Loading...
HomeMy WebLinkAboutContract 49009-FP1 � FO RT WO RT H. CITY SECRETARY CONTRACT NO. 4gOOq-FPI S�QQ TRANSPORTATION AND PUBLIC WORKS c NOTICE OF PROJECT COMPLETION ✓ City Project NO: 100630 Regarding contract 49009 f r CONCRETE RESTORATION(2017-1)AT VARIOUS LOCATIONeas required by the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on 03/I7/2017 through"fA&C C-28134 the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the recommendation of the Assistant Director of the Transportation&Public Works Department has accepted the project as complete. Original Contract Prices: $818,975.00 ►�' Amount of Approved Change Orders: Na 1 Revised Contract Amount: $818,975.00 Total Cost Work Completed: $706,194.51 ✓ Less Deductions: Liquidated Damages: Days @$210.00/Day Pavement Deficiencies: Total Deduction Amount: $0.00 Total Cost Work Completed: $706,194.51 Less Previous P me ts: $670,884.78 Final Paymen Due $35,309.73 ✓ Recommended hr A ptance Date Asst. Director, TPW - Infrastructure Design and Construction Celt Accept Date AM Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT AL" Asst ty Manager Date Comments: EFtWORTH COIL® 30100 — a ble OD00-- - 100630- i?�TPri N TARY , TX E.F Routing And Transmittal SlipDate 5/1/19 TO: Initials: Date: Karen Striker Tarqui 1 Islam Lauren Pri eu r Richard Martinez Steve Cooke Susan Al ani s � .�. Nikki McLero Karen Striker _ACTION _FILE _APPROVAL _FOR CLEARANCE _PER CONVERSATION _AS REQUESTED _FOR CORRECTION _PREPARE REPLY _CIRCULATE _FOR YOUR INFORMATION _SEE ME _COMMENT _INVESTIGATE X SIGNATURE _COORDINATION _JUSTIFY _OTHER NOTE AND RETURN N Ckkil McLeray L8363 Phone No. 1! TPW Construction Invoice Contract: CS49009 P.O.# PO-17-00099098 / Payment Date: TO:ARREGUIN GROUP INC INV.# CS49009-20+N h L ✓ Estimate No. 20 DOE: 8204 ELMBROOK DR 240 ProjManager DALLAS TX 75247 FOR: Concrete Restoration at various locations Contract Amount: $818,975.00 ✓ Completed Ret Pen Adi Pay Total to Date: $706,194.51 $0.00 $0.00 $0.00 $706,194.51 Previous Estimate: $706,194.51 $0.00 $0.00 $0.00 $670,884.78 Earned to Date: Payments: 30100-0200431-5740010-100630-003380-9999 $818,975.00 Total to Date: $706,194.51 $0.00 $0.00 $0.00 $706,194.51 Previous Estimate: $706,194.51 $35,309.73 $0.00 $0.00 $670,884.78 Earned to Date: $0.00 ($35,309.73) $0.00 $0.00 $35,309.73 30 lov aai'cooa - 1 r.C)L-3c k-eT,41 N Page 1 of 1 Tuesday,May 28,2019 rn p: o O d O r N O J of N Ur o N_ O O N � l0 O N O v� 0 o F 0 a ° c u a z w J - Q1 Q M N F rr MU a C L 0 W 0 V N J U R R a � R d 0 0 N O J O a r - o 0 Z 0 O v �w N C o O jJ o a d 16 p 0 0 O a�0 T i -o p m O O oo > U c E a) W W p � N a � LL ¢ J li ¢ a o LLL m s n in L N ' K L c v ti O C U a a c o 0 0 (1 i >- ° y 9 m =Y w U d c v s v e H U a N � •-, � � � � � m •o a -' � e O •a a a A d A a m M a 0 a U 61 i d vl a, A Q ME U 0 i Q m 3 Z C c + .c O ° ] o i C7 p v o a L c" o L; U O o. Z + [o Y N c • w tj v > O.U) O d O F 9 a Z C W Fr ..1 'F •� L1 `!- t d ° a a Q c a � � � O F a s W -- O U L a F V O U e W d .c u ca W > A o U aQJ d en U S y < F w F W C7 CQG o v ' m e a u Z j 00- a Z U Q F a F O O .d ? O C d rn 2 V1 O Z u °F C4 a d a < yQj U U c ; MN N M -4 Vl IC t� .6 O m M W `• '� O C o O j c O C J a O c a cca O p li,y .. U U b o Z U r/ y E3.Jo O (e'� .