HomeMy WebLinkAboutContract 52710 Received Date: 09/03/19
Received Time:8:13 AM
Developer and Project Information Cover Sheet:
Developer Company Name: Rob Riner Companies GP,LLC a Texas Limited Liability Company
Address, State,Zip Code: P O Box 907,Fort Worth,TX 76101
Phone&Email: 972-689-0669,rrinerarobriner.com
Authorized Signatory,Title: Rob Riner,,Managing Partner
Project Name: Joel East Road Improvements
Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights,Traffic Signals
Project Location: Intersection of Joel East Road and Oak Grove Rd
Plat Case Number: Plat Name:
Mapsco: I I Council District: 8
CFA Number: CFA18-0186 City Project Number: 101903
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Joel East Road Improvements
CFA Official Release Date:02.20.2017 CITY SECRETARY
Page 1 of 11 FT. WORTH,TX
STANDARD COMMUNITY FACILITIES AGREEMENT
THE STATE OF TEXAS § City Secretary
COUNTY OF TARRANT § Contract No. 52710
WHEREAS, Rob Riner Companies GP, LLC a Texas Limited Liability Company ,
("Developer"), desires to make certain specific improvements, as described below and on the
exhibits attached hereto ("Improvements") related to a project generally described as Joel East
Road Improvements ("Project") within the City or the extraterritorial jurisdiction of Fort Worth,
Texas("City"); and
WHEREAS, the City has no obligation to participate u}the cost of the Improvements or
Project; and
WHEREAS,any future City participation in this CFA is subject to the availability of City
funds and approval by the Fort Worth City Council and shall be memorialized as an amendment
to this Agreement; and
WHEREAS, the Developer and the City desire to enter into this Community Facilities
Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the
Project.
NOW,THEREFORE,for and in consideration of the covenants and conditions contained
herein,the City and the Developer do hereby agree as follows:
General Requirements
A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001,
approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated
into this Agreement as if copied herein verbatim. Developer agrees to comply with all
provisions of said Policy in the performance of its duties and obligations hereunder and to
cause all contractors hired by Developer to comply with the Policy in connection with the
work performed by said contractors.
B. Developer shall provide financial security in conformance with paragraph 6, Section II, of
the Policy and recognizes that there shall be no reduction in the collateral until the Project
has been completed and the City has officially accepted the Improvements. Developer
City of Fort Worth,Texas E
Standard Community Facilities Agreement-Joel East Road Improvements RECORD
CFA Official Release Date:02.20.2017 EI!'ARY
Page 2 of 11 �,
further acknowledges that said acceptance process requires the Developer's contractor(s)
to submit a signed affidavit of bills paid and consent of Surety signed by its surety to
ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally,
the contractor will provide in writing that the contractor has been paid in full by Developer
for all the services provided under this contract.
C. Developer agrees to cause the construction of the Improvements contemplated by this
Agreement and that said construction shall be completed in a good and workmanlike manner
and in accordance with all City standards and the City-approved construction plans,
specifications and cost estimates provided for the Project and the exhibits attached hereto.
D. The following checked exhibits describe the Improvements and are incorporated herein:
Water (A) ®, Sewer(A-1) ❑X, Paving (B) ®, Storm Drain (13-1) ❑X, Street Lights & Signs
(C) M.
E. The Developer shall award all contracts for the construction of the Improvements in
accordance with Section 11,paragraph 7 of the Policy and the contracts shall be administered
in conformance with paragraph 8, Section I1, of the Policy. Developer shall ensure its
contractor(s)pays the then-current City-established wage rates.
F. For all Improvements included in this Agreement for which the Developer awards
construction contract(s), Developer agrees to the following:
i. To employ a construction contractor who is approved by the director of the
department having jurisdiction over the infrastructure to be constructed, said
contractor to meet City's requirements for being prequalified, insured, licensed and
bonded to do work in public ways and/or prequalified to perform water/wastewater
construction as the case may be.
ii. To require its contractor to furnish to the City a payment and performance bond in
the names of the City and the Developer for one hundred percent (100%) of the
contract price of the infrastructure, and a maintenance bond in the name of the City
for one hundred percent (100%) of the contract price of the infrastructure for a
period of two (2) years from the date of final acceptance insuring the maintenance
and repair of the constructed infrastructure during the term of the maintenance
City of Fort Worth,Texas
Standard Community Facilities Agreement-Joel East Road Improvements
CFA Official Release Date:02.20.2017
Page 3 of 11
bond. All bonds to be furnished before work is commenced and to meet the
requirements of Chapter 2253, Texas Government Code.
iii. To require the contractor(s) it hires to perform the construction work contemplated
herein to provide insurance equal to or in excess of the amounts required by the
City's standard specifications and contract documents for developer-awarded
infrastructure construction contracts. The City shall be named as additional insured
on all insurance required by said documents and same will be evidenced on the
Certificate of Insurance (ACORD or other stag-approved form) supplied by the
contractor's insurance provider and bound in the construction contract book.
iv. To require its contractor to give 48 hours advance notice of intent to commence
construction to the City's Construction Services Division so that City inspection
personnel will be available;to require the contractor to allow the construction to be
subject to inspection at any and all times by City inspection forces,to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a responsible City
inspector is present and gives his consent to procieed, and to make such laboratory
tests of materials being used as may be required ley the City.
