Loading...
HomeMy WebLinkAboutContract 52697 Received Date: 08/28/19 Received Time:9:52 AM Developer and Project Information Cover Sheet: Developer Company Name:7D.R.Horton-Texas,Ltd. Address, State,Zip Code: 6751 North Frwy.,Fort Worth,Texas 76131 Phone&Email: 817-230-0800+sbrim@drhorton.com Authorized Signatory,Title: Benjamin Clark,Assistant Vice President Project Name: Bridgeview Phase I Brief Description: Water, Sewer,Paving, Street Signs, Storm Drain, Street Lights Project Location: 11000 US 287,Fort Worth,Texas 76131 -J Plat Case Number: PP-18-027; Plat Name: Bridgeview FP-18-121 Mapsco: Council District: 7 CFA Number: CFA19-0036 City Project 101912 I .IPRC18-0110 Number: City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Bridgeview Phase I C]'(Y SECRETARY CFA Official Release Date:02.20.2017 Page 1 of 11 FT. WORTH,TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 52697 WHEREAS, D.R. Horton- Texas, Ltd., ("Developer"), desires to make certain specific improvements as described below and on the exhibits attached hereto("Improvements")related to a project generally described as Bridgeview Phase I ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas ("City"); and WHEREAS, the City has no obligation to participate it the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section H, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer further acknowledges that said acceptance process requires the Developer's contractor(s) City of Fort Worth,Texas Standard Community Facilities Agreement-Bridgeview Phase I OFFICIAL RECORD CFA Official Release Date:02.20.2017 Page 2 of 11 CITY SECRETARY FT. WORTH,TX to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water(A) , Sewer(A-1) ,Paving(B) ®, Storm Drain(B-1) ®, Street Lights & Signs (C) M. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section II,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section II, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified,insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure,and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2)years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. City of Fort Worth,Texas Standard Community Facilities Agreement-Bridgeview Phase I CFA Official Release Date:02.20.2017 Page 3 of 11 iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other state-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to proceed, and to make such laboratory tests of materials being used as may be required by the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Bridgeview Phase I CFA Official Release Date:02.20.2017 Page 4 of 11 I J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted, brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from,or in any way connected with,the construction of the infrastructure contemplated herein, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Bridgeview Phase I CFA Official