CONTRACT NO..
QRT WORTH City of Fort Worth
Construction Allowance Request Breakdown
Construction CA# Date 6M2019 City Sec# 1 51012
Client Project#(s)l 101333
FAC#(s)J 30100-0200431-5740010-101333-006280
Project Name HMAC(2018-4)HIR Street Rehabilitation
Description
Contractorl Cutler Repaving, Inc. City Inspector Jarad Sounders
Funding Water Sewer TPW Select Day Type
Allocation Account Totals
Original Contract Amount $1,865,363.60 $1,865,363.60 150
Extras to Date
Credits to Date
Current Contract Amount $1,865,363.60 $1,865,363.60 150
Amount of Proposed Allocation $0.00 $0.00 $22,472.22 $22,472.22
Original Allowance Available for Allocation $102,443.00 $102,443.00
Allowance Funds Previously Allocated $55,290.00 $55,290.00 ' dCMNMI
Remaining Funds Available for this Allocation 1 $47,153.00 $47,153.00
mama
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST,THE CONTRACTOR SHALL:Furnish all labor and material
as per attached proposed Construction Allowance Request(with attachments)to the Construction Allowance Request: Appropriated
Construction Allowance funds are being requested to be used for pavement surface milling on Trinity Boulevard.Construction Allowance No.1
added this item to the contract;however,the quantities were insufficient for the street segments,Trinity Boulevard and International Plaza.This
allowance will adjust the quantities to the actual quantity for the work performed.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and
represents payment in full for all costs arising out of,or incidental to,the above Construction Allowance Request.Contract Time will be adjusted on the
basis of the time shown on this Construction Allowance Request by a later Change Order,if necessary.
°f
OFFICIAL RECORO
�JENeD C17Y SECRETARY
AUG 15 201 FT, WORTH,'TX
CI CICESECAEfA�Y g
FORT WORTH. City of Fort Worth
— Construction Allowance Request Breakdown
Construction FOA# Date 6/7/2019 City Sec# F51012
Client Project#(s)I 101333
FAC#(s)l 30100-0200431-5740010-101333-006280
Project Name HMAC(2018-4)HIR Street Rehabilitation
Description
Contractorl Cutler Repaving,Inc. City Inspector Jarad Sounders
ADDITIONS
epUnit Unit Cost o a
Pavement Surface Milling
Change Order Additions Page 2 of 8
Water 0.00
Sewer $0.00
TPW $22,472.22
Sub Total Additions
Change Order Additions Page 3 of 8
FORT WORTH. City of Fort Worth
Construction Allowance Request Breakdown
Construction FDA# 3 Date 6/7/2019 City Sec# F51012
Client Project#(s)l 101333
FAC#(s)1 30100-0200431-5740010-101333-006280
Project Name HMAC(2018-4)HIR Street Rehabilitation
Description
Contractorl Cutler Repaving,Inc. City Inspector Jarad Sounders
CONSTRUCTION ALLOWANCE ITEMS TO BE REDUCED
ITEM UESCRIP(ION DepUFAC uty Unitn os o a
Change Order Deletions Page 4 of 8
Water 0.00
Sewer $0.00
TPW $0.00
Sub Total Deletions $0.00,
Change Order Deletions Page 5 of 8
MIWBE Breakdown for this Construction Allowance Request
MWBE Sub Type of Service Amount for this FOA
Total $0:00
Previous Construction Allowance Requests
Co# DATE AMOUNT
Total $0.00
BIM 360 Document Management Page 1 of 2
AUTODESr BIM 360' fortworthgov >101333-HMAC(2018-4) HIR Street Rehabilitation- A KS
Document Management FOLDERS REVIEWS TRANSMITTALS ISSUES
Reviews > Review detail
CLOSED ##10 Construction Allowance Approval Workflow
Name^ D(
PROGRESS
'�—�-- 101333_H2O18-4)-Construction Allowance Request Breakdown(3).pdf -
Initiator Initial Review n
13 101333_H2O18-4)-Construction Allowance Request Breakdown(3).xlsm -
- KS Kristian Sugrim Jun 19,1:51 PM
<kristian.sugrim@fortworthtexas.gov>
Submitted to Reviewer 1
Reviewer 1 Initial Review 1 n
®� Fop LP Lauren Prieur Jun 20,2:34 PM
