te Proceedi people have been Contacted concerning the request )F PROJECT COMPLETION
•final payment&have released this project for such payment Developer Projects)
learance Conducted By Etta Bacy h �n ,A City Project Ns: 100389
w efI4 S t)� 'L'S#q?9o9
Regarding contract 100389 for ELAN RIVER DISTRICT-STREET LIGHTS as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through
M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportatioti&Public Works Department has accepted the project
as complete.
Original Contract Price: $123,951.44
Amount of Approved Change Orders: No 1
Revised Contract Amount: $123,951.44
Total Cost Work Completed: $123,951.44
Recommend ceptance Date
Directowl -
Asst. Development Services
Accepted Date
IM Director,
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
Asst. City Manager Date
Comments: IiECE1/rnp OFFICIAL.RECORD
SEP -3 2019 CITY sECRETARy
cmraFFORT FT. WORT4�TX
cllysr*rA s
Rev.9/22/16 '' �.
FORT WORTH
CITY OF FORT WORTH
PARTIAL PAYMENT REQUEST
Contract Name ELAN RIVER DISTRICT
Contract Limits
Project Type STREET LIGHTING
City Project Numbers 100389
DOE Number 0389
Estimate Number 1 Payment Number 1 For Period Ending 2/28/2018
Project Funding
CD
City Secretary Contract Number Contract Time 821 CD
Contract Date 7/28/2016 Days Charged to Date 567
Project Manager NA Contract is 100.00 Complete
Contractor GREYSTAR DEVELOPMENT&CO STRUCTION
750 BERING DR.SUITE 200
HOUSTON, TX 44057
Inspectors RODGERS / HERNANDEZ
Friday,March 9,2018 Page 1 of 4
City Project Numbers 100389 DOE Number 0389
Contract Name ELAN RIVER DISTRICT Estimate Number 1
Contract Limits Payment Number 1
Project Type STREET LIGHTING For Period Ending 2/28/2018
Project Funding
UNIT V:STREET LIGHTING IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 MOBILIZATION 1 LS $7,036.00 $7,036.00 1 $7,036.00
2 TEMPORARY STREET LIGHTING 1 LS 1
3 FURNISH/INSTALL WASHINGTON POSTLITE 27 EA $3,172.00 $85,644.00 27 $85,644.00
SERIES LUMINAIRE FULL CUTOFF LED
4 2"CONDT PVC SCH 80 OPEN CUT 1838 LF $9.00 $16,542.00 1838 $16,542.00
5 CIRCUIT WIRING 3X#6 XHHW AL, IX#8 XHHW 1838 LF $4.88 $8,969.44 1838 $8,969.44
AL
6 GROUND BOX TYPE B W/APRON 8 EA $720.00 $5,760.00 8 $5,760.00
Sub-Total of Previous Un t $123,951.44 $123,951.44
Friday,March 9,2018 Page 2 of 4
I _
City Project Numbers 100389 DOE Number 0389
Contract Name ELAN RIVER DISTRICT Estimate Number 1
Contract Limits Payment Number 1
Project Type STREET LIGHTING For Period Ending 2/28/2018
Project Funding
Contract Information Summary
Original Contract Amount $123,951.44
Change Orders
Total Contract Price $123,951.44
Date ff Total Cost of Work Completed $123,951.44
Inspection Sup isor Less %Retained $0.00
Net Earned $123,951.44
Date / Earned This Period $123,951.44
Project Manager
Rettinage This Period $0.00
ate S/ D Less Liquidated Damages
Director/Con acting Department Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $123,951.44
Friday,March 9,2018 Page 3 of 4
City Project Numbers 100389 DOE Number 0389
Contract Name ELAN RIVER DISTRICT Estimate Number I
Contract Limits Payment Number I
Project Type STREET LIGHTING For Period Ending 2/28/2018
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors RODGERS / HERNANDEZ Contract Date 7/28/2016
Contractor GREYSTAR DEVELOPMENT&CONSTRUCTION Contract Time 821 CD
750 BERING DR.SUITE 200 Days Charged to Date 567 CD
HOUSTON, TX 44057 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMAR OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
------------------------ -
Total Cost of Work Completed $123,951.44
Less %Retained $0.00
Net Earned $123,951.44
Earned This Period $123,951.44
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $123,951.44
Friday,March 9,2018 Page 4 of 4
AFFIDAVIT
STATE OF Texas
COUNTY OF Harris
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day per onally appeared Ross Marshall,
Proejct Director Of Greystar Development & Construction,known to me
to be a credible person, who being by me duly sworn, upon his oath
deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Utility and Paving Improvements to serve Elan River District
BY
Ross Marshall
Subscribed and sworn before me on this date 12th of March, 2018.
