Loading...
HomeMy WebLinkAboutContract 50573-AR1 Al CITY RECEIVED CONTRACcT�Y5�573-AIZI AUG 3 0 2019 CITY OF FORT WOR7}1 GITYSECR TORT , City of Fort worth Construction Allowance Request Construction FOA#�_� Date [- 4/8/2019 COySec# 60573 Client Project#(s)l CO2661 FAC#(s)J 59601/69607/34014/39411/52002-600430R004301200431-5740010-CO2661-CO1783/CO2483/CO2883-9999 Project Name Kimbo Road from N.Sylvania to Mesquite Road-This Is a street reconstruction project including Water/Sanitary Sewer Descriptlon Main and Storm Water Improvements Contreclorl Conatser ConsUuctlon TX,LP City Inspector Ryan Miller Funding Water&Sewer Stormwater TPW Paving Contract Time Allocation Account Totals (CD) Original Contract Amount 8 9, A 21578 3.00 4,982,3 6.00 500 Extras to Dale Credits to Dale Current Contract Amount $1,867,048.00 899,455.00 2,215,823.00 $4,982,326.00 500 Amount of Proposed Allocation 30.00 0.0D 2 , 9 . 0 Mr,N00 OrlglnalAilowance,Availablefor Aloca $140,000,00 $60,000.00 $12 ,000. 0 $320,000.00 Allowance Funds Previously Allocated Remalning Funds Available for this Allocation $140,000.00 $60,000.00 $120,000.00 320,000.00 JUSInFICATIOR SUMMARV IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material as peratteched proposed Construction Allowance Request(WIh attachments)to the Construction Allowance Request:due to conflict with Contena Fiber Ones found In Kimbo Rd,the Contractor had to remobilize 2 times and to locate and verify the location and elevation of the exlsting Conlerra underground Fiber lines that are in conflict with the proposed stonowater box in Kimbo Rd. It Is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment In full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the basis of the Ilma shown on this Construction Allowance Request by a later Change Order,If necessary. Co ctor's Re resents a Date Ins a or Date /O—J ArchitecUDesi n En Ineer Date Pro ect Mane er Date f Proqrpm Manager Date Ital Pm ect.OfBcor/Asst.D)r ate it E1 ctor Date %&QO"ey JDate, r {�t�l Asst..CJ •M nor to z'L OFFICIAL RECOIZO CITY SECRETARY ' FT. WORTH,TX , FORT WORTHr City of Fort Worth Construction Allowance Request Construction FOA# Date 4AM19 CRY Sec# 50573 Client Project#(s) CO2661 FAC#(s) 59601/59607/34014139411/52002-600430/700430120(kt31-5740010-0O2661-0017831CO24831CO2883-9999 Project Name Kimbo Road from N.Sylvania to Mesquite Road-This is a street reconstruction project including Water/Sanitary Sewer Main and Storm Description Water Improvements Contractorl Conatser Construction TX,LP Cray inspector r-Ryan MiLar ADDITIONS Dept/FAGITEM DEbCRIP I ION y Unit UnitCost Total m - emo ization I PW Faving nrlExploratory Excavation of Existing Utilities nterraFiber) Paving Water&Sewer $0.00 Stonnwater $0.00 TPW Paving $20,890.00 bUb I Otal AaalbonS Change Order Additions Page 2 of 4 FORT WORTH.. City of Fort Worth Construction Allowance Request Construction FDA# Date 40Z19 7:7 City Sec# 50573 Client Project#(s)J CO2661 FAC#(s)I 59601159607134014/39411/52002-6004301700430I200431-5740010-0O2661-001783/CO24831CO2883-9999 Project Namel Kimbo Road from N.Sylvania to Mesquite Road-This is a street reconstruction project including Water/Sanitary Sewer Main and Storm Descriptionj Water Improvements Contraclorl Conatser Construction TX,LP City Inspector �- Ryan(Miller CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED p y m Units Total m - Paving Improvements ns ruc ion owance Paving Water&Sewer 0.00 Stormwater $0.00 TPW Paving $20,890.00 Sub Totaletions Change Order Deletions Page 1 of 1 MIWBE Breakdown for this Construction Allowance Request MWBE Sub Type of Service Amount for this FOA Total $0,00 Previous Construction Allowance Requests Co# DATE AMOUNT Total p.00