� IU .V y m a `� E O O O o 0 0 0� vo oa„n f - 3 3Q � c .s a b O A N r u t r0 O c d U O O U 2 7 J O o 3�° g �'�o3 O O CJ K V7 3 47 m o UZ O F Z O N R C4 U z - L U U•D U U U J O a`� O u .. � •Ua z W ¢ e ``° i'`m Sa�`!� � mCa O .o ib ° z U UUm ¢ oo'n� 5 U J ^C X C F U Q F Q Z j F o a ms a 3 a s aci U m C �- m � � V N U o c m M r Cry1 m !m fA H �.., /h fH 69 'A (A 69 f 9 Ge 66 65 M O m U Q h O o q W U a o 3z � a mX � •o + a �: e d U c o C� zCL .O � •... 1 rUr ti O O � ..i F fVrJ d � adi „ N N QO � aj 4 L U QO d L ►Ui V] R �` � C C) F Zd t > ° U O z U „ QQJ z U U w z z a' Z U U a a �i a 0. o z ° F o cc d an d O Gn O z U a O ° w w .� o O w 5 o z v I-. a d a d v u C Davy z o n °v a�i y. ON42 o "O'C O 00 O O So 0. Ei p C 4 ti y'yLD C, U b oz uvb'dE� X°' r 'a � "o E A > o V ° U V L W �•+�].d y m� 3 w tll N s G 0 O L O ,jay P` IDui 00 B «eddd /Ww O F U y•p G �F C ° b ^� m•�6� °Q U Q01 O a° o �303<°' c - o u W 2 c0 T s o N 'b r ` ram. W 3 u o a 3 w3'3r0 Ja 3 o VOvo z O �O"°v! U O m N •r .o r U u U = F z' Q Ems'- y E a° �' paq z ° U ° a VraIoco - o p. O W ° O p° Q U F o o w c3 aw aciU OI I M O Il- cl Yo O Z ul N M_ O M M O O M ti y m m E (� tm d M C CJ U U A EL a N O G a < G1 a, o 0 o ea o 0 0 C1 tA' en C C N '^ (3 O a) ti U O N cc a L N p " e n a z o i o m oo o O Cc C E U L C M >O Za o F F J M a e a o LL F� c I Ocv w w Ua U z 0 U a o R � A d w N M O c) I F co U O F O A d � m� z ¢ ` of �o U C O A 7 0 a I M V O N _T O U Oo OMIOiO O O Iola O O O,O I ' ' O i p E N z E ' ti CA M H � Q d z � o o � N Q N CD a L U ° K P. o vu O s a E n a Z ! N O Ecli d E d "' � d a OzQ o H ~ CL co e M U » LL oil ow w u z 0 o l o 0) I ON 'b C U � '� N O) r{ O O 6 m( i O Gl o N O$ P. O_ M 'a M "O m O ° Mp ° pM C O d 0 a, O C O C O C O ' a — - M m M m M z ¢ C ° 'a U C O O O A U C - � p p O n n + o v ti M M M N 4 O O O y? O O CN i O U 0 0 M 0 0 0 0 0 0 0 0 0 0 �.io 0 0 0.O�O 0 0 0 0 OM 0''.0`O 010 O'0'0, 0 o � I I N Z M_ O M M O O a R m I cm O c0 O C y ^`� r LL O W O N 0. L Q 1 . U a O - F ci; a z c cr � O � E Q � Q a E O O O C !' E F Q O O M O y LL O O CG F W -1-_ w C) o 0 LL W O O O m rn rn C M C> a T N O o O O 2 0 N Oo 0.. U 'O M 00 0 M Cl) 6 M O - O O O 41 c d 0 d 0 d 0 U C O C O C O 0. L O t 0 t COz a c U o U o U o V U c O O O F LL O O O z 19 �1 R ' V V 7 O O O O O O N N NC, ! O O O U € 0 0 0 m 0 0 0 0�O O O O O O M i i I o N Z M_ O M i O O y a � N � � R z 6l •� d Q. Q I � t O CC c, y c, O CQ O O N O � w o � O N a L � L a � O F p A I > £ � Q a cn L `✓z o Ozp a cli E O v LL o � o i � I 0 I o da wo vo CL V 'O M D M M M c - o o Cl) c a+o 41 a o o a c cn CDc o c o E a t m t o = m 2 Q c U o U o U o v U c O O O L C LL O O O 0 10 U n 1 O I O O O ' Cl O N N N O O O U O O O M;O 0 0 0 Oio 0 O Of0 C7 0 C. 0 C.10 0 0 0 0 0 0 0 0 o.0 O O O O O 5/28/2019 BIM 360 Document Management B AUTODESK` BIM 360' fortworthgov > 100630 - Concrete Restoration 2017-1 - ® KS .,. Document FOLDERS REVIEWS TRANSMITTALS ISSUES Management — Reviews > Review detail OPEN #2 - Final Review O Due date: May 4 Contractor Final Estimate Approval Workflow Start review Void entire review Name PROGRESS #20 RETAINAGE C-620 Contractor-s Unit Price Applical Initiator n Q #20 RETAINAGE C-620 Contractor-s Unit Price Applical VA Veronica Arreguin