V. To require its contractor to have fully executed contract documents submitted to
the City in order to schedule a Pre-Construction Meeting. The submittal should
occur no less than 10 working days prior to the desired date of the meeting. No
construction will commence without a City-issued Notice to Proceed to the
Developer's contractor.
vi. To delay connections of buildings to service lines of sewer and water mains
constructed under this Agreement, if any, until said sewer and water mains and
service lines have been completed to the satisfaction of the Water Department.
G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering
drawings and documents necessary to construct the improvements under this Agreement.
H. Developer shall cause the installation or adjustment of the required utilities to serve the
development or to construct the Improvements required herein.
I. City shall not be responsible for payment of any costs that may be incurred by Developer in
the relocation of any utilities that are or may be in conflict with any of the community facilities
to be installed hereunder.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Joel East Road Improvements
CFA Official Release Date:02.20.2017
Page 4 of 11
J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless
for any inadequacies in the preliminary plans,specifications and cost estimates supplied
by the Developer for this Agreement.
K. Developer agrees to provide, at its expense, all necessary rights of way and easements across
property owned by Developer and required for the construction of the current and future
improvements provided for by this Agreement.
L. The Developer further covenants and agrees to, and by these presents does hereby,
fully indemnify, hold harmless and defend the City, its officers, agents and employees
from all suits, actions or claims of any character,whether real or asserted,brought for
or on account of any injuries or damages sustained by any persons (including death)
or to any property, resulting from or in connection with the construction, design,
performance or completion of any work to be performed by said Developer, its
contractors, subcontractors, officers, agents or employees, or in consequence of any
failure to properly safeguard the work, or on account of any act, intentional or
otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors,
officers, agents or employees, whether or not such injuries, death or damages are
caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its
officers, servants, or employees.
M. Developer will further require its contractors to indemnify, defend and hold harmless
the City, its officers, agents and employees from and against any and all claims, suits or
causes of action of any nature whatsoever, whether real or asserted, brought for or on
account of any injuries or damages to persons or property, including death, resulting
from, or in any way connected with,the construction of the infrastructure contemplated
herein,whether or not such injuries, death or damages are caused, in whole or in part,
by the alleged negligence of the City of Fort Worth, its officers, servants, or employees.
Further,Developer will require its contractors to indemnify, and hold harmless the City
for any losses, damages, costs or expenses suffered by the City or caused as a result of
said contractor's failure to complete the work and construct the improvements in a good
and workmanlike manner, free from defects, in conformance with the Policy, and in
accordance with all plans and specifications.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Joel East Road Improvements
CFA Official Release Date:02.20.2017
Page 5 of 11
N. Upon completion of all work associated with the construction of the Improvements,
Developer will assign to the City a non-exclusive right to enforce the contracts entered into
by the Developer with its contractor along with an assignment of all warranties given by the
contractor,whether express or implied. Further,Developer agrees that all contracts with any
contractor shall include provisions granting to the City the right to enforce such contracts as
an express intended third party beneficiary of such contracts.
O. Inspection and material testing fees are required as follows:
i. Developer shall pay in cash water and wastew4ter inspection fees and material
testing fees equal to two percent(2%) for a total of 4% of the developer's share of
the total construction cost as stated in the construction contract.
ii. Developer shall pay in cash paving and storm drain inspection fees equal to four
percent (4%) and material testing fees equal to two percent(2%) for a total of 6%
of the developer's share of the total construction cost as stated in the construction
contract.
iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing
the streetlights, inspection fees equal to four percent(4%) of the developer's share
of the streetlight construction cost as stated in the construction contract.
iv. Developer shall pay in cash the total cost of street signs.
P. COMPLETION WITHIN 2 YEARS
i. Developer shall complete the Improvements Within two (2) years, provided,
however, if construction of the Improvements has started within the two year
period,the developer may request that the CFA be extended for one additional year.
ii. Nothing contained herein is intended to limit the Developer's obligations
under the Policy, this Agreement, its financial guarantee, its agreement with
its contractor or other related agreements.
iii. The City may utilize the Developer's financial guarantee submitted for this
Agreement to cause the completion of the cons"ction of the Improvements if at
the end of two(2)years from the date of this Agreement(and any extension period)
the Improvements have not been completed and accepted.
iv. The City may utilize the Developer's financial guarantee to cause the completion
of the construction of the Improvements or to cause the payment of costs for
City of Fort Worth,Texas
Standard Community Facilities Agreement-Joel East Road Improvements
CFA Official Release Date:02.20.2017
Page 6 of 11
construction of same before the expiration of two (2) years if the Developer
breaches this Agreement, becomes insolvent or fails to pay costs of construction
and the financial guarantee is not a Completion Agreement. If the financial
guarantee is a Completion Agreement and the Developer's contractors and/or
suppliers are not paid for the costs of supplies and/or construction, the contractors
and/or suppliers may put a lien upon the property which is the subject of the
Completion Agreement.
Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government
Code,the City is prohibited from entering into a contract with a company for goods or services
unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms
"boycott Israel" and "company" shall have the meanings ascribed to those terms in Section
808.001 of the Texas Government Code. By signing this contract, Developer certifies that
Developer's signature provides written verification to the City that Developer: (1) does not
boycott Israel; and(2)will not boycott Israel during the term of the contract.
IMMIGRATION AND NATIONALITY ACT
R. Developer shall verify the identity and employment eligibility of its employees who perform
work under this Agreement, including completing the Employment Eligibility Verification
Form (1-9). Upon request by City, Developer shall provide City with copies of all 1-9 forms
and supporting eligibility documentation for each employee who performs work under this
Agreement. Developer shall adhere to all Federal and State laws as well as establish
appropriate procedures and controls so that no services will be performed by any Developer
employee who is not legally eligible to perform such services. DEVELOPER SHALL
INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY
DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR
LICENSEES. City, upon written notice to Developer, shall have the right to immediately
terminate this Agreement for violations of this provision by Developer.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Joel East Road Improvements
CFA Official Release Date:02.20.2017
Page 7 of 11
Cost Summary Sheet
Project Name: Joel East Road Improvements
CFA No.: CFA18-0186 City Project No.: 101903
An Engineer's Estimate of Probable Cost is acceptable. Howev�r, the construction contract price
will ultimately determine the amount of CFA fees and financial guarantee. The bid price and
any additional CFA payments will be required prior to scheduling a pre-construction meeting.
An itemized estimate corresponding to each project-specific exhibit is required to support the
following information.
Items Developer's Cost
A. Water and Sewer Construction
1. Water Construction $ 74,01fi.00
2.Sewer Construction $ 34,090.00
Water and Sewer Construction Total $ 108,105.00
B. TPW Construction
1.Street $ 1,381,781.50
2.Storm Drain $ 664,89E.00
3.Street Lights Installed by Developer $ 44,OOC,.00
4. Signals $ 800.00
TPW Construction Cost Total $ 2,091,470.50
Total Construction Cost(excluding the fees): $ 2,199,581.50
Construction Fees:
C. Water/Sewer Inspection Fee(2%) $ 2,162.10
D. Water/Sewer Material Testing Fee(2%) $ 2,162.10
Sub-Total for Water Construction Fees $ 4,324.20
E. TPW Inspection Fee(4%) $ 81,867.06
F. TPW Material Testing(2%) $ 40,933.53
G. Street Light Inspsection Cost $ 1,760.00
H. Signals Inspection Cost $ 32.00
H. Street Signs Installation Cost $
Sub-Total for TPW Construction Fees $ 124,592,59
Total Construction Fees: $ 128,916M79
Choice
Financial Guarantee Options,choose one Amount Mark one
Bond=100% $ 2,199,581.50
Completion A reement=100%/Holds Plat $ 2,199,581.50
Cash Escrow Water/Sanitary Sewer—125% $ 135,131.25
Cash Escrow Paving/Storm Drain=125% $ 2,614,345,63
Letter of Credit=125%w/2 r expiration period $ 2,749,476,88 x
City of Fort Worth,Texas
Standard Community Facilities Agreement-Joel East Road Improvements
CFA Official Release Date:02.20.2017
Page 8 of 11
ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be
executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as
of the date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH DEVELOPER
Rob Riner Companies GP,LLC a Texas Limited
Daher
Liability Company
Burghdot r
Dana Burghdoff ug 30,2019)
Dana Burghdoff
Interim Assistant City Manager
Date: Aug 30,2019A�`�
Robert Riner(Aug 29,2019)
Recommended by: Name: Rob Riner
Title: Managing Partner
r �t Date: Aug 29,2019
ln�Robe (Aug29,2019)
Evelyn Roberts/Jennifer Ezernack
Project Assistant
Planning and Development
Contract Compliance Manager:
By signing, I acknowledge that I am the
Approved as to Form &Legality: person responsible for the monitoring and
administration of this contract, including
Rsch�d A ensuring all performance and reporting
Richard A.McCracken(Aug 30,2019) requirements.
Richard A. McCracken n�-
Assistant City Attorney
MN/A
D rney A5 -Pl —
M&C No. 'V A Jennifer Ezernack on behalf of Janie Morales(Aug 29,2019)
Date: Name: Janie Morales
Title: Development Manager
Form 1295: oR,r ;
ATTEST: F-
�D`l�� uG�l�tr,�i •., •� .
