Loading...
HomeMy WebLinkAboutContract 52710 Received Date: 09/03/19 Received Time:8:13 AM Developer and Project Information Cover Sheet: Developer Company Name: Rob Riner Companies GP,LLC a Texas Limited Liability Company Address, State,Zip Code: P O Box 907,Fort Worth,TX 76101 Phone&Email: 972-689-0669,rrinerarobriner.com Authorized Signatory,Title: Rob Riner,,Managing Partner Project Name: Joel East Road Improvements Brief Description: Water, Sewer,Paving, Storm Drain, Street Lights,Traffic Signals Project Location: Intersection of Joel East Road and Oak Grove Rd Plat Case Number: Plat Name: Mapsco: I I Council District: 8 CFA Number: CFA18-0186 City Project Number: 101903 City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Joel East Road Improvements CFA Official Release Date:02.20.2017 CITY SECRETARY Page 1 of 11 FT. WORTH,TX STANDARD COMMUNITY FACILITIES AGREEMENT THE STATE OF TEXAS § City Secretary COUNTY OF TARRANT § Contract No. 52710 WHEREAS, Rob Riner Companies GP, LLC a Texas Limited Liability Company , ("Developer"), desires to make certain specific improvements, as described below and on the exhibits attached hereto ("Improvements") related to a project generally described as Joel East Road Improvements ("Project") within the City or the extraterritorial jurisdiction of Fort Worth, Texas("City"); and WHEREAS, the City has no obligation to participate u}the cost of the Improvements or Project; and WHEREAS,any future City participation in this CFA is subject to the availability of City funds and approval by the Fort Worth City Council and shall be memorialized as an amendment to this Agreement; and WHEREAS, the Developer and the City desire to enter into this Community Facilities Agreement ("CFA" or "Agreement") in connection with the collective Improvements for the Project. NOW,THEREFORE,for and in consideration of the covenants and conditions contained herein,the City and the Developer do hereby agree as follows: General Requirements A. The Policy for the Installation of Community Facilities ("Policy") dated March 2001, approved by the City Council of the City of Fort Worth, as amended, is hereby incorporated into this Agreement as if copied herein verbatim. Developer agrees to comply with all provisions of said Policy in the performance of its duties and obligations hereunder and to cause all contractors hired by Developer to comply with the Policy in connection with the work performed by said contractors. B. Developer shall provide financial security in conformance with paragraph 6, Section II, of the Policy and recognizes that there shall be no reduction in the collateral until the Project has been completed and the City has officially accepted the Improvements. Developer City of Fort Worth,Texas E Standard Community Facilities Agreement-Joel East Road Improvements RECORD CFA Official Release Date:02.20.2017 EI!'ARY Page 2 of 11 �, further acknowledges that said acceptance process requires the Developer's contractor(s) to submit a signed affidavit of bills paid and consent of Surety signed by its surety to ensure the contractor has paid any sub-contractor(s) and suppliers in full. Additionally, the contractor will provide in writing that the contractor has been paid in full by Developer for all the services provided under this contract. C. Developer agrees to cause the construction of the Improvements contemplated by this Agreement and that said construction shall be completed in a good and workmanlike manner and in accordance with all City standards and the City-approved construction plans, specifications and cost estimates provided for the Project and the exhibits attached hereto. D. The following checked exhibits describe the Improvements and are incorporated herein: Water (A) ®, Sewer(A-1) ❑X, Paving (B) ®, Storm Drain (13-1) ❑X, Street Lights & Signs (C) M. E. The Developer shall award all contracts for the construction of the Improvements in accordance with Section 11,paragraph 7 of the Policy and the contracts shall be administered in conformance with paragraph 8, Section I1, of the Policy. Developer shall ensure its contractor(s)pays the then-current City-established wage rates. F. For all Improvements included