 �N� O �Z0 �Z0 m IL �cL (3 WNW N � 0 a U 0 N�> OHIL wO OX�EL w N L�+ �NNa: Lu Z IL Om a-Om O>>> J Y I 3 3: / 1 � to W W x o a za :2 Mi°' II � 0 o ter. ^i _ o w r Lv � � �n w N fU I fD I� Q a0 I UOA J O� NQ NQ N� draw ao ao aQ w ci OQ OQ 0} p U (L x IL Of CL n 1-041on aoop 'Yid 9Z:4 6L0Z/0£/* '6Mp•84!q!4x3 Vd0 03oAz eso4d 0301\a4!q!4x3 Z04\aw 004\9000\aw—X1N\:S a / C) LL OC 00 \ \ d / 6 z \ 7 W � z z 2 X LU m C) w 9 1� t=w - \ n w m o 3c C, LL. LLJ w 0 -s w co CO 0 m xt IL W m w AM w �a \ 2 \ xt CD z LLJ le U) LLT in w z Z \ , C13 C-4 z \ \ LL; =I w w X 0 in z LLJ N, z C14 w z z m-C-4 w w z z to C-4 =1 w o 02 0 W C/) =1 w 't fcx) o x 0 3c C,4 C) U) cn . o a C14 =1 w 02 IL Nn O'k&.L) z Z IL o C14 Li z C14 IL 1-041OP4 ter ' 6Z:* 6LOZ/02/t lbmp,rllql4x3 VAO 030AZ 08-4d 33EI—\qlq!4x3 ZO*\GNVI 00*\9000\ONY1—Xl.N\:S o_ 'D ti m E" o w W N � QLLJW O LL Q CD Z Ll0 � Q � Q o m P" LLI Z J Z Z W O 04 u j 3 m wz J O � U C' a z I— a a CO J _j o- o O 0 LO c C 0- w z ` U 4 CD N J � x N ? OP -o F M N Z LL o a� C.W W W C9 0 m O O O Z 3 8UNA Q_ 0_ cL F O O O m M w w W X _ U V) U wT w a � Tl i I�� r � �W L� -" a Z � z 0 �U 6 — J C RI G ICR SS RO 7� al _ U S 1 8'X4' J ? L as N o o saa ,sX L Las N i�. CY ti z c� wo oe m LU 3pya NO � 1S ' a z Zuaa 14n�a w w os a 0 ,sX£ gas IL m S z "� ww 71 w x — - _N tea$ ell20 O I 2 _O !-e410w GODr 'Wd 0£:4 61OZ/0£/i '6MP'63!9!4x3 V30 03C1\Z eso4d 030LL\iq!9!4x3 Z04\ONVI 00*\9000\ONVI—XLN\:S o 'D x C 00 CD w W tV LL v w Q Q o0 c U Q m .WaO a Z o m OwZ Zw � J z = rnW0. di LLI 0z � Z O w Q U N N F�M d LLJ it O Co O J Z ^ U ca x Y Z 5oF M o L- U w w W U, < o 0 0 0 0 z 3 o N W O O O X W Z � / L0-a 0 / N I �lss l X It I J2 SDI tp J!6' w 6 G,2s w / U W� / W M W=j / 50O I I ate` 0 IL LLJ 0)x n / xxO G N N U U / Boa ,£X,9 9GS U) N WU WAN in H On U a..a..dU W^�Nd J � W,,, O»> O 1-941014 s00p 'Wd L£:4 61OZ/02/* '6MP'el!q!4x3 d30 0301\Z aso4d 0301\Gq!9!4x3 Z04\ONdl 004\9000\OMd7—X1N\:S o co x N LL W p v CD NiQ00 0 ►.axO a WA, � owz � N W 0 � Lc., C � N x L CD z- u LL 3 CDO N [9 ._a � � i S�o 4p t Y h w cc (L a W le _ L11 • !n O N 9 N CoL1J Q � Q Z �0 Z o p m z 0 O LU J'2 U) x u� N }A3 0 � N ry z w Z z Lit Z J Lit 0 Z-' J 0 Q O O J Q j Z g O 0 O O O Z 0_ 0_ 0_ F- O O O N 0_ 0_ 0_ X 0_ 0_ 0_ W !