Apr 12, 1:19 PM <vgarreguin@arreguingroup.com> e Submitted to Reviewer 1 To replace Estimate that was rejected due to error found by PM. Reviewer 1 Initial Review 1 n ` sy MF Michael Flute Apr 12,3:52 PM <michaeLflute@freese.com> Submitted to Reviewer 2 No changes required F ,; Reviewer 2 Initial Review 2 n TI Tariqul Islam Apr 12, 4:37 PM <ta riqu l.islam @fortworthtexas.gov> Submitted to Reviewer 3 Final pay estimate to release retainage is approved. Reviewer 3 Initial Review 3 https://docs.b360.autodesk.com/projects/a8f9b42c-cbab-4Oa8-94cb-132bd4889gl b/reviews/f7c4l42e-aa84-47be-bat a-76cedf33cgf5 1/1 5/28/2019 BIM 360 Document Management B AUTODESK` BIM 360' fortworthgov > 100630 - Concrete Restoration 2017-1 - A KS Document ... FOLDERS REVIEWS TRANSMITTALS ISSUES Management Reviews > Review detail OPEN #2 - Final Review G Due date: May 4 Contractor Final Estimate Approval Workflow Start review Void entire review Name^ PROGRESS & #20 RETAINAGE C-620 Contractor-s Unit Price Applical Reviewer 3 Initial Review 3 n p #20 RETAINAGE C-620 Contractor-s Unit Price Applical RN Had nusrallah Apr 16, 5:22 PM <riad.nusrallah@fortworthtexas.gov> Submitted to Reviewer 4 Reviewer 4 Initial Review 4 n / LP Lauren Prieur Apr 24, 8:45 AM <lauren.prieur@fortworthtexas.gov> Submitted to Reviewer 5 Reviewers Initial Review 5 SC steve cookes May 1, 4:52 PM <stephen.cooke@fortworthtexas.gov> Submitted to Approver Approver Final Review n Tpw Bsap Recon Team, Cost Manager Send email notification https://docs.b360.autodesk.r-om/projects/a8f9b42c-cbab-4Oa8-94cb-132bd48899l b/reviews/f7c4l42e-aa84-47be-bat a-76cedf33c9f5 1/1 E ii � 0 8S m �8888.8m 8.8888888888.88888 ° � e s M - J y �xp yytt yxp yyp N L 8 l088S 8 88 X �9 8 8 8 8 gStB$ 8 8 88 a 8 486q m 8 88 9 88 8, 88.88888 888.8888888888888 �5 Y 88 m »88881w,r m8888$53$888$$8538 �m Jf? = w » E c y � aall QQ 69 N tnUUUrYn�V�i `LLiI uSWW�Wu�ug u�ug ug����� V = d � d � Q s - a R g U Ul V m s 3 d m E E 14 E W g gg m y 96 s g ) k � � Eq K; ■ j !]` �. ■, � . m !! -_ � � . ■l !� k ■ ;� . . ( q \ ! , � ! ■ k if j !! Bond No. 1017192 0061 19-1 MAINTENANCE BOND Page 1 of 3 1 SECTION 00 61 19 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we ARREGUIN GROUP.INC.. known as 9 "Principal"herein and OKLAHOMA SURETY COMPANY , a corporate surety 10 (sureties,if more than one)duly authorized to do business in the State of Texas,known as 11 "Surety"herein(whether one or more),are held and firmly bound unto the City of Fort Worth,a 12 municipal corporation created pursuant to the laws of the State of Texas,known as"City"herein, 13 in the sum of EIGHT HUNDRED EIGHTEEN THOUSAND,NINE HUNDRED SEVENTY- FIVE AND 00/100 Dollars 14 ($818,975.00),lawful money of the United States,to be paid in Fort Worth, 15 Tarrant County,Texas,for payment of which sum well and truly be made unto the City and its 16 successors, we bind ourselves,our heirs,executors, administrators,successors and assigns,jointly 17 and severally,firmly by these presents. 