1`�i4�itr�s
�t` N CRoq
P
s ...n.�/ Sf d
I 4�
,, dp�I�iioi`1
,� \
I��S'feX,as
CONSENT OF SURETY OWNRR ❑
ARCHITrCT ❑
TO FINAL PAYMENT CONTRACTOR ❑
.ALA Document G707 SUR n ❑
OTHrR
Bond No. SUR0035672
TO OWNEIL• ARCHITECT'S PROJECT NO.:
Name and adekw)
Elan River District, L.P. and the City of Fort Worth CONS'RACr FOR:
1000 Throckmorton St.
Fort Worth,TX 76102
PROJECT: CONTRACT DATED:
(Nautc cord addrv*V
Elan River District, Community Facilities Agreement(CFA) No. 2016-040
In aceordanm with die provisions of the Contract between the Owner and the Contractor as indicawxl above,the
(/rrse+t nnmraud addtxn oj$artly)
Argonaut Insurance Company
13100 Wortham Center Drive, Suite 290
Houston.TX 77065
SURETY,
on bond of
(In cn aanreand addreza ojCommciw-)
Greystar Development and Construction, L.P. -Elan River District Contractor Series
750 Bering Drive, Suite 200
Houston.TX 77057
CONTRACTOR,
hereby approves of the final payment to the Contractor,and agrees that final payment to the Contractor shall not relieve the Surety or
any of its obligations to
(hurl tame and addsmv of0it c,,)
Elan River District, L.P and the City of Fort Worth
1000 Throckmorton St.
Fort Worth,TX 76102
o�mrx,
as set foal)in said Surety's bond.
1,N1 WITNESS WIIrRLOF,the Surety has hereunto set its hand on this date: March 12, 2018
(boon iu uril/r�y tlx•utantd jdlauctll,l'lltx nnnrr,ic tlnrr unr!tcwr.i
Argonaut Insurance Company
(5eurg9 ,
Bylo�
(•tjq,pturroJ abo rrp,xartnatirol N—
Attest: a f j Angela M. Tindol Attorney-in-Fact
(Sea]): JJ-41 . Elwell,Witness
(P)iiurri rtunrr uud tidcl
Surety Phone No. 281-640-7912
G707--1994
Argonaut Insurance Company
Deliveries Only: 225 W. Washington, 24th Floor
Chicago, IL 60606
United States Postal Service: P.O. Box 469011, San Antonio, TX 78246
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS That the Argonaut insurance Company,a Corporation duly organized and existing undet the laws of the State
of Illinois and having its principal office in the County of Cook,Illinois does hereby nominate.constitute and appoint
Anui Jain,Sheila J,Montoya,Charles McDaniel,Mona D Weaver,Angela M1 .I indol,Janet M Angela It.Yanotsk±,Shalcen R.Lovitit.John
Browning,Justin Tomlin
Their true and lawful agent(s)and attorneys)-in-fact.each in their separate capacity if more than one is named aNyve,to make.e\ccutc,sea]and deliver for
and on its behalf as surety,and as its act and deed any and all bonds,contracts,agreements of indemnity and othei undertakings in suretyship provided,
however,that the penal sum of any one such instrument executed hereunder shall not exceed the sum of
$75,000,000,00
This Power ofAtiomcy is granted and is signed and sealed under and by the authority of the follow oi Rc*,!-tuton adopted by the Board of Directors of
Argonaut Insurance Company
"RESOLVED,That the President.Senior Vice President-Vice President,Assistant Vice PresidLK Sccretary,Treasurer and each of them hereby is
authorized to execute powers of attorney,and such authority can be executed by use of facsimile s4piature,which may be attested or acknowledged by any
officer or attorney,of the Company,qualifying the attorney or attorneys named in the gi%4hi p1YW1 01'attOrTICY,to execute in behalf of,and acknowledge as
the act and deed of the Argonaut Insurance Company.all bond undertakings and contract,cif4urctyslup,and to affix the corporate seal thereto
IN WITNESS WHEREOF,Argonaut Insurance Company has caused its official-af to be hereunto affixed and these presents to be signed by its duly
authorized officer on the 8th day of May,2017,
Argonaut Insurance Company
si>SUR4,V
0( (
0
by:
Joshua C Betz Senior Vice President
STATE OF TEXAS ......
