Loading...
HomeMy WebLinkAboutOrdinance 6283 ORDINANCE NO.4 AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF ATE. 38TH STREET FROM NORTH MAIN STREET TO 651 FEET EAST AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE +CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort.Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: /YF•UNIT 1: 4i. 38TH STREET From North Main Street to 651' East, known and designated as Unit 1, Project No. 104-24000-196, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on an eight-inch thick lime stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be forty feet wide and by constructing four-foot wide concrete sidewalks and six-inch thick concrete driveways where specified. UNIT 2: COLUMBUS STREET From NW. 34th Street to NW. 35th Street, known and designated as Unit 2, Project No. 104-24000*4960 to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 3: Columbus Avenue From NW. 31st Street to Angle Avenue, known and designated as Unit 3, Project No. 104-24000-196, to be improved with six-inch thick hot-mix asphaltic con- crete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be twenty-six feet wide from NW. 31st Street to NW. 32nd Street and thirty feet wide from NW. 32nd Street to Angle Avenue. r together with concrete curbs, gutters, driveways and incidentals to such improvements on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said im- provements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; contract therefore has been made and entered into with Nr ost Loyd and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been examined, NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of streets, avenues, and public places hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting pro- perty and the owners thereof, are as follows, to-wit: UNIT 1: NW. 38th STREET From North Main Street to 651' East, known and designated as Unit 1, Project No. 104-24000-196. The estimated cost of improvements is $ 19*773.33 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 3.09 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 7.90 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for four-feet wide concrete sidewalk is $ 3.18 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for six-inch thick concrete driveway is $ .90 per square foot; the total estimated amount per front foot to be as against abutting property and the owners thereof is $ 14.07 , plus the cost incurred for concrete driveway construction where specified. III. A hearing be given and held by and before the City Council of the City of Fort Worth, Texas, to all owning or claiming any property abutting upon said portions of highways, streets, avenues and public places, as well as to all owning or claiming any intexept in any such pr perty. Such hearing shall be given and held on the day of mom , 19 70 , at 9:30 A.M. , in the Council Chamber in the City Hall in tM7MCity of Fort Worth, Texas, and the City Secretary is hereby directed to give or cause to be given notice of the time and place of such hearing and of other matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1, emergency effective May 12, 1967. Such notice shall be by advertisement inserted at least three (3) times in a newspaper published in the City of Fort Worth, Texas , the first publication to be made at least twenty-one (21) days before the date of said hearing. Said notice shall comply with and be in accordance with the terms and provisions of said Act as amended. The City Secretary is further directed to give or cause to be given personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such personal notice shall be in writing and shall be given or caused to be given by the City Secretary by depositing such written notice in the United States Mail at least fourteen (14) days before the date of the hearing, postage prepaid, in envelopes addressed to all persons owning or claiming any interest in the respective properties abutting the high- ways, streets, avenues and public places or portions thereof to be improved, as the names of such persons are shown on the current rendered tax rolls of the City of Fort Worth and at the addresses so shown, or if the name of such respective owners do not appear on such rendered tax rolls, then address to such owners as their names are shown on the current unrendered tax rolls of the City of Fort Worth at the addresses shown thereon. In those cases in which an owner of property abutting a highway, street, avenue or public place or portion or portions there- of which is to be improved is listed as "unknown" on the then current City of Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth tax rolls but no address for such owner is Shawn, no notice need be mailed. In those cases where the owner is shown to be an estate, the mailed notice may be addressed to such estate. In this connection, the City Secretary shall prepare and file or cause to be prepared and filed with these proceedings a list of the properties to be assessed, the names of those persons owning or claiming any interest in said properties to whom the notice was mailed, together with the last known addresses determined as aforesaid of the respective owners and those per- sons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties in said list whose address is shown on the then current rendered or unrendered tax rolls of the City of Fort Worth was mailed a copy of the notice of hearing and shall further certify the date or dates on which said notice was mailed. A copy of each notice shall be attached to such certificate. The certificate of the City Secretary will be con.• clusive evidence of the facts therein recited. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. Passed and approved this day of 1� ICJ APPROVED AS TO FORM AND LEGALITY: City Attorney UNIT '2: COLUMBUS AVENUE From NW. 34th Street to NW. 35tb • Street, known and designated as ' Unit 2, Project No. 104-24000-196. The estimated cost of improvements is $ 12,191.23 ; the estimated amount per front foot to be assessed against abuttiifg property and the owners thereof for concrete curb and gutter is $ 2_85 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ _90 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ g_Q3 plus the cost incurred for concrete driveway con- struction where specified. UNIT 3: COLUMBUS AVENUE From NW. 31st Street to 32nd Street, (26 foot roadway) known and designated as Unit 3, Projeet No. 104-24000-196. The estimated cost of improvements is $ 20,831.25 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.85 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 6,51 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ -0- per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 9.36 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 3: COLUMBUS AVENUE From NW. 32nd Street to Angle Avenue, (30 foot roadway) known and designated as Unit 3, Project No. 104-24000-196. The estimated cost of improvements is $ 20-831.25 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $—$.A.S_ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 7_27 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0<_ wide concrete sidewalk is $ -a- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ -n- per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 10_12 , plus the cost incurred for concrete driveway con- struction where specified. UNIT'4: NORTH PECAN STREET From NE. 30th Street to NE, Und • Street, known and designated a's ' Unit 4, Project No. 104-24000-196. The estimated cost of improvements is $ 32,327,62 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.85 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ LL8 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .90 _ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 8.03 , plus the cost incurred for concrete driveway con- struction where specified. UNIT NO. 5: NORTH HAMPTON STREET From NE. 29th Street to NE. 31st Street, known and designated as Unit 5, Project No. 104-24000-196. The estimated cost of improvements is $ 34.156010 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.85 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.58 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ .0. ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ _90 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 8.43 plus the cost incurred for concrete driveway con- struction where specified. UNIT 6: NW. LORAINE STREET From McKinley Avenue to Roosevelt Avenue, known and designated as Unit 6, Project No. 104-24000-196. The estimated cost of improvements is $ 9-029_45 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2_8.5 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ .5_27 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for .0- wide concrete sidewalk is $ .0. ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ w90 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ X.12 plus the cost incurred for concrete driveway con- struction where specified. UNIT 7*0 NW. 26TH STREET From Ross Avenue to Clinton Street, known and designated as Unit t, Project No. 104-24000-196. The estimated cost of improvements is $ 10,_086.45 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.85 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.76 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for four-feet wide concrete sidewalk is $ 3.IS ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .90 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 11.79 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 8: ROSS AVENUE From NE. 25th Street to Cliff Street, known and designated as Unit 8, Project No. 104-24000-196. The estimated cost of improvements is $ 36,339.60 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.85 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $6.03 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for four-feet wide concrete sidewalk is $ 3_18 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ _90 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 12.06 plus the cost incurred for concrete driveway con- struction where specified. The estimated cost of improvements is $ the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ , plus the cost incurred for concrete driveway con- struction where specified. UNIT 4: NORTH PECAN STREET From NE. 30th Street to NE. 32nd Street, known and designated as Unit 4, Project No. 104-24000-1969 to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be twenty-six feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 5: NORTH HAMPTON STREET From NE. 29th Street to NE. 31st Street, known and designated as Unit 5, Project No. 104-24000-196, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be twenty-six feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalks where specified. UNIT 6: NW. LORAINE STREET From McKinley Avenue to Roosevelt Avenue, known and designated as Unit 6, Project No. 104-24000-196, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 7: NW. 26TH STREET From Ross Avenue to Clinton Street, known and designated as Unit 7, Project No. 104-24000-196, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing four-foot wide concrete sidewalks and six-inch thick concrete driveways where specified. UNIT 8: ROSS AVENUE From NW. 25th Street to Cliff Street, known and designated as Unit 8, Project No. 104-24000-196, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing four-foot wide concrete sidewalks and six-inch thick concrete driveways where specified. FORT WORTH, TEXAS 19 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below: Estimates of the total cost of improvements on a portion of NE. 38TH STREET FROM NORTH MAIN STREET TO 651' EAST and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: PROJECT NO,�104-24000-196, UNIT 1: NW, 38TH STREET FROM NORTH MAIN STREET TO 651 ' EAST, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on an eight-inch thick lime stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be forty feet wide and by constructing four-foot wide concrete sidewalks and six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter . . . . . . . . . . . $3.09 /LF Seven-inch hot-mix asphaltic concrete pavement (Unzoned and Ind. Zoning less $ .27 credit) . . . $7.80 /LF Five-inch thick concrete sidewalk . . . . . . . . . . . . $3.18 /LF Six-inch thick concrete driveway . . . . . . . . . . . . . $ .90 per Sq. Ft. PROJECT N0, 104-24000-196, UNIT 2: COLUMBUS AVENUE FROM NW. 34TH STREET TO NW, 35TH STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified, The following assessment rates have been established: Seven-inch high curb and eighteen-inch gutter . . . . . . . $2.85 /LF Six-inch hot-mix asphaltic concrete pavement (Res. Zoning) . . . . . . . . . . . . . . . . . . . $2.55 /LF Six-inch thick concrete driveway . . . . . . . . . . . $ .90 per Sq. Ft. _PROJECT NO. 104-24000-196, UNIT 3: COLUMBUS AVENUE FROM NW. 31ST STREET TO ANGLE AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be twenty-six feet wide from NW. 31st Street to NW. 32nd Street and thirty feet wide from NW, 32nd Street to Angle Avenue, The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . $2.85 /LF Six-inch hot-mix asphaltic concrete pavement (Res. Zoning) . . . . . . . . . . . . . . . . . . $2.55 /LF Six-inch hot-mix asphaltic concrete pavement (Res. Zoning - "Non-Conforming") . . . . . . . . $7.27 /LF PROJECT NO. 104-24000-196, UNIT 4: NORTH PECAN STREET FROM NE. 30TH STREET TO NE. 32ND STREET, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be twenty-six feet wide and by constructing six- inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . , . . . . . $2.85 /LF Seven-inch hot-mix asphaltic concrete pavement (Res. Zoning) . . . . . . . . . . . . . . . . . . $2.55 /LF Seven-inch hot-mix asphaltic concrete pavement (Ind, Zoning) . . . . . . . . . . . . . . . . . . $5.18 /LF Seven-inch hot-mix asphaltic concrete pavement (Ind, Zoning - Owner Occupied) . . , . , . . . . . $3.87 /LF Six-inch thick concrete driveway . . . . . . . . . . . . . $ .90 per Sq. Ft. PROJECT NO. 104-24000-196, UNIT 5: NORTH HAMPTON STREET FROM NE. 29TH STREET TO NE. 31ST STREET, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be twenty-six feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalks where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch glitter . . . . . . . . . $2.85 /LF Seven-inch hot-mix asphaltic concrete pavement (Res. Zoning) . . . . . . . . . . . . . . . . . . $2.55 /LF Seven-inch hot-mix asphaltic concrete pavement (Comm. Zoning) . . . . . . . . . . . . . . . . . $5.58 /LF Six-inch thick concrete driveway . . . . . . . . . . . . . $ .90 per Sq. Ft. PROJECT NO. 104-24000-196, UNIT 6 NW. LORAINE STREET FROM McKINLEY AVENUE TO ROOSEVELT AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty-feet wide and by constructing six-inch thick driveways where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . $2.85 /LF Six-inch hot-mix asphaltic concrete pavement (Res. Zoning) . . . . . . . . . . . . . . . . . . $2.55 /LF Six-inch thick concrete driveway . . . . . . . . $ .90 per Sq. Ft. PROJECT NO. 104-24000-196,. UNIT 7: NW. 26TH STREET FROM ROSS AVENUE TO CLINTON STREET, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing four- foot wide concrete sidewalks and six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . $2.85 /LF Seven-inch hot-mix asphaltic concrete pavement (Res. Zoning) . . . . . . . . . . . . . . . . $2.55 /LF Seven-inch hot-mix asphaltic concrete pavement (Comm. & Apt. Zoning ) . . . . . . . . . . . . . . $5.76 /LF Seven-inch hot-mix asphaltic concrete pavement (Comm. & Apt. Zoning - Owner Occupied) . . . . . . $4.16 /LF Five-inch thick concrete sidewalk . . . . . . . . . . . . $3.18 /LF Six-inch thick concrete driveway . . . . . . . . . . . . . $ .90 per Sq. Ft. PROJECT NO. 104-24000-196, UNIT 8: ROSS AVENUE FROM NW. 25TH STREET TO CLIFF STREET, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing four- foot wide concrete sidewalks and six-inch thick concrete driveways where specified, The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . $2.85 /LF Eighteen-inch gutter only . . . . . . . . . . . . . . . . . . $1.43 /LF Seven-inch hot-mix asphaltic concrete pavement (Res. Zoning less $ .27 credit) . . . . . . . . . $2.28 /LF Seven-inch hot-mix asphaltic concrete pavement (Apt. & Comm. Zoning) . . . . . . . . . . . . . . $6.03 /LF Seven-inch hot-mix asphaltic concrete pavement (Apt. & Comm. Zoning - Owner Occupied) . . . . $4.29 /LF Five-inch thick concrete sidewalk . . . . . . . . . . . . . $3.18 /LF Six-inch thick concrete driveway . . . . . . . . . . . . . $ .90 per Sq. Ft. The assessments result in the following division of costs: TOTAL PROPERTY OWNERS' COST FOR PAVEMENT . . . . . . $47,574.48 TOTAL PROPERTY OWNERS' COST FOR CURB, GUTTER, DRIVEWAYS & SIDEWALKS. . . . . . . . . $40,823,83 TOTAL PROPERTY OWNERS' COST . . . . . . . . $88,403.31 TOTAL CITY OF FORT WORTH'S COST . . . . . $85,321.72 TOTAL .ESTIMATED COST . . . . . . $173,725.03 .AiC M. GR M, P.E., PUBLIC WORKS DIRECTOR 2 r Z 1I Uli8TH'ST i H I TH ty zLT I HJVfLB II n M ST n OE ` J N Z S - Q WAS-IIN(TON E KI q IC Sr--, � H IGH S N yid ER al T S � 3 Si ST Q V 4 \ \ \ ,, Unit 30 TH Z U2\9TH = o w a T T Z Unit 5 = 3 L RAI E 28 T ST.5027T 1 D � O LX 26i ST 12.5 TH I Unit 710, a Q E RANGE AVE Assessment Paving 8 LOCATIONS ON THE NORTH SIDE Project No. 104. 