18 19 WHEREAS,the Principal has entered into a certain written contract with the City awarded 20 the 7th day of March, 20 17,which Contract is hereby 21 referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 22 materials, equipment labor and other accessories as defined by law, in the prosecution of the 23 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 24 the "Work") as provided for in said contract and designated as CONCRETE 25 RESTORATION(2017-1)at VARIOUS LOCATIONS, CITY PROJECT NUMBER: 100630;and 26 27 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 28 accordance with the plans,specifications and Contract Documents that the Work is and will 29 remain free from defects in materials or workmanship for and during the period of two(2)years 30 after the date of Final Acceptance of the Work by the City("Maintenance Period");and 31 32 WHEREAS,Principal binds itself to repair or reconstruct the Work in whole or in part 33 upon receiving notice from the City of the need therefor at any time within the Maintenance 34 Period. CITY OF FORT WORTH Concrete Restoration 2017-1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 0061 19-2 MAINTENANCE BOND Page 2 of 3 1 2 NOW THEREFORE,the condition of this obligation is such that if Principal shall 3 remedy any defective Work, for which timely notice was provided by City,to a completion 4 satisfactory to the City,then this obligation shall become null and void;otherwise to remain in 5 full force and effect. 6 7 PROVIDED,HOWEVER,if Principal shall fail so to repair or reconstruct any timely 8 noticed defective Work, it is agreed that the City may cause any and all such defective Work to 9 be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and 10 the Surety under this Maintenance bond;and 11 12 PROVIDED FURTHER,that if any legal action be filed on this Bond, venue shall lie in 13 Tarrant County,Texas or the United States District Court for the Northern District of Texas,Fort 14 Worth Division; and 15 16 PROVIDED FURTHER,that this obligation shall be continuous in nature and 17 successive recoveries may be had hereon for successive breaches. 18 19 20 CITY OF FORT WORTH Concrete Restoration 2017-1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 0061 19-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF,the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 7th day of March 3 2017 4 5 PRINCIPAL: 6 Arreguin Group, Inc. 7 8 9 B . 10 Signature 11 ATTLS : 12 13 Valentin Arreguin, President 14 (Principal)See re y Name and Title 15 16 Address: 8204 Elmbrook Dr.,#192 17 Dallas,TX 75247 18 19 20 Witness as to Principal 21 SURETY: 22 Oklahoma Surety Company 23 24 25 BY: 26 Signature 27 28 Brent M. Blonigan,Attorney-in-Fact _ 29 ATTEST: Name and Title 30 31 Address: 1437 South Boulder, Suite 200 32 (Surety)Secretary P.O. Box 1409 et 33 o Af Tulsa, Oklahoma 74101 34 35 0iftn-eYs&o ure y Telephone Number: 918-588-1253 36 37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address, both must be provided. 40 The date of the bond shall not be prior to the date the Contract is awarded. 