COUNTY OF HARRIS SS:
On this 8th day of May,2017 A.DII.,beft me. otary Public of the State of Texas,in and for the County of Harris,duly commissioned and qualified,
came THE E ABOVE OFFICER 0
NY.to me personally known to be the individual and officer described in,and who executed the
preceding instrument,and he ack' god the execution of same.and being by me duly sworn,deposed and said that he is the officer of the said
Company aforesaid,and that the ffixcd to the preceding instrument is the Corporate Sea]of said Company,and the said Corporate Seal and his
signature as officer werqAuIN 4fixed and subscribed to the said instrument by the authority and direction of the said corporation,and that Resolution
adopted by the Board ojrj)irevn#s of said Company,referred to in the preceding instrument is now in force
IN TESTIMONY vAjff-,VOF,I have hereunto set my hand.and affixed my Official Seal at the County of Hams,the day and year first above written
ff
U"
(Notary Public)
1,the undersigned Officcr of the Argonaut Insurance Company.Illinois Corporation,do hereby certify that the original POWER OF ATTORNEY of which
the foregoing is a full,true and correct copy is still in full force and effect and has not been revoked
IN WITNESS WHEREOF,I have hereunto set my hand,and affixed the Seal of said Company,on the 12th day of March
2018
� SFALt
L.
James Bluzard Vice President-Surety
THIS DOCUMENT IS NOT VALID UNLESS THE WORDS ARGO POWER OFATTORNEV AND THE SERIAL NUMBER IN THE UPPER
RIGHT HAND CORNER ARE IN BLUE,AND'I[IF DOCUMENT IS ISSUED ON WATERMARKED PAPER,IF YOU HAVE QUESTIONS
ON AUTHENTICITY OF THIS DOCUMENT CALL(210)321-8400,
FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
INSPECTION PUNCH LIST
1. Redo MH's for Type 2 inlet at Sta.6+36.75. Inlet needs two MI 's
Contractor
�Is4pector
�-�. 5 . SQ Tf � �r=tc��J
FORTWORTH REV 8/20/16
�V.
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I CONTRACTOR&PROJECT DATA
Name of Contractor Project Name
Gra star Development and Construction Elan River District
Inspector City Project Number
Hershel Stanley Sutterfield 100389
Construction Components Project Manager
Water ❑Waste Water [ 'Storm Drainage Pavement Aaron Lon
Initial Contract Amount ProjectDi�culty
$635,706,30 0 Simple (9 Routine Q Complex
Final Contract Amount Date
$635,706.30 3/13/2018
II)PERFORMANCE EVALUATION
0-Inadequate I-Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 2 8 4
2 Public Notifications 5 Y 3 20 15
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 3 20 15
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 Y 3 20 15
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 354
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 354
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS] *100%) 354 / 448 = 79%
Performance Category Good
<20%=Inadequate 20%to<40%=Deficient 40%to<60%=Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector Signature IZ2 Contractor Signature
Inspector's Supervisor Signature
��Jr cool
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•8851 Camp Bowie West Blvd.•Fort Worth,TX 76116•(817)392-8306
• FORTWORTH REV:02/22ro'
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
PROJECT INFORMATION Date: 3/12/2018
Name of Contractor Project Name
Gre star Development and Construction Elan River District
DOE Inspector Project Manager
Hershel Stanley Sutterfield Aaron Lon
DOE Number Project Difficulty Ty*of Contract
N/A CPN 100389 10 Simple 0 Routine 0 Complex ❑water ❑waste water ❑ Storm Drainage ❑ Pavement
Initial Contract Amount Final ContractAmount
$123,951.44 ,�_$123,951.44
H)PERFORMANCE EVALUATION
i
0-Inadequate 1 -Deficient 2- Standard 3 -Good 4-Excellent
ELEMENT RATING ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS& SPECIFICATIONS