in this Agreement for which the Developer awards construction contract(s), Developer agrees to the following: i. To employ a construction contractor who is approved by the director of the department having jurisdiction over the infrastructure to be constructed, said contractor to meet City's requirements for being prequalified, insured, licensed and bonded to do work in public ways and/or prequalified to perform water/wastewater construction as the case may be. ii. To require its contractor to furnish to the City a payment and performance bond in the names of the City and the Developer for one hundred percent (100%) of the contract price of the infrastructure, and a maintenance bond in the name of the City for one hundred percent (100%) of the contract price of the infrastructure for a period of two (2) years from the date of final acceptance insuring the maintenance and repair of the constructed infrastructure during the term of the maintenance City of Fort Worth,Texas Standard Community Facilities Agreement-Joel East Road Improvements CFA Official Release Date:02.20.2017 Page 3 of 11 bond. All bonds to be furnished before work is commenced and to meet the requirements of Chapter 2253, Texas Government Code. iii. To require the contractor(s) it hires to perform the construction work contemplated herein to provide insurance equal to or in excess of the amounts required by the City's standard specifications and contract documents for developer-awarded infrastructure construction contracts. The City shall be named as additional insured on all insurance required by said documents and same will be evidenced on the Certificate of Insurance (ACORD or other stag-approved form) supplied by the contractor's insurance provider and bound in the construction contract book. iv. To require its contractor to give 48 hours advance notice of intent to commence construction to the City's Construction Services Division so that City inspection personnel will be available;to require the contractor to allow the construction to be subject to inspection at any and all times by City inspection forces,to not install or relocate any sanitary sewer, storm drain, or water pipe unless a responsible City inspector is present and gives his consent to procieed, and to make such laboratory tests of materials being used as may be required ley the City. V. To require its contractor to have fully executed contract documents submitted to the City in order to schedule a Pre-Construction Meeting. The submittal should occur no less than 10 working days prior to the desired date of the meeting. No construction will commence without a City-issued Notice to Proceed to the Developer's contractor. vi. To delay connections of buildings to service lines of sewer and water mains constructed under this Agreement, if any, until said sewer and water mains and service lines have been completed to the satisfaction of the Water Department. G. Developer shall provide at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to construct the improvements under this Agreement. H. Developer shall cause the installation or adjustment of the required utilities to serve the development or to construct the Improvements required herein. I. City shall not be responsible for payment of any costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with any of the community facilities to be installed hereunder. City of Fort Worth,Texas Standard Community Facilities Agreement-Joel East Road Improvements CFA Official Release Date:02.20.2017 Page 4 of 11 J. Developer hereby releases and agrees to indemnify, defend and hold the City harmless for any inadequacies in the preliminary plans,specifications and cost estimates supplied by the Developer for this Agreement. K. Developer agrees to provide, at its expense, all necessary rights of way and easements across property owned by Developer and required for the construction of the current and future improvements provided for by this Agreement. L. The Developer further covenants and agrees to, and by these presents does hereby, fully indemnify, hold harmless and defend the City, its officers, agents and employees from all suits, actions or claims of any character,whether