HomeMy WebLinkAboutContract 36063 COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TA NT § Contract No.3jlb�)
WHEREAS, FS RP 600 DFW, L.P., hereinafter called "Developer", desires to
make certain improvements to Riverpark Meeker Addition, Curb Inlet Relocation,
Building 600, an addition to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called "City", to do
certain work in connection with said improvements.
NOW, THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
r
of financial security prior to project completion and acceptance by the
City.
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 1A
Policy.
1
F. T e contracts for the construction of the public infrastructure shall be
administered in conformance with paragraph 8, Section II, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fart Worth, its ofEicers, servants, or employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
2
construct current and future improvements provided for in this
i
agreement.
M. D veloper agrees to construct proposed improvements as shown on the
ex ibits attached hereto. The following exhibits are made a part
hereof. Water (A)None; Sewer (A-1) None; Paving (B)None; Storm
Drain(B-1) Attached; Street Lights and Signs (C)None..
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
II. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B 1.
B. As shown below in the "Summary of Cost for Street and Storm Drain
Facilities", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B 1.
The estimated total cost of current improvements and related support
services specified in this agreement, including design, construction and
inspection is estimated to $ 20,711.34
3
SUMMARY OF COST
RIVERPARK BLDG 600
Item Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $0.00 $ -
2. Storm Drainage $19,539.00 $ 19,539.00
3. Street Lights $0.00 $ -
4. Street Name Signs $0.00 $B. Engineering Design $ -
C. Construction Engineering
and Management by DOE (4%) $ 781.56 $ 781.56
D. Materials Testing by DOE (2%) $ 390.78 $ 390.78
TOTALS $ 20,711.34 $ - $ 20,711.34
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
4
RECEDED
AUG 17
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, rth the corporate seal of the City affixed, an said D�qvell per h s
executed this instrumnt in triplicate, at Fort Worth,Texas this the5May of,
2007.
Approval Recommended:
Transportation and Public Works
Department
Robert Goode, P. E.
Director
City of h
Marc Ott Assistant City Manager
ATTEST:
Marty Hendrix
City Secretary
Approv to Form:
A tant ty ttorney
ATTEST: DEVELOPER
By: ..
ecretary I
Corporatf�i
PART B—PROPOSAL
DEVELOPER AWARDED CONTRACTS
This proposal must not be removed from this book of Contract Documents.
TO: Seefried Properties
PROPOSAL FOR: PROJECT NAME Riverpark Meeker Addition, Curb Inlet
Relocation, Building 600
FILE NO. SD-0177
Includes the furnishing of all materials, except materials specified to be furnished by the
City, equipment and labor for the installation of(description of project) and all necessary
appurtenances and incidental work to provide a complete and serviceable project
designated as:
Riverpark Meeker Addition, Curb Inlet Relocation, Building 600
Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly
examined the Contract Documents, including plans, special contract documents, the
General Contract Documents and General Specifications for Water Department Projects,
the General Contract Documents and General specifications for Transportation and Public
works Projects, the site of the project and understanding the amount of work to be done,
and the prevailing conditions, hereby proposes to do all the work, furnish all labor,
equipment and material except as specified to be furnished by the City, which is
necessary to fully complete the work as provided in the Plans and Contract Documents
and subject to the inspection and approval of the Director of the Department of
Engineering of the City of Fort Worth, Texas; and binds himself upon acceptance of this
Proposal to execute a contract and furnish an approved Performance Bond, Payment
Bond, Maintenance Bond, and such other bonds, if any, as may be required by the
Contract Documents for the performing and completing of the said work. Contractor
proposes to do the work within the time stated and for the following sums:
B-1
UNIT III: STORM DRAIN
ITEM APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
NO. QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
(Furnish and install, including all appurtenant work, complete in place,the following
items)
Item Approx. Unit Item Description Unit Price Total
No. Quantity Measurement "D" Item reference Amount
1. 1 EA 10' Concrete Curb Inlet $ 3S. $ 1 3S.s=
2. 310 SF Remove and Replace 6" $ $
Reinforced Concrete
Driveway per City of Fort
Worth Standards
3. 37 LF Concrete Curb and Gutter $ �a $
4. 900 SF 8"Reinforced Concrete $ q. $ $, (DD
Pavement Repair,per City
of Fort Worth Standards
5. 1 EA Removal and Disposal of $ �K $ •
Existing 10' Curb Inlet
6. 5 LF Removal and Disposal of $ 0' $ 5fl-
21" Storm Drain
7. 38 LF Trench Safety $ 15 $ •
8. 1 LS Traffic Control $ ,l00`1 $ a,
q DJ
TOTAL AMOUNT BID STORM DRAIN $
GRAND TOTAL AMOUNT BID $ S 3q
B-2
PART B - PROPOSAL (Cont.)