Release Date: 02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor, whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastew<<ter inspection fees and material testing fees equal to two percent(2%) for a total of 4%of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streei;l ights or if the city is not installing the streetlights, inspection fees equal to four pert nt(4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financiJ guarantee submitted for this Agreement to cause the completion of the construction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Bridgeview Phase I CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1)does not boycott Israel; and(2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Developer shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Bridgeview Phase I CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name:Bridgeview Phase I CFA No.: CFA19-0036 City Project No.: 101912 1 JPRC 18-0110 An Engineer's Estimate of Probable Cost is acceptable. However, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 990,390.50 2.Sewer Construction $ 1,211,287.50 Water and Sewer Construction Total $ 2,201,678.00 B. TPW Construction 1.Street $ 1,926,277.70 2.Storm Drain $ 1,571,834.00 3.Street Lights Installed by Developer $ 481,095.00 4. Signals TPW Construction Cost Total . $ 3,979,206.70 Total Construction Cost(excluding the fees): $ 6,180,884.70 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 44,03;.56 D. Water/Sewer Material Testing Fee(2%) $ 44,034.56 Sub-Total for Water Construction Fees $ 88,067.12 E. TPW Inspection Fee(4%) $ 139,924.47 F. TPW Material Testing(2%) $ 69,9fi .23 G. Street Light Inspsection Cost $ 19,24 .80 H. Signals Inspection Cost $ - H. Street Signs Installation Cost $ - Sub-Total for TPW Construction Fees $ 229,130.50 Total Construction Fees: $ 317,197.62 Choice Financial Guarantee Options,choose one Amount Mark onc' Bond=100% $ 6,180,884.70 X Completion Agreement=100%/Holds Plat $ 6,180,884.70 Cash Escrow Water/Sanitary Sewer-125% $ 2,752,097.50 Cash Escrow Paving/Storm Drain=125% $ 4,974,008.38 Letter of Credit=125°/u w/2 r expiration period $ 7,726,10F.88 City of Fort Worth,Texas Standard Community Facilities Agreement-Bridgeview Phase I CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY,the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER D.R.Horton-Texas,Ltd.,a Texas Limited n i / Partnership Dana Burghdoff(Aug 27,20 By:D.R.Horton,Inc.a Delaware Dana Burghdoff Corporation Interim Assistant City Manager Its authorized agent Date: _Aug 27,2019 Recommended by: Benjarnin Clark(Aug 27,2019) Evelyn Rob` Sl (Aug 27,2019) Name: Benjamin Clark Evelyn Roberts/Jennifer Ezernack Title: Assistant Vice President Project Assistant Date: Aug 27,2019 Planning and Development Approved as to Form &Legality: Contract Compliance Manager: By signing, I acknowledge that I am the Riohard A. McGracXan person responsible for the monitoring and -hard A.McCracken(Aug 27,2019) Richard A. McCracken administration of this contract, including Assistant City Attorney ensuring all performance and reporting M&C No. N/A requirements. Date: k RT�`F: Form 1295: N/A Jenniver Ezernack on behalf of Janie Morales(Aug 27,2019) �•. �'f� Name: Janie Morales f'` ;_ •Title: Development Manager ATTEST: 4 RG`!'LA,GO f, l.7'!