Ronald P.Gonzales(Aug 30,2019) ' ..............R C-1
Mary J. Kayser/Ronald Gonzales ......, '
City Secretary/Assistant City Secretary
City of Fort Worth,Texas OFFICIAL RECORD
Standard Community Facilities Agreement-Joel East Road Improvements CITY SECRETARY
CFA Official Release Date:02.20.2017
Page 9 of 11 FT.WORTHo TX
Check items associated with the project being undertaken; checked items must be
included as Attachments to this Agreement
Included Attachment
® Attachment 1 -Changes to Standard Community Facilities Agreement
® Location Map
® Exhibit A: Water Improvements
® Exhibit A-1: Sewer Improvements
® Water and Sewer Cost Estimates
® Exhibit B: Paving Improvements
® Paving Cost Estimate
® Exhibit B-1: Storm Drain Improvements
® Storm Drain Cost Estimate
® Exhibit C: Street Lights and Signs Improvements
® Street Lights and Signs Cost Estimate
(Remainder of Page Intentionally Left Blank)
City of Fort Worth,Texas
Standard Community Facilities Agreement-Joel East Road Improvements
CFA Official Release Date:02.20.2017
Page 10 of 11
ATTACHMENT"1"
Changes to Standard Agreement
Community Facilities Agreement
City Project No. 101903
None.
City of Fort Worth,Texas
Standard Community Facilities Agreement-Joel East Road Improvements
CFA Official Release Date:02.20.2017
Page 11 of 11
00 42 43
DAP-BID PROPOSAL
Pale 1 of to
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Speeificatian Unit of Bid Unit Price Bid Value
No. Description Section No. Meaoure Quantity
UNIT 1:WATER IMPROVEMENTS
1 3312.2203 2"Water Service 331210 EA 6 $ 3,000.00 $ 18,000.00
2 3312.411416"x12"Tapping Sleeve&Valve 331225 EA 4 $ 4,500.00 $ 18,000.00
3 3311.0441 12"Water Pipe 331110 LI 39 $ 80.00 $ 3,120.00
4 3312.4112 16"x 8"Tapping Sleeve&Valve 331225 EA 4 $ 4,000.00 $ 16,000.00
5 3311.0241 8"Water Pipe 3311 10 LIF 45 $ 55.00 $ 2,475.00
6 3305.0109 Trench Safety 330610 LIB 84 5.00 $ 420.00
7 3312.0106 Connection to Existing 16"Water Main 33 12 25 EA 16 1,00000 $ 1600.00
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMEIN-IS-DEVELOPER AWARDED PROJECTS
Copy of0o 42 43 Bid Propo>.i DAP(2019.07.22 CONTRACT')
Fonn Version Seplemba 1,2015
00 4_43
DAP-BID PROPOSAL
Page 2 of 10
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Specification Unit of Bid
No Description Section No. Measure QuantityUnit Price Bid Value
45
TOTAL UNIT I:WATER IMPROVEMENTS $74,015.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1.2015 Copy of 00 42 0 RW P oposol_DAP(20I9.0712 CONTRACT)
00 42 43
DAP-BCD PROPOSAL
P&p3 of10
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item Description Specification Unit of Bid Unit Price Bid Value
No. Section No. M.W. Quantity
UNIT II:SANITARY SEWER IMP EMENTS
3339.1001 4'Manhole 33 39 10,33 39 EA
1 20 1 $ 4,200.00 $ 4,200.00
2 3331.3201 6"Sewer Service 33 31 50 EA 1 $ 1,150.00 $ 1.150.00
3311 10,33 31
3 '12,33 31 20 LF
3331.4108 6"Sewer Pipe 48 $ 45.00 $ 2,160.00
4 3331.3301 8"Sewer Service 33 31 50 EA' 3 $ 1,250.00 $ 3,750.00
3331.4115 8"Sewer Pipe 33 11 10.33 31
5 12,333120 LF 143 $ 60.00 $ 8,580.00
6 3339.1002 4'Drop Manhole 33 39 10,33 39 EA 1 $ 5,200.00 $ 5,200.00
7 3339.0001 Epoxy Manhole Liner 33 39 60 VF 24 $ 285.00 $ 6,840.00
8 3301.0001 Pre-CCTV Inspection 33 01 31 LF 191 $ 5.00 $ 955.00
9 3301.0002 Post-CCTV Inspection 33 01 31 LF 191 $ 5.00 $ 955.00
10 3301.0101 Manhole Vacuum Testing 33 01 30 EA 2 $ 150.00 $ 300.00
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
TOTAL UNIT 11:SANITARY SEWER IMP VEMENTS $34.090.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS•DEVELOPER AWARDED PROJECTS
Form Vesioa Septen4w 1.2015 Copy of 00 42 43_Bid PFopc _DAP(2019.07.23_CONTRACT)
00 42 43
DAP•am PROPOSAL
Pacc 4 of 10
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Itcm Description Specification Unit of Bid Unit Price Bid Value