24000. 196 ' r C'IIY OF FORT WORTH PUBLIC WORKS DEPARTMENT ENGINEERING DIVISION ASSESSMENT FAVINO AT 8 LOCATIONS ON THE NORTH SIDE PROJECT NO, 104-24000-196 A Neighborhood hearing was ;conducted by the Engineering Division of the Public Works Department at the Washington Heights Elementary School on April 13, 1970 at 7:30 p.m. , for the Assessment Paving of 8 Locations on the Forth Side. Procedures concerning owner participation in the cost, method and policies of determining assessments, street construction standards and methods of payment were explained by Mr. Schmidt to the twenty-eight (28) persons present. Unit 1, NE,, 38th Street: W, R� Hall, representing Freuhaf Trailer Company, Tract 1-A of W. B. Tucker Survey was concerned with what type of pavement was to be used and asked about credit being given on existing pavement. Don Wills, representing Mobil Oil Company, Tract 1=8, W, B. Tucker Survey asked about the radius of the curve from one driveway to North Main Street , S, A. Wakefield, Lot 24, Block 11, Fostepco Heights Addition did not see the necessity for sidewalks. Also he said he did not need a forty-foot or fifteen-foot driveway, Jack Daniels, Traffic Engineering Department, is going to talk to him, Unit 2, Columbus Avenue: Walter ?lacy, lots 16 and 17, Block 4, Worth Hills Addition asked about the reason for different types of pavement, Unit 3, Columbus Avenue: Willie Kennard, Lots 22 and 23, Block 35, Oak Grove Addition asked about the elevation on; his street and about lay down curb and gutter. This was ex- plained by Mr, Schmidt„ Unit 4, forth Pecan Street.* Mrs, Lean Maggard, Lots 1 and 2, Block 80, Fostepco Heights Addition, was concerned about the grade of the parkway, She has a fence on her property and is afraid it will fall down and her yard will wash if the grade is steep. Ira Ward, representing Earl ]Lamb, lots 21 and 22, Block 81, Fostepco Heights Addition was very interested in getting the pavement since he is buying this property, Mrs, Johnny Kratky, who came with her father, lots 7 and 8, Block 80, Fostepco Heights Addition was interested in the difference In penetration and permanent type of pavement. Mr. Jones Leonard Robinson asked the price of single driveway. Unit 5, North Hampton Street, Carmen Vasquez, representing her mother, Delores Torres, Lot 5, Block 86, Eostepco Heights Addition asked about assessment on this property. Also, Mrs. Torres who is now Mrs, Vasquez is buying Lots 3, Block 86, Eostepco Heights Addition for her daughter, Carmen, from Marion Goetsch, Unit 6, NW. Loraine Street- No comment. Unit 7, NW., 26th Street.- Eula Bundage, owner of W. 35 feet of Lot 12, Block 24, M. G. Ellis Addition and Imogene and Ella Bundage, owners of West 1/3 of Lots 13 and 14, Block 24, M., G� Ellis Addition did not understand owner occupied credit. This was explained. Unit 8, Ross Avenue. Mrs, 3osie Giddings, Lots 11 and 12, Block 25, M, G. Ellis Addition is against sidewalks and does not want a driveway on Lot 12, as she has no car. Several people asked about hardship cases and Mr, Schmidt explained to them who came in this category. After a lengthy, but interesting period of discussion, the meeting adjourned. 1 i 1 1 T4..1-6 T2.I-Q 4 t p s as f st � 4 21 • Z' f so s :o Is i Its Q ro s f q 00 h ST. s I c a 16 LI w IS io. IS Q 1• 2 i� Unit 1 : NE . 38th Street f rom North Main Street to 651 Feet East �r urr ry ♦ � Je_ � `J' � � � 4 0 � ♦ V q y , V 9 ODD Jove. "y a t ovrNc y ° e v y i x � � .AvENaE IN 14 ♦ o . ; y o. n, �. a y n v e 10 0 0 pill ' H se J1 0 � �O ♦ V Yt M � W i4v� o JO JO J1` � � Z .lam ' w v ♦ �o p` . h o u` ti W a 4 �+' v ♦ �o p c � se `` 11 I J O �0 ♦ V w 4 ♦ W Ave \ �tS CHEST�UT o so �-- wa so Jr n't 2 : Columbus Avenue from NW. 34th Street to NW. 35th Street = (^ N W { N A J O O N � t N W { N T U+ '1 p Gi Loving h ; jo- 0 •-i C In 1M H }N N N N ON b ►�• � A IM N — i Cad � � t7 SO O• v"� • N y rN Uj lA !I J (I !P /1 !• 0 � v 4 a � 4 • C irr AvE = r o N c 4 U nit 3: Columbus Avenue from NW. 31st Street to Angle Avenue aa.. NORTH GROVE Lo * R in ®� CO ♦ W N M « gorrh Pemn strht J se w a w � � N f7 M M TERRY rt � a `� O r w h � �. ti ♦ 4 � 0 1 Unit 4 : North Pecan Street from NE. 30th Street to NE. 32nd Street CR! A w -IMm w ; . • v w 4 w w 1• • M N O1 � O �p nr N N•+�N N N N N N • � \ . y� y \ ^> 4 � ti V � h w 1 t I Ha 1-1 s STREET ' y tid A w ro = g OB m .j m a a w N h a c v b w y 1 l� w ~ \ H H w ` \ ,`. v a • N a a IA Q1 J O t0 O N W 1 A O y 01 U! ♦ W N N N N � N N N �� � \ � \ � � � I �+ Iy , ►• � �y T) ti h N 1 N. NA vs dT b HAYES 5T NORTH Unit 5: North Hamp ton Street from NE. 29th Street to NE. 31st Street e <.✓ e o •J s rJ s i! ) rI ) i O iJ f �J i J f S ii S K J ri 1 .s s 2 �y r iy r iy 2 .ro ,io ,in ,in ,ice .io L O.eA/NE K s rz s k rr O .a ,`s Y If 1 10 3 i0 ! io i 2 9 r y r $ y t a e , ' ?ITiY dT.�EET Unit : NW. Loraine street from McKinley Avenue to Roosevelt r , /O /t /o / er/G� Sir 91 Ar /e s ; /9 l� t 3 22 ? r ?Y 22 3 2q-, O a µe 2 24f ti � l•• lse • se s /f• v axx mx. 26 T1/.Ae c I• /I• /f0 /I Il Y � /iI /I• /i /s /o t /r /a /G 9 7,'— is 9 • Unit : NW. 26th Street from Ross Avenue to Clinton Street e o \ b ly `P V •° D \ I w I A r1 ^ V 1 '° p ♦ 4 G= A Vr _ y � le i� W �' � ; p �0 � � V a. (� 'P W o ^, a 'A W N \ O �o � •Y q 1r� `� t \ to W p n V m `0 Is a r� r • r. s A, v v ° c t Cl-INTaN AVC wh ,.-., �. I�. i i r• r• re IJ Unit 8: Ross Avenue from NW 25th Street to Cliff Street FORT WORTH, TEXAS 19 TO THE HONORABLE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS. Gentlemen: In accordance with the proceedings of your Honorable Body, I have prepared estimates of the cost of street improvements as shown below; Estimates of the total cost of improvements on a portion of NE. 38TH STREET FROM NORTH MAIN STREET TO 651' EAST and portions of sundry other streets, avenues and public places in the City of Fort Worth, Texas, and estimated amounts per front foot to be assessed against abutting property and the owners thereof, on each portion of street, avenue and public place are as follows, to-wit: PROJECT NO. ,104-24000-196, UNIT 1. NWo 38TH STREET FROM NORTH MAIN STREET TO 651 ' EAST, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on an eight-inch thick lime stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be forty feet wide and by constructing four-foot wide concrete sidewalks and six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and two-foot gutter . . . . . . . . . . . $3.09 /LF Seven-inch hot-mix asphaltic concrete pavement (Unzoned and Ind. Zoning less $ .27 credit) . $7.80 /LF Five-inch thick concrete sidewalk . . . . . . . . . . . . $3.18 /LF Six-inch thick concrete driveway . . . . . . . . . . . . . $ .90 per Sq. Ft. PROJECT NO. 104-24000-196, UNIT 2: COLUMBUS AVENUE FROM NW. 34TH STREET TO NW. 35TH STREET, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch high curb and eighteen-inch gutter . . . . . . . $2.85 /LF Six-inch hot-mix asphaltic concrete pavement (Res. Zoning) . . . . . . . . . . . . . . . . . $2.55 /LF Six-inch thick concrete driveway . . . . . . . . . . . . $ .90 per Sq. Ft. PROJECT NO. 104-24000-196, UNIT 3: COLUMBUS AVENUE FROM NW. 31ST STREET TO ANGLE AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be twenty-six feet wide from NW. 31st Street to NW. 32nd Street and thirty feet wide from NW. 32nd Street to Angle Avenue. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . $2.85 /LF Six-inch hot-mix asphaltic concrete pavement (Res, Zoning) . . . . . . . . . . . . . . . . . . $2.55 /LF Six-inch hot-mix asphaltic concrete pavement (Res. Zoning - "Non-Conforming") . . . . . . . . $7.27 /LF PROJECT NO. 104-24000-196, UNIT 4: NORTH PECAN STREET FROM NE. 30TH STREET TO NE. 32ND STREET, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be twenty-six feet wide and by constructing six- inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . $2.85 /LF Seven-inch hot-mix asphaltic concrete pavement (Res. Zoning) . . . . . . . . . . . . . . . . . $2.55 /LF Seven-inch hot-mix asphaltic concrete pavement (Ind, Zoning) . . . . . . . . . . . . . . . . . . $5.18 /LF Seven-inch hot-mix asphaltic concrete pavement (Ind. Zoning - Owner Occupied) . . . . . . . . . . $3.87 /LF Six-inch thick concrete driveway . . . . . . . . . . . . . $ .90 per Sq. Ft. PROJECT NO. 104-24000-196, UNIT 5: NORTH HAMPTON STREET FROM NE. 29TH STREET TO NE. 31ST STREET, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be twenty-six feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalks where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . $2.85 /LF Seven-inch hot-mix asphaltic concrete pavement (Res. Zoning) . . . . . . . . . . . . . . . . . . $2.55 /LF Seven-inch hot-mix asphaltic concrete pavement (Comm. Zoning) . . . . . . . . . . . . . . . . . $5.58 /LF Six-inch thick concrete driveway . . . . . . . . . . . . . $ .90 per Sq. Ft. PROJECT NO. 104-24000-196, UNIT 6: NW. LORAINE STREET FROM McKINLEY AVENUE TO ROOSEVELT AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty-feet wide and by constructing six-inch thick driveways where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . $2.85 /LF Six-inch hot-mix asphaltic concrete pavement (Res. Zoning) . . . . . . . . . . . . . . . . $2.55 /LF Six-inch thick concrete driveway . . . . . . . . $ .90 per Sq. Ft. PROJECT NO. 104-24000-196, UNIT 7: NW. 26TH STREET FROM ROSS AVENUE TO CLINTON STREET, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing four- foot wide concrete sidewalks and six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . $2.85 /LF Seven-inch hot-mix asphaltic concrete pavement (Res. Zoning) . . . . . . . . . . . . . . . . . $2.55 /LF Seven-inch hot-mix asphaltic concrete pavement (Comm. & Apt. Zoning ) . . . . . . . . . . . . . . $5.76 /LF Seven-inch hot-mix asphaltic concrete pavement (Comm. & Apt. Zoning - Owner Occupied) . . . . . . $4.16 /LF Five-inch thick concrete sidewalk . . . . . . . . . . . . $3.18 /LF Six-inch thick concrete driveway . . . . . . . . . . . . . $ .90 per Sq. Ft. PROJECT NO. 104-24000-1962 UNIT 8: ROSS AVENUE FROM NW. 25TH STREET TO CLIFF STREET, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing four- foot wide concrete sidewalks and six-inch thick concrete driveways where specified. The following assessment rates have been established: Seven-inch curb and eighteen-inch gutter . . . . . . . . . $2.85 /LF Eighteen-inch gutter only . . . . . . . . . . . . . . . . . . $1.43 /LF Seven-inch hot-mix asphaltic concrete pavement (Res. Zoning less $ .27 credit) . . . $2.28 /LF Seven-inch hot-mix asphaltic concrete pavement (Apt. & Comm. Zoning) . . . . . . . . . . . . . . $6.03 /LF Seven-inch hot-mix asphaltic concrete pavement (Apt. & Comm. Zoning - Owner Occupied) . . . $4.29 /LF Five-inch thick concrete sidewalk . . . . . . . . . . . . . $3.18 /LF Six-inch thick concrete driveway . . . . . . . . . . . . . $ .90 per Sq. Ft. The assessments result in the following division of costs: TOTAL PROPERTY OWNERS' COST FOR PAVEMENT o . $47,579.48 TOTAL PROPERTY OWNERS' COST FOR CURB, GUTTER, DRIVEWAYS & SIDEWALKS. . . . . . . . . . . $40,823.83 TOTAL PROPERTY OWNERS' COST . . . . . . . . $88,403.31 TOTAL CITY OF FORT WORTH'S COST . . . . . . $85,321.72 TOTAL ESTIMATED COST . . . . . . . $173,725.03 PROJECT NO. 104-24000-196, UNIT 1: NE. 38th STREET FROM NORTH MAIN TO 651' EAST to be im- proved with seven-inch thick hot-mix asphaltic concrete pavement on an eight-inch thick lime stabilized subgrade, seven-inch high concrete curb and two-foot wide concrete gutter, so that the finished roadway will be forty feet wide and by constructing four-foot wide concrete side- walks and six-inch thick concrete driveways where specified. BLOCK OWNER LOT 20NING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORT HEA3T CORNER OF NORTH MAIN AND NE. 38th NORTH SIDE OF STREET W. B. TUCKER SURVEY Mobil Oil Company Tract 150' Pavement (27,; Cr.) 3600 N. Sylvania 1®B $7.80 $1,170.00 76111 Unzoned 117' Curb & Gutter 3.09 361.53 117' Sidewalk 3.18 372.06 $1,903.59 Freuhaf Trailer Co. Tract 478,73' Pavement 609 North Main 1-A (27�, Cr.) $7.80 $3,734.09 76102 Unzoned $3,734.09 SOUTH SIDE OF STREET FOSTEPCO HEIGHTS ADDITION Nat RakhOover 1 10 340' Pavement 3411 Autumn Drive 24 & Ind. (27,r, Cr.) $7.80 $2,652.00 -761Q9 Closed 340' Curb & Gutter 3.09 1,050.60 Alley between 304' Sidewalk 3.18 966.72 Lots 1 & 24 & $4,669.32 Closed street between Lot 24 & Tract E & Tract E COMMERCE STREET INTERSECTS S. A. Wakefield 24 11 125' Pavement Ind. (27(� Cr.) $7.80 $ 975.00 2020 Williams Place 125' Curb & Gutter 3.09 386.25 76111 70' Sidewalk 3.18 222.60 151 Sq. Ft. Drive .90 135.90 $1,719.75 1. PROJECT NO. 104-24000-196, UNIT to NE. 38th STREET FROM NORTH MAIN TO 651' EAST, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET EOSTEPCO HEIGHTS ADDITION Mrs. Bessie Vacker 1 11 115' Pavement 3820 North Main Ind, (27� Cr.) $7.80 $897.00 76106 75' Curb & Gutter 3.09 231.75 40' Gutter Only 1.55 62.00 83 Sq} Ft. Drive .90 74.70 $1,265.45 COST TO PROPERTY OWNERS m ASSESSMENT . . . . . . . . . $13,292.20 COST TO CITY OF FORT WORTH . . . . . . . . . . . . . . 6,481.13 TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . . $19,773.33 UNIT 1 2. PROJECT NO. 104-24000-196, UNIT 2- COLUMBUS AVENUE FROM NW. 34th STREET TO NW. 35th STREET to be improved-with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF NW. 34th AND COLUMBUS AVENUE WEST SIDE OF STREET WORTH HILLS ADDITION Oscar Biggins 1 3 50' Pavement $2.55 $127.50 3401 Columbus 76106 Res. 50' Curb & Gutter 2.85 142.50 $ 270.00 Major Moore 2 3 501 Pavement $2.55 $127.50 3315 Prairie 76106 Res. 50' Curb & Gutter 2.85 142.50 118 Sq. Ft. Driveway .90 106.20 $ 376.20 Calvin Williams 3 & 4 3 100' Pavement $2.55 $255.00 3405 Columbus 76106 Res. 1001 Curb & Gutter 2.85 285.00 118 Sq. Ft. Driveway .90 106.20 $ 646.20 Mattie Cotton Laws 5 & 6 3 100' Pavement $2.55 $255.00 1431 Pennsylvania Res. 100' (curb & Gutter 2.85 285.00 Wichita 14, Kansas $ 540.00 Ruthie Davis 7 3 50' Pavement $2.55 $127.50 c/o Mary Bryant Res. 501 Curb & Gutter 2.85 142.50 3112 Lee Avenue 76106 $ 270.00 L. C. & Marie Cherry 8 3 50' Pavement $2.55 $127.50 3415 Columbus 76106 Res. 50' Curb & Gutter 2.85 142.50 118 Sq. Ft. Driveway .90 106.20 $ 376.20 3 PROJECT NO. 104-24000-196, UNIT 2% COLUMBUS AVENUE FROM NW. 34TH STREET TO NW. 25TH STREET, CONTINUED. OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET WORTH HILLS ADDITION P. T. Richardson 9 & 10 3 85' Pavement $2.55 $216.75 3417 Columbus 76106 Res. 85' Curb & Gutter 2.85 242.25 $ 459.00 NW. 35TH STREET INTERSECTS EAST SIDE OF STREET Jeff Stinson 11 4 35' Pavement $2.55 $ 85.25 3102 Prospect 76106 Res. 35' Curb & Gutter 2.85 99.75 $ 185.00 South Fort Worth 12 4 50' Pavement $2.55 $127.50 State Bank Res, 50' Curb & Gutter 2.85 142.50 716 W. Magnolia 76104 118 Sq. Ft. Driveway .90 106.20 $ 376.20 M. T. Riddle 13, 14 & 15 4 150' Pavement $2.55 $382.50 2518 Lipscomb 76110 Res. 150' Curb & Gutter 2.85 427.50 354 Sq. Ft. Driveway .90 318.60 $1,128.60 Walter Lacy 16 & 17 4 100' Pavement $2.55 $255.00 3408 Columbus 76106 Res. 100' Curb & Gutter 2,85 285.00 236 Sq. Ft. Driveway .90 212.40 $ 752.50 L. G. Wynn 18 4 50' Pavement $2.55 $127.50 3404 Columbus 76106 Res. 50' Curb & Gutter 2.85 142.50 118 Sq. Ft. Driveway .90 106.20 $ 376.20 4 PROJECT NO. 104-24000-196, UNIT 20 COLUMBUS AVENUE FROM NW. 34TH STREET TO NW. 35TH STREET, CONTINUED. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET WORTH HILLS ADDITION Helen Jameson 19 4 501 Pavement $2.55 $127.50 3402 Columbus 76106 Res. 50' Curb & Gutter 2.85 142.50 118 Sq. Ft. Driveway .90 106.20 $ 376.20 James Warner 20 4 50°Pavement $2.55 $127.50 3712 Falcon 76119 Res, 50' Curb & Gutter 2.85 142.50 $ 270,00 COST TO PROPERTY OWNERS - ASSESSMENT . . . . . . . . . . $ 6,402.20 COST TO CITY OF FORT WORTH . . . . . . . . . . . . . . .5,779203 TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . . .$12.181.23 UNIT 2 5 PROTECT NO. 104-24000-196, UNIT 3e COLUMBUS AVENUE FROM NW. 31st STREET TO ANGLE AVENUE to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter so that the finished roadway will be twenty-six feet wide from NW. 31st Street to NW. 32nd Street and thirty feet wide from NW. 32nd Street to Angle Avenue. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF NW. 31st STREET AND COLUMBUS AVENUE WEST SIDE OF STREET OAK GROVE ADDITION Vivian K. Howard 1 36 50' Pavement $2.55 $127.50 Rt. 9 - Box 381-B Res, 50' Curb & Gutter 2.85 142.50 76106 $270.00 S. E. Hardeman 2 36 50' Pavement $2.55 $127.50 Rt. 9 - Box 396 Res, 50' Curb & Gutter 2.85 142.50 76106 $270.00 Anna Lora Gilchrist 3 36 50' Pavement $2.55 $127.50 W. T. Waggoner Bldg, Res. 50' Curb & Gutter 2.85 142.50 76102 $270.00 Anna Mae Douglas 4 36 50' Pavement $2.55 $127.50 P.O. Box 272 Res. 50' Curb & Gutter 2.85 142.50 Caldwell, Texas $270.00 Artillia Davis 5 36 50' Pavement $2.55 $127.50 3108 Loving Res. 50' Curb & Gutter 2.85 142.50 76106 $270.00 Ozzie Lee Davis 6 36 50' Pavement $2.55 $127.50 3108 Loving Res. 50' Curb & Gutter 2.85 142.50 76106 $270.00 6. PROJECT N0, 104-24000-196, UNIT 3: COLUMBUS AVENUE .FROM NW, 31st STREET TO ANGLE AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT 1M9 SIDE OF STREET OAK GROVE ADDITION Francis Cato 7 36 50' Pavement $2,55 $127.50 Rt. 9 - Box 381-B Res, 50' Curb & Gutter 2.85 142,50 76106 $270.00 Trentman Co, 8 36 50' Pavement $2,55 $127.50 1008 Mallick Tower Rs. 50' Curb & Gutter 2,85 142.50 One Summit Ave, 76102 $270.00 Ernestine White 9 36 50' Pavement $2,55 $127.50 3117 Columbus Res, 50' Curb & Gutter 2.85 142.50 76106 $270.00 Trentman Co. 10 & 36 100' Pavement $2.55 $255.00 Mallick Tower 11 Res, 100' Curb & Gutter 2,85 285.00 76102 $540.00 Jimmie La Woodard 12 36 50' Pavement $2.55 $127.50 Rt. 9 - Box 363 Reso 50' Curb & Gutter 2,85 142.50 76106 $270;00 NW. 32nd STREET INTERSECTS City of Fort Worth 1 30 50' No Assessment Res. M. T. Riddle 2 & 30 100' Pavement $2,55 $255.00 2518 Lipscomb 3 Res. 100' Curb & Gutter 2,85 285.00 76110 $540.00 7, PROJECT NO. 104-24000-196, UNIT 3; COLUMBUS AVENUE FROM NW. 31st STREET TO ANGLE AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET OAK GROVE ADDITION Imogene Wilson 4 30 35' Pavement $7.27 $254.45 2125 Kingsdale Dr. Res. 35' Curb & Gutter 2.85 99.75 76119 (Non-Conforming) $354.20 Imogene Wilson 5 30 Existing Facilities No Assessment 2125 Kingsdale Dr. Comm. 76119 ANGLE AVENUE INTERSECTS EAST SIDE OF STREET Marise Ella Douglas 24 31 139' Slant Lot Adjusted to c/o C. F. Gilchrist Est. Res. 85' Pavement $2.55 $216.75 319 W. T. Waggoner Bldg. 85' Curb & Gutter 2.85 242.25 76102 $459.00 NW. 32nd STREET INTERSECTS Otto Williams 13 35 50' Pavement $2.55 $127.50 Rt. 9 m Box 353 Res. 50' Curb & Gutter 2.85 142.50 76106 $270.00 James Johnson 149 15 35 200' Pavement $2.55 $510.00 2904 Ross 16 & Res. 200' Curb & Gutter 2.85 570.00 76106 17 $1,080.00 James A. Rowe 18 35 50' Pavement $2.55 $127 .50 302 Burton Street Res. 50' Curb & Gutter 2.85 142.50 76114 $270.00 Bankers Development Corp. Richardson Savings 19 35 50' Pavement $2.55 $127.50 & Loan Res. 50' Curb & Gutter 2.85 142.50 P.O. Box 768 $270.00 Richardson, Texas 8. PROJECT NO. 104-24000-196, UNIT 3: COLUMBUS AVENUE FROM NW. 31st STREET TO ANGLE AVENUE, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET OAK GROVE ADDITION Tommie Reed 20 35 50' Pavement $2.55 $127.50 P.O. Box 4099 Res. 50' Curb & Gutter 2.85 142.50 76106 $270.00 Ethel Rhodes 21 35 50' Pavement $2.55 $127.50 Rto 9 - Box 357 Res. 50' Curb & Gutter 2.85 142.50 76106 $270.00 Willie Kennard 22 & 35 100' Pavement $2.55 $255.00 Rt. 9 m Box 358 23 Res. 100' Curb & Gutter 2,85 285.00 76106 $540.00 Moates & Graham 24 35 50' Pavement $2e55 $127.50 200 Houston Res, 50' Curb & Gutter 2.85 142.50 76102 $270.00 COST TO PROPERTY OWNERS m ASSESSMENT . . . . . . . . $ 7,833.20 COST TO CITY OF FORT WORTH . . . . . . . . . . . . . 12,998.05 TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . $20,831.25 UNIT 3 90 PROJECT NO. 104-24000-196, UNIT 4e NORTH PECAN FROM N.E. 30th STREET TO N.E. 32nd STREET to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide gutter, so that the finished roadway will be twenty-six feet wide and by constructing six-inch thick concrete driveways where specified, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF NE. 30TH STREET AND NORTH PECAN WEST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION Andrew J. Jackson 9 & 8 93 300' Pavement $5.18 $1,554.00 3118 N. Pecan 76106 Ind. 300' Curb & Gutter 2.85 855.00 171 Sq. Ft. Driveway .90 153.90 $2,562.90 L. H. Long 7 93 50' Owner Occupied 3113 N. Pecan 76106 Ind. 50' Pavement $3.87 $193.50 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 412.50 Garland Flowers 6 93 50' Pavement $5.18 $259.00 416 W. T. Waggoner Ind. 45' Curb & Gutter 2.85 128.25 Building 76102 85 Sq. Ft. Driveway .90 76.50 $ 463.75 Marion Goetsch 5 93 50' Pavement $5.18 $259.00 3309 Friendwood Ind. 50' Curb & Gutter 2.85 128.25 Arlington, Texas 76010 $ 387.25 C. C. Hall 4 93 501 Owner Occupied 3119 Pecan 76106 Ind. 50' Pavement $3.87 $193.50 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 412.50 Jerry Wayne Davis 3 2® 50' Pavement $5.18 $259.00 5901 Lovell 76107 Ind. 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 478.00 10 PROJECT NO. 104-240000-196, UNIT 4- NORTH PECAN STREET FROM NE. 30th STREET TO NE. 32nd STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET FOSTEPCO FIGHTS ADDITION Lloyd R. Horton 2 93 50' Pavement $5.18 $259.00 2720 NW. 26th 76106 Ind. 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 478.00 Charles J. Thorp 1 93 50' Owner Occupied 3125 W. Pecan 76106 Ind. 50' Pavement $3.87 $193.50 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 412.50 NE. 31st INTERSECTS Jewell Urbane 13 & 14 81 100' Pavement $2.55 $255.00 3201 N. Pecan 76106 Res. 100' Curb & Gutter 2.85 285.00 140 Sq. Ft. Driveway .90 126.00 $ 666.00 John Medrano 15 81 _ 50' Pavement $2.55 $127.50 1516 Circle Park Blvd. 76106 Res. 50" Curb & Gutter 2.85 142.50 $ 270.00 Mike Medrano 16 81 50' Pavement $2.55 $127.50 1809 Lincoln Avenue 76106 Res. 41' Curb & Gutter 2.85 116.85 $ 244.35 E. J. Cupp 17 & 18 81 100' Pavement $2.55 $255,00 3211 N. Pecan, 76106 Res. 93' Curb & Gutter 2.85 265.05 85 Sq. Ft. Driveway .90 76.50 $ 596.55 R. W. Lester 19 81 50' Pavement $2.55 $127.50 3213 N. Pecan 76106 Res. 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 346.50 11 PROJECT N0, 104=24000-196. UNIT 4: NORTH PECAN STREET FROM NE.. 30th STREET TO NE. 32nd STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION Ben 0. Miller 20 81 50' Pavement $2.55 $127.50 3215 N. Pecan 76106 Res. 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 346.50 Earl Iamb 21 & 22 81 100' Pavement $2.55 $255.00 3219 N. Pecan 76106 Res, 100' Curb & Gutter 2.85 285.00 85 Sq. Ft. Driveway .90 76.50 $ 616.50 Andres Montecon 23 81 50' Pavement $2.55 $127.50 3221 N. Pecan 76106 Res, 50' Curb & Gutter 2.85 142.50 $ 270.00 Andres Montecon 24 8_1 50' Pavement $5.18 $259.00 3221 N. Pecan 76106 Comm. 50' Curb & Gutter 2.85 142.50 $ 401.50 NE. 32ND STREET INTERSECTS EAST SIDE OF STREET Lena S. Maggard 1 & 2 80 100' Pavement $2.55 $255.00 3224 N. Pecan 76106 Res. 100' Curb & Gutter 2.85 285.00 $ 540.00 'Alford P. Bowman 3 80 50' Pavement $2.55 $127.50 3223 N. Terry 76106 Res. 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 346.50 12 PROJECT NO, 104-24000-196, UNIT 4: NORTH PECAN STREET FROM NE, 30th STREET TO NE. 32nd STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION J. B. Whatley 4 80 50' Pavement $2.55 $127.50 3216 N. Pecan 76106 Res. 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $346.50 Mary Burns 5 80 50' Pavement $2.55 $127.50 3214 N. Pecan 76106 Res. 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $346.50 Mendel L. Black 6 80 50' Pavement $2.55 $127.50 709 Lynda Lane Res. 50' Curb & Gutter 2.85 142.50 Arlington, Texas 85 Sq. Ft. Driveway .90 76.50 $346.50 Seller: Jones Leonard Robinson 7 80 50' Pavement $2.55 $127.50 3208 N. Pecan 76106 Res. 43' Curb & Gutter 2.85 122.55 Buyer: 85 Sq. Ft. Driveway .90 76.50 J. R. Cruz $326.55 3210 N. Pecan 76106 Jones Leonard Robinson 8 80 50' Pavement $2.55 $127.50 3208 N. Pecan 76106 Res. 50' Curb & Gutter 2.85 142.50 $270.00 J. F. Dickenson 9 & 10 80 100' Pavement $2.55 $255.00 1715 Grand 76106 Res. 91' Curb & Gutter 2.85 259.35 85 Sq. Ft. Driveway .90 76.50 $590.85 13 PROJECT NO. 104-24000-196, UNIT 4e NORTH PECAN STREET FROM NE. 30th STREET TO NE. 32nd STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION G. J. Rotton 11 & 12 80 100' Pavement $2.55 $255.00 3202 N. Pecan Res. 100' Curb & Gutter 2.85 285.00 85 Sq. Ft. Driveway .90 76.50 $616.50 Bill Lynch 1 92 50' Pavement $5.18 $259.00 1710 Homan 76106 Ind. 