HomeMy WebLinkAboutContract 36083 COMMUNITY FACILITIES AGREEMENT
THE STATE OF XAS § City Secretary
COUNTY OFT T § Contract No.
WHEREA ,OF
Worth Country Day School, hereinafter called "Developer",
desires to make certain improvements to Fort Worth Country Day School, an addition
to the City of Fort Worth, Texas; and
WHEREAS, the said Developer has requested the City of Fort Worth, a municipal
corporation of Tarrant, Denton and Wise Counties, Texas, hereinafter called"City", to do
certain work in connection with said improvements.
NOW,THEREFORE, KNOW ALL BY THESE PRESENTS:
For and in consideration of the covenants and conditions contained herein, the City and
the Developer do hereby agree as follows:
I. General Requirements
A. The Policy for the Installation of Community Facilities ("Policy")
dated March 2001, approved by the City Council of the City of Fort
Worth and subsequently amended, is hereby incorporated into this
Community Facilities Agreement as if copied herein verbatim.
Developer agrees to comply with all provisions of said Policy in the
performance of its duties and obligations hereunder.
B. The requirements of the Policy shall govern this Community Facilities
Agreement, provided, however, that any conflict between the terms of
this Community Facilities Agreement and the Policy shall be resolved
in favor of this Agreement.
C. Developer shall provide financial security in conformance with
paragraph 6, Section II, of the Policy.
D. Developer acknowledges that there shall be no reduction in the amount
of financial security prior to project completion and acceptance by the
City.
Fort Worth Country Day School 1 .__.��
CFA 2007073
071107 �'�vL�;o�`�
E. The Developer shall award all contracts for the construction of
community facilities in accordance with Section II, paragraph 7 of the
olicy.
F. a contracts for the construction of the public infrastructure shall be
dministered in conformance with paragraph 8, Section 11, of the
Policy.
G. The Developer further covenants and agrees to, and by these presents
does hereby, fully indemnify, hold harmless and defend the City, its
officers, agents and employees from all suits, actions or claims of any
character, whether real or asserted, brought for or on account of any
injuries or damages sustained by any persons (including death) or to
any property, resulting from or in connection with the construction,
design, performance or completion of any work to be performed by
said Developer, his contractors, subcontractors, officers, agents or
employees, or in consequence of any failure to properly safeguard the
work, or on account of any act, intentional or otherwise, neglect or
misconduct of said DEVELOPER, his contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or
damages are caused, in whole or in part, by the alleged negligence of
the City of Fort Worth, its officers, servants, or employees.
H. Developer shall install or adjust all of the required utilities to serve the
development or to construct the improvements required herein.
I. In the event that City participation exceeds $25,000, Developer agrees
that no street construction or storm drainage will begin prior to City
Council approval of this Community Facilities Agreement. (Article
104.100, Ordinance 7234).
J. Developer agrees that no lot shall be occupied under a certificate of
occupancy until the improvements required herein have been
constructed (Article 104.100, Ordinance 7234).
Fort Worth Country Day School 2
CFA 2007073
071107
K. Developer hereby releases and agrees to indemnify and hold the City
harmless for any inadequacies in the preliminary plans, specifications
and cost estimates supplied by the Developer for this contract.
L. Developer agrees to provide, at its expense, all necessary rights of way
and easements across property owned by Developer required to
construct current and future improvements provided for in this
agreement.
M. Developer agrees to construct proposed improvements as shown on the
exhibits attached hereto. The following exhibits are made a part
hereof: Water (A)None; Sewer (A-1) None; Paving (B)None Storm
Drain (B-1)Attached; Street Lights and Signs (C) None..
N. City shall not be responsible for any costs that may be incurred by
Developer in the relocation of any utilities that are or may be in
conflict with any of the community facilities to be installed hereunder.
H. Street and Storm Drain Facilities
A. The Developer(s) agree to install or to cause to have installed, the street,
storm drainage, street lighting, street name sign and other community
facilities improvements shown as "current improvements" on the attached
Exhibits B 1.
B. As s own below in the "Summary of Cost for Street and Storm Drain
Fac' ies", the Developer shall fund its share of "current improvements"
and shall pay to the City for its share of the cost of street, storm drainage,
street lighting, street name signs as shown on the attached Exhibits B 1.