real or asserted,brought for or on account of any injuries or damages sustained by any persons (including death) or to any property, resulting from or in connection with the construction, design, performance or completion of any work to be performed by said Developer, its contractors, subcontractors, officers, agents or employees, or in consequence of any failure to properly safeguard the work, or on account of any act, intentional or otherwise, neglect or misconduct of said Developer, its contractors, sub-contractors, officers, agents or employees, whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. M. Developer will further require its contractors to indemnify, defend and hold harmless the City, its officers, agents and employees from and against any and all claims, suits or causes of action of any nature whatsoever, whether real or asserted, brought for or on account of any injuries or damages to persons or property, including death, resulting from, or in any way connected with,the construction of the infrastructure contemplated herein,whether or not such injuries, death or damages are caused, in whole or in part, by the alleged negligence of the City of Fort Worth, its officers, servants, or employees. Further,Developer will require its contractors to indemnify, and hold harmless the City for any losses, damages, costs or expenses suffered by the City or caused as a result of said contractor's failure to complete the work and construct the improvements in a good and workmanlike manner, free from defects, in conformance with the Policy, and in accordance with all plans and specifications. City of Fort Worth,Texas Standard Community Facilities Agreement-Joel East Road Improvements CFA Official Release Date:02.20.2017 Page 5 of 11 N. Upon completion of all work associated with the construction of the Improvements, Developer will assign to the City a non-exclusive right to enforce the contracts entered into by the Developer with its contractor along with an assignment of all warranties given by the contractor,whether express or implied. Further,Developer agrees that all contracts with any contractor shall include provisions granting to the City the right to enforce such contracts as an express intended third party beneficiary of such contracts. O. Inspection and material testing fees are required as follows: i. Developer shall pay in cash water and wastew4ter inspection fees and material testing fees equal to two percent(2%) for a total of 4% of the developer's share of the total construction cost as stated in the construction contract. ii. Developer shall pay in cash paving and storm drain inspection fees equal to four percent (4%) and material testing fees equal to two percent(2%) for a total of 6% of the developer's share of the total construction cost as stated in the construction contract. iii. Developer shall pay in cash the total cost of streetlights or if the city is not installing the streetlights, inspection fees equal to four percent(4%) of the developer's share of the streetlight construction cost as stated in the construction contract. iv. Developer shall pay in cash the total cost of street signs. P. COMPLETION WITHIN 2 YEARS i. Developer shall complete the Improvements Within two (2) years, provided, however, if construction of the Improvements has started within the two year period,the developer may request that the CFA be extended for one additional year. ii. Nothing contained herein is intended to limit the Developer's obligations under the Policy, this Agreement, its financial guarantee, its agreement with its contractor or other related agreements. iii. The City may utilize the Developer's financial guarantee submitted for this Agreement to cause the completion of the cons"ction of the Improvements if at the end of two(2)years from the date of this Agreement(and any extension period) the Improvements have not been completed and accepted. iv. The City may utilize the Developer's financial guarantee to cause the completion of the construction of the Improvements or to cause the payment of costs for City of Fort Worth,Texas Standard Community Facilities Agreement-Joel East Road Improvements CFA Official Release