1 Availability of Inspector 1 Accuracy of Plans to Existin Conditions
2 Knowledge of Inspector 2 Clarity& Sufficiency of Details
3 Accuracyo f Measured Quantities J 3 Applicability of Specifications
__.
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance- Setting up Valve Crews,Labs 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processin�Time 3 Communication
2 Timliness of Contractor Payments 4 Resolution of UtilityC onflicts
e.
3 Bid Opening to Pre-Con Meeting Timeframe
II1)COMMENTS&SIGNATURES
COMMENTS SireetLights
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(817) 392-7941 • Fax: (817) 392-7845
1
FORTWORTH rev 03/05/07
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Elan River District
PROJECT NO.: 100389 CONTRACTOR: Graystar Development
DOE NO.: /'/ q_
PERIOD FROM:08/24/16 TO: 03/13/18 FINAL INSPECTION DATE: 13-Mar-18
WORK ORDER EFFECTIVE:8/24/2016 CONTRACT TIME: 567 0 WD W CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS REASON FOR DAYS
MONTH DCGEGD CREDITED MONTH DCI�GG CREDITED
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
S. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS* CHARGED DAYS
THIS
PERIOD 567 567
PREVIOUS
PERIOD
TOTALS
TO DATE 567 567
*REMARKS:
CONTRACTOR DATE INSP CTOR DATE
ENGINEERING DEPARTMENT
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(a (817)392-7941 •Fax: (817)392-7845
FORTWORTH®
TRANSPORTATION AND PUBLIC WORKS
NOTICE OF PROJECT COMPLETION
(Developer Projects)
(,64 Se-�m&a—'
��jl/s City Project Ns: 100389
v CS#Nq9or
Regarding contract 100389 for ELAN RIVER DISTRICT - PAVING&DRAINAGE as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on N/A through
M&C N/A the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project
as complete.
Original Contract Price: $635,706.30
Amount of Approved Change Orders: N2 1
Revised Contract Amount: $635,706.30
Total Cost Work Completed: $635,706.30
Recom for Acceptance Date
Asst. Dir r, TPW - Development Services
I w, 5-121
Accepted Y Date
- Director,
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
Assn Cit Manager Date
Comments:
Rev.9/22/16 �j�/
FORTWORTH
CITY OF FORT WORTH
PARTIAL PAYMENT REQUEST
Contract Name ELAN RIVER DISTRICT
Contract Limits
Project Type PAVING&DRAINAGE
City Project Numbers 100389
DOE Number 0389
Estimate Number 1 Payment Number 1 For Period Ending 2/28/2018
Project Funding
CD
City Secretary Contract Number Contract Time 821 CD
Contract Date 7/2812016 Days Charged to Date 567
Project Manager NA I
Contract is 100.00 Complete
Contractor GREYSTAR DEVELOPMENT&CONSTRUCTION
750 BERING DR.SUITE 200
HOUSTON, TX 44057
Inspectors RODGERS / HERNANDEZ
.,r
i
Friday,March 9,2018 Page 1 of 4
�1/ ' /�
City Project Numbers 100389 DOE Number 0389
Contract Name ELAN RIVER DISTRICT Estimate Number 1
Contract Limits Payment Number I
Project Type PAVING&DRAINAGE For Period Ending 2/28/2018
Project Funding
UNIT III:DRAINAGE IMPROVEMENTS
Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed
No. Quanity Total Quanity Total
1 5X3 BOX CULVERT 875 LF $325.00 $284,375.00 875 $284,375.00
2 24"RCP CLASS IIII 250 LF $65.00 $16,250.00 250 $16,250.00
3 2 1"RCP CLASS 111 88 LF $60.00 $5,280.00 88 $5,280.00
4 10'CURB INLET 2 LF $3,400.00 $6,800.00 2 $6,800.00
5 4'STACKED MANHOLE I EA $6,500.00 $6,500.00 1 $6,500.00
6 5'STORM JUNCTION BOX I EA $5,800.00 $5,800.00 1 $5,800.00