41 CITY OF FORT WORTH Concrete Restoration 2017-1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No.100630 Revised July 1,2011 OKLAHOMA SURETY COMPANY 1437 SOUTH BOULDER, SUITE 200 • TULSA, OKLAHOMA 74119 • 918-587-7221 • FAX 918-588-1253 POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the OKLAHOMA SURETY COMPANY , a corporation organized and existing under and by virtue of the laws of the State of Ohio,does hereby nominate, constitute and appoint the person or persons named below, each individually if more than one is named,its true and lawful attorney-in-fact,for it and in its name,place and stead to execute on behalf of the said Company, as surety, any and all bonds,undertakings and contracts of suretyship, or other written obligations in the nature thereof. Brent M. Blonlgan, Rob Dreiling, Debbie Palmer and Kara Pierce, all of RICHARDSON, TX IN WITNESS WHEREOF,the OKLAHOMA SURETY COMPANY has caused these presents to be signed and attested by its appropriate officers and V gorporate seal hereunto affixed this 11 day of March 2019 '11P$0 ET), �0�OPQ Q R y. Oro OKLAHOMA SURETY COMPANY ATTEST: SHARON HACKL Secretary TODD BAZATA VICE PRESIDENT On this 11 day of March 1 2019 before me personally appeared TODD BAZATA ,to me known, being duly sworn,deposes and says that s/he resides in Broken Arrow,Oklahoma,that s/he is a Vice President of Oklahoma Surety Company,the company described in and which executed the above instrument;that s/he knows the seal of the said Company;that the seal affixed to the said instrument is such corporate seal;that it was so affixed by authority of her/his office under the By-Laws of said Company,and that s/he signed his name thereto by like authority. 1+��+GALIAy'� Commission# 11008253 STATE OF OKLAHOMA SS .+`"�•acAAyw � r My C ion expire: 0 —08-19 COUNTY OF TULSA pil6�-f014 _ % ,,GaNER Gas+�` JULIE AL HAN Notary Public l�r+N7 J t"+j� This Power of Attorney is granted by authority of the following resolutions adopted by the Board of Directors of Oklahoma Surety Company by unanimous written consent dated September 25,2009. RESOLVED: That the President,the Executive Vice President,the several Senior Vice Presidents and Vice Presidents or any one of them, be and hereby is authorized,from time to time,to appoint one or more Attorneys-in-Fact to execute on behalf of the Company, as surety,any and all bonds, undertakings and contracts of suretyship,or other written obligations in the nature thereof;to prescribe their respective duties and the respective limits of their authority; and to revoke any such appointment at any time. RESOLVED FURTHER: That the Company seal and the signature of any of the aforesaid officers and any Secretary or Assistant Secretary of the Company may be affixed by facsimile to any power of attorney or certificate of either given for the execution of any bond,undertaking, contract of suretyship,or other written obligation in the nature thereof,such signature and seal when so used being hereby adopted by the Company as the original signature of such officer and the original seal of the Company,to be valid and binding upon the Company with the same force and effect as though manually affixed. CERTIFICATION SHARON HACKL Secretary of Oklahoma Surety Company,do hereby certify that the foregoing Power of Attorney and the Resolution:;of the Board of Directors of September 25,2009 have not been revok and a*rein kfrce a d effect. -FI ',,`fft" Signed and sealed this y o `i�PyLkET� °SEAL SHARON HACKL Secretary 0WO,0 per.,n i VOID IF BOX IS EMPTY MID-CONTI TENT CASUALTY COMPANY OKLAHOMA SURETY COMPANY STATE OF TEXAS