The estimated total cost of current improvements and related support
services specified in this agreement, including design, construction and
inspection is estimated to $ 98,580.00.
Fort Worth Country Day School 3
CFA 2007073
07 11 07
SUMMARY OF COST
FORT WORTH COUNTRY DAY
SCHOOL
/tern Developer City Cost Total Cost
Cost
A. Construction $ -
1. Streets $0.00 $
2. Storm Drainage $93,000.00 $ 93,000.00
3. Street Lights (4%) $0.00 $
4. Street Name Signs $0.00 $
B. Engineering Design $
C. Construction Engineering
and Management by DOE (4%) $ 3,720.00 $ 3,720.00
D. Materials Testing by DOE (2%) $ 1,860.00 $ 1,860.00
TOTALS $ 98,580.00 $ - $ 98,580.00
Notes:
1. All Preliminary Plats filed after July 2000 will require sidewalks on all streets.
2. Developer's column for Item C represents four percent (4%) cost for construction
inspection fees. The City will pay additional inspection fee over 4%.
3. City not preparing plans and specifications.
4. Developer's column for Item D represents two percent (2%) of paving and storm drain
costs for materials testing.
Fort Worth Country Day School 4
CFA 2007073
071107
IN TESTIMONY WHEREOF, the City of Fort Worth has caused this instrument to be
executed in triplicate in its name and on its behalf by its Assistant City Manager, attested by
its City Secretary, with the corporate seal of the City affixed, and said Dev loper as
executed this instrument in triplicate,at Fort Worth,Texas this the day of
92007.
Approval Recommended:
Transportation and Public Works
Department
Robert Goode, P. E.
Director
City of rt
Marc Ott
NO M C REQUIRED Assistant City Manager
ATTEST:
'4Z�'
0
Marty Hen
City Secretary
Appr e as to
9
Assistantp Atllrney
ATTEST: DEVELOPER
By. U
Corpor Secretary ��. 01P cTJf CP
IVECEIVED
Fort Worth Country Day School 5 5 2G
^' ----,� .
,. �rJ7 r
CFA 2007073
07 11 07 ���
i
CFA Cost EstimateAs Baird, Hampton Brown, Inc. 8✓10/2007
6300 Rldglea Place,Ste 700,
Fort Worth,Tx 76116
Tel 3W-1277,Fax 33&9245
COST ESTIMATE
Public Drainage Improvements
Country Day School Dining Hall
Fort Worth,Texas
ITEM DESCRIPTION QUANTITY I UNIT UNIT PRICE TOTAL
Demolish/Remove Existing Box Culvert&
1 Headwalls 1 LS $5,000.00 $5,000.00
2 Excavation and Backfill 1 LS $10,000.00 $10,000.00
3 4'x7' Box Culvert 235 LF $275.00 $64,625.00
4 4' Headwalls 2 Ea $2,000.00 $4,000.00
5 Grouted Rock Riprap 200 SF $5.00 $1,000.00
Sub-Total $84,625.00
Contingency 10% $8,375.00
Total Construction Cost $93,000.00
4% Inspection Fee Separate Check to City $3,720.00
2%Testing Fee Separate Check to City $1,860.00
Total $98,580.00
2 of 2
III STREETLIGHTS
I. STREETLIGHTS COST ESTIMATE:
QUANTITY UNIT COST TOTAL COST
INTERSECTIONS 0 EA $ 2,600 $00,000.00
MID-BLOCK RESIDENTIAL 0 EA $ 2,600 $00,000.00
CHANGE OF DIRECTION RESIDENTIAL 0 EA $ 2,600 $00,000.00
MID-BLOCK COLLECTOR 0 EA $ 2,600 $00,000.00
MID-BLOCK ARTERIAL 0 EA $ 3,200 $00,000.00
MID-BLOCK ARTERIAL MEDIAN 0 EA $ 3,200 $00,000.00
RELOCATE EXISTING LIGHT 0 EA $ 1,650 $00,000.00
Subtotal $00,000.00
City's Cost $00,000.00
Developer's Subtotal $00,000.00
4% Inspection fee $0,000.00
Project Total $00,000.00
Adjacent Developer's Cost $00.000.00
Developer's Cost $0,000.00
DEVELOPERS COST: $0.00
CFA CODE # 2007073
Fort Worth Country Day School
Fort Worth,Texas July 11, 2007
PAGE 1 OF EXHIBIT "C"
II. STREETLIGHTS WORK DESCRIPTION:
1. The Developer shall provide for the installation of streetlights at the approximate locations
shown in exhibit "C", immediately after final acceptance of the street construction, in
accordance with engineering plans and specifications approved by the Transportation and
Public Works Department.