Date:02.20.2017 Page 6 of 11 construction of same before the expiration of two (2) years if the Developer breaches this Agreement, becomes insolvent or fails to pay costs of construction and the financial guarantee is not a Completion Agreement. If the financial guarantee is a Completion Agreement and the Developer's contractors and/or suppliers are not paid for the costs of supplies and/or construction, the contractors and/or suppliers may put a lien upon the property which is the subject of the Completion Agreement. Q. Developer acknowledges that in accordance with Chapter 2270 of the Texas Government Code,the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Developer certifies that Developer's signature provides written verification to the City that Developer: (1) does not boycott Israel; and(2)will not boycott Israel during the term of the contract. IMMIGRATION AND NATIONALITY ACT R. Developer shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (1-9). Upon request by City, Developer shall provide City with copies of all 1-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Developer shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER, DEVELOPER'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Developer, shall have the right to immediately terminate this Agreement for violations of this provision by Developer. City of Fort Worth,Texas Standard Community Facilities Agreement-Joel East Road Improvements CFA Official Release Date:02.20.2017 Page 7 of 11 Cost Summary Sheet Project Name: Joel East Road Improvements CFA No.: CFA18-0186 City Project No.: 101903 An Engineer's Estimate of Probable Cost is acceptable. Howev�r, the construction contract price will ultimately determine the amount of CFA fees and financial guarantee. The bid price and any additional CFA payments will be required prior to scheduling a pre-construction meeting. An itemized estimate corresponding to each project-specific exhibit is required to support the following information. Items Developer's Cost A. Water and Sewer Construction 1. Water Construction $ 74,01fi.00 2.Sewer Construction $ 34,090.00 Water and Sewer Construction Total $ 108,105.00 B. TPW Construction 1.Street $ 1,381,781.50 2.Storm Drain $ 664,89E.00 3.Street Lights Installed by Developer $ 44,OOC,.00 4. Signals $ 800.00 TPW Construction Cost Total $ 2,091,470.50 Total Construction Cost(excluding the fees): $ 2,199,581.50 Construction Fees: C. Water/Sewer Inspection Fee(2%) $ 2,162.10 D. Water/Sewer Material Testing Fee(2%) $ 2,162.10 Sub-Total for Water Construction Fees $ 4,324.20 E. TPW Inspection Fee(4%) $ 81,867.06 F. TPW Material Testing(2%) $ 40,933.53 G. Street Light Inspsection Cost $ 1,760.00 H. Signals Inspection Cost $ 32.00 H. Street Signs Installation Cost $ Sub-Total for TPW Construction Fees $ 124,592,59 Total Construction Fees: $ 128,916M79 Choice Financial Guarantee Options,choose one Amount Mark one Bond=100% $ 2,199,581.50 Completion A reement=100%/Holds Plat $ 2,199,581.50 Cash Escrow Water/Sanitary Sewer—125% $ 135,131.25 Cash Escrow Paving/Storm Drain=125% $ 2,614,345,63 Letter of Credit=125%w/2 r expiration period $ 2,749,476,88 x City of Fort Worth,Texas Standard Community Facilities Agreement-Joel East Road Improvements CFA Official Release Date:02.20.2017 Page 8 of 11 ACCORDINGLY, the City of Fort Worth and Developer have each caused this instrument to be executed in quadruplicate in each entity's respective name by its duly authorized signatories effective as of the date executed by the City's City Manager or his/her designee. CITY OF FORT WORTH DEVELOPER Rob Riner Companies GP,LLC a Texas Limited Daher Liability Company Burghdot r Dana Burghdoff ug 30,2019) Dana Burghdoff Interim Assistant City Manager Date: Aug 30,2019A�`� Robert Riner(Aug 29,2019) Recommended by: Name: Rob Riner Title: Managing Partner r �t Date: Aug 29,2019 ln�Robe (Aug29,2019) Evelyn Roberts/Jennifer Ezernack Project Assistant Planning and Development Contract Compliance Manager: By signing, I acknowledge that I am the Approved as to Form &Legality: person responsible for the monitoring and administration of this contract, including Rsch�d A ensuring all performance and reporting Richard A.McCracken(Aug 30,2019) requirements. Richard A. McCracken n�- Assistant City Attorney MN/A D rney A5 -Pl — M&C No. 