After acceptance of this Proposal, the undersigned will execute the formal contract and
will deliver an approved Surety Bond and such other bonds as required by the Contract
Documents, for the faithful performance of the Contract. The attached bid security, if
required is to become the property of the Developer.
The undersigned bidder certified that he has obtained at least one set of the General
Contract Documents and General Specifications for Water Department Projects dated
January 1, 1978, and that he has read and thoroughly understands all the requirements and
conditions of those General Documents and the specific Contract Documents and
appurtenant plans.
The successful bidder shall be required to perform the work in accord with the
following publications, both of which are incorporated herein and made a part
hereof for all purposes:
1. The General Contract Documents and General Specifications for
Water Department Projects dated January 1, 1978, which may be purchased
from the Water Department.
2. The Standard Specifications for Street and Storm Drain Construction
which may be purchased from the Department of Transportation & Public
Works.
The undersigned assures that its employees and applicants for employment and those of
any labor organization, subcontractors, or employment agency in either famishing or
referring employee applicants to the undersigned are not discriminated against as
prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No.
7400.
The Bidder agrees to begin construction within )p calendar days after issue of the work
order, and to complete the contract within 110 working days after beginning construction
as set forth in the written work order to be furnished by the Owner.
(Complete A or B below, as applicable:)
A. The principal place of business of our company is in the State of
Nonresident bidders in the State of ,our principal
place of business, are required to be percent lower than resident bidders
by state law. A copy of the statute is attached.
Non resident bidders in the State of ,our principal
B-3
place of business, are not required to underbid resident bidders.
�B. The principal place of business of our company or our parent company or
majority owner is in the State of Texas.
B-4
I(we) acknowledge receipt of the following addenda to the plans and specifications, all of
the provisions and requirements of which have been taken into consideration on
preparation of the foregoing bid:
Addendum No. 1 (Initials) Addendum No. 3 (Initials)
Addendum No. 2 (Initials) Addendum No. 4 (Initials)
Respectfully submitted,
By:
Don c, e-
Title `
Address
Telephone: L qd SI " -zye�
(Seal)
Date:
B-5
RECEIVED
FUMAL FLAT
LOTS 2C=Rl, 2CmR2,