7 6'STORM JUNCTION BOX I EA $6,800.00 $6,800.00 1 $6,800.00
8 10'TYPE 2 INLET I EA $3,650.00 $3,650.00 1 $3,650.00
9 T GRATE INLET 1 EA $4,550.00 $4,550.00 1 $4,550.00
10 CONNECT TO EXISTING RCP I EA $2,000.00 $2,000.00 1 $2,000.00
Sub-Total of Previous Unit $342,005.00 $342,005.00
UNIT IV:PAVING IMPROVEMENTS
Item Description of Items Estimat Unit Unit Cost Estimated Completed Completed
No. Quaniti Total Quanity Total
1 6"CONC PVMT 230D SY $80.19 $184,437.00 2300 $184,437.00
2 6"CONCRETE DRIVEWAY 420 SY $80.19 $33,679.80 420 $33,679.80
3 REMOVE CONC PVMT 110 SY $12.00 $1,320.00 110 $1,320.00
4 3"ASPHALT PVMT TYPE D 1190 SY $25.55 $30,404.50 1190 $30,404.50
5 6"LIME TREATMENT 2720 SY $13.00 $35,360.00 2720 $35,360.00
6 HYDRATED LIME 50 TN $170.00 $8,500.00 50 $8,500.00
Sub-Total of Previous Unit $293,701.30 $293,701.30
Friday,March 9,2018 Page 2 of 4
- i
City Project Numbers 100389 DOE Number 0389
Contract Name ELAN RIVER DISTRICT Estimate Number I
Contract Limits Payment Number I
Project Type PAVING&DRAINAGE For Period Ending 2/28/2018
Project Funding
Contract Information Summary
Original Contract Amount $635,706.30
Chanize Orders
Total Contract Price $635,706.30
"Oe e-
Date " ly Total Cost of Work Completed $635,706.30
nspo or $0.00ecti
/h Net Earned $635,706.30
uct— I Date `�Xl' Earned This Period $635,706.30
Project Manager
' ^ /�/ Retainage This Period $0.00
L✓ Date 7i (0 Less Liquidated Damages
Direct /Contracting Departme Days @ /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $635,706.30
Friday,March 9,2018 Page 3 of 4
City Project Numbers 100389 DOE Number 0389
Contract Name ELAN RIVER DISTRICT Estimate Number I
Contract Limits Payment Number I
Project Type PAVING&DRAINAGE For Period Ending 2/28/2018
Project Funding
Project Manager NA City Secretary Contract Number
Inspectors RODGERS / HERNANDEZ Contract Date 7/28/2016
Contractor GREYSTAR DEVELOPMENT&CONSTRUCTION Contract Time 821 CD
750 BERING DR.SUITE 200 Days Charged to Date 567 CD
HOUSTON, TX 44057 Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $635,706.30
Less %Retained $0.00
Net Earned $635,706.30
Earned This Period $635,706.30
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 /Day $0.00
LessPavement Deficiency $0.00
Less Penalty $0.00
Less Previous Payment $0.00
Plus Material on Hand Less 15% $0.00
Balance Due This Payment $635,706.30
Friday,March 9,2018 Page 4 of 4
CONSENT OF SURETY OWNER ❑
TO FINAL PAYMENT ARCH-11TECT �I
ALA Docur)?e t G707 CONTRACTOR ❑
SURETY rJ
Bond No. SUR0035672 OTHER 0
TO OWNER: ARCHITECT'S PROJECT NO.:
(Name rutd addrev)
Elan River District, L.P. and the City of Fort Worth
1000 Throckmorton St. CONTRACrFOR:
Fort Worth,TX 76102
PROJECT: CONTRACT BATED:
(Mime and ar ar w.,zq
Elan River District, Community Facilities Agreement(CFA) No. 2016-040
In accordance with the provisions of The Contract between the Ownerand the Contractor as indicated above,the
(lawn wwre and adrhrm;cfSurtrtq
Argonaut Insurance Company
13100 Wortham Center Drive, Suite 290
Houston,TX 77065
SURETY,
on bond of
pnccx rrantr.rrrtr7addrrsc q/'ConnacrurJ
Greystar Development and Construction, L.P. - Elan River District Contractor Series
750 Bering Drive, Suite 200
Houston,TX 77057
CONTRACTOR,
hereby approves of the final payrnenr to the Contractor,and agrees that final payment to the Conn-actor shall not relieve the Surety of