'V A Jennifer Ezernack on behalf of Janie Morales(Aug 29,2019) Date: Name: Janie Morales Title: Development Manager Form 1295: oR,r ; ATTEST: F- �D`l�� uG�l�tr,�i •., •� . Ronald P.Gonzales(Aug 30,2019) ' ..............R C-1 Mary J. Kayser/Ronald Gonzales ......, ' City Secretary/Assistant City Secretary City of Fort Worth,Texas OFFICIAL RECORD Standard Community Facilities Agreement-Joel East Road Improvements CITY SECRETARY CFA Official Release Date:02.20.2017 Page 9 of 11 FT.WORTHo TX Check items associated with the project being undertaken; checked items must be included as Attachments to this Agreement Included Attachment ® Attachment 1 -Changes to Standard Community Facilities Agreement ® Location Map ® Exhibit A: Water Improvements ® Exhibit A-1: Sewer Improvements ® Water and Sewer Cost Estimates ® Exhibit B: Paving Improvements ® Paving Cost Estimate ® Exhibit B-1: Storm Drain Improvements ® Storm Drain Cost Estimate ® Exhibit C: Street Lights and Signs Improvements ® Street Lights and Signs Cost Estimate (Remainder of Page Intentionally Left Blank) City of Fort Worth,Texas Standard Community Facilities Agreement-Joel East Road Improvements CFA Official Release Date:02.20.2017 Page 10 of 11 ATTACHMENT"1" Changes to Standard Agreement Community Facilities Agreement City Project No. 101903 None. City of Fort Worth,Texas Standard Community Facilities Agreement-Joel East Road Improvements CFA Official Release Date:02.20.2017 Page 11 of 11 00 42 43 DAP-BID PROPOSAL Pale 1 of to SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Speeificatian Unit of Bid Unit Price Bid Value No. Description Section No. Meaoure Quantity UNIT 1:WATER IMPROVEMENTS 1 3312.2203 2"Water Service 331210 EA 6 $ 3,000.00 $ 18,000.00 2 3312.411416"x12"Tapping Sleeve&Valve 331225 EA 4 $ 4,500.00 $ 18,000.00 3 3311.0441 12"Water Pipe 331110 LI 39 $ 80.00 $ 3,120.00 4 3312.4112 16"x 8"Tapping Sleeve&Valve 331225 EA 4 $ 4,000.00 $ 16,000.00 5 3311.0241 8"Water Pipe 3311 10 LIF 45 $ 55.00 $ 2,475.00 6 3305.0109 Trench Safety 330610 LIB 84 5.00 $ 420.00 7 3312.0106 Connection to Existing 16"Water Main 33 12 25 EA 16 1,00000 $ 1600.00 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMEIN-IS-DEVELOPER AWARDED PROJECTS Copy of0o 42 43 Bid Propo>.i DAP(2019.07.22 CONTRACT') Fonn Version Seplemba 1,2015 00 4_43 DAP-BID PROPOSAL Page 2 of 10 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit of Bid No Description Section No. Measure QuantityUnit Price Bid Value 45 TOTAL UNIT I:WATER IMPROVEMENTS $74,015.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1.2015 Copy of 00 42 0 RW P oposol_DAP(20I9.0712 CONTRACT) 00 42 43 DAP-BCD PROPOSAL P&p3 of10 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. M.W. Quantity UNIT II:SANITARY SEWER IMP EMENTS 3339.1001 4'Manhole 33 39 10,33 39 EA 1 20 1 $ 4,200.00 $ 4,200.00 2 3331.3201 6"Sewer Service 33 31 50 EA 1 $ 1,150.00 $ 1.150.00 3311 10,33 31 3 '12,33 31 20 LF 3331.4108 6"Sewer Pipe 48 $ 45.00 $ 2,160.00 4 3331.3301 8"Sewer Service 33 31 50 EA' 3 $ 1,250.00 $ 3,750.00 3331.4115 8"Sewer Pipe 33 11 10.33 31 5 12,333120 LF 143 $ 60.00 $ 8,580.00 6 3339.1002 4'Drop Manhole 33 39 10,33 39 EA 1 $ 5,200.00 $ 5,200.00 7 3339.0001 Epoxy Manhole Liner 33 39 60 VF 24 $ 285.00 $ 6,840.00 8 3301.0001 Pre-CCTV Inspection 33 01 31 LF 191 $ 5.00 $ 955.00 9 3301.0002 Post-CCTV Inspection 33 01 31 LF 191 $ 5.00 $ 955.00 10 3301.0101 Manhole Vacuum Testing 33 01 30 EA 2 $ 150.00 $ 300.00 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 TOTAL UNIT 11:SANITARY SEWER IMP VEMENTS $34.090.