39 49 & 5, BLOCK I
& LOT 3, BLOCK 2
MEEKER ADDITION
AND BEING A REPLAT OF
LOT 2C, BLOCK 1 , MEEKER ADDITION
AN ADDITION TO THE CITY OF FORT WORTH, TEXAS
AND BEING OUT OF THE
L.D. BURNETT SURVEY, ABSTRACT NO. 177,
P.R. SPLANE SURVEY, ABSTRACT NO. 1454,
AND JOHN CHILDRESS SURVEY, ABSTRACT NO. 268,
TARRANT COUNTY, TEXAS
CASE NO.: FP-005- 124
(6 INDUSTRIAL LOTS 162. 142 ACRES)
Pacheco Koch Consulting Engineers
8350 N. CENTRAL EXPWY. SUITE 1000 DALLAS, TX. 75206 972.235.3031
DRA WN B Y CHECKED B Y SCALE DA TE JOB NUMBER
MWW CJE/NK 1"=200' DEC. 2005 2507-04.128
REMOVE 38 LFt EXISTING CONCRETE CURB AND GUTTER ( n4ZD
REMOVE EXISTING CONCRETE TO CENTERLINE OF DRIVEWAY I TC 425.65 a
INSTALL 310 SF 6" REINFORCED CONCRETE DRIVEWAY
PER CITY OF FORT WORTH STANDARDS
CONNECT TO EXISTING DRIVEWAY
INSTALL 37 LF CONCRETE CURB AND GUTTER PER CITY EXISTING CONCRETE DRIVEWAY —
OF FORTH WORTH STANDARDS CONSTRUCTED 2007
CONNECT TO EXISTING CURB AND GUTTER `8150 PART OF RIVERPARK MEEKER TC 19,D
IC 49175 ADDITION BUILDING 600 9 49 65
"mN9•Y MIET
_"T-48171 ♦ }]] 3
FL 36-Bt TC 194.DD TC 4 D
to' UTILITY EASEMENT
I
—(CAB A. SLIDE 10734� c /azw s
"Seto PRIVATE
C 492.9 CU9B WET
1
�nPuffac
F�• �q TC 492. N .'INLET TC-192.57
Y' 9/� 4G 9 4 F4
D u TC 492
FIRE HYDRANT ASSEMBLY
E STM9 STO wN
HIGH RIVER ROAD rLWW6 RELOCATED AS PART OF
R 76 RIVERPARK MEEKER ADDITION N
49 + �i 4011e4'e 41°� BUILDING 600 CONSTRUCTION W
.0 1547
PROPOSED 8" REINFORCED CONCRETE STREET CONTRACTOR TO REMOVE CONCRETE PAVEMENT AS REQUIRED TO REMOVE EXISTING
REPLACEMENT CURB INLET SAG. REPLACE TO THE GRADES INDICATED AND AS REQUIRED BY
PROPOSED 6' REINFORCED CONCRETE CITY OF FORT WORTH STANDARDS. CONTRACTOR TO REMOVE AND REPLACE
o DRIVEWAY EXISTING CONCRETE PAVEMENT BETWEEN EXISTING JOINTS. 8" REINFORCED
o CONCRETE PAVEMENT TO BE REPLACED PER CITY OF FORT WORTH DETAILS.
z
a NOTES
< 1. REFER TO CITY OF FORT WORTH TRANSPORTATION AND PUBLIC WORKS
9 TYPICAL STREET CONSTRUCTION DETAILS.
PAVING
U
n
n
�0
Q O
M �
M O
N
DOE NO. 5640
n 3
0
CURB INLET
RELOCATION
N mmillmPacheco Koch Consulting Engineers BUILDING soo
N 8350 N. CENTRAL EXPWY. SUITE 1000 DALLAS. TX. 75206 972.235.3031 RNERPARK MEEKER ADDITION
z �
0 3 DRAWN BY CHECKED BY SCALE DATE JOB NUMBER FORT WORTH
o% JCL JCL NTS MAY 2007 2507-06.177 TARRANT COUNTY, TEXAS
DWG FILE: 2507-06.177CV2—CFA—GANDD.DWG
I
INSTALL: —
1 — STANDARD 10' CURB INLET
CONTRACTOR TO INSTALL INLET PER CITY OF FORTH WORTH DETAIL
CONNECT EXISTING 36" STORM DRAIN TO 10' CURB INLET PER CITY
OF FORT WORTH DETAIL AND SPECIFICATIONS I
CONSTRUCT CURB INLET DEPRESSION AS REQUIRED BY CITY
OF FORT WORTH STANDARDS
SEE EXHIBITS B—IA AND B—IB --
TC=492-50
G=492.00
FL IN=480-5 t
FL OUT=480.3 t