/l1iZRl�S� ••�"'i,,+ Ronald P.Gonzales(Au 28 2019) ±d Mary J.Kayser/Ronald Gonzales ''" City Secretary/Assistant City Secretary City of Fort Worth,Texas OFFI AL RE ORE) Standard Community Facilities Agreement,Bridgeview Phase I CITY SECRETARY CFA Official Release Date:02.20.2017 Page 9 of 11 FT. WORTH,TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map Exhibit A: Water Improvements ® Exhibit A-1: Sewer Improvements ® Exhibit B: Paving Improvements ® Exhibit B-1: Storm Drain Improvements ® Exhibit C: Street Lights and Signs Improvements ® Signed Construction Bid Costs (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Bridgeview Phase I CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101.912 1 IPRC 18-0110 None. City of Fort Worth,Texas Standard Community Facilities Agreement-Bridgeview Phase I CFA Official Release Date:02.20.2017 Page 11 of 11 0 LL 0 �u � 3z T aa Z U N W N U W x co w o r� -co- N v � AC � L x ��H M o 0 co Wo W J 5 U) O n H � O z Z U � w OU a � iw O oz N � OD� z �-- OD U U) J - Nmix3mtl A3MVA QZ Y O U U N Y 4� m S9tIItldS AOTDA 2 - --i p I --------------- MDlgn>! MojpW 'WV 19:6 6LOZ/9Z/L '6Mp•9}!q!4x3 V30 199o4d\L 99o4d\V30\sq!q!4x3 Z04\ONVI 004\4000\ONV1—XLN\:5 to H C.0 f" 00 0 O lL , J \� �, a o� cc Q = x z a W ~ N d m a W x W w �= o = r� Cl v LO J ^ U X co h+l Z ni �/ 3 o m 0 1 Il /i .a !/ O � R G rh ;o a w z o z Q bi J 3AJaa x dHO // o Z "�o L) z LLJ cn 9 �� •• o N (n __.. z D ry W a w / 1 W w Z J o z J � �_ H N ! —� - W U _1 W o a j 3 a a e 3 c9 Ii a 3 � � °o 0 o w � w zi Zz O O O O O `` r �o w w 0_ 0= 0= 0- a: jo!gn)l impuy IRV 14:6 61OZ/9Z/L '6MP'sq!q!4x3 V30 I oso4d\l 0e04d\V30\%Iq!4x3 Z0i,\aNVI 00i,\4000\aNVI—X1N\:S H �o o U co 0 �j N co LL co w I.^i/i c0 11 t LL w " z0 wm = Wa 3 Cl)CWI Q W ~ U x �Z W co �- ~ U � �o F o tz v �, o �� =— (- - - - - - E! 3NVI dWH o w Z z a' S. W �f --- - L ZI a r I / ' w� 0 3 � t o 'o \` / N Q2 n V O YQ 00 J7 FFF--�jm� mm" Ld \ 4, ZN,NZ r�oa o52rn I a p_oU \ Ul.1m 1 12QU im 3N80 x dHo wk 0 In Z m _ 9 .j�y�oJ o/ �5� •s. / � //� Z-SS s� n J y LP •ry w (n (n w m t J Q o Q o V '\ 2 2 W Z Z Z Z - LL- 0 0 0 0 o 0 0 0 MDlgnH MerPW IM L4:6 6LOZ/9Z/L '6MP'61!q!4x3 Vj0 1 9GD4d\L 661)4d\V30\6q!q!4x3 Z04\ONVI 004\4000\ONVI-XLN\:S LVo II d II m o Q 11 I — z r, -4 IL IL r, CD o 3 Y N d J co n a � a za a = Umm 'n3SawmW Xo o 0 LLI LLI wmw m a i X LU of -i J� WNr - OWNWawas NO - jns O aLo ll ID Z Z a-M orv )0 omo0 a rWvAr •- mca° fna w W na— wg� NmpNwO > o03- >0 Oo 0r : aoF- 03� 0O oa a0 a0 