No. I Section No. Measure Quantity
UNIT III:DRAINAGE IMPROVEMENTS
1 3341.1102 4x3 Box Culvert 3341 10 LF 799 $ 185.00 $ 147,815.00
2 3349.0003 6'Storm Junction Box 33 49 10 EA 2 $ 7,500.00 $ 15,000.00
3 3349.6001 10'Recessed Inlet 33 49 20 EA 11 $ 3,600.00 $ 39,600.00
4 3349.6002 15'Recessed Inlet 33 49 20 EA 2 $ 4,600.00 $ 9,200.00
5 3349.6003 20'Recessed Inlet 34 49 20 EA 2 $ 5,600.00 $ 11,200.00
6 3349.4001 SET,Type I for Box Culverts 33 49 40 CY 4 $ 2,750.00 $ 11,000.00
7 3137.0101 Concrete Rlprap(6"Thick) 31 3700 SY 187 $ 75.00 $ 14,025.00
8 3341.0201 21"RCP,Class III 3341 10 LF 449 $ 50.00 $ 22,450.00
9 3137.0104 Medium Stone Rlprap,dry 31 37 00 SY 113 $ 105.00 $ 11,865.00
10 3305.0116 Concrete Encasement for Utility Pipes 33 05 10 CY 3 $ 200.00 $ 600.00
11 3125.0101 SWPPP 2 1 acre 31 2500 LS 1 $ 13,500.00 $13,500.00
12 3341.0402 42"RCP,Class III 3341 10 LF 795 $ 120.00 $95,400.00
13 3341.0309 36"RCP,Class III 3341 10 LF 1741 $ 100.00 $174,100.00
14 3349.0104 4'Stacked Manhole 33 49 10 LF 2 $ 2,500.00 $5,000.00
15 3341.1001 3x2 Box Culvert 3341 10 LF 464 $ 155.00 $11,920.00
16 3349.0001 4'Storm Junction Box 33 49 10 LF 4 $ 4,500.00 $18,000.00
17 3341.0302 30"RCP,Class III 3341 10 LF 9 $ 80.00 $720.00
18 3349.2005 30"Parallel Headwall,1 pipe 33 49 40 EA 1 $ 3,500.00 $3,500,00
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
TOTAL UNIT III:DRAINAGE IMPROVEMENTS $664,895.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS•DEVELOPER AWARDED PROJECTS
Copy ofQO 42 U BW Pmpmal DAP(2019.07.22 CO?rrRACT)
Form Vmioa SWember 1,2015
00 42 43
DAP-BID PROPOSAL
Pop 5 or 10
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item loformation Bidder's Proposal
Bidlist Item Specification Unit of Bid Unit Price Bid Value
No. Description Section No. Ideaaure Quantity
UNIT IV:PAVING IMPROVEMENTS
1 0241.1100 Remove Asphalt Pvmt 0241 15 SY 10,288 $ 8.00 $ 82,304.00
2 0241,0500 Remove Fence 0241 13 LF 2,475 $ 3.00 $ 7,425.00
3 0241.3015 Remove 24"Storm Line 0241 14 LF 66 $ 20.00 $ 1,320.00
4 3305.0111 Valve Box Adjustment 33 05 14 EA 2 $ 500.00 $ 1.000.00
5 3471.0001 Traffic Control 3471 13 MO 5 $ 1,500.00 $ 7,500.00
6 3213.0103 8"Conc Pvmt 32 13 13 SY 15,732 $ 46.00 $ 723,672.00
7 3213.0102 7"Conc Pvmt 321313 SY 1,509 $ 42.00 $ 63,378.00
8 3212.0302 2"Asphalt Pvmt Type D 321216 SY 845 $ 14.00 $ 11,830.00
9 3212.0501 4"Asphalt Base Type 8 321216 SY 845 $ 24.00 $ 20,280.00
10 3213.0301 4"Conc Sidewalk 32 13 20 SF 58,022 $ 3.50 $ 203,077.00
11 3211.0502 8"Lime Treatment 32 11 29 SY 17,430 $ 3.50 $ 61,005.00
12 3211.0401 Commercial Lime Slurry 32 11 29 TN 424 $ 190.00 $ 80,560.00
13 3291,0100 Topsoil 329119 CY 1,958 $ 20.00 $ 39,160.00
14 3217.0004 4"SLD Pvmt Marking HAS(Y) 321723 LF 10,799 $ 2.00 $ 21.598.00
15 3217,0203 8"SLD Pvmt Marking Tape(W) 32 17 23 LF 261 $ 3.00 $ 783.00
16 3217.0204 8"SLD Pvmt Marking Tape(Y) 32 17 23 LF 140 $ 3.00 $ 420.00
17 3217.1002 Lane Legend Arrow 32 17 23 EA 21 $ 450.00 $ 9,450.00
18 3217.1004 Lane Legend Only 32 17 23 EA 3 $ 456.00 $ 1,350.00
19 3217.2103 REFL Raised Marker TY II-A-A 32 17 23 EA 174 $ 5.25 $ 913.50
20 3123.0101 Unclassified Excavation by Plan 31 2316 CY 4,126 $ 6.00 $ 24,756.00
21 3110.0101 Site Clearing 31 1000 LS 1 $ 15,000.00 $ 15,000.00
22 0170.0100 Mobilization 01 7000 LS 1 $ 5.000.00 $ 5,000.00
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
TOTAL UNIT IV:PAVING IMP OVEMENTS1 $1,381,781.50
cnY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Copy or00 C 43 os+l_Bid Prop DAP(:019.07.22 CONfRACTI
Fofm Venice Swee'bc 1.20 15
00 42 43
DAP-BIDPROPOSAL
PWe 6 of 10
SECTION 00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
—[
Bidiist Ttem Specifiption Unit of Bid Unit Price Bid Value
Description Section No. Measure Queotiry
No.