CLABI NOTICE ENDORSEIIENT In accordance with Section 2253.021 (f) of the Texas Government Code and Section 53.202(6) of the Texas Property Code, any notice of claim to the named surety under this bond(s)should be sent to: llailinb: MID-CONTINENT CASUALTY COMPANTY OKLAHOMA SURETY COMPANY P.O. BOX 1409 TULSA, OK 74101 TELEPHONE NO. 1-800-722-4994 FAX NO. 1-918-586-0840 E-MAIL: CLAL'\ZS @MCG-I S.COM Physical: 1437 S. BOULDER SUITE 200 TULSA, OKLAHOMA 74119 ATTACH THIS NOTICE TO YOUR BOND UPON EXECUTION OF THE BOND TXclmendsmt07 AFFIDAVIT STATE OF TEXAS COUNTY OF DALLAS Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared VERONICA ARREGUIN, Administrator Of ARREGUIN GROUP, INC., known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; 2017 - 1 CONCRETE RESTORATION# 100630 BY V A ARREGUIN bscrib d and sworn before me on this date S pill , CRYSTAL ESPINOZA Notary ID A131314610 My Commission Expires October 12,2021 Notary P blic DALLAS, TX FORT WORTH,, TRANSPORTATION AND PUBLIC WORKS STATEMENT OF CONTRACT TIME STATEMENT# FINAL STATEMENT# 1 CPN 1 100630 NAME OF PROJECT: Concrete Restoration(2017-1) Contractor Arre uin Group YEAR:j 2019 PROJECT NO.: FINAL INSPECTION DATE 8/1 012 0 1 8 100630 1 WD CD CONTRACT TIME 150 X PERIOD FROM: 4/1/2019 TO: 1 4/15/2019 1 BEG - Month I I DEVELOPMEN Y/N)I N WORK ORDER EFFECTIVE: 5/22/2017 BEG /n Y MID /n 100.0% DAY OF MONTH DAYS REASON FOR DAY OF MONTH DAYS REASON FOR CHARGED DAYS CREDITED CHARGED DAYS CREDITED 1 Mon 0 OTH 16 2 Tue 0 OTH 17 3 Wed 0 OTH 18 4 Thu 0 OTH 19 5 Fri 0 OTH 20 6 Sat 0 OTH 21 7 Sun 0 OTH 22 8 Mon 0 OTH 23 9 Tue 0 OTH 24 10 Wed 0 OTH 25 11 Thu 0 OTH 26 12 Fri 0 OTH 27 13 Sat 0 OTH 28 14 Sun 0 OTH 29 15 Mon 0 OTH 30 31 Not Applicable SAT,SUN,and WEATHER UTILITIES OTHERS DAYS TOTAL DAYS HOLIDAYS RELOCATE CHARGED THIS PERIOD 0 0 0 0 0 PREVIOUS PERIOD 0 150 150 TOTAL TO DATE 0 0 0 0 150 150 REMARKS: OTH:Waiting for final inspection schedule and punch list complete. Signature: a Signature: � (Print Name) n Michael Flu CONTRACTOR + DATE INSPECTOR DATE a/9/2o19 FORTWORTHOH TRANSPORTATION AND PUBLIC WORKS April 9, 2019 Arreguin Group Inc. 8204 Elmbrook Dr.#192 Dallas Tx. 75247 RE: Acceptance Letter Project Name: Concrete Retoration (2017-1) At Various Locations Project Type: 03 Paving City Project No.: 100630 To Whom It May Concern: On August 10, 2018 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on March 21, 2019. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on March 21, 2019, which is the date of the punch list completion and will extend of two (2)years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-2486. Sincerely, 4-- Tariqul Islam, Project Manager Cc: Michael Flute, Inspector Wade Miller, Inspection Supervisor Ariel Duarte, Senior Inspector Riad Nusrallah, Program Manager NA, Consultant Arreguin Group Inc., Contractor NA, Developer File E-Mail: Douglas W. Wiersig, P.E., PhD., Director,TPW Wendy Chi-Babulal, P.E.,Water Richard Martinez, Assistant Director,TPW Tony Sholola, P.E., Water Marisa Conlin, Traffic Engineering Richard Zavala, Director, PARD Allen Hall, Superintendent,TPW David Creek,Assistant Director, PARD John Robert Carman, P.E., Director,Water Chris Harder, P.E., Assistant Director,Water Rev.9/15/16