EL a=a o oa oa 0 0r ti I 3NY1 dHVH a � Z O O w j ��N J 3 of �, re ~Ozw Fin w�� — , / iy o�Zz o /J o�0� �oaw W 00, a 3A1210 N dH N W o 'r LL \o-z o �/DUVQ 1 - f \ r,oJ LLI U 111041, z Lid Z. - - J � r lD!gDH MojPW IWV 09:6 6LOZ/9Z/1 '6MP'83!q!4x3 Vjo I GOD4d\l OGD4d\Vdo\sl!q!4x3 Zoo\OM/l oot\4000\aNyi—xLN\:S MW b U co af 0 (O z II z U- m i 0 Q a in cu _ � xz Zia n W a a 3 m N W K K Z I f l W co FBI O a AU cu x L ID .H �1 O O�m m (/ I (D._ — 3NV1 dHVH z IN Z N d �' o z /A L o NZ _ x re r�m X Zx m // / W CO o w 3/U21a x dHON / a 0 / o ml- O z N O \ m 1IZ b85*O z wwx 8 o,a y2 ybd /ox b In N � N LL � \� _ r b o o o LP l Z J Z o b_� m W z D W —' \ / W z W LLI Q �e J JO Q U O �� -- — a Z 0 !n U- � I I OW W W (n IT�® (n (n (n U' O - En_ Z � O O O d d d W MD!gn)l m-puV 'WV 09:6 6LOZ/9Z/1 'Bmp•allq!4x3 Vd3 I QGD4d\L OGD4d\Vd0\sq!q!4x3 Z04\ONVi OOi\ti000\ONVI-X1N\:S Ei �o to o /U1 LL V N (((��n FAi/I to !! co m Z z � � U- J ff nn rLi rl � a U 3 o fQ� W X p a V CO SD WF LW x co A C L x a> .Cow o� oto COO d m I — — — — 2 3 dHVH— 0 1 m I ui a I ( f II � 3 II SUS / J / I LaRiI-= / L 3AR10 d / r z d�J z� 4P� \ - _ o w Lv w --j CD 7- — Lv U) !- w / z o Fn Ix L_ w o a � O_ J L — — — — Mo!gnH m-PW 'WV 6i46 6LOZ/9Z/L '6MP'iq!q!4x3 VdO 1 ooD4d\t 96D4d\Vj3\sq!q!4x3 ZOt\ONVI OOt\i000\ONVI—XLN\:S F, .�o CID 1� OD o � 0 Z Z LL z C� U z w co � 00 *� Qy' WX Way03 WF W > x WLU CID N cc U `c x x 0 o f t t >:g �/ ! C/� 3 0 �U)o — — — —— — 3Mf1 daVH \ /� 0 O O Y m I In a .� z x Ir al II BMW / } / J I �3Naa N dko / 9 ti�� ✓ \ / �o L � _ Z W I y? mN I \ I y L _ _ z Z & - w Z H WLLI W \ / 0 IL f � LL Wo En d J Mo!gn)i m-puy 'yVy 64:6 6Loz1gz L '6Mp•a}!q!4x3 V3D I ooD4d\L eso4d\VdO\sq!q!4x3 Z04\ONVI OOi\t000\aNVI—X1N\:S 0042431WATEA) DAP-SID PROPOSAL Page 1 of 1 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Item Information Bidder's Proposal Bidlist Description Specification Section No. Unit OfMeasrve Bid Quantity Unit Price Bid Value Item No. UNIT AT ER IMPROVEMENTS 1 3305.0109 Trench Safety 3305 10 LF 10898 $ 0.25 $ 2,724.50 2 3305.1 I03 20"Casing By Other Than Open Cut 33 05 22 EA 360 S 580.00 S 208,800.00 3 3311.0001 Ductile Iron Water Fittings w/Restraint 3311 11 TON 5.96 $ 4,000.00 $ 23,940,00 4 3311.0041 4"Water Pipe 33 11 10,33 11 12 LF 214 $ 30.00 $ 6,420.00 5 3311.0241 8"Water Pipe 33 11 10,33 11 12 LF 7841 $ 34.00 $ 266,594.00 6 3311.0441 12"Water Pipe 33 11 10,33 11 12 LF 2763 $ 46.00 $ 127,098.00 7 3311.0447 12"Water Pipe,CLSM Bakcfill 33 11 10 LF 80 $ 56.00 $ 4,480.00 8 3311.0454 12"DIP Water(Restrained Joints) 33 1100 LF 372 S 72.00 S 26,794,00 9 3312.000I Fire Hydrant 33 1240 EA 8 S 4,500.00 S 36,000.00 10 3312.0106 Connection to Existing 16"Water Main 33 1225 EA 1 S 1,000.00 S 1,000.00 11 3312.2003 1"Water Service 33 1210 EA 206 S 950.00 S 195,700.00 12 3312.2103 1 1/2'Water Service 33 1210 EA 5 $ 1,500.00 $ 7,500.00 13 3312.2203 2'Water Service 33 1210 EA 2 $ 2,800-00 