2. Streetlights on residential and/or collector streets can be installed using overhead or
underground conductors with the approval of the director of transportation and Public
Works.
3. The City of Fort Worth will install all the streetlights that use overhead or underground
conductors on residential, and collector streets. The developer agrees to pay the City of
Fort Worth the amount shown below prior to the City starting its design efforts, at the option
of the developer and at their expense they may purchase the poles, fixtures, and mast arms
from the City in order to assure compliance with city material standards
4. Street lights on arterial streets shall be installed with underground conductors
5. The developer agrees to dedicate all easements required for the installation and
maintenance of the street lights and to provide for the installation of any electrical
transformers required for the proper operations of the street light system
6. The estimated cost of this streetlight installation is detailed on page (1) of exhibit "C" and is
summarized below. The streetlights will remain the property of, and will be maintained by
the City of Fort Worth.
DEVELOPERS COST: $0.00
July 11, 2007
CFA CODE # 2007073
Fort Worth Country Day School
PAGE 2 OF EXHIBIT "C"
III. STREETLIGHTS LOCATIONS:
CFA CODE # 2007073
Fort Worth Country Day School
PACE 3 OF EXHIBIT "C"
Iv
STREET NAME SIGNS
1. The City of Fort Worth will install the street name signs upon final
approval of the street construction. The street name signs will remain
the property of, and will be maintained by, the City of Fort Worth.
2. The Developer will pay for the street name sign installations required
for this development to the extent of$245.00 per intersection. This
unit cost will be revised annually by the Department of Transportation
and Public Works to reflect prevailing costs of materials and labor.
3. This development creates the following zero (0) intersections at a cost
to the Developer of$0.00:
(No new intersections)
Fort Worth Country Day School
CFA code: 2007073 July 11, 2007
< COMO
0 MAN ATTEN CF ARIO
BRA TS ,? SHII.OH
SUMAC Z
VALLEY
IDGLEA VIEW
R S 910
w
Q
w
Z �A RJ R
V)
e-
�
z I-A N 0 P
m 'f'
v
PROJECTS °G� y VIEW
LOCATION Z �'ti°F RUN
eC��'RF z z �R�R'� p
a
TFR Woo a
RF�KE <9c0 K RYgNT m
E ON Y N Dq rST SpN fR, Q � p i
U y� cr
BURRY Co LEGENDS J y
sv V'Ly=
� �?O � h 3 w 18 � °L��T
Ld
m
m OJ o0
�O OS AN 2
DWAR m 46 P�PZP
Sp
�Ty
820 20 �Fsr
RK
cn LPNP
�o Pb w Q
Ir
0 6 �0 w
a o z
LD w �OG�
o = �. LAS EN
z F
m oz LEDGE PARTR G KEN AY
DRAWN BY: AB
gogiro 8 , HOWON BroWn. InC. COUNTRY DAY SCHOOL DINING HALL CHECKED BY: BB
0 e Enginorin9 & Surveying BHB PROJECT: 2006.177.001
aw erg rsa es w�ti ava■pax umr was
LOCATION MAP DATE: June, 2007
I
I 1 Ilan
II {
� 1 � 1 •
I owl
SCale: 1" = 50'
s,-
•
�\\ op�=—
1
PROP. 47' I
BOX CULVERT
_-- ---------------- l s a
———— 1
EXISTING 3'x6'
BOX CULVERT
L---
° .
L--J
°
° r
I
\ { { °I 'L II I
DRAWN BY: AB
n p gdrd, }gyp & &M, IN, COUNTRY DAY SCHOOL DINING HALL CHECKED BY: BB
D
�ti ibq b.7R R 6ELRn IIg WiInM Uel BHB PROJECT: 2006.177.001
" & Surveying N�1�11'YdY
STORM DRAIN CULVERT RELOCATION E)UMIT IDATE: dune, 2007
l-) I