UNIT V:STREET UG TING IMPROVEMENTS
1 3441.3201 LED Lighting Fixture 34 41 20 EA 20 $1,000.00 $20,000.00
2 3441.3323 Furnishlinstall 8'Wood Light Pole.Arm 34 41 20 EA 20 $1,200.00 $24,000.00
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
CrTY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
F%m Varstuu Septembcr 1,20t3 'of 00 42 47 Bid PmpwY SAP(1019.07,22 CONTMCI')
004243
DAP•BID PROPOSAL
Page 7 of 10
SECTION.00 42 43
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Bidlist Item DescSpecification Unit of Bid
No. d�°B Section No. Me4wre Quantity Unit Price Bid Value
45
TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $44,000.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS
Form Version September 1,2013 Copyor00.12 43 BidPropw@l DAP(20MO72_CONTRACT)
00 42 4a
DAP-BID PROPOSAL
Pwgofto
SECTION 00 42 43
DevelcDi�r Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlisxo.t Item Specification Unit of Bid Unit Price Bid Value
Description Section No. Measure Quantity
UNIT VI-TRAFFIC SIGNAL IMPROVEMENTS
1 3441.4001 Furnish/install Alum Sign Mast Arm 34 41 30 EA 1 $ 800.00 $800.00
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECInCATIoN DOCIJAIENTS-DEVELOPER AWARDED PROJECTS Copy 0r00 42 43 Did Ropoal DNP inI9.0712_CONrRAC17
Form Veaion September 1,2015
00 32 13
DAP-BID PROPOSAL
Page 9 or 10
SECTION 00 42 40
Developer Awarded Projects-PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidder's Proposal
Ilidli,t i!c111 r Specification I�ni o; ' vBr=i
Description Unit Price Bid Value
No, Section No. \teasur Quantity
45
TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS $800.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUbIENTS-DRVELOPTR AWARDED PROJECTS
Form Vesion September 1,_2015 Copy or0o 42 43_Bid Proposal DAP(2019.07.22_CON I R4CT)
00 42 43
DAP•BID PROPOSAL
Fqe 10 of 10
SECTION 00 42 43
Developer Awarded Projects- PROPOSAL FORM
UNIT PRICE BID Bidder's Application
Project Item Information Bidders Proposal
Bidlist Item Description Specification Unit of Bid Unit Price Bid Value
No. Section No. Measure Quantity
Bid Summary
UNIT 1:WATER IMPROVEMENTS $74,015.00
UNIT Ii:SANITARY SEWER IMPROVEMENTS $34,090.00
UNIT III:DRAINAGE IMPROVEMENTS $664,895.00
UNIT IV:PAVING IMPROVEMENTS $1,381,781.50
UNIT V.STREET LIGHTING IMPROVEMENTS $44,000.00
UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS $800.00
Total Construction Bid $2.199.581.50
Contractor agrees to complete WORK for FINAL.ACCEPTANCE withini 210 calendar days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
ck 111O ZA 4QSXVEJ7-
(.pu�rsfac(,a�.tsrt.�T��G•�
CrrY OF FORT WORTH
STANDARD CONSTRUCTION SPECWJCATION DOCLUEN TS•DEVELOPER AWARDED PROJECTS
Form Venim Sep®ber 1,2015 Copy 9f00 42 43 BW PmpudrW("I9.07.22 CONTRACT)
dMmolrly [flap
JG'
�Q
w
C)
O GZ,.