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS•DEVELOPER AWARDED PROJECTS Form Vesioa Septen4w 1.2015 Copy of 00 42 43_Bid PFopc _DAP(2019.07.23_CONTRACT) 00 42 43 DAP•am PROPOSAL Pacc 4 of 10 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Itcm Description Specification Unit of Bid Unit Price Bid Value No. I Section No. Measure Quantity UNIT III:DRAINAGE IMPROVEMENTS 1 3341.1102 4x3 Box Culvert 3341 10 LF 799 $ 185.00 $ 147,815.00 2 3349.0003 6'Storm Junction Box 33 49 10 EA 2 $ 7,500.00 $ 15,000.00 3 3349.6001 10'Recessed Inlet 33 49 20 EA 11 $ 3,600.00 $ 39,600.00 4 3349.6002 15'Recessed Inlet 33 49 20 EA 2 $ 4,600.00 $ 9,200.00 5 3349.6003 20'Recessed Inlet 34 49 20 EA 2 $ 5,600.00 $ 11,200.00 6 3349.4001 SET,Type I for Box Culverts 33 49 40 CY 4 $ 2,750.00 $ 11,000.00 7 3137.0101 Concrete Rlprap(6"Thick) 31 3700 SY 187 $ 75.00 $ 14,025.00 8 3341.0201 21"RCP,Class III 3341 10 LF 449 $ 50.00 $ 22,450.00 9 3137.0104 Medium Stone Rlprap,dry 31 37 00 SY 113 $ 105.00 $ 11,865.00 10 3305.0116 Concrete Encasement for Utility Pipes 33 05 10 CY 3 $ 200.00 $ 600.00 11 3125.0101 SWPPP 2 1 acre 31 2500 LS 1 $ 13,500.00 $13,500.00 12 3341.0402 42"RCP,Class III 3341 10 LF 795 $ 120.00 $95,400.00 13 3341.0309 36"RCP,Class III 3341 10 LF 1741 $ 100.00 $174,100.00 14 3349.0104 4'Stacked Manhole 33 49 10 LF 2 $ 2,500.00 $5,000.00 15 3341.1001 3x2 Box Culvert 3341 10 LF 464 $ 155.00 $11,920.00 16 3349.0001 4'Storm Junction Box 33 49 10 LF 4 $ 4,500.00 $18,000.00 17 3341.0302 30"RCP,Class III 3341 10 LF 9 $ 80.00 $720.00 18 3349.2005 30"Parallel Headwall,1 pipe 33 49 40 EA 1 $ 3,500.00 $3,500,00 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 TOTAL UNIT III:DRAINAGE IMPROVEMENTS $664,895.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS•DEVELOPER AWARDED PROJECTS Copy ofQO 42 U BW Pmpmal DAP(2019.07.22 CO?rrRACT) Form Vmioa SWember 1,2015 00 42 43 DAP-BID PROPOSAL Pop 5 or 10 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item loformation Bidder's Proposal Bidlist Item Specification Unit of Bid Unit Price Bid Value No. Description Section No. Ideaaure Quantity UNIT IV:PAVING IMPROVEMENTS 1 0241.1100 Remove Asphalt Pvmt 0241 15 SY 10,288 $ 8.00 $ 82,304.00 2 0241,0500 Remove Fence 0241 13 LF 2,475 $ 3.00 $ 7,425.00 3 0241.3015 Remove 24"Storm Line 0241 14 LF 66 $ 20.00 $ 1,320.00 4 3305.0111 Valve Box Adjustment 33 05 14 EA 2 $ 500.00 $ 1.000.00 5 3471.0001 Traffic Control 3471 13 MO 5 $ 1,500.00 $ 7,500.00 6 3213.0103 8"Conc Pvmt 32 13 13 SY 15,732 $ 46.00 $ 723,672.00 7 3213.0102 7"Conc Pvmt 321313 SY 1,509 $ 42.00 $ 63,378.00 8 3212.0302 2"Asphalt Pvmt Type D 321216 SY 845 $ 14.00 $ 11,830.00 9 3212.0501 4"Asphalt Base Type 8 321216 SY 845 $ 24.00 $ 20,280.00 10 3213.0301 4"Conc Sidewalk 32 13 20 SF 58,022 $ 3.50 $ 203,077.00 11 3211.0502 8"Lime Treatment 32 11 29 SY 17,430 $ 3.50 $ 61,005.00 12 3211.0401 Commercial Lime Slurry 32 11 29 TN 424 $ 190.00 $ 80,560.00 13 3291,0100 Topsoil 329119 CY 1,958 $ 20.00 $ 39,160.00 14 3217.0004 4"SLD Pvmt Marking HAS(Y) 321723 LF 10,799 $ 2.00 $ 21.598.00 15 3217,0203 8"SLD Pvmt Marking Tape(W) 32 17 23 LF 261 $ 3.00 $ 783.00 16 3217.0204 8"SLD Pvmt Marking Tape(Y) 32 17 23 LF 140 $ 3.00 $ 420.00 17 3217.1002 Lane Legend Arrow 32 17 23 EA 21 $ 450.00 $ 9,450.00 18 3217.1004 Lane Legend Only 32 17 23 EA 3 $ 456.00 $ 1,350.00 19 3217.2103 REFL Raised Marker TY II-A-A 32 17 23 EA 174 $ 5.25 $ 913.50 20 3123.0101 Unclassified Excavation by Plan 31 2316 CY 4,126 $ 6.00 $ 24,756.00 21 3110.0101 Site Clearing 31 1000 LS 1 $ 15,000.00 $ 15,000.00 22 0170.0100 Mobilization 01 7000 LS 1 $ 5.000.00 $ 5,000.00 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 TOTAL UNIT IV:PAVING IMP OVEMENTS1 $1,381,781.50 cnY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Copy or00 C 43 os+l_Bid Prop DAP(:019.07.22 CONfRACTI Fofm Venice Swee'bc 1.20 15 00 42 43 DAP-BIDPROPOSAL PWe 6 of 10 SECTION 00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal —[ Bidiist Ttem Specifiption Unit of Bid Unit Price Bid Value Description Section No. Measure Queotiry No. UNIT V:STREET UG TING IMPROVEMENTS 1 3441.3201 LED Lighting Fixture 34 41 20 EA 20 $1,000.00 $20,000.00 2 3441.3323 Furnishlinstall 8'Wood Light Pole.Arm 34 41 20 EA 20 $1,200.00 $24,000.00 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 CrTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS F%m Varstuu Septembcr 1,20t3 'of 00 42 47 Bid PmpwY SAP(1019.07,22 CONTMCI') 004243 DAP•BID PROPOSAL Page 7 of 10 SECTION.00 42 43 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item DescSpecification Unit of Bid No. d�°B Section No. Me4wre Quantity Unit Price Bid Value 45 TOTAL UNIT V:STREET LIGHTING IMPROVEMENTS $44,000.