-e4}on eoop IQ ZVi 6LOZ/0£/4 '6MP'sl!9!4x3 Vd0 0301\Z 0e1)4d 0301\s}!9!4X3 Z04\ONVI 00i\9000\ONVI-X1N\'-S O CO m ti O W N lL I N O J Z `� 000 0 ,1- Q 1 U U S 0 a N W a, o w °Q Owz w z I o X tnwUd CD o z z H W V 5 3 W (n J w N a x w !- w E- w N 62 w ro w o ti V) pr- •• v m p N L y N L� o V) o O z v y LL- 0 V) N 4 o ro O _ � Cr X :2 0 W _j W 2 Y N W W d' U W TF IL wa LL LL/ YW W ce- U � / m \a� w w `S' 3 J 0 = W 3 NoLsr)3 O� Y W U as Nn�� a Ir W W O I 4 1-0440!4 030r 'Wd W4 61OZ/0£/t '6Mp•s}!q!4x3 V33 330AZ es04d 3301\s4!q!4x3 Z04\ONVI 00i\9000\ONVI—XLN\:S o co F N LL Qo�o 't LL Oc LLI� a wLJ 4-4 7 � aL) 3 a "LI N J O� cu L X VP 0�� Z V , LL �0 3iso 0 cn o N W 2 N 1 of n (n _ W / -' C� U ! " cn (n F- U O 0: Y 0 �' m N a W F- W !�"%w w 0!— W 0 X2 WU U DU S Z W n SSSQ a W=j �W Z ' J o Itlp I � I � 1 � Y 1 � 0 W z 2 z W�N�t J ~ U W r W H Ld ad(LU W O p �m 'o O V) LL -NNE V) (D O Z o»> O V ~ O X � W J !we4;or! soop 'Wd M* 61OZ/0£/i '6Mp•s}!q!4x3 d30 0301\Z e604d 0301\e4!q!4X3 Z04\ONYI OOti\9000\aW—XLN\,.S o co L� 5%r- w I r N 2 U N CA o°Oo i L) axo c V) Z J W �- 2 w W W OWZ CD w o WX v� Wa T w N Z H a U 3 U y _I C9 -Wi a c5 Z O w o Z (N d ti V)CD p corH O Za� c y N Z N LL. CD Q X of - U)W 0_ J _ . o Y W W U W N T FT TT a� ° ssoao o� 0 �d a y 3 LU NO1sn3 O Y v w m tea° NndVFI� 0 I iwe4iom eoop 'Wd W4 6LOZ/08/ti '6MP'6l!Q!4X3 d30 0301\Z eso4d 0301\Iq!Q!4X3 Z04\ONVI 00*\9000\ONbI—X1N\-S o co 10 N 00 LL 00 LL Y N Q oa wLd axo VUS 3 W N U) a 9 o LLI (a N r 2 •� L) cu O L X CV J� VOJ� z v 3 F- U- co o u 3� �=— o � � N Li 1 � CO ~ - J 2 U N H � J LLIw 0�- WX LL, � W U) ULf) WM O MW Wj C40. 4 J'Mew 90 W V I I J LLJ 1 I Y � I I !- I Z J !— I W w U w W ILf V) W�N7 J W U J r W U dd4U 0 Z O U . . .6 Z 0 �� to 04 N c� w o z V) != o_ g»> O ~ X w W 0- J !ous44Ory 000r 'Wd 9£4 6LOZ/OS/4 '6MP's}!9!4x3 Vd0 030AZ Sso4d 0301\sq!9!4x3 Z04\ONVI 004\9000\ONVI—X1N\:S