CD
Y
Q
O
ALTA MESA
-o
v�
T
PROJECT LOCATION
w 9<
0
0 �o
0
z
AST
TARRANT COUNTY
MAPSCO F105-D
VICINITY MAP
(NOT TO SCALE)
6100 WESTERN PLACE, SUITE 1001 JOEL EAST RD IMPROVEMENTS
Pacheco Koch FORT WORTH, TX 76107 817.412.7155 VICINITY MAP CFA EXHIBITS
TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903
TX REG. SURVEYING FIRM LS-10193824 LOCATED IN THE CITY OF FORT WORTH, TEXAS
AND BEING OUT OF THE SHELBY LANDS SURVEY,
ABSTRACT NO. 1375
PAC CJS NTS 06/05/2019 2685-18.181 TARRANT COUNTY, TEXAS
�lALfll� � �� aV n aD o VL'/ lid Ll �W
0 200 400 800
GRAPHIC SCALE IN FEET
—
'- _T"
EXIST. 16" WATERLINE
X-24079
" Fr-
CONNECT TO EXISTING 16"
CONNECT TO EXISTING 16"
WATER MAIN WATER MAIN
PROPOSED 2" PROPOSED 2" CONNECT TO EXISTING 16"
IRRIGATION TAP IRRIGATION TAP WATER MAIN E
_ Y
PROPOSED 2"
IRRIGATION TAP
I I -jl I
O
v
I i
,
,
--'-- - ;;.di :. -.. .w.w ,say. •,asF
t!�
V
I ' I
I
I
I I CONNECT TO EXISTING 16"
WATER MAIN
IL I
im
I I I
' I
LEGEND
-*r- - EXISTING 16" WATER LINE
PROPOSED WATER LINE
6100 WESTERN PLACE, SUITE 1001 JOEL EAST RD IMPROVEMENTS
APacheco Koch FORT WORTH, TX 76107 817.412.7155 WATER CFA EXHIBIT
TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903
TX REG. SURVEYING FIRM LS-10193824 LOCATED IN THE CITY OF FORT WORTH, TEXAS
AND BEING OUT OF THE SHELBY LANDS SURVEY,
PAC CJS 1"=400' 02/25/2019 2685-18.18'1 ABSTRACT NO. 1375
TARRANT COUNTY, TEXAS
EXHO o O U SEWER
0 150 300 600
memo GRAPHIC SCALE IN FEET
n_ _
CONNECT TO EX. PROPOSED 4' DIAMETER I I PROPOSED 4' DIAMETER
I
SANITARY SEWER SANITARY SEWER DROP SANITARY SEWER MANHOLE
MANHOLE MANHOLE
CONNECT TO EX. _
SANITARY SEWER
II MANHOLE _
a o
o
Of a
a
I
EXISTING 8" SANITARY SEWER
PLAN NO. 16623
Li u �.�fl—�_
"L EAST RD
\ LEGEND
EXISTING 8" SANITARY SEWER
PROPOSED SANITARY SEWER LINE
6100 WESTERN PLACE, SUITE 1001 JOEL EAST RD IMPROVEMENTS
WORTH,RTH, TX 7s107 at7.a12.71ss SEWER CFA EXHIBITS
Pacheco Koch
TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903
TX REG. SURVEYING FIRM LS-10193824 LOCATED IN THE CITY OF FORT WORTH, TEXAS
AND BEING OUT OF THE SHELBY LANDS SURVEY,
DRAWN BY CHECKED BY SCALE DATE JOB NUMBER ABSTRACT NO. 1375
PAC CJS NTS 06/05/2019 2685-18.181 TARRANT COUNTY, TEXAS
KCHEM ® o Mwolm(a
PROPOSED CONCRETE PAVEMENT ® PRO L POSED HMA TRANSITN]N L J 0 250 500 1 000
PROPOSED CONCRETE SIDEWALK ® PROPOSED CONCRETE DRIVEWAY
GRAPHIC SCALE IN FEET
o \
0
PROPOSED CONCRETEI
PAVEMENT
d n I \
a . . . . . . . . . a
LL-
[PROPOSED 5'
SIDEWALK
• 11PROPOSED 10' I DRIVEWAYS III
SIDEWALK
I
PROPOSED 36'
WIDE STREET PROPOSED 6'
SIDEWALK
PROPOSED PROPOSED
DRIVEWAYS DRIVEWAY
6100 WESTERN RLACE, Ill TE 1001 JOEL EAST RD IMPROVEMENTS
Pacheco Koch FORT WORTH, TX 76107 817.412.7155 PAVING CFA EXHIBITS
TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903
TX REG. SURVEYING FIRM LS-10193824 LOCATED IN THE CITY OF FORT WORTH, TEXAS
DRAWN BY CHECKED BY SCALE DATE JOB
NUMBER AND BEING OUT OF THE SHELBY LANDS SURVEY,
PAS CJS 1"=600' O6/05/2019 2685-18.181 ABSTRACT N0. 1 TEX
TARRANT COUNTY, TEXAS
ENNOoOT `B? o STORM] MAN
JOOEL EA37 IND.
PROPOSED 4'X3' PROPOSED 0 20p 400 800
RCB SET AND
CONCRETE PRAPHIC SCALE IN FEET
PROPOSED 4'X4' LINED
JUNCTION BOX DITCH
PROPOSED 10' 23-J 1'
RECESSED CURB INLET k =PROPOSED,21" PUBLIC
N
PROPOSED 10'
RECESSED CURB INLET PROPOSED 4'X3'
PROPOSED 10' RCB
RECESSED CURB INLET =PROPOSED 'X6'
OX
PROPOSED 21" PUBLIC
STORM DRAIN
PROPOSED 10' PROPOSED 10'
RECESSED CURB INLET RECESSED CURB INLET
PROPOSED 21" PUBLIC PROPOSED 6'X6'
STORM DRAIN JUNCTION BOX
PROPOSED 20 I PROPOSED 42" PUBLIC
RECESSED CURB INLET I STORM DRAIN
JPROPOSED 21" PUBLIC PROPOSED O'X6'
STORM DRAIN JUNCTION BOX
'
I PROPOSED 36" PUBLIC PROPOSED 10
STORM DRAIN RECESSED CJRB INLET
PROPOSED 4' p PROPOSED 4'X4'
MANHOLE JUNCTION BOX
Cc
F.