S 5,600.00 14 3312.3001 4"Gate Valve 33 1220 EA I S 750.00 S 750.00 15 3312.3003 8"Gate Valve 33 1220 EA 28 S 1,250.00 S 35,000.00 16 3312.3005 12"Gate Valve 33 1220 EA I I S 2,600.00 $ 28,600.00 17 9999.0001 2"Potable Combination Air Valve Assembly 33 1230 EA 3 S 4,500.00 $ 13,500.00 TOTAL UNIT I-WATER IMPROVEMENTS S 990,390.50 CITY OF FORT WORM 004243(WAX ER) STANDARD CONSTRICTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROTECTS SRIDGEVIE W_00 4243_2019.01.24Ahm Form Version Apra 2.2014 aMge lew Phase 111019121 Do Q 43(SEWER) DAD.BID PROPOSAL Page 1 aF 1 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Item Informatiun Bidders Proposal Bidlist Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value Item No. NIT II-SEWER IMPR V MENTS 1 0330 0001 Concrete Encase Sewer Pipe 03 3000 C'Y 461 S200.00 $9,200.00 2 3301,0002 Post-CCTV Inspection 33 01 31 LF 13859 $ 2,00 $27,718.00 3 3301,0101 Manhole Vacuum Testing 33 01 30 EA _ 54 $ 150.00 S8,100.00 4 3305.0109 Trench Safety 33 05 10 LF 13859 E L00 $13,859.00 5 3305.0113 Trench Water Stops 33 05 15 EA 11 $ 250.00 $2,750,00 6 3305,1 I04 24"Casing By Other Than Open Cut 33 05 22 LF 120 $ 680,00 $81,600.00 7 3331,3101 4"Sewer Service 33 31 50 EA 266 E 650,00 $172,900.00 8 3331.4115 8"Sewer Pipe(SDR-26,ASTM D3034) 33 11 10,33 31 12,33 31 20 LF 8318 E 38.00 S316,084.00 9 3331.4116 8"Sewer Pipe(SDR-26,ASTM D3034 w/CSS) 10,33 31 12,33 31 20,33 05 10(: LF 514 $ 48.00 $24,672.00 10 3331.4201 10"Sewer Pipe(SDR-26,ASTM D3034) 10,33 31 12,33 31 20,3305 100 LF 1017 S 48,00 $49,816.00 11 3331.4208 12"Sewer Pipe(SDR-26,ASTM D3034) 10,33 31 12,33 31 20,33 05 10(. LF 3143.0 $ 58,00 $182,294 00 12 3331 4215 15"Sewer Pipe(SDR-26,.ASTM D3034) 10,33 31 12,33 31 20,33 05 10(. LF 867 $ 72.00 $62,424.00 13 3339,0001 Epoxy Manhole Liner 333960 VF 43.7 E 215.00 S9,39550 14 3339,1001 4'Manhole 33 39 10,33 39 20 EA 49 E 4,000.00 $196,000.00 15 1 3339.1002 4'Drop Manhole 33 39 10,33 39 20 EA 4 E 4,800.00 $19,200,00 16 3339.1003 4'Exaa Depth Manhole 33 39 10,33 3920 VF 173 E 175,00 $30,275,00 17 3339.1004 4'Shallow Manhole 333910.333920 EA 1 E 4,000,00 $4,000.00 18 9999.0002 Connection to Existing Manhole 33 39 10.33 39 20 EA 1 $ 2,000,00 $2,000.00 TOTAL UNIT it-SEWER IMPROVEMENTS $1,211,287.50 CITY OF FORT WORTH DO 4243(SEWER) STANDARD CONSTRUCTION SPECIFICATION OMMENTS-DEVELOPER AWARDED PROJECTS BRIDGEVIEW 004243 2019,07.24.M1P, Form Verdpn Aprii 2,W14 9ridVWe1 Phase 1[1019121 OD tl 49(STORM) OAP.DID PROPOSAL PaPI FI SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Bern Wormstion Bidders Proposal Bidlist pesc::Vym Sped AUM Scum NO. Unit ofMe9sure Bid Quamity UDit Price Bid Value hem No 1 3137.0101 Concrete Riprap 313700 SY 616 $ 90.00 $ 55,440.00 2 313T0102 Large Stone Riprap,dry 313700 LF 1395 S 95.00 S 132,525.00 7 3305.0109 Trench Safety 3305 10 EA 6049 $ 1.00 $ 6,049.00 4 3305.0112 Concrete Collar 3305 17 LF 4 S 500.00 