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS-DEVELOPER AWARDED PROJECTS Form Version September 1,2013 Copyor00.12 43 BidPropw@l DAP(20MO72_CONTRACT) 00 42 4a DAP-BID PROPOSAL Pwgofto SECTION 00 42 43 DevelcDi�r Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlisxo.t Item Specification Unit of Bid Unit Price Bid Value Description Section No. Measure Quantity UNIT VI-TRAFFIC SIGNAL IMPROVEMENTS 1 3441.4001 Furnish/install Alum Sign Mast Arm 34 41 30 EA 1 $ 800.00 $800.00 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECInCATIoN DOCIJAIENTS-DEVELOPER AWARDED PROJECTS Copy 0r00 42 43 Did Ropoal DNP inI9.0712_CONrRAC17 Form Veaion September 1,2015 00 32 13 DAP-BID PROPOSAL Page 9 or 10 SECTION 00 42 40 Developer Awarded Projects-PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Ilidli,t i!c111 r Specification I�ni o; ' vBr=i Description Unit Price Bid Value No, Section No. \teasur Quantity 45 TOTAL UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS $800.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUbIENTS-DRVELOPTR AWARDED PROJECTS Form Vesion September 1,_2015 Copy or0o 42 43_Bid Proposal DAP(2019.07.22_CON I R4CT) 00 42 43 DAP•BID PROPOSAL Fqe 10 of 10 SECTION 00 42 43 Developer Awarded Projects- PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity Bid Summary UNIT 1:WATER IMPROVEMENTS $74,015.00 UNIT Ii:SANITARY SEWER IMPROVEMENTS $34,090.00 UNIT III:DRAINAGE IMPROVEMENTS $664,895.00 UNIT IV:PAVING IMPROVEMENTS $1,381,781.50 UNIT V.STREET LIGHTING IMPROVEMENTS $44,000.00 UNIT VI:TRAFFIC SIGNAL IMPROVEMENTS $800.00 Total Construction Bid $2.199.581.50 Contractor agrees to complete WORK for FINAL.ACCEPTANCE withini 210 calendar days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION ck 111O ZA 4QSXVEJ7- (.pu�rsfac(,a�.tsrt.�T��G•� CrrY OF FORT WORTH STANDARD CONSTRUCTION SPECWJCATION DOCLUEN TS•DEVELOPER AWARDED PROJECTS Form Venim Sep®ber 1,2015 Copy 9f00 42 43 BW PmpudrW("I9.07.22 CONTRACT) dMmolrly [flap JG' �Q w C) O GZ,. CD Y Q O ALTA MESA -o v� T PROJECT LOCATION w 9< 0 0 �o 0 z AST TARRANT COUNTY MAPSCO F105-D VICINITY MAP (NOT TO SCALE) 6100 WESTERN PLACE, SUITE 1001 JOEL EAST RD IMPROVEMENTS Pacheco Koch FORT WORTH, TX 76107 817.412.7155 VICINITY MAP CFA EXHIBITS TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903 TX REG. SURVEYING FIRM LS-10193824 LOCATED IN THE CITY OF FORT WORTH, TEXAS AND BEING OUT OF THE SHELBY LANDS SURVEY, ABSTRACT NO. 1375 PAC CJS NTS 06/05/2019 2685-18.181 TARRANT COUNTY, TEXAS �lALfll� � �� aV n aD o VL'/ lid Ll �W 0 200 400 800 GRAPHIC SCALE IN FEET — '- _T" EXIST. 16" WATERLINE X-24079 " Fr- CONNECT TO EXISTING 16" CONNECT TO EXISTING 16" WATER MAIN WATER MAIN PROPOSED 2" PROPOSED 2" CONNECT TO EXISTING 16" IRRIGATION TAP IRRIGATION TAP WATER MAIN E _ Y PROPOSED 2" IRRIGATION TAP I I -jl I O v I i , , --'-- - ;;.di :. -.. .w.w ,say. •,asF t!� V I ' I I I I I CONNECT TO EXISTING 16" WATER MAIN IL I im I I I ' I LEGEND -*r- - EXISTING 16" WATER LINE PROPOSED WATER LINE 6100 WESTERN PLACE, SUITE 1001 JOEL EAST RD IMPROVEMENTS APacheco Koch FORT WORTH, TX 76107 817.412.7155 WATER CFA EXHIBIT TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903 TX REG. SURVEYING FIRM LS-10193824 LOCATED IN THE CITY OF FORT WORTH, TEXAS AND BEING OUT OF THE SHELBY LANDS SURVEY, PAC CJS 1"=400' 02/25/2019 2685-18.18'1 ABSTRACT NO. 1375 TARRANT COUNTY, TEXAS EXHO o O U SEWER 0 150 300 600 memo GRAPHIC SCALE IN FEET n_ _ CONNECT TO EX. PROPOSED 4' DIAMETER I I PROPOSED 4' DIAMETER I SANITARY SEWER SANITARY SEWER DROP SANITARY SEWER MANHOLE MANHOLE MANHOLE CONNECT TO EX. _ SANITARY SEWER II MANHOLE _ a o o Of a a I EXISTING 8" SANITARY SEWER PLAN NO. 16623 Li u �.