PROPOSED 10'
PROPOSED 15' W RECESSED CURB INLET
RECESSED CURB INLET v
PROPOSED 'PROPOSED 36" RCB PUBLIC STORM
PUBLIC STORM DRAIN DRAIN
PROPOSED 4' I I PROPOSED 4'X4'
I MANHOLE I JUNCTION BOX I
PROPOSED SX2'
RCB PUBLIC STORM
PROPOSED 15' DRAIN
RECESSED CURB INLET ( PROPOSED 6'X6'
I PROPOSED 36" JUNCTION BOX
PUBLIC STORM DRAIN PROPOSED 10'
RECESSED CURB INLET
PROPOSED 4' PROPOSED 21" PUBLIC
MANHOLE STORM DRAIN
PROPOSED 36" PROPOSED 21"
PUBLIC STORM DRAIN PUBLIC STORM DRAIN
PROPOSED 20' PROPOSED 10'
RECESSED CURB INLET RECESSED CURB INLET
6100 WESTERN PLACE, SUITE 1001 JOEL EAST AND OAK GROVE RD IMPROVEMENTS
Pacheco Koch FORT WORTH, TX 76107 817.412.7155 CFA EXHIBITS
TX REG. ENGINEERING FIRM F-14439 LOCATED IN THE CITY OF FORT WORTH, TEXAS
TX REG. SURVEYING FIRM LS-10193824 AND BEING OUT OF THE SHELBY LANDS SURVEY,
ABSTRACT NO. 1375
PAC CJS 1"=400' 06/05/2019 2685-18.181 TARRANT COUNTY, TEXAS
0 100 200 400
GRAPHIC SCALE IN FEET
IIIIUIIIIIIIIIIU
II
I► !
I � ► If II
I I
II
3 ,,,; . ,.,, •� alllnlllllllalallnl►I111111l�Iv► 3
-
I_ �
n - - - - JOEL EA s RD - - n
205 09 03 .2
r r
Z Z
m m
� n
0o n
ADD LED LIGHTING TO
EX. TIMBER POLES
6100 WESTERN PLACE, SUITE 1001 JOEL EAST RD IMPROVEMENTS
Pacheco Koch FORT WORTH, TX 76107 817.412.7155 STREET LIGHT AND SIGN CFA EXHIBITS
TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903
TX REG. SURVEYING FIRM LS-10193824 LOCATED IN THE CITY OF FORT WORTH, TEXAS
DRAWN BY CHECKED 6 SCALE DATE JOB NUMBER AND BEING OUT OF THE SHELBY LANDS SURVEY,
PAC JLB 1"=200' 08 27 2019 1 2685-18.181 ABSTRACT N0. 1TEX
TARRANT COUNTY, TEXAS
0 100 200 400
GRAPHIC SCALE IN FEET
I
II
II
II
II I
II I
TffffU'ill'T'IITTTTfIL'.�
206'
2
r r
Z Z
m m
n v
n v
ADD LED LIGHTING TO
EX. TIMBER POLES
6100 WESTERN PLACE, SUITE toot JOEL EAST RD IMPROVEMENTS
Pacheco Koch FORT WORTH, TX 76107 817.412m 7155
STREET LIGHT AND SIGN CFA EXHIBITS
TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903
TX REG. SURVEYING FIRM LS-1019382a LOCATED IN THE CITY OF FORT WORTH, TEXAS
AND BEING OUT OF THE SHELBY LANDS SURVEY,
DRAWN BY I CHECKED BY SCALE DATE JOB NUMBER ABSTRACT NO. 1375
PAC JLB 1"=200' 08/27/2019 2685-18.181 TARRANT COUNTY, TEXAS
0 100 200 400
GRI PHIC SCALE IN FEET
I �
N o'
WATER
SM T.
a I JOEL EAST RD
WAILN
r ESMT.
Z
m
v
v
ADD LED LIGHTING TO
EX. TIMBER POLES
6100 WESTERN PLACE, SUITE 1001 JOEL EAST RD IMPROVEMENTS
Pacheco Koch FORT WORTH, TX 76107 817.412.7155 STREET LIGHT AND SIGN CFA EXHIBITS
TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903
TX REG. SURVEYING FIRM LS-10193824 LOCATED IN THE CITY OF FORT WORTH, TEXAS
ORA WN BY I CHECKED BY SCALE GATE JOB NUMBER AND BEING OUT OF THE SHELBY LANDS SURVEY,
PAC JLB 1"=200' 08 27 2019 2685-18.181 ABSTRACT N0. 1375 TARRANT ,,^,DUS TEXTY, TEXAS