S 2,000.00 5 3341.0201 21"RCP,Class III 3341 10 LF 762 $ 50.00 $ 39,100.00 6 3341.0205 24'RCP,Class M 3341 10 LF 1757 S 55.0o $ %,635.00 7 3341.0302 30"RCP,Class ID 3341 10 LF 1218 $ 70.00 S 85,260.00 8 3341.0309 36'RCP,Class ID 3341 10 LF 172 S 95.00 $ 16,340.00 9 3341.0402 42'RCP,Class 117 3341 10 LF 243 $ 130.00 $ 31,590.00 l0 334LI 103 4x4 Box Culvert 3341 10 LF 621 $ 205.00 S 127,305.00 11 3341,1402 7x4 Box Culvert 3341 10 LF 766 S 360.00 $ 275,760.00 12 3341.1502 8x5 Box Culvert 3341 10 LF 284 S 415.00 $ 117,860.00 13 3341.1601 9x4 Box Culvert 334110 LF 226 $ 443.00 $ 100,570.00 14 3349,0001 4'Storm Jmcdm Box 33 49 10 EA 9 $ 5,000.00 $ 45,000.00 Is 7749.0002 5'Storm Junction Box 3349 10 EA 2 $ 6,500.00 S 13,000,00 16 3349.0003 6'Storm Junction Box 3349 10 EA I S 8,000.00 $ 8,000.00 17 3349.0102 4'Mmbole Riser 3349 10 EA 5 S 2,500.00 $ 12,500.00 18 3349.5001 10'Curb Inlet 33 49 20 EA 33 S 3,200.00 $ 105,6W.00 19 3349.5002 15'Curb Wet 34 49 20 EA 2 S 4,800.00 S 9,600.00 20 3349.7001 4'Drop Inlet 33 49 20 EA 3 $ 5,000.00 $ 15,000.00 21 9999.0003 Inlet Protection 3125 00(MOD) EA 38 $ 150.00 $ 5,700.00 22 9999.0004 Bonds for all Utility Ion roventents 0073 10 LS 1 S 65,000.00 S 65,000.00 27 9999.0005 TXDOT PW-1 Headwall(4:1)for 2-8'x5'RCB 3341 10 EA 2 S 21,500.00 S 43A00.00 24 9999.0006 TXDOT PW-1 Headwall(4:1)for 2-9'x4'RCB 3341 IO EA 2 S 22,500.00 $ 45,000.00 25 9999.0007 Commie Drop Structure 3341 10 LS 1 $ 49,500.00 $ 49,500.00 26 9999.0008 Concrete Spillway and Outfall Structure 37 41 10 LS I $ 69,500.00 $ 69,500.00 TOTAL UNff III-STORM IMPROVEMENTS S 1571.834.00 OTTOFFORT WORTH OD Az 49lsTDRMI STANDARD CONSIRIKrgN SPEOFiCATtON DOCUMENTS.DEVELOPER AWARDED PROJECTS 9MDGEMEW MC7l%-2019L714id- ForM VWWW APr91.3014 61149-hr P%-11=9121 004243(PAYING) DAP-BID PROPOSAL Page 1 of I SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Item Information Bidders Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value UNIT IV- "ING IMPROVEMENTS 1 3211,0501 6"Lime Treatment(324/SY) 32 11 29 SY 28361 S 5.38 $ 152,582,18 2 3211,0502 8"Lime Treatment(42#/SY) 32 1129 SY 17084 $ 6.78 $ 115,829.52 3 3213 0101 6"Conc Pvmt 32 13 13 SY 26614 $ 33.00 $ 878,262,00 4 3213,0301 4"Conc Sidewalk 32 13 20 SF 21904 $ 300 $ 65,712 00 5 3213.0501 Barrier Free Ramp,Type R-1 32 13 20 EA 16 S 1,200.00 $ 19,200.00 6 3213 0504 Barrier Free Ramp,Type M-2 32 13 20 EA 2 $ 1,300.00 $ 2,600.00 7 3213.0506 Barrier Free Ramp,Type P-1 32 13 20 EA 20 $ 1,200,00 $ 24,000.00 8 3213.0510 Barrier Free Ramp,Type C-3 32 13 20 EA I $ 1,200.00 S 1,200.00 9 9999,0008 7.5"Conc Pvmt 32 13 13 SY 15594 S 39,00 S 592,572,00 t0 9999,0013 Install FOR Barricade 34 4130(MOD) LF 268 $ 20,00 $ 5,360.00 11 9999.0015 Pavement Header 32 13 13 LF 268 S 20,00 $ 5.360.00 12 9999,0016 SWPPP Maintenance 312500(MOD) LS 1 S 5,000.00 $ 5,000.00 13 9999,0017 City Bonds for all Paving Improvements 0073 10 LS I $ 40,000.00 