Loading...
HomeMy WebLinkAboutContract 51135-A1 %OFU� CITY SECRETARY � T , 5113 5-/ I �Q AMENDMENT No.1 C�sFc��s 9� TO CITY SECRETARY CONTRACT No. 51135 WHEREAS, the City of Fort Worth (CITY) and Stream Water Group, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 51135, (the CONTRACT) which was authorized by M&C C-28704 on the 5th day of June, 2018 in the amount of $ 123 , 073 . 00; and WHEREAS, the CONTRACT involves engineering services for the following project: Loving Avenue Culvert and Channel improvements; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated July 4, 2019, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $38, 593. (See Attached Funding Breakdown Sheet, Page -3-) 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $161, 666. 00. 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: p A ���p City of Fort Worth Lovi FJK Ef WMt4X vements Professional Services Agreement Amendment Template CITY SECRETARY 00621 CFW Official Release 9/19/2017 Page 1 of 3 FT. WORTH,TX City of Fort Worth ENGINEER Stream Water up, Inc. Dana Burghdofi Shamsul Arefi , PE, CFM Interim Assi-stant City Manager President DATE: I �--1 1 DATE: APPROVAL RECOMMENDED: 4. eve Co Interim Director, Transportation and Public Works Department Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements . C Mik Be ett Pr 'ect Manager APPROVED AS TO FORM AND LEGALITY: M&C: 414 Date: Douglas W. �Black Assistant City Attorney ATTEST: � Mar J. EYserV p,. City Secretary r City of Fort Worth Loving Ave C iOfiFLMs Professional Services Agreement Amendment Template ��������.rA„pQ6 6 CFW Official Release 9/19/2017 �((''1� Page 2 of 3 �'r 9v�®R��r . FUNDING BREAKDOWN SHEET City Secretary No. 51135 Amendment No. 1 Department Fund-Account-Center Amount TPW 52002 0200431 5330500 C00626 CO2830 $38, 593 . 00 Total : $38, 593 . 00 City of Fort Worth Loving Ave Channel&Culvert Improvements Professional Services Agreement Amendment Template 00626 CFW Official Release 9/19/2017 Page 3 of 3 @ Mp July 4, 2019 Mike Bennett, P.E., PMP Project Manager Capital Delivery Division Transportation/Public Works Department City of Fort Worth Office: 817.392.7891 Cell: 817.307.9039 Email: mike.ben nett(a_fortworthtexas.gov RE: Contract Amendment No. 1 Engineering Design Services: Loving Ave Channel &Culvert Improvements City Project No. 00626 Dear Mr. Bennett: The following is a summary of additional work requested for Amendment No. 1 to the above referenced project, per recent design meetings with City of Fort Worth officials. Four(4)Additional Temporary Construction Easement Documents, Change in Existing Channel due to erosion-Adjust Channel Cross Section and modify Plan and Cross Section Sheets, Modify Grading Sheet Update Hydraulic Model, Street Closer Exhibit, survey and design update Prairie Ave- Amendment No. 1 amount (see Exhibits"A"): $38,593.00 The current status of the contract between Stream Water Group, Inc and City of Fort Worth for the above referenced project is as follows: Original Contract Amount(City Secretary Contract No. 51135, M&C C-28704)_ $ 123,073.00 Amendment No. 1 Amount= $ 38,593.00 Total Contract Amount including Amendment No. 1 = $ 161,666.00 Please process Amendment No. 1, to the Loving Avenue Channel &Culvert Improvements, City Project No. 00626 in the amount of$38,593.00. If you require any additional information or have any questions regarding this matter, please give me a call at 817-446-4171. We appreciate the opportunity to provide engineering design services for the City of Fort Worth. Sincerely, Stream Water Group, Inc. Shamsul Arefin, PE, CFM President Copy: File f,?.' fire I)tv,00d titair Rc! • S[IIIC ;(! I ,,rt W oI i l F '(1 1 Phunc ,t 4 4 6 1 • Fa R I 7 44%, 4 1\\l i\. �tl cj III\i'llll_I O LIP.CUtil ƒ k / \ R 2 m 2 a 2 / § V 2 n \ m MI m Q e a e & e ¢ / Q \ / \ \ k Cl) ° C LL m o } o $ ¥ \ @ c j (0 2 ° § 7 % / (0 c 2 �2 § 0 � c J L L / 1 � 2 § > o - + — .. / CD . � / { � c 2 7 ( � \ $/ E r- a J ^ / a Q _ _ ° : E > \ k cu « _ _0 \ ] E 7 ) § cu \ Ea) 0 f \ ] ) 2 > c a Q - ca ( m .0 C ) 5 o s 0 § ® ° f $ $ 0 6 [ a) E ; f 2 2 ' o / a § cm _ 3 \ _lu 0� k \ t \ � � ) x � ) / $ \ a) cC) _ ° m \ ® g 3 0 k = ] _ © & - k } ) f t % a 2 ( ch \ / 7 / f 0 / ± § § ± � M< 2 (0 � = w