�fl—�_ "L EAST RD \ LEGEND EXISTING 8" SANITARY SEWER PROPOSED SANITARY SEWER LINE 6100 WESTERN PLACE, SUITE 1001 JOEL EAST RD IMPROVEMENTS WORTH,RTH, TX 7s107 at7.a12.71ss SEWER CFA EXHIBITS Pacheco Koch TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903 TX REG. SURVEYING FIRM LS-10193824 LOCATED IN THE CITY OF FORT WORTH, TEXAS AND BEING OUT OF THE SHELBY LANDS SURVEY, DRAWN BY CHECKED BY SCALE DATE JOB NUMBER ABSTRACT NO. 1375 PAC CJS NTS 06/05/2019 2685-18.181 TARRANT COUNTY, TEXAS KCHEM ® o Mwolm(a PROPOSED CONCRETE PAVEMENT ® PRO L POSED HMA TRANSITN]N L J 0 250 500 1 000 PROPOSED CONCRETE SIDEWALK ® PROPOSED CONCRETE DRIVEWAY GRAPHIC SCALE IN FEET o \ 0 PROPOSED CONCRETEI PAVEMENT d n I \ a . . . . . . . . . a LL- [PROPOSED 5' SIDEWALK • 11PROPOSED 10' I DRIVEWAYS III SIDEWALK I PROPOSED 36' WIDE STREET PROPOSED 6' SIDEWALK PROPOSED PROPOSED DRIVEWAYS DRIVEWAY 6100 WESTERN RLACE, Ill TE 1001 JOEL EAST RD IMPROVEMENTS Pacheco Koch FORT WORTH, TX 76107 817.412.7155 PAVING CFA EXHIBITS TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903 TX REG. SURVEYING FIRM LS-10193824 LOCATED IN THE CITY OF FORT WORTH, TEXAS DRAWN BY CHECKED BY SCALE DATE JOB NUMBER AND BEING OUT OF THE SHELBY LANDS SURVEY, PAS CJS 1"=600' O6/05/2019 2685-18.181 ABSTRACT N0. 1 TEX TARRANT COUNTY, TEXAS ENNOoOT `B? o STORM] MAN JOOEL EA37 IND. PROPOSED 4'X3' PROPOSED 0 20p 400 800 RCB SET AND CONCRETE PRAPHIC SCALE IN FEET PROPOSED 4'X4' LINED JUNCTION BOX DITCH PROPOSED 10' 23-J 1' RECESSED CURB INLET k =PROPOSED,21" PUBLIC N PROPOSED 10' RECESSED CURB INLET PROPOSED 4'X3' PROPOSED 10' RCB RECESSED CURB INLET =PROPOSED 'X6' OX PROPOSED 21" PUBLIC STORM DRAIN PROPOSED 10' PROPOSED 10' RECESSED CURB INLET RECESSED CURB INLET PROPOSED 21" PUBLIC PROPOSED 6'X6' STORM DRAIN JUNCTION BOX PROPOSED 20 I PROPOSED 42" PUBLIC RECESSED CURB INLET I STORM DRAIN JPROPOSED 21" PUBLIC PROPOSED O'X6' STORM DRAIN JUNCTION BOX ' I PROPOSED 36" PUBLIC PROPOSED 10 STORM DRAIN RECESSED CJRB INLET PROPOSED 4' p PROPOSED 4'X4' MANHOLE JUNCTION BOX Cc F. PROPOSED 10' PROPOSED 15' W RECESSED CURB INLET RECESSED CURB INLET v PROPOSED 'PROPOSED 36" RCB PUBLIC STORM PUBLIC STORM DRAIN DRAIN PROPOSED 4' I I PROPOSED 4'X4' I MANHOLE I JUNCTION BOX I PROPOSED SX2' RCB PUBLIC STORM PROPOSED 15' DRAIN RECESSED CURB INLET ( PROPOSED 6'X6' I PROPOSED 36" JUNCTION BOX PUBLIC STORM DRAIN PROPOSED 10' RECESSED CURB INLET PROPOSED 4' PROPOSED 21" PUBLIC MANHOLE STORM DRAIN PROPOSED 36" PROPOSED 21" PUBLIC STORM DRAIN PUBLIC STORM DRAIN PROPOSED 20' PROPOSED 10' RECESSED CURB INLET RECESSED CURB INLET 6100 WESTERN PLACE, SUITE 1001 JOEL EAST AND OAK GROVE RD IMPROVEMENTS Pacheco Koch FORT WORTH, TX 76107 817.412.7155 CFA EXHIBITS TX REG. ENGINEERING FIRM F-14439 LOCATED IN THE CITY OF FORT WORTH, TEXAS TX REG. SURVEYING FIRM LS-10193824 AND BEING OUT OF THE SHELBY LANDS SURVEY, ABSTRACT NO. 1375 PAC CJS 1"=400' 06/05/2019 2685-18.181 TARRANT COUNTY, TEXAS 0 100 200 400 GRAPHIC SCALE IN FEET IIIIUIIIIIIIIIIU II I► ! I � ► If II I I II 3 ,,,; . ,.,, •� alllnlllllllalallnl►I111111l�Iv► 3 - I_ � n - - - - JOEL EA s RD - - n 205 09 03 .2 r r Z Z m m � n 0o n ADD LED LIGHTING TO EX. TIMBER POLES 6100 WESTERN PLACE, SUITE 1001 JOEL EAST RD IMPROVEMENTS Pacheco Koch FORT WORTH, TX 76107 817.412.7155 STREET LIGHT AND SIGN CFA EXHIBITS TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903 TX REG. SURVEYING FIRM LS-10193824 LOCATED IN THE CITY OF FORT WORTH, TEXAS DRAWN BY CHECKED 6 SCALE DATE JOB NUMBER AND BEING OUT OF THE SHELBY LANDS SURVEY, PAC JLB 1"=200' 08 27 2019 1 2685-18.181 ABSTRACT N0. 1TEX TARRANT COUNTY, TEXAS 0 100 200 400 GRAPHIC SCALE IN FEET I II II II II I II I TffffU'ill'T'IITTTTfIL'.� 206' 2 r r Z Z m m n v n v ADD LED LIGHTING TO EX. TIMBER POLES 6100 WESTERN PLACE, SUITE toot JOEL EAST RD IMPROVEMENTS Pacheco Koch FORT WORTH, TX 76107 817.412m 7155 STREET LIGHT AND SIGN CFA EXHIBITS TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903 TX REG. SURVEYING FIRM LS-1019382a LOCATED IN THE CITY OF FORT WORTH, TEXAS AND BEING OUT OF THE SHELBY LANDS SURVEY, DRAWN BY I CHECKED BY SCALE DATE JOB NUMBER ABSTRACT NO. 1375 PAC JLB 1"=200' 08/27/2019 2685-18.181 TARRANT COUNTY, TEXAS 0 100 200 400 GRI PHIC SCALE IN FEET I � N o' WATER SM T. a I JOEL EAST RD WAILN r ESMT. Z m v v ADD LED LIGHTING TO EX. TIMBER POLES 6100 WESTERN PLACE, SUITE 1001 JOEL EAST RD IMPROVEMENTS Pacheco Koch FORT WORTH, TX 76107 817.412.7155 STREET LIGHT AND SIGN CFA EXHIBITS TX REG. ENGINEERING FIRM F-14439 CITY PROJECT #101903 TX REG. SURVEYING FIRM LS-10193824 LOCATED IN THE CITY OF FORT WORTH, TEXAS ORA WN BY I CHECKED BY SCALE GATE JOB NUMBER AND BEING OUT OF THE SHELBY LANDS SURVEY, PAC JLB 1"=200' 08 27 2019 2685-18.181 ABSTRACT N0. 1375 TARRANT ,,^,DUS TEXTY, TEXAS