any of its obligations to
(Juk rr rrameund addrtr,.q(CknrrrrJ
Elan River District, L.P. and the City of Fort Worth
1000 Throckmorton St.
Fort Worth, TX 76102
OWNEI.
as set forth in said Surety's bond.
LN WiTNUS WHEREOF,the Surety has hereunto set its hand on this date: March 12, 2018
(ltzwrtt in uvlllir({fix uxrnr6 jr>tlnuarl ht r(x rr,utrc,ic drrreand reY+r.)
Argonaut Ins ranee Company
(tiut+w t
By:
rul-V of rrJwt zrd rrpr�nrrtratir rJ
Attest:
Angela M. Tindol Attorney-in-Fact
(Seal:
Ja Iwe-I, Witness Ofnredawneauddik)
Surety Phone No. 281-640-7912
G707---1994
' Argonaut Insurance Company AS-0128508
Deliveries Only: 225 W. Washington, 24th Floor
Chicago, IL 60606
United States Postal Service: P.O. Box 469011, San Antonio, TX 78246
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the Argonaut Insurance Company,a Corporation duly organized and existing under the laws of the State
of Illinois and having its principal office in the County of Cook,Illinois does hereby�ominate,constitute and appoint:
Anu4 Jain Sheila J.Montoya Charles McDaniel Mona D.Weaver.Angela M.Tindol Janet M.Elwell Angela R.Yanotskv Shaleen R.Lovitt John
Browning,Justin Tomlin
Their true and lawful agent(s)and attomey(s)-in-fact,each in their separate capacity if more than one is named above,to make,execute,seal and deliver for
and on its behalf as surety,and as its act and deed any and all bonds,contracts,agreements of indemnity and other undertakings in suretyship provided,
however,that the penal sum of any one such instrument executed hereunder shall not exceed the sum of:
$75A00.000.00
This Power of Attorney is granted and is signed and sealed under and by the authority of the following R�-)UYpted by the Board of Directors of
Argonaut Insurance Company:
"RESOLVED,That the President,Senior Vice President,Vice President,Assistant Vice President,Secretary,Treasurer and each of them hereby is
authorized to execute powers of attorney,and such authority can be executed by use of facsimile signature,which may be attested or acknowledged by any
officer or attorney,of the Company,qualifying the attorney or attorneys named in the given power of attorney,to execute in behalf of,and acknowledge as
the act and deed of the Argonaut Insurance Company,all bond undertakings and contracts of suretyship,and to affix the corporate seal thereto."
IN WITNESS WHEREOF,Argonaut Insurance Company has caused its official seal to be hereunto affixed and these presents to be signed by its duly
authorized officer on the 8th day of May,2017.
Argonaut Insurance Company
CV
SEAL.*.
=
IOU 2pa by:
••7tMo��''�•'
* Joshua C.Betz, Senior Vice President
STATE OF TEXAS
COUNTY OF HARRIS SS:
On this 8th day of May,2017 A.D.,before me,a Notary Public of the State of Texas,�n and for the County of Harris,duly commissioned and qualified,
came THE ABOVE OFFICER OF THE COMPANY,to me personally known to be the individual and officer described in,and who executed the
preceding instrument,and he acknowledged the execution of same,and being by me duly sworn,deposed and said that he is the officer of the said
Company aforesaid,and that the seal affixed to the preceding instrument is the Corporate Seal of said Company,and the said Corporate Seal and his
signature as officer were duly affixed and subscribed to the said instrument by the authority and direction of the said corporation,and that Resolution
adopted by the Board of Directors of said Company,referred to in the preceding instrument is now in force.