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $478.00 Thomas R. Ham 2 92 50' Pavement $5.18 $259.00 3120 N. Pecan 76106 Ind. 50' Curb & Gutter 2.85 142.50 $401.50 Thomas R. Ham 3 & 4 92 100' Owner Occupied 3120 N. Pecan 76106 Ind. 100' Pavement $3.87 $387.00 100' Curb & Gutter 2.85 285.00 85 Sq. Ft. Driveway .90 76.50 $748.50 A. J. Jackson 5 92 50' Owner Occupied 3118 N. Pecan 76106 Ind. 50' Pavement $3.87 $193.50 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $412.50 Francis Haba 6 92 50' Owner Occupied 3114 N. Pecan 76106 Ind. 50' Pavement $3.87 $193.50 45' Curb & Gutter 2.85 128.50 85 Sq. Ft. Driveway .90 76.50 $398.50 14 PROJECT NO. 104-24000-196, UNIT 4e N, PECAN STREET FROM NE, 30TH STREET TO NE, 32ND STREET, CONTINUED, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION Ora Fitzgerald 7 92 50' Owner Occupied 3112 N. Pecan 76106 Ind. 50' Pavement $3.87 $193.50 45' Curb & Gutter 2.85 128.50 85 Sq. Ft. Driveway .90 76.50 $ 398.50 Ora Fitzgerald 8 92 50' Pavement $5.18 $259.00 3112 N. Pecan 76106 Ind. 50' Curb & Gutter 2.85 142.50 $ 401.50 Ed Turney 99 10, & 12 92 150' Pavement $5.18 $777.00 3104 N. Pecan 76106 Ind. 150' Curb & Gutter 2.85 427.50 85 Sq. Ft. Driveway .90 76.50 $1,281.00 Ed Turney 11 92 50' Owner Occupied 3104 N. Pecan 76106 Ind. 50' Pavement $3.87 $193.50 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 412.50 Linda Copenhaver 13 92 50' Pavement $5.18 $259.00 1313 Selene 76106 Ind. 50' Curb & Gutter 2.85 142.50 $ 401.50 COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . . . . $18,429.20 COST TO CITY OF FORT WORTH . . . , . . . . . . . . 13,898.42 TOTAL ESTIMATED CONSTRUCTION COST . . . , , . . . . . . $32,327.62 UNIT 4 15 PROJECT NO, 104-24000-196, UNIT 5. NORTH HAMPTON STREET FROM NE, 29th STREET TO NE. 31st STREET, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be 26-feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHWEST CORNER OF NE. 29th STREET AND NORTH HAMPTON STREET WEST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION Jasper Smith 15 & 16 95 87.5' Pavement $5.58 $488.25 c/G E. W. Haynes Comm. 87.5' Curb & Gutter 2.85 249.38 Rt. 1, Crowley, Texas $ 737.63 76036 Domingo A. Grinie 17 95 50' Pavement $2.55 $127.50 P.O. Box 14 Res. 50' Curb & Gutter 2.85 142.50 Saginaw, Texas 76079 85 Sq. Ft. Driveway .90 76.50 $ 346.50 M. C. Stuart 18 & 19 95 100' Pavement $2.55 $255.00 3009 N. Hampton 76106 Res. 100' Curb & Gutter 2.85 285.00 85 Sq. Ft. Driveway .90 76.50 $ 616.50 Gerald Nuckols 20 95 50' Pavement $2.55 $127.50 Rt. 1, Box 47 Res. 50' Curb & Gutter 2.85 142.50 Burleson, Texas 76028 85 Sq. Ft. Driveway .90 76.50 $ 346.50 R. J. Nuckols 21 95 50' Pavement $2.55 $127.50 Rt. 2, Burleson, Texas Res, 50' Curb & Gutter 2.85 142.50 76028 $ 270.00 J. W. Wilson 22 95 50' Pavement $2.55 $127.50 3015 N. Hampton 76106 Res. 50' Curb & Gutter 2,85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 346.50 16 PROJECT NO. 104-24000-196, UNIT 5s NORTH HAMPTON STREET FROM NE. 29TH STREET TO NE. 31ST STREET, CONTINUED. BLOCK OWNER LOT Z2NILGG FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION John Stember 23 & 24 95 100' Pavement $2.55 $255.00 13210 Sun Dale Res. 1001 Curb & Gutter 2.85 285.00 Houston, Texas $ 540.00 Manuel G. Camacho 25 95 50' Pavement $2.55 $127.50 3021 N. Hampton '76106 Res. 501 Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveways .90 76.50 $ 346.50 Floys E. Hogan 26 95 50' Pavement $2.55 $127.50 3024 N. Hampton 76106 Res. 50' Curb & Gutter 2.85 142.50 $ 270.00 T. B. Britt 27 & 28 95 1001 Pavement $2.55 $255.00 3410 N. Grove 76106 Res. 1001 Curb & Gutter 2.85 285.00 85 Sq. Ft. Driveway► .90 76.50 $ 616.50 NE. 30TH STREET INTERSECT A. H. Parks 14 87 50' Pavement $2.55 $127.50 3101 N. Hampton 76106 Res, 501 Curb & Gutter 2.85 142.50 $ 270.00 Robert W. Bruce 15 87 501 Pavement $2.55 $127.50 5301 Greenlee Res, 501 Curb & Gutter 2.85 142.50 Apt. 104 $ 270.00 76115 Arlington Savings 16 87 501 Pavement $2.55 $127.50 Association Res. 501 Curb & Gutter 2.85 142.50 311 W. Abram 85 Sq. Ft. Driveways .90 76.50 Arlington, Texas 76011 $ 346.50 17 PROJECT NO. 104-24000-196, UNIT 5: NORTH HAMPTON STREET FROM NE. 29TH STREET TO NE. 31st STREET, CONTINUED. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION David Dyer 17 87 50' Pavement $2.55 $127.50 c/o Jack Dyer Res. 50' Curb & Gutter 2.85 142.50 Rt. 2, Box 362-A $ 270.00 Grapevine, Texas 76051 Juan Partida 18 87 50' Pavement $2.55 $127.50 3420 Denton Hwy. Res. 50' Curb & Gutter 2.85 142.50 76117 85 Sq. Ft. Driveway .90 76.50 $ 346.50 Cey H. Summers 19 87 50' Pavement $2.55 $127.50 2124 Dorothy Lane Res. 50' Curb & Gutter 2.85 142.50 Azle, Texas 76020 85 Sq. Ft. Driveway .90 76.50 $ 346.50 Arleene Calloway 20 87 50' Pavement $2.55 $127.50 3420 Denton Hwy. Res. 50' Curb & Gutter 2.85 142.50 76117 85 Sq. Ft. Driveway .90 76.50 $ 346.50 James E. Gentry 21 87� 50' Pavement $2.55 $127.50 3115 N. Hampton 76106 Res. 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 346.50 F. W. Cowan 22 87 50' Paven ent $2.55 $127.50 3117 N. Hampton 76106 Res. 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 346.50 Monroe E. Wilcox 23 87 50' Pavement $2.55 $127.50 5301 Patterson Drive Res. 50' Curb & Gutter 2.85 142.50 76117 85 Sq. Ft. Driveway .90 76.50 $ 346.50 18 PROJECT NO. 104®24000m196, UNIT 5e NORTH HAMPTON STREET FROM NE. 29th STREET TO NE. 31st STREtT,, CONTINUED. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT. WEST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION Elias G. Sant.uianes 24 87 501 Pavement $2.55 $127.50 3113 N. Hays St. 76106 Res, 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 346.50 James T. Hobbs Properties 25 & 26 EV 100' Pavement $2.55 $255.00 1313 Wayne 76117 Res. 1001 Curb & Gutter 2.85 285.00 $ 540.00 NE. 31ST STREET INTERSECTS EAST SIDE OF STREET Pleaze W. Walker 1 86 501 Pavement $2.55 $127.50 3126 N. Hampton 76106 Res. 500 Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 346.50 Ernest Tywater 2 86 501 Pavement $2.55 $127.50 3018 N. Harding Res. 50' Curb & Gutter 2.85 142.50 76106 85 Sq. Ft. Driveway .90 76.50 $ 346.50 Marion Goetsoh 3 86 ® 501 Pavement $2.55 $127.50 3309 Friendwood Res. 50' Curb & Gutter 2.85 142.50 Arlington, Texas 76010 85 Sq. Ft. Driveway .90 76.50- $ 346.50 J. F. Phillips 4 8866� 501 Pavement $2.55 $127.50 3118 N. Hampton Res, 500 Curb & Gutter 2.85 142.50 76106 85 Sq. Ft. Driveway .90 76.50 $ 346.50 19 PROJECT NO. 104-24000-196, UNIT 5s NORTH HAMPTON STREET FROM NE. 29th STREET TO NE. 31st STREET, CONTINUED. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION Dolores,Torres 5 86 501 Pavement $2.55 $127.50 3116 N, ,Hampton Res. 501 Curb & Gutter 2.85 142.50 76106 85 Sq. Ft. Driveway .90 76.50 $ 346.50 E. A. Calloway, Jr. 6 86 501 Pavement $2,55 $127.50 3420 Denton Hwy. Res. 501 Curb & Gutter 2.85 142.50 76117 $ 270.00 Gene R. McClendon 7 86 501 Pavement $2.55 $127.50 3310 N. Elm 76106 Res. 501 Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 346.50 Mrs. C. L. Colvin 8 86 50' Pavement $2.55 $127.50 P.O. Box 88 Res. 500 Curb & Gutter 2.85 142.50 Newark, Texas 76071 85 Sq. Ft. Driveway .90 76.50 $ 346.50 Josephine Flores 9 86 501 Pavement $2.55 $127.50 c/o A. E. Calloway Res. 501 Curb & Gutter 2.85 142.50 3420 Denton Hwy. 85 Sq. Ft. Driveway .90 76.50 76117 $ 346.50 J. A. Allison 10 86 501 Pavement $2.55 $127.50 3106 N. Hampton Res, 50' Curb & Gutter 2.85 142.50 76106 85 Sq. Ft. Driveway .90 76.50 $ 346.50 Japan Partida 11 86 500 Pavement $2.55 $127.50 3109 N. Hampton Res. 501 Curb & Gutter 2.85 142.50 76106 $ 270.00 20 PROJECT NO, 104-24000-196,, UNIT 5. NORTH HAMPTON STREET FROM NE. 29TH STREET TO NE, 32ND STREET,, CONTINUED. BLOCK OWNER LOT ZONING FROG RATE AMOUNT ASSESSMENT EAST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION Clarence E. Smith 12 86 50' Pavement $2.55 $127.50 237 Shoreline Drive Res, 50' Curb & Gutter 2.85 142.50 Azle, Texas 76020 $ 270.00 R. T. Gillentine 13 866 50' Pavement $2.55 $127.50 1617 Lee Avenue Res. 50' Curb & Gutter 2,85 142.50 76106 85 Sq. Ft. Driveway .90 76.50 $ 346.50 NE. 30TH STREET INTERSECTS R. C. Johnston 1 94 50' Pavement $2.55 $127.50 3026 N. Hampton Res. 50' Curb & Gutter 2.85 142.50 76106 85 Sq. Ft. Driveway .90 76.50 $ 346.50 Victoriano Vanes 2 94 50' Pavement $2.55 $127.50 3024 N. Hampton Res. 50' Curb & Gutter 2.85 142.50 76106 85 Sq. Ft. Driveway .90 76.50 $ 346.50 R. H, Hobbs 3 94 50' Pavement $2.55 $127.50 3022 N, Hampton Res, 50' Curb & Gutter 2,85 142.50 76106 85 Sq. Ft. Driveway .90 76.50 $ 346.50 Robert E. Williams 4 94 50' Pavement $2.55 $127.50 3020 N. Hampton Res. 50' Curb & Gutter 2.85 142.50 76106 85 Sq. Ft. Driveway .90 76.50 $ 346.50 Ben W. Baker 5 94 50' Pavement $2.55 $127.50 4801 E. Belknap Res. 50' Curb & Gutter 2.85 142.50 76117 100 Sq. Ft. Driveway .90 90.00 $ 360„00 21 PROJECT NO, 104-24000-196, UNIT 5, NORTH HAMPTON STREET FROM NE, 29TH STREET TO NE. 31ST STREET, CONTINUED. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET FOSTEPCO HEIGHTS ADDITION J. S. Seaton 6 94 50' Pavement $2.55 $127.50 3016 N. Hampton 76106 Res. 50' Curb & Gutter 2.85 142.50 85 Sq. Ft. Driveway .90 76.50 $ 346.50 Buster Roe 7 & 8 94 100' Pavement $2.55 $255.00 902 S. Wilhite Res. 100' Curb & Gutter 2.85 285.00 Cleburne, Texas 76031 85 Sq. Ft. Driveway .90 76.50 $ 616.50 M. C. Stuart 9, 10, & 94 150' Pavement $2.55 $382.50 3009 N. Hampton 11 Res. 150' Curb & Gutter 2.85 427.50 76106 $ 810.00 W. P. Hartsell 12 94 50' Pavement $2.55 $127.50 2249 Grace Res. 50' Curb & Gutter 2.85 142.50 76111 85 Sq. Pt. Driveway .90 76.50 $ 346.50 M. C. DeLa Flor 13 & 14 94 87.5' Pavement $5.58 $488.25 3125 N.- Main Co, . 87.5' Curb & Gutter 2.85 249.38 76106 85 Sq. Ft. Driveway .90 76.50 $ 814.13 COST TO PROPERTY OWNERS - ASSESSMENT. . . . . . . . . . . $17,513.26 COST TO CITY OF FORT WORTH . . . . . . . . . . . . . . . . 16,,642.84 TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . . . $34,156.10 UNIT 5 22 PROJECT NO, 104=24000-196., UNIT 6.0 ](.ORAINIS STREET FROM R7C EEC° �},�1 _TD ZOO LT AVENUE, to he improved with six-inch thick knot-mix asphaEtic concrete Pavement on a six- inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteeE-inch wide concrete ncirete gutter, jo that tt'he finished roadway will be thirty feet aside and by constructing six-inch thick d7riveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMNT BEGINNING AT NORTHEAST CORNER OF McKINLEY AVENUE AND NW. LORAINE STREET NORTH SIDE OF STREET JOHNSON'S NORTHSIDE ADDITION `- Lasard Plata 20 3 140' Side Lot Credit 2900 McKinley Res, 100' Pavement $2.55 $255.00 76106 100' Curb & Gutter 2.85 285.00 $540.00 R. M. Beaver 1 3 140' Side Lot Credit 2901 Roosevelt Res. 100' Pavement $2.55 $255.00 76106 100' Curb & Gutter 2.85 285.00 $540.00 ROOSEVELT AVENUE INTERSECTS SOUTH SIDE OF STREET ROSEN HEIGHTS ADDITION, FIRST FILING Sam Eoydston 7 50 140' Side Lot Credit 2813 Roosevelt Res. 100' Pavement $2.55 $255.00 76106 100' Curb & Gutter 2.85 285.00 158 Sq. Ft. Drive .90 142.20 $682.20 W. L. Harkins 14 50 140' Side Lot Credit 2812 McKinley Res. 100' Pavement $2.55 $255.00 76106 100' Curb & Gutter 2.85 285.00 158 Sq. Ft. Drive ,90 142.20 $682.20 COST TO PROPERTY OWNERS - ASSESSMENTS . . . . . . . $29444.40 COST TO CITY OF FORT WORTH . . . . . . . . . . . . . 5,585.05 TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . $89029.45 UNIT 6 23 PROJECT NO, 1104-24000-196, UNIT 7: NW, 26th STREET PROM ROSS AVENUE TO CLINTON STREET, to be improved with seven-inch thick hot-mix asphaltic (concrete 1pavement,'on a six-inch thick lime stabilized subgrade9 seven-inch high concrete curb and eighteen-inch wide concrete gather, so that the finished ,roadway will be thirty feet wide and by constructing four- foot wide concrete sidewalks and six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHEAST CORNER OFROSS AVENUE AND NW. 26TH STREET NORTH SIDE OF STREET M. G. ELLIS ADDITION Rebecca Dawson Warren W. 37 70' Pavement $2.55 $178- 50 414 NW. 26th of 23 Res. 70' Curb & Gutter 2.85 199:50 76106 & 24 59' Sidewalk 3.18 187.62 85 Sq. Pt, Drive o90 76050 $642.12 Gilberto M. Carbajal E. 37 70' Pavement $2.55 $178.50 410 NW. 26th of 23 Res. 70' Curb & Gutter 2.85 199.50 76106 & 24 59' Sidewalk 3.18 187.62 85 Sad. Ft. Drive .90 76.50 $642.12 J. V. Hampton Wo 37 135' Pavement $5.76 $777.60 P.O. Box 4175 of 1 & Comm. 135' Curb & Gutter 2.85 384.75 Stockyard Station 2 & Ee 135' Sidewalk 3.18 429.30 76106 of 1 & 2 $1,591.65 CLINTON STREET INTERSECTS SOUTH SIDE OF STREET Sam Rener Ea 35' 24 30' Pavement $5.76 $172.80 2710 Chestnut of Lot Gomm. 30' Curb & gutter 2.85 85.50 76106 12 30' Sidewalk 3.18 95040 $353.70 A. To Ermis W. 35' 24 3V Pavement $5.76 $201.60 2008 Ebbtide of Ea 70' C-ona. 35' Curb & Gutter 2.85 99.75 Dallas, Texas of Lot 12 5° Sidewalk 3.18 15.90 $317 e 25 24 PROJECT NO, 104-24000-196, UNIT 7. NW, 26TH STREET FROM ROSS AVENUE TO CLINTON STREET, CONTINUED, BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT' SOUTH SIDE OF STREET M. G. ELlLIS ADDITION Sam H. Lame Wo 35' 24 35' Pavement $5.76 $201.60 306 Thr®ckm®rt®n of E, Comm. 35' Curb & Gutter 2085 9 M 5 76102 105' of 20' Sidewalk 3.18 63060 Lot 12 85 Sq. Ft. Drive .90 76.50 $441.45 Eula Bundage W. 35' 24 35' owner Occupied 407 NW, 26th ®f Comm, 35' Pavement $4.16 $145.60 76106 Lot 12 35' Curb & Cutter 2.85 99.75 $245.35 Charley Pointer E, 1/3 24 46.33' Owner Occupied 409 NW, 26th of 13 Apt. 46.33' Pavement $4.16 $192.73 76106 & 14 46.33' Curb & Cutter 2.85 132.04 58 Sidewalk 3.18 15.90 $340.67 Sam H. Lane M, 1/3 24 46.33' Pavement $5.76 $266.86 306 Thr®ckmorton of 13 Apt, 46,33' Curb & Gutter 2.85 132.04 76102 & 14 35.33' Sidewalk 3.18 112.35 85 Sq. Ft. Drive .90 76.50 $587.75 Imogene & Ella W. 1/3 24 46.33' Owner Occupied Bundage ®f 13 Apt. 46.33' Pavement $4.16 $192.73 415 NW, 26th & 14 46.33' Curb & Gutter 2.85 132.04 76106 45' Sidewalk 3,18 143.10 $467.87 COST TO PROPERTY OWNERS m ASSESSMENTS o , , , , , , $5,629.93 COST TO CITY OF FORT WORTH , , , , , a , , , , , 0 42456.52 TOTAL ESTIMATED CONSTRUCTION COST , , a , , , , , 10 086,45 UNIT 7 25 PROJECT NO. 104-24000-196, UNIT 8s ROSS AVENUE FROM NW. 25th STREET TO CLIFF STREET, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgtade, seven-inch highs concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing four- foot wide concrete sidewalks and six-inch thick concrete driveways where specified.. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHWEST CORNER OF NW. 25TH STREET AND ROSS AVENUE WEST SIDE OF STREET M. G. ELLIS ADDITION Joe Trojacek, Sr. 1 & 2 25 1000 Pavement $6.03 $603.00 4352 College Avenue Comm, 100' Gutter Only 1.43 143.00 76115 $746.00 Mary Cattley 3 25 50' Owner Occupied 2505 Ross Avenue Apt. 50' Pavement $4.29 $214.50 76106 50' Gutter Only 1.43 71.50 $286.00 E. L. Taylor 4 25 50' Owner Occupied 2507 Ross Avenue Apt. 50' Pavement $4.29 $214.50 76106 50' Gutter Only 1.43 71.50 $286.00 Herbert E. Hart 5 25 50' Pavement $6.03 $301.50 P.O. Box 4390 Apto 39' Gutter Only 1,43 55.77 76106 $357.27 Sam H. Lane, Jr, 6 25 50' Pavement $6003 $301.50 1929 Berkeley Place Apt, 50' Curb & Gutter 2.85 142.50 76110 39' Sidewalk 3.18 124.02 85 Sq. Ft. Drive .90 76.50 $644.52 Mrs. Johnnie Chapple Lot 7 25 60' Pavement $6.03 $361.80 412 Cliff & S. Apt. 60' Curb & Gutter 2.85 171.00 76106 10' Of 8 60' Sidewalk 3.18 190.80 $723.60 26 PROJECT NO. 104-24000-196, UNIT 8s ROSS AVENUE FROM NW, 25TH STREET TO CL'IFY STREET C ONT INUEID BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESS 'N`I 'VEST SIDE OIL STREET Ms G. ELLIS ADDITION Katie B. Jackson N. 40' 25 90` Owner` Occupied 2517 Ross 76106 of 8, Apt. 90' Pavement $4,29 $386, 10 All of 9 909 Curb & Gutter 2.85 256050 79' Sidewalk 3�18 251 22 85 Sq, Ft. Driveway �90 76 0 50 $970,32 Katie B. Jackson 10 25 50' Pavement $6.03 $301,50 2517 Ross 76106 Apt. 50' Curb & Gutter 2.85 142,50 50' Sidewalk 3.18 159,00 $603700 Laymon D. Giddings 11 25 50' Pavement $6,03 $301,50 2523 Ross Ave. 76106 Apt 50' Curb & Gutter L 85 $142,50 39' Sidewalk 3.18 124,,02 85 Sq, Ft. Driveway a90 76�50 $644.32 Laymon D. Giddings 12 25 50' Owner 0ccuflpied 2523 Ross 76106 Apt, W Pavement $4,29 $214 50 50' Curb & Gutter 2.85 142�50 39' Sidewalk 3.18 124.02 85 Sq, Ft. Driveway 190 76,50 $557 :52 NW, 26TH STREET INTERSECTS Julia S, Williams 1 36 50' Pavement 2520 Clinton 76106 Res, (2% Cr.) $L 28 $114,00 50' Curb & Gutter 2,85 142,50 50` Sidewalk 3, 18 159,00 $415,50 27 PROJECT NO. 104-24000-196, UNIT 8: ROSS AVENUE FROM NW. 25TH STREgT TO CLIFF STREETS, CONTINUED. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET M. G. ELLIS ADDITION Herbert Howard 2 36 50' Pavement 2603 Ross Avenue Res. (27(,% Cr.) $2.28 $114.00 76106 50' Curb & Gutter 2.85 142.50 39' Sidewalk 3.18 124.02 85 Sq. Ft. Drive .90 76.50 $457.02 Christine Price 3 36 50' Pavement (270Cr)$2.28 $114.00 3108 Ross Avenue Res. 50' Curb & Gutter 2.85 142.50 76106 $256.50 Mary E. Williams S. ' 36 50' Pavement 413 Bennet of 4 Res. (270, Cr.) $2.28 $114.00 Marlin, Texas & N. 50' Curb & Gutter 2.85 142.50 of 4 50' Sidewalk 3.18 159.00 w $415.50 James Bradley 5 36 50' Pavement(270 Cr)$2.28 $114.00 2609 Ross Res. 50' Curb & Gutter 2.85 142.50 76106 39' Sidewalk 3.18 124.02 85 Sq. Ft. Drive .90 76.50 $457.02 Claude Norwood 6 36 50' Pavement 2611 Ross Avenue Res. (27q% Cr.) $2.28 $114.00 76106 50' Curb & Gutter 2.85 142.50 39' Sidewalk 3.18 124.02 85 Sq. Ft. Drive .90 76.50 $457.02 28 PROJECT NO. 104-24000-196, UNIT 8e ROSS AVENUE FROM NW. 25TH STREET TO CLIFF STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET M. G. ELLIS ADDITION J. Dorsey Adams 7 36 50' Pavement 1009 Evans Avenue Res. (27e, Cr.) $2.28 $114.00 76104 50' Gutter Only 1.43 71.50 $185.50 Albert Scott 8 36 50' Pavement 2617 Ross Avenue Res. (27e,, Cr.) $2.28 $114.00 76106 50' Gutter Only 1.43 71.50 $185.50 Anita T. Knowles 9 36 50' Pavement 3112 Ross Avenue Res. (27e,% Cr.) $2.28 $114.00 76106 39' Gutter Only 1.43 55.77 39' Sidewalk 3.18 124.02 85 Sq. Ft. Drive .90 76.50 $370.29 Willard C. Thomas 10 36 Existing Facilities No Assessment 3120 McKinley Comm. 76106 CLIFF STREET INTERSECTS EAST SIDE OF STREET Hillery Hardeman 17 37 60' Slant Lot Adjusted to 3002 Lee Comm. 35' Pavement 76106 (27o, Cr.) $5.76 $201.60 35' Curb & Gutter 2.85 99.75 60' Sidewalk 3.18 190.80 85 Sq. Ft. Drive .90 76.50 $568.65 29 PROJECT NO. 104-24000-196, UNIT 8e ROSS AVENUE FROM NW. 25th STREET TO CLIFF STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET M. G. ELLIS ADDITION Tennessee Hardeman W. 110' 37 50' Pavement 2612 Ross of Res. (27t, Cr.) $2.28 $114.00 76106 Lot 18 50' Gutter Only 1.43 71.50 $185.50 Alfredo E. Romero 19 37 50' Pavement 2610 Ross Avenue Res. (27t,' Cr.) $2.28 $114.00 76106 50' Gutter Only 1.43 71.50 $185.50 L. Conner 20 37 50' Pavement 3200 Lee Res. (27C Cr.) $2.28 $114.00 76106 50' Gutter Only 1.43 71.50 85 Sq. Ft. Drive .90 76.50 $262.00 Annie L. Thompson 21 37 50' Pavement 2606 Ross Avenue Res. (27C Cr.) $2.28 $114.00 76106 50' Gutter Only 1.43 71.50 $185.50 Fred Thompson 22 37 50' Pavement 2606 Ross Avenue Res. (27(,% Cr.) $2.28 $114.00 76106 39' Gutter Only 1.43 55.77 11' Curb & Gutter 2.85 31.35 85 Sq. Ft. Drive .90 76.50 $277.62 Rebecca Dawson Warren W. ' 37 100' Pavement 414 NW 26th of 23 Res. (271� Cr.) $2.28 $228.00 76106 & 24 100' Curb & Gutter 2.85 285.00 100' Sidewalk 3.18 318.00 $831.00 30 PROJECT NO. 104-24000-196, UNIT 8° ROSS AVENUE FROM NW. 25th STREET TO CLIFF STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET M. G. ELLIS ADDITION NW. 26TH STREET INTERSECTS Imogene & Ella W. 24 50' Owner Occupied Bundage of 13 Apt. 50' Pavement $4.29 $214.50 415 NW. 26th 50' Curb & Gutter 2.85 142.50 76106 50' Sidewalk 3.18 159.00 $516.00 Imogene & Ella W. 24 50' Pavement $6.03 $301.50 Bundage of 14 Apt. 50' Curb & Gutter 2.85 142.50 415 NW. 26th 50' Sidewalk 3.18 159.00 $603.00 City of Fort Worth 15 24 50' Frontage No Assessment T-Pt. Clarence Nelms 16 24 50' Owner Occupied 2518 Ross Avenue Apt. 50' Pavement $4.29 $214.50 76106 50' Gutter Only 1.43 71.50 39' Sidewalk 3.18 124.02 85 Sq. Ft. Drive .90 76.50 $486.52 Faye Branch N. 33.5' 24 33.5' Pavement $6.03 $202.00 1709 Uvalde of 17 Apt. 33.5' Gutter Only 1.43 47.91 76104 33.5' Sidewalk 3.18 106.53 $356.44 Dan Wesley N. 16' 24 32' Owner Occupied 2514 Ross Ave. of 18 Apt. 32' Pavement $4.29 $137.28 76106 & S. 16' 32' Gutter Only 1.43 45.76 of 17 32' Sidewalk 3.18 101.76 $284.80 31 PROJECT NO. 104-24000-196, UNIT 8e ROSS AVENUE FROM NW. 25th STREET TO CLIFF STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET M. G. ELLIS ADDITION Daisy Mae Garnett S. 34' 24 34' Pavement $6.03 $205.02 1944 S. Harper Ave. of 18 Apt. 34' Gutter Only 1.43 48.62 Los Angeles, Calif. 34' Sidewalk 3.18 108.12 $361.76 Aubrey Kennard 19 24 50' Owner Occupied 2510-B Ross Ave. Apt. 50' Pavement $4.29 $214.50 76106 50' Gutter Only 1.43 71.50 $286.00 Wilson Talley 20 24 50' Owner Occupied 2510-A Ross Avenue Apt. 50' Pavement $4.29 $214.50 76106 39' Gutter Only 1.43 55.77 $270.27 R. V. Bebout 21 24 50' Pavement $6.03 $301.50 1349 Bomber Road Apt. 50' Gutter Only 1.43 71.50 76108 $373.00 Nealious B. Skillern 22 24 50' Pavement $6.03 $301.50 412 Nw 25th Apt. 50' Gutter Only 1.43 71.50 76106 50' Sidewalk 3.18 159.00 $532.00 Nealious B. Skillern W. 70' 24 100' Pavement $6.03 $603.00 412 NW. 25th of 23 Comm. 100' Curb & Gutter $2.85 285.00 76106 & 24 82' Sidewalk 3.18 260.76 140 Sq. Ft. Drive .90 126.00 $1,274.76 32 PROJECT NO. 104-24000-196, UNIT 8e ROSS AVENUE FROM NW. 25th STREET TO CLIFF STREET, CONTINUED BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET M. G. ELLIS ADDITION COST TO PROPERTY OWNERS — ASSESSMENT . . . . $16,858.92 COST TO CITY OF FORT WORTH . . . . . . . . . 19,480.68 TOTAL ESTIMATED CONSTRUCTION COST . . . . $36,339.60 UNIT 8 33 City of Fort Worth, Texas LING mo n PH IS Mayor and Council Communication M'` R' DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE 4/27/70 Paving of 8 Locations on the North Side lob 3 C-1716 PRESTON City- Council action is requested on the project: described below. Project Description Nature of Work: Assessment Paving of 8 Locations on the North Side. Roadway Unit Street Limits "Width R.O.W. 1 NE 38th Street North Main to 651' East 40 feet 50 feet 2 Columbus Avenue NW 34th to NW 35th Street 30 feet 60 feet 3 Columbus Avenue NW 31st Street to NW 32nd 26 feet 60 feet Street NW 32nd Street to Angle 30 feet 60 feet Avenue 4 North Pecan Street NE 30th Street to NE 32nd 26 feet 50 feet Street 5 North Hampton Street NE 29th Street to NE 31st 26 feet 50 feet Street 6 NW Loraine McKinley Avenue to 30 feet 60 feet Roosevelt Avenue 7 NW 26th Street Ross Avenue to 30 feet 60 feet Clinton Street 8 Ross Avenue NW 25th Street to 30 feet 80 feet Cliff Street Petitions have been received from property owners for the paving of all units, except Unit 1, which was City initiated as a result of request from major property owner and poll-card survey. Sidewalks Sidewalks have been included in Units 1, 7 and 8 of subject project for the following reasons: Unit 1, NE 38th Street: To tie in with existing sidewalks, to serve commercial property and street also ties into a major thoroughfare - North Main Street. Unit 7, NW 26th Street: To tie in with existing sidewalks and leads to Sam Rosen Elementary School, some twelve (12) blocks west and to North Main, one block east. DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE NUMBER 4/27/70 C-1716 Paving of 8 Locations on the North Side 2 of 3 Unit 8, Ross Avenue: To tie in with 50% existing sidewalks. Submission of Bids The following bids have been received: Bidder Amount Bid Ernest Loyd $157,931.85 Austin Road Company $161,945.64 Texas Bitulithic Company $168,993.80 Glade, Inc. $177,653.25 General Construction Company $178,698.65 SRO Asphalt, Inc. $191,448.25 Bids Received: April 2, 1970 Working Time: 140 Working- Days Project Cost,and Financing Based on the low net bid, approximately $88,403.31 will be assessed against abutting property owners. The cost to the City-at-large will be approximately $86,000.00, including engineering expenses, inspection and miscellaneous ex- penditures. A Bond Fund Transfer from Unspecified Funds is proposed to provide for the City's portion of the cost of the project. Recommendations 1) The following Bond Fund Transfers be approved: Amount From To Reason $88,403.31 Unspecified 8 Locations on Property Owners' Portion 042-09724-901 North Side of Construction Cost 042-10424-196 $86,000.00 Unspecified 8 Locations on City's Portion of Con- 104-24000-901 North Side struction Cost, inspec- 104-24000-196 tion, engineering ex- penses, and miscellane- ogs expenditures. 2) An Ordinance be adopted: a) Declaring the necessity for ordering the improvements; b) Make provisions for levying of assessments; c) Directing the Public Works Department to prepare estimates of costs and amounts to be assessed; d) Awarding the contract to Ernest Loyd, in the amount of $157,931.85; and, e) Making appropriations to cover indebtedness thereby.-in- curred for improvements of the project named above. ' 1 DATE REFERENCE SUBJECT: Award of Contract - Assessment PAGE NUMBER 4/27/70 C-1716 Paving of 8 Locations on the North Side 3 of 3 3) An Ordinance be adopted: a) Approving the estimates of cost and amounts proposed to be assessed; and, b) Setting May 25, 1970, as the date for the Benefit Hearing. HDM/je Attachments: "A" - Map of Project "B" - Resume and Location Maps "C" - Engineers' Preliminary Assessment Rolls SUBMITTED BY: DISPOSIT BY COUNCIL: PRO SED BY L ❑ APPROVED ❑ OTHER (DESCRIBE) Adqptad OardLuanca DO-OArW NecossUrciTy SECRETARY and Ordering Paying and Qrdina"A no, ��'h� DATE CITY MANAGER � %Y} .f