, <lauren.prieur@fortworthtexas.gov>
A by' s U
Submitted to Reviewer 2
�.1
3Q- Reviewer2 InitialReview2 n
onald P. Gonzales.As ity Sec
•�f
SC steve cookes Jul 1,2:29 PM
<stephen.cooke@fortworthtexas.gov>
Submitted to Reviewer 3
Reviewer 3 Initial Review 3 n
DB Douglas Black Jul 25,4:01 PM
<doug.black@fortworthtexas.gov>
Submitted to Approver
approved
Show more
Approver Final Review n
DB Dana Burghdoff Jut 28,5:42 PM
<dana.burghdoff@fortworthtexas.gov>
Review ended
Review closed
a"$FR IAL RECORD
�s,u°�V SECRETARY
FT WORTH..TX
c >
https://does.b3 60.autodesk.com/projects/bOba7b07-682a-432a-a6a7-b063 edabaf8f/reviews/Ofc9d9... 8/15/2019
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Kristian Sugrim --
Name of Employee/Signature
Project Manager
Title
I This form is N/A as No City Funds are associated with this Contract
Kristian SuRrim / t�� �� ��►�
Printed Name Signature
F k;)fl OVIAL RECORD
Fy SECRETARY
F a WORTH,TX
Soto, Vania Elizabeth
From: Black, Doug
Sent: Tuesday, September 3, 2019 2:59 PM
To: Soto, Vania Elizabeth; Sugrim, Kristian
Cc: TPW Contracts
Subject: FW: Missing Vendor Signature
Attachments: RE: 2018-4
Importance: High
I'm going to approve this one. In the future, I'm told that TPW will be acquiring the contractor's signature prior to
loading the change order/allowance requests into the electronic routing system.
Thanks,
Doug
From:Soto, Vania Elizabeth
Sent: Friday, August 16, 2019 12:02
To: Black, Doug<Douglas.Black@fortworthtexas.gov>
Subject: FW: Missing Vendor Signature
Please see email attachment from Kristian. It was missing the vendor's approval/signature for the Construction Allowance
Request. Please let me know if this email thread is good enough for a vendor agreeing. Thank you.
Vania E. Soto
Administrative Assistant
City Secretary's Office
817-392-6090
V ania.Sotogfortworthtexas.gov
From:Sugrim, Kristian
Sent: Friday, August 16, 2019 11:56 AM
To:Soto, Vania Elizabeth <Vania.Soto@fortworthtexas.gov>
Subject: RE: Missing Vendor Signature
Elizabeth,
At this time, would this work?Thanks.
From: Soto,Vania Elizabeth
Sent: Friday, August 16, 2019 11:46 AM
To:TPW Contracts<TPWContracts@fortworthtexas.gov>; Sugrim, Kristian <Kristian.Sugrim@fortworthtexas.gov>
Subject: Missing Vendor Signature
Importance: High
Allowance Request No. 3 to CSC No. 51012 is missing the vendor signature. You must include some form of the vendor
agreeing to do the work. Whether it is an email or having a separate signature page attached for them. Please provide the
documentation. Thank you.
1
Vania E. Soto
Administrative Assistant
City Secretary's Office
817-392-6090
V ania.Soto@fortworthtexas.gov
z
Soto, Vania Elizabeth
From: Sugrim, Kristian
Sent: Thursday, August 15, 2019 4:00 PM
To: Bob Veskerna; Souders, Jarad
Cc: Mason, William C.
Subject: RE: 2018-4
Attachments: 20190815155924999.pdf
Hi Bob,
CA3 for$22K+was approved by our ACM, during my absence; thanks for the reminder. I'll get it executed and placed
into the C-620. I'm very sorry about my oversight.
From: Bob Veskerna [mailto:bveskerna@cutlerrepaving.com]
Sent:Thursday,August 15, 2019 12:17 PM
To:Souders,Jarad <Jarad.Souders@fortworthtexas.gov>
Cc:Sugrim, Kristian<Kristian.Sugrim@fortworthtexas.gov>
Subject: FW: 2018-4
Hi Guys,
I don't believe this CA for 2018-4 Surface Milling has ever been processed.
Thanks,
Bob
From: Bob Veskerna
Sent: Wednesday, May 8, 2019 1:07 PM
To:Souders,Jarad <Jarad.Souders@fortworthtexas.gov>
Cc:Sugrim, Kristian <Kristian.Sugrim@fortworthtexas.gov>
Subject: 2018-4
Hello Again,
Attached is a CA Request to adjust actual Surface Milling quantities performed.
Thank You,
Bob