Loading...
HomeMy WebLinkAboutContract 51455-A1 45t � ��r CITY SECRETARY CONTRACT NO. 5- ��J`� o0o� CONTRACT NUMBER 582-19-90031 d'� Z AMENDMENT #i The Texas Commission on Environmental Quality("TCEQ")and the City of Fort Worth,agree to amend Contract 582-19-90031(Contract)to update the FY ig Notices,Project Representative and Records Location sheet in accordance with General Terms and Conditions,Section 1.2.In addition,the term of the Contract is extended to August 31,202o by exercising the first of three, one-year renewal options in accordance with Special Terms and Conditions,Section 1. The maximum compensation possible under the contract is increased by$386,000.00 for Fiscal Year 2020(FY2o),increasing the total contract amount to$772,000.00. The following outlines the changes in this amendment: i. The total compensation possible under this contract is increased as follows: Original Contract Amount(FYi9) $386,000.00 Amendment#i(FY2o Renewal) $386.000.00 Total Contract Amount(Maximum TCEQ Obligation) $772,000.00 2. The Maximum Amount of Contract is increased to$772,000.00. 3. The Term of the Contract is extended to August 31, 2020. 4. The TCEQ has reviewed and approved the budget submitted by the City of Fort Worth. The Cost Budget for Fiscal Year 2020 is hereby included in its entirety by Attachment A of this Amendment. 5. The revised FYig Notices,Project Representative and Records Location sheet is attached as Attachment B and is effective upon execution of this amendment. All other conditions and requirements of Contract Number 582-19-9oo3r remain unchanged. TCEQ: PERFORMING PARTY: Texas Commission on Environmental Quality City of Fort Worth &LA .By: � (Signature) (Signature) Stephanie Bergeron Perdue Valerie Washington (Printed Name) (Printed Name) Deputy Executive Director Assistant City Manager (Title) (Title) 16((6LM (Date Signed) (Date Signed) �8RT tapplto'JL�D AS To FoR1t AND LEGALITY: n act N .58 �431 lasistant City Attorney _ end AUevv t, ag 19A L RL,/ A CITY SECRE° FT VfOqTt�,J Mary J. S , City S Attachment A Cost Budget Cooperative Reimbursement Contract for State Agencies and Local Governments i. Budget. Authorized budgeted expenditures for work performed are as follows: Budget Category Cost for Work to be Performed Salary/Wages $213,000.00 Fringe Benefits $98,746.8o(46.36%) Travel $3,835.65 Supplies $11,550.00 Equipment $0.00 Contractual $0.00 Construction $0.00 Other $19,400.00 Indirect Costs $39,467.55 Total $386,000.00 2. Indirect Cost Reimbursable Rate. The reimbursable rate for this Contract is 12.66% of(check one): ❑salary and fringe benefits ®modified total direct costs ❑ other direct costs base If other direct cost base,identify: This rate is less than or equal to(check one): ❑ Predetermined Rate—an audited rate that is not subject to adjustment. ®Negotiated Predetermined Rate—an experienced-based predetermined rate agreed to by Performing Party and TCEQ.This rate is not subject to adjustment. ❑ Default rate—a standard rate of ten percent of salary/wages may be used in lieu of determining the actual indirect costs of the service. 3. Other. If Budget Category"Other"is greater than $25,000 or more than lo%of budget total,identify the main constituents: Costs include site improvements,vehicle fuel and maintenance costs, and medical supplies. Contract No.582-19-90031 Amendment No.i Page 2 of 6 4. Travel. In order to be reimbursable,travel costs must be specifically authorized in advance of the travel. Travel costs will be reimbursed only in the amount of actual costs, up to the maximum allowed by law for employees of the State of Texas at the time the cost is incurred. 5. Budget Categories. The Budget Categories above have the definitions,requirements and limitations stated in UGMS. Construction costs are not reimbursable without prior, specific written authorization from TCEQ. 6. Budget Control. a. Cumulative transfers equal to or less than io%of the Total Budget. Performing Party may transfer amounts between the approved direct cost budget categories so long as cumulative transfers from direct cost budget categories during the Contract Period do not exceed ten percent(io%)of the Total Budget amount. Performing Party must timely submit a Budget Revision Request(BRR)Form reflecting the revised budget. Upon approval by TCEQ, the BRR will be incorporated into this Contract as though it is a document revised under General Term and Condition Section 1.2.The lo%limit does not reset with the approval of each BRR. It resets when an amendment is signed by the parties reflecting changes to the budget. b. Cumulative transfers greater than io%of the Total Budget. TCEQ must pre- approve in writing all budget revisions that result in the cumulative transfer from direct cost budget categories of funds greater than 1o%of the Total Budget during the Contract Period. The Performing Party must request to amend the Contract.A contract amendment is required before Performing Party incurs these costs. c. Performing Party may not transfer amounts to budget categories containing zero dollars without TCEQ pre-approval in writing. 