MR08i.89.): Ensnxc f){
R 36-81.5! 'Y-ET
10'UTILITY EASEMENT � � sam u•Aa
(CAB A, AIDE 10734) 7 _
`CM9.1ET PRIVATE
" EnSTMG STORM — FIRE HYDRANT ASSEMBLY
CONTRACTOR TO TAKE NECESSARY M-4926 EXISTING RELOCATED AS PART OF
PRECAUTIONS TO PROTECT F1 M N-n.3I
`DOE/BB 4)s,}s CASTIxG)t-F� EDGE OF RIVERPARK MEEKER ADDITION
Ensnxc.6-s)o"M oaNN XISTING 12" WATER LINE 1 a) BUILDING 600 CONSTRUCTION
DOES DURINr CON 4 NN
16') REMOVE EXISTING 10 CURB INLET •�16a)
HIGH RIVER ROAD EnS,MGJB 6,q"�"" _
o j a8a6
•0 i6a) REMOVE EXISTING 21" STORM DRAT SEE DEMOLITION PLAN THI H T
u
3
g DRAINAGE
z
a
a
y
N
U
U
r`
r`
Qo
n o
N
DOENO,5640
00
n 3
CURB INLET
RELOCATION
Ln Pacheco Koch Consulting Engineers BUILDING 600
N 8350 N. CENTRAL EXPWY. SUITE 1000 DALLAS. TX. 75206 972.235.3031 RNERPARK MEEKER ADDITION
z
FORT WORTH
0 3 DRAWN BY CHECKED BY SCALE DATE JOB NUMBER
o% JCL JCL NTS MAY 2007 2507-06.177 TARRANT COUNTY, TEXAS
DWG FILE: 2507-06.177CV2—CFA—GANDD.DWG
EW LI LI O B O T B Qa
II
RIM EL= 492.50
INSTALL STD. 10' CURB INLET PER
CITY OF FORT WORTH STANDARD
S-SD2. PROVIDE MH STEPS PER
CITY OF FORT WORTH STANDARD
S-SD9.
CONNECT TO INLET CONNECT TO INLET
GROUT OPENING AND PROVIDE GROUT OPENING AND PROVIDE
WATERTIGHT SEAL PER CITY OF WATERTIGHT SEAL PER CITY OF
FORT WORTH SPECIFICATIONS FORT WORTH SPECIFICATIONS
0100= 35.14 cfs EX. 36" ® 0100= 32.43 cfs
EX. 36' ® �— V100= 4,59 fps
V?00= 4.97 fps �4.2Nt 4.2%t V'/2G= 0.33
V/2G= 0.38 n= 0.013
n= .013
Sf= .00278 Sf= .00236
FL IN = 480.5t
FL OUT = 480.3t GROUT INVERT CHANNEL
aI
CURB INLET DETAIL
OT TO SCALE
U
3
0
0
z
z
a
9
a
Ll
N
U
n
n
0
Q O
no
N
DOE NO.5640
00
0 0
CURB INLET
00
01
RELOCATION
Pacheco Koch Consulting Engineers BUILDING 600
N 8350 N. CENTRAL EXPWY. SUITE 1000 DALLAS. TX. 75206 972.235.3031 RIVERPARK MEEKER ADDITION
z ,
0 o DRAWN 8Y I CHECKED 8Y SCALE DATE ✓OB NUMBER FORT WORTH
o JCL JCL NTS MAY 2007 2507-06.177 TARRANT COUNTY, TEXAS
DWG FILE: 2507-06.177CV2-CFA-GANDD.DWG
1
(�MM
3
0
,4
,moo
^`O
REMOVE EXISTING 36"
STORM DRAIN AS REQUIRED EXISTING 21" STORM DRAIN
TO BE REMOVED.
TO INSTALL CURB INLET. 14,,j 0 EXISTING 10' CURB INLET
TO BE REMOVED.
PROPOSED
10' CURB INLET
L- - - - - - - - - - - - - - - -J
REMOVE 38 LFt EXISTING CONCRETE CURB
AND GUTTER
REMOVE EXISTING CONCRETE PAVING AS
REQUIRED
HIGH RIVER ROAD
DEMOLITION PLAN
NOT TO SCALE
0
0
0
Z
y
N
1
U
n
_n
1 0
Qo
n I
n o
e6
N
DOENO.5640
n 3
00
CURB INLET
00
RELOCATION
Pacheco Koch Consulting Engineers BUILDING 600
8350 N. CENTRAL EXPWY. SVITE 1000 DALLAS. TX. 75206 972.235.3031 RIVERPARK MEEKER ADDITION
Z 1
0 3 DRAWN BY I CHECKED BY SCALE DATE JOB NUMBER FORT WORTH
o� JCL JCL NTS MAY 2007 1 2507-06.177 TARRANT COUNTY, TEXAS
DWG FILE: 2507-06.177CV2-CFA-GANDD.DWG