IN TESTIMONY W HERFOF,I have hereunto set my hand,and affixed my Official Seal at the County of Harris,the day and year first above written.
t)�uj n`1 Y1. rY�at lV�
• s KAT Nt FFN M MFE's
Stag W 70— —-
Comm E.a:.�.:o7-15-102. (Notary Public)
Nw-y:S7 56i'go
2 8
I,the undersigned Officer of the Argonaut Insurance Company,Illinois Corporation, hereby certify that the original POWER OF ATTORNEY of which
the foregoing is a full,true and correct copy is still in full force and effect and has rotten revoked.
IN WITNESS WHEREOF,I have hereunto set my hand,and affixed the Seal of said Company,on the 12th day of March 20 18
James Bluzard Vice President-Surety
THIS DOCUMENT IS NOT VALID UNLESS THE WORDS ARGO POWER OF ATTORNEY AND THE SERIAL NUMBER IN THE UPPER
RIGHT HAND CORNER ARE IN BLUE,AND THE DOCUMENT IS ISSUED ON WATERMARKED PAPER.IF YOU HAVE QUESTIONS
ON AUTHENTICITY OF THIS DOCUMENT CALL(210)321-8400.
AFFIDAVIT
STATE OF Texas
COUNTY OF Harris
Before me, the undersigned authority, a notary public in the state
and county aforesaid, on this day personally appeared Ross Marshall,
Proejct Director Of Greystar Development & Construction, known to me
to be a credible person, who being by me duly sworn, upon his oath
deposed and said;
That all persons, firms, associations, corporations, or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of
Fort Worth has been paid in full;
That there are no claims pending for personal injury and/or
property damages;
On Contract described as;
Utility and Paving Improvements to serve Elan River District
BY / 11�e(
Ross Marshall
Subscribed and sworn before me on this date 12th of March, 2018.
�p,N CRoq
%
'.gip OF
F
i F :3p74��:�0
,_
�otat`J texas
�arcis,
TW T;
TRANSPORTATION AND PUBLIC WORKS
INSPECTION PUNCH LIST
1. Redo MH's for Type 2 inlet at Sta.6+36.75. In et needs two M14's
Contractor
Idspector S T T-c
D/q
FORT WORTH REV:02/22/0'
• �..0 �
TRANSPORTATION AND PUBLIC WORKS
CONTRACTOR'S EVALUATION OF CITY
I PROJECT INFORMATION Date: 3/12/2018
Name of Contractor Pr�iect Name
Greystar Development and Construction Elan River District
ector Pro p
DOEIns ~ Project Manager
ld Aaron Lon�w
Hershel Staple Sutterfie
�E Number Project Difficulty Type of Contract
N/A CPN 100389 0 Simpie 0 Routine 0 Complex ❑ water ❑waste water Storm Drainage Pavement
Initial Contract Amount Final Contract Amount
$635 706 30 1$635,706.30
H)PERFORMANCE EVALUATION
0-Inadequate i -Deficient 2- Standard 3 -Good_ _4-Excellent _
ELEMENT RATING� ELEMENT RATING
(0-4) (0-4)
INSPECTION EVALUATION PLANS& SPECIFICATIONS
1 Availability of Ins ector Ll 1 Accuracy of Plans to Existing Conditions
2 Knowledge of Inspector 2 Clarity& Sufficiency of Details
3 Accurac of Measured Quantities 3 Applicability of Specifications
4 Display Of Professionalism 4 Accuracy of Plan Quantities
5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION
6 Performance-Settin up Valve Crews,Labs L 1 Knowledge And/Or Problem Resolution
ADMINISTRATION 2 Availability of Project Manager
1 Change Order Processing Time 3 Communication