7. Invoice Submittal. Unless otherwise stipulated in the Contract, invoices must be submitted monthly and invoices shall be submitted within thirty(3o)days after the end of the fiscal month to the individual named in TCEQ Project Representatives and Records Location. Final invoices shall be submitted within two(2)calendar months after completing the Scope of Work activities. TCEQ may unilaterally extend this deadline by e-mail. a. All invoices must be submitted in a format that clearly shows how the budget control requirement is being met. 8. Supporting Records. Performing Party shall submit records and documentation to TCEQ as appropriate for the review and approval of reimbursing costs. TCEQ may reject invoices without appropriate supporting documentation. TCEQ has the right to request additional documentation such as expenses for the invoice period,year-to-date expenses, projected totals for the year(or applicable contract period),percent of budget spent to date, and percentage of budget projected to be spent. Performing Party shall maintain records subject to the terms of this Contract. Contract No.582-19-90031 Amendment No.1 Page 3 of 6 9. Indirect Costs. Performing Party's indirect costs will be reimbursed at the reimbursable rate entered above. If no reimbursable rate is shown above, indirect costs are not reimbursable under this Contract. The reimbursable rate must be less than or equal to the rate authorized under UGMS. To the extent that the reimbursable rate is lower than Performing Party's actual indirect costs, Performing Party is contributing its unreimbursed indirect costs to the successful performance of this Contract, and waives any right it may have to reimbursement of those costs(if this Contract requires matching funds, Performing Party may claim its unreimbursed indirect costs as part or all of its match). Performing Party must fund all unreimbursed indirect costs from other funds.It is the Performing Party's responsibility to ensure that unreimbursed indirect costs are not charged to other projects which do no benefit from them,and that it uses funding sources that may be properly used to fund its unreimbursed costs. Contract No.582-19-90031 Amendment No.1 Page 4 of 6 Attachment B NOTICES,REPRESENTATIVES,AND RECORDS LOCATION Contract Number:582-19-90011 Contract Name:City of Fort Worth Whole Air Monitoring_ Representatives.The individual(s)named below are the representatives of TCEQ and Contractor.They are authorized to give and receive communications and directions on behalf of the TCEQ and Contractor as indicated below.All communications including official contract notices must be addressed to the appropriate representative or his or her designee. Changes in Representatives.Either party may change its representatives by unilateral amendment. TCEQ Representatives. TCEQ CONTRACT MANAGER TCEQ PROJECT MANAGER (for Contractual Matters) (for Technical Matters) Deanna Sivek Carl Skellev Contract Manager 177 Whole Air Coordinator 177 (Title) (Mail Code) (Title) (Mail Code) Texas Commission on Environmental Quality Texas Commission on Environmental Quality P.O.Box 13087 P.O.Box 13087 Austin,Texas 78711-3087 Austin,Texas 78711-3087 Telephone No.:(512)239- 5074 Telephone No.:(512)239- 1151 Facsimile No.:(512)239- 0404 Facsimile No.:(512)239- 0404 TCEQ PROJECT MANAGER (for Technical Matters) Rick Molinar Whole Air Coordinator 177 (Title) (Mail Code) Texas Commission on Environmental Quality P.O.Box 13087 Austin,Texas 78711-3087 Telephone No.:(512)239- 0 1 Facsimile No.:(512)239- 0404 Contractor Representatives. For Contractual Matters: For Technical Matters: Anthony Williams Daniel Fernandez (Name) (Name) Environmental Supervisor Senior Environmental Specialist (Title)1 (Title 200Texas Street 2oVTexas Street (Mailing Address) Mailin Address) Fort Worth,Texas 76102 Fort Worth,Texas 76102 (City) (State) (Zip Code) (City) (State) (Zip Code) Telephone No.: (817) 392- 5462 Telephone No.: 8( 17 l 392_ 5444 Facsimile No.: (_) Facsimile No.: (_) Invoice Submittal.Invoices must be submitted to the TCEQ Contract Manager. Contract No.582-19-90031 Amendment No.1 Page 5 of 6 Designated Location for Records Access and Review.Contractor designates the physical location indicated below for record access and review pursuant to any applicable provision of this contract: 9o8 Monroe Street (Physical Location Address Line 1) City Hall Annex,Seventh Floor (Physical Location Address Line 2) Fort Worth,Texas 76102 (City),(State),(Zip Code) Contract No.582-19-90031 Amendment No.1 Page 6 of 6 Contract Compliance Manager: By signing this document, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Anthony Williams NAME SlGihTkft— Environmental Supervisor TITLE 0 This form is N/A as No City Funds are associated with this Contract Printed Name Signature EOFFICIALCORDTARYH,TX