1$ 40,000,00 TOTAL UNIT IV-PAYING IMPROVEMENTS S 1,907,677.70 CITY OF FORT WORTH 0042 43(PAVING) STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROTECTS BRIDGEVIEW 004243 2019.07.24.xlsm Form Version April 2.2014 Bridgeview Phase 111019121 00 42 43(STREET LIGHTS) DAP-BID PROPOSAL Page 1 or 1 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Item Information Bidder's Proposal tem is BidlN Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value It NIT VI- TREET LIGHTS IMPROVEMENTS 1 2605.3015 2a Condt PVC SCH 80(T) 260533 LF 60531$ 12.00 1$ 72,636.00 2 3441 3401 6-6-6 Triplex Alum Elec Conductor 34 41 20 LF 6053 $ 3.00 $ "'159.00 3 9999.0018 Street Lights 0073 10 EA 87 $ 4,400.00 $ 382,800.00 4 9999.0019 City bonds for all Street Light Improvements 0073 10 LS 1 $ 7,500.00 1$ 7,500.00 TOTAL UNIT VI-STREET LIGHTS IMPROVEMENTS $ 481,095.00 CITY OF FORT WORTH Go 42 43(STREET LIGH TSI STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS BRIDGEVIEW 00 42 43 2019.02.24.1Ism Form V-1—APO 2,2014 Bridgeview Phase 1[101912) OD4243(WATER) OAP-BID PROPOSAL Page 1 of 1 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Project Item Information Bidder's Proposal Bidlst it.. S Description Specification Section No. Un i it of Measure Bid Quantity Unit Price Bid Value NIT V TREET NAME SIGNS IMPROVEMENTS 1 9999.0009 Furnish/Install Alum.Sign Ground Mount City Std.-RI-1 Stop Sign& 3441 30 EA 19 $ 450.00 $ 8,550.00 Detail D633 Street Name&Pole 2 9999,0010 Furnishanstall Alum.Sign Ground Mount City Std-W 14-2 No Outlet& 34 41 30 EA I $ 500.00 $ 500.00 Pole 3 9999.0011 Furnish/Install Alum.Sign Ground Mount City Sid.-R4-7 Median 3441 30 EA 2 $ 500.00 $ 1000.00 Avrroachinu&Pole 4 9999 0012 Furnish Install Alum,Sign Ground Mount City Sid.-Detail D633 Street 3441 30 EA 19 $ 450.00 $ 8,550,00 Name&Pol e TOTAL UIYI'T V-STREET NAME SIGNS IMPROVEDIENTS S 18,600.00 0T OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROTECTS Farm Yersinn February 36,201a W 4243_Bid Proposal DAP_Rev 02-36-i8 DO 4243 Summary DAP-BID PROPOSAL Page i of 1 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM BID SUMMARY TOTAL UNIT 1-WATER IMPROVEMENTS S 990,390,50 TOTAL UNIT 11-SEWER IMPROVEMENTS $ 1,211,287.50 TOTAL UNIT III-STORM IMPROVEMENTS S 1,571,834,00 TOTAL UNIT IV-PAVING IMPROVEMENTS $ 1,907,677.70 TOTAL UNIT V-STREET LIGHTS IMPROVEMENTS S 481,095.00 TOTAL UNIT VI-STREET NAME SIGNS IMPROVEMENTS $ 18,600.00 Total Construction Bid S 6,180,884.70 This Bid is submitted by the entity named below: R BIDDER: BY: Conatser Construction TX,L.P. 5327 Wichita Street TITLE: Brock ugglns,Presit e Fort Worth,TX 76119 DATE: Contractor agrees to complete WORK for FINAL ACCEPTANCE within 2 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH 00 42 43 Aen V STANDARD CONSTRUCTKKJ SPEOFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS BRIDGEVIEW 0D4243 2019.177.14jlsm Form Verslp AprII 2,2014