2 Timliness of Contractor Payments 47 4 Resolution of Utilit Conflicts
3 Bid Opening.to_Pre-Con Meeting Timeframe
III)COMMENTS& SIGNATURES
COMMENTS
I
Signature Contractor
Signature DOE Inspector
Signature DOE Inspector's Supervisor
INSPECTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth• 1000 Throckmorton Street• Fort Worth,TX 76012-6311
(817) 392-7941 • Fax: (817) 392-7845
FORTWORTHV 8120/16
TRANSPORTATION AND PUBLIC WORKS
PERFORMANCE EVALUATION OF CONTRACTOR
I CONTRACTOR&PROJECT DATA
Name ofContraetor Project Name
Gra star Development and Construction Elan River District
Inspector City Project Number
Hershel Stanley Sutterfield 100389
Construction Components Project Manager
Water ❑waste Water El Storm Drainage Q Pavement Aaron Lon
Initial Contract Amount Project Dijjiculty
$635,706.30 Q Simple Q Routine Q Complex
Final Contract Amount Date
$635,706,30 3/13/2018
H)PERFORMANCE EVALUATION
0-Inadequate 1 -Deficient 2-Standard 3-Good 4-Excellent
ELEMENT WEIGHT(x) APPLICABLE(Y/N) RATING(0-4) MAX SCORE SCORE
1 Submission of Documents 2 Y 2 8 4
2 Public Notifications 5 Y 3 20 15
3 Plans on Site 5 Y 3 20 15
4 Field Supervision 15 Y 3 60 45
5 Work Performed 15 Y 3 60 45
6 Finished Product 15 Y 3 60 45
7 Job Site Safety 15 Y 4 60 60
8 Traffic Control Maintenance 15 Y 3 60 45
9 Daily Clean Up 5 Y 3 20 15
10 Citizen's Complaint Resolution 5 Y 3 20 15
11 Property Restoration 5 Y 3 20 15
12 After Hours Response 5 Y 3 20 15
13 Project Completion 5 Y 4 20 20
TOTAL ELEMENT SCORE(A) 354
BONUS POINTS(25 Maximum)(B)
TOTAL SCORE(TS) 354
III)CONTRACTOR'S RATING
Maximum Score(MS)=448 or sum of applicable element score maximums which= 448
Rating([TS/MS] *100%) 354 / 448 = 79%
Performance Category Good
<20%=Inadequate 20%to<40%=Deficient 40%to<60%—Standard 60%to<80%=Good >80%=Excellent
Inspector's Comments(INCLUDING EXPLANATION OF BONUS POINTS AWARDED)
Inspector Signature Contractor Signature �'Ll
Inspector's Supervisor Signature
CONTRACTOR'S COMMENTS
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth•8851 Camp Bowie West Blvd. • Fort Worth,TX 76116• (817)392-8306
FORTW rev 03/05/07
ORTH
TRANSPORTATION & PUBLIC WORKS
FINAL STATEMENT OF CONTRACT TIME
FINAL STATEMENT NO.:1
NAME OF PROJECT: Elan River District
PROJECT NO.: 100389 CONTRACTOR: Graystar Development
DOE NO.: �/ A
PERIOD FROM:08/24/16 TO: 03/13/18 FINAL INSPECTION DATE: 13-Mar-18
WORK ORDER EFFECTIVE:8/24/2016 CONTRACT TIME: 567 0 WD • CD
DAY OF DAYS REASON FOR DAYS DAY OF DAYS
MONTH CHARGED CHARGED REASON FOR DAYS
DURING CREDITED MONTH DING CREDITED
1. 16.
2. 17.
3. 18.
4. 19.
5. 20.
6. 21.
7. 22.
S. 23.
9. 24.
10. 25.
11. 26.
12. 27.
13. 28.
14. 29.
15. 30.
31.
SAT,SUN, RAIN,TOO WET, UTILITIES DAYS TOTAL
&HOLIDAYS &TOO COLD RELOCATIONS OTHERS * CHARGED DAYS
THIS
PERIOD 567 567
PREVIOUS
PERIOD
TOTALS
TO DATE 567 567
*REMARKS:
ail
CONTRACTOR y ATE INSPECTOR DATA
Pc-
ENGINEERING DEPARTMENT
The City of Fort Worth• 1000 Throckmorton Street•Fort Worth,TX 76012